HomeMy WebLinkAboutADP 2013-05-14 minutes.pdfAdvisory Design Panel Minutes Page 1 of 3
District of Maple Ridge
MAPLE RIDGE
ADVISORY DESIGN PANEL
The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the
Blaney Room at Maple Ridge Municipal Hall,11995 Haney Place,Maple Ridge,British
Columbia, on Tuesday, May 14, 2013 at 4:00 pm.
COMMITTEE MEMBERS PRESENT
Peter Lovick, Chair Architect
Chris Mramor, Vice-Chair Landscape Architect
Blair Arbuthnot Landscape Architect
Johnny Leung Architect
Colleen Dixon Architect
COMMITTEE MEMBERS ABSENT
STAFF MEMBERS PRESENT
Rasika Acharya Planner II
Joanne Georgelin Committee Clerk
______________________________________________________________________
________
1.Call to Order and Introduction s
The meeting was called to order at 4:09 pm.
2.Agenda Approval
RESOLUTION:
Th at the May 1 4, 2013 agenda be approve d.
CARRIED
3.Approval of the Minutes – February 1 2, 2013
RESOLUTION:
That the Minutes of the meeting of February 1 2, 201 3 be approved.
CARRIED
4.New Business
Maple Ridge Advisory Design Panel
Tuesday, May 14, 2013 - Draft
Maple Ridge Advisory Design Panel Minutes Page 2 of 4
4.1 2013 ADP Membership Update
Rasika Acharya introduced a new panel member,Colleen Dixon to the Panel as
the new Architect,joining the Advisory Design Panel for a term (two years,up to
December 2014).
5.Projects
5.1 Development Permit:2013-019-DP
Applicant: J. Kristianson
Project Architect: J. Kristianson
Landscape Architect: Jonathan Losee Ltd.
Proposal: Replace existing Kal Tire service facility with a new
facility and a CRU building
Location: 20803 Lougheed Highway
Planning Technician & File Manager:Adrian
The following applicants were present at the meeting;
John E. Kristianson, Architect
Johnathan Losee, Landscape Architect
David Penner, Kal Tire
Rasika Acharya reviewed the Advisory Design Panel Memo dated May 14,2013
attached to the agenda,with respect to the location,context,surrounding uses,
OCP designation,site access,proposed design,form,building materials,on-site
landscaping,off-site upgrades and comments/concerns from other internal
departments.
John Kristianson, Architect, presented the proposed design details to the Panel.
Note: Colleen Dixon entered the meeting at 4:20 pm.
Johnathan Losee,Landscape Architect,presented the proposed details of the on-
site landscaping to the Panel.
RESOLUTION:
The following concerns be addressed and digital version of revised drawings
&memo be submitted to Planning staff;and further that Planning staff forward
this on to the Advisory Design Panel for information ;
Consider architectural treatment on south elevation of the Kal Tire building
.
Provide details of garbage and recycling area and ensure they confo rm
with waste management for both buildings .
Consider the security issues with the rear access.
Clari fy the landscape treatment on 119 th Avenue.
Maple Ridge Advisory Design Panel
Tuesday, May 14, 2013 - Draft
Maple Ridge Advisory Design Panel Minutes Page 3 of 4
Provide an arborist report .
Provide details of the hedge replacement and screening of the storage
area .
Consider returning the hedge along the west property line to the rear of
the building .
Provide a pedestrian connection from both buildings to Lougheed highway
and possibly 119 th Avenue.
Consider the use of porous paving in areas of the parking area .
Consider low planting in between the second bank of car stalls .
Consider traffic calming features in the parking area .
Consider addressing the street with the design of the southernmost retail
unit .
Consider extension of low planting between parking lots ,along Lougheed
highway and 119 th Avenue.
CARRIED
5.2 Development Permit:2013-037-DP
Applicant: Spire Development Corporation
Project Architect: Hugh Cochlin
Landscape Architect: Al Tanzer
Proposal: Internal and external renovations to existing
building (Former Roger’s Video Store).
Location: 11965 Fraser Highway
Planning Technician & File Manager:Adrian
The following applicants were present at the meeting;
Al Tanzar, Landscape Architect
Hugh Cochlin, Architect
Pete Rackow, Spire Development Corporation
Shauna Johnson, Spire Development Corporation
Mike Salter, Spire Development Corporation
Rasika Acharya reviewed the Advisory Design Panel Memo dated May 14,2013
attached to the agenda,with respect to the location,context,surrounding uses,
OCP designation,site access,existing building and uses,proposed building
façade changes,on-site landscaping,and comments/concerns from other internal
departments.
Hugh Cochlin, Architect, presented the proposed design details to the Panel.
Al Tanzar,Landscape Architect,presented the proposed landscaping to the
Panel.
RESOLUTION:
Maple Ridge Advisory Design Panel
Tuesday, May 14, 2013 - Draft
Maple Ridge Advisory Design Panel Minutes Page 4 of 4
The following concerns be addressed and digital version of revised drawings
&memo be submitted to Planning staff;and further that Planning staff forward
this on to the Advisory Design Panel for information;
Consider green wall treatment at the wall beside the stair
Consider replacing all exiting shrub planting with proposed materials in
order to give a consistent landscape treatment with updated architecture.
Consider the use of structural soil for the new trees along McIntosh
Avenue.
Consider landscape containers on the upper level parking.
Consider improving the sense of entry to the main lobby to access upper
level.
CARRIED
6.PRESENTATIONS
7.CORRESPONDENCE
8.Next Meeting :Tuesday , June 11, 2013
Agenda deadline:Tuesday, May 28, 2013
Adjournment:6:04 pm
/jg