HomeMy WebLinkAboutADP 2013-10-08 minutes.pdfAdvisory Design Panel Minutes Page 1 of 3
District of Maple Ridge
MAPLE RIDGE
ADVISORY DESIGN PANEL
The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the
Blaney Room at Maple Ridge Municipal Hall,11995 Haney Place,Maple Ridge,British
Columbia, on Tuesday, October 8, 2013 at 4:00 pm.
COMMITTEE MEMBERS PRESENT
Blair Arbuthnot Landscape Architect
Chris Mramor, Vice-Chair Landscape Architect
Johnny Leung Architect
COMMITTEE MEMBERS ABSENT
Colleen Dixon Architect
Peter Lovick, Chair Architect
STAFF MEMBERS PRESENT
Rasika Acharya Planner II & ADP Staff Liaison
Joanne Georgelin Committee Clerk
______________________________________________________________________
________
1.Call to Order and Introduction s
The meeting was called to order at 4:07 pm.
2.Agenda Approval
Moved and Seconded :
Th at the October 8 , 2013 agenda be approve d with the following change:
4.1 Update on revised ADP Guidelines for applicants
4.2 Update on Tandem Parking- draft zoning and parking amendments
CARRIED
3.Approval of the Minutes – September 10 , 2013
Moved and Seconded :
That the Minutes of the meeting of September 10 , 201 3 be approved.
CARRIED
4.New Business
Maple Ridge Advisory Design Panel
Tuesday, September 10, 2013 - Draft
Maple Ridge Advisory Design Panel Minutes Page 2 of 3
4.1 Update on Revised ADP Guidelines for Applicants
Rasika Acharya reviewed the revised ADP Guidelines for Presentations to
the Maple Ridge Advisory Design Panel,in which Bulletin 31 of the
Architects Act has been added to remind potential applicants to assess if
their project requires the services of an Architect,as per Bulletin 31,early
on in the process.Ms.Acharya asks if Panel members have any
comments to please email her.
4.2 Tandem Parking -draft zoning and parking amendments Rasika Acharya
updated Panel on the Council report with proposed bylaw amendments
including next steps of organizing an “Open House”to seek input from the
stakeholders.
5.Projects
5.1 Development Permit:2011-109-DP
Applicant: Gary Lycan/Double Gold Holdings
Project Architect: Harvey Hatch
Landscape Architect: David Mitchell, M2 Landscape
Architects
Proposal: Addition/Extension of an existing Industrial
Building in the M-3 zone
Location:20120 113B Avenue
Planning Technician/File Manager: Siobhan Murphy
The following applicants were present at the meeting:
Harvey Hatch, Architect
Meredith Mitchell, Landscape Architect
Rasika Acharya reviewed the Advisory Design Panel Memo dated September 10,
2013 attached to the agenda,with respect to the location,context,surrounding
buildings,OCP designation and Industrial DP Guidelines,site access,proposed
design and colours,materials,number of units,storm water management and
sanitary sewer connections, landscaping and parking.
Harvey Hatch, Architect, presented the proposed design details to the Panel.
Meredith Mitchell,Landscape Architect,presented the proposed details of the on-
site landscaping to the Panel.
Moved and Seconded :
Maple Ridge Advisory Design Panel
Tuesday, September 10, 2013 - Draft
Maple Ridge Advisory Design Panel Minutes Page 3 of 3
The application be supported and the following concerns be addressed as the
design develops and submitted to Planning staff for follow-up:
Consider reducing parking count to max of 20 stalls and consider the
remaining spaces to be reallocated to back-up functions and landscaping.
Consider introduction of landscape buffer between east property line and
parking.
Consider extension of acoustic wall to wrap around east property line to
beginning of parking and to west to the proposed building edge.
Provide clarification and details for garbage and recycling area.Consider
addition of landscaping in the area not used for garbage/recycling.
Provide additional site grading elevation and building slab elevations.
Provide additional information and details of signage in front of the
building
Clarify building heights shown on architectural sections.
Provide architectural wall lighting over main entries and loading doors and
site lighting for parking areas.
Consider ways to integrate architectural expression of the three separate
buildings and consider alternate roof strategy for the storage shed.
Consider provision of outdoor seating area/ picnic area for staff.
Consider additional storm water management strategies to integrate storm
oil interceptor with landscape bio-soils.
Consider security fencing along all property edges and a secure access
point at the front of the building.
CARRIED
6.PRESENTATIONS - Nil
7.CORRESPONDENCE - Nil
8.Next Meeting :Tuesday , November 12 , 2013
Agenda deadline:Monday, October 21, 2013
Adjournment:5:06 pm
/jg