Loading...
HomeMy WebLinkAboutADP 2015-07-14 minutes.pdfAdvisory Design Panel Minutes Page 1 of 3 City of Maple Ridge ADVISORY DESIGN PANEL The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the Blaney Room at Maple Ridge Municipal Hall,11995 Haney Place, Maple Ridge, British Columbia, on Tuesday,June 14, 2015 at 4:00 pm. COMMITTEE MEMBERS PRESENT Blair Arbuthnot Landscape Architect Roger Amenyogbe Architect Johnny Leung Architect Mark Lesack Architect STAFF MEMBERS PRESENT Sunny Schiller Committee Clerk Adrian Kopystynski Staff Liaison, Acting Manager of Development and Environmental Services REGRETS Kyoung Bae Park Landscape Architect 1.CALL TO ORDER The Chair called the meeting to order at 4:05 pm. 2.AGENDA ADOPTION R15-016 It was moved and seconded That the agenda be amended to postpone Item 5.1 to the September meeting and be adopted as amended. CARRIED 3.MINUTES APPROVAL R15-017 It was moved and seconded That the Minutes of June 9, 2015 be approved. CARRIED Maple Ridge Advisory Design Panel -Tuesday,July 14, 2015 Maple Ridge Advisory Design Panel Minutes Page 2 of 4 4.PROJECTS 4.1 Development Permit No:2015-043-DP Applicant:Curtis Gray/Cheryl Bijl, Krahn Engineering Project Architect:Larry Podhora Project Landscape Architect:KD Planning and Design Ltd. Owners:MDZ Holdings Ltd. Proposal:A single-storey multi-tenant industrial concrete tilt-up building. Location:20159 115A Avenue File Manager:Michelle Baski The project applicant, architect and landscape architect were introduced.The Staff Liaison provided an overview of the proposed project. The project team made a presentation of the project plans. R15-018 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1.Consider a corner massing element on the south west corner 2.Consider a stronger colour element on the building 3.Consider west façade entries with design elements that may include canopies and spaces for signage for each unit 4.Consider providing a continuous pedestrian corridor along the west façade, that matches hard scape surfacing of entry ways 5.Consider providing an outdoor amenity space 6.Portray an accurate image of the art work on the south façade 7.Consider additional architectural features on south façade (Consider modifying design of windows on south elevation 8.Provide additional detailing for rear and east fencing 9.Provide additional security for rear access path 10.Provide additional detail for standalone sign to ensure sign does not conflict with art work. In addition to confirming consistency of mate rials between building and sign 11.Provide further design refinement of outdoor storage area (screening, buffering of storage, fencing details) 12.Show bollards on elevations for overhead doors 13.Show further information on retaining wall details 14.Preference for providing accessible pathway connection between sidewalk and building 15.Consider providing exterior lighting on artwork CARRIED Maple Ridge Advisory Design Panel -Tuesday,July 14, 2015 Maple Ridge Advisory Design Panel Minutes Page 3 of 4 4.2 Development Permit:2015-081-DP Applicant:Harj Sekhon Project Architect:Heather Johnston Landscape Architect: Owners:931919 B.C. Ltd. Proposal:Restaurant (Freshii) Location:22464 Lougheed Highway File Manager:Adam Rieu The applicant and architect were introduced.The Staff Liaison reported that this was a returning application from the June 2015 meeting and gave an overview of the recommendations made at that time. The architect made a presentation of the revised plans. R15-019 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1.Confirm the cornice is within the property line on the east side 2.Provide further details on profile of canopy. Confirm canopy is within city bylaws for covering sidewalk.Confine the canopy within the concrete pilasters 3.Consider consistency between front and rear façade materials 4.Consider additional architectural feature on rear upper façade 5.Consider formalizing the mural on the east façade with context for art and provide further details on installation 6.Consider additional landscape details for planter boxes in front and rea r areas 7.Provide additional landscape in rear planter 8.Consider additional window features on frontage (for example awning on upper windows) 9.Provide additional details for frontage hardscape pavers 10.Provide additional detail of garbage area and ensure materi als are consistent with building façade CARRIED 4.3 Development Permit No:2015-194-DP Applicant:Stantec Project Architect:Stantec Project Landscape Architect:None Owners:Narland Properties (Haney) Ltd Proposal:Rebrand the west end of the existing shopping centre structure from Target to Walmart. Location:11900 Haney Place File Manager:Amelia Bowden Maple Ridge Advisory Design Panel -Tuesday,July 14, 2015 Maple Ridge Advisory Design Panel Minutes Page 4 of 4 The Staff Liaison provided an overview of the plan to update the façade of 11900 Haney Place. The colour scheme and logo elements will be updated. R15-020 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1.Consider alternate texture transition for the pedestrian zone in front of main entry in lieu of speed bumps. Should speed bumps be retained consider alternative texture at east west drive aisles entering onto pedestrian crossing 2.Consider vertically aligning the pharmacy signage with main Walmart sign 3.Consider installing landscaping islands were previous cart corals were located 4.Review and supplement all landscape areas with new plant material for full coverage in all existing landscape areas 5.Consider weather protection over west exit doors CARRIED 5.NEW BUSINESS & UNFINISHED BUSINESS 5.1 Village Commercial Development Permit Area Guidelines Postponed 5.2 ADP Applicant Checklist Feedback from panel members has been incorporated into the checklist. A printed updated checklist was reviewed by the panel and further suggestions were made to improve the form. Once these suggestions are included the form is ready for distribution. 6.PRESENTATIONS -Nil 7.C0RRESPONDENCE -Nil 8.NEXT MEETING Tuesday,September 8, 2015 Applicant deadline:Monday,August 17, 2015 9.ADJOURNMENT /ss