Loading...
HomeMy WebLinkAboutADP 2016-06-14 minutes.pdf- .MAPLE-RIIJG!E ------ llttllllo l;lllUTI~ll! City of Maple Ridge ADVISORY DESIGN PANEL The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the Blaney Room at Maple Ridge Municipal Hall, 11995 Haney Place, Maple Ridge, British Columbia, on Tuesday, June 14, 2016 at 4:00 pm. COMMITTEE MEMBERS PRESENT Blair Arbuthnot, Chair Landscape Architect Roger Amenyogbe Architect Andrew Igel Arch itect Mark Lesack, Vice Chair Architect Kyoung Bae Park Landscape Architect STAFF MEMBERS PRESENT Sunny Schiller Committee Clerk Adrian Kopystynski Staff Liaison, Planner 2 REGRETS 1. Call To Order Mr. Arbuthnot called the meeting to order at 4:13 pm. The Staff Liaison led the Chair and Vice- Chair election process. 2. 2016 Chair And Vice-Chair Elections R/2016-004 It was moved and seconded That Blair Arburthnot be appointed Advisory Design Panel Chair. CARRIED R/2016-005 It was moved and seconded That Mark Lesack be appointed Advisory Design Panel Vice-Chair. CARRIED 3. Agenda Adoption R/2016-006 It was moved and seconded That the agenda dated June 14, 2016 be adopted. CARRIED ) ADP Minutes June 14, 2016 Page 2 of 3 4. Minutes Approval R/2016-007 It was moved and seconded That the Minutes of May 10, 2016 be approved. 5. Representative to Developer Public Art Steering Committee CARRIED The Staff Liaison reported that Mr. Lesack has volunteered to represent the Advisory Design Panel on the Developer Public Art Steering Committee. 6. Projects 6.1 Development Permit No: Applicant: Project Architect: Project Landscape Architect: Owners: Proposal: Location: File Manager: 2015-253-DP (New Submision) James Iversen, Concosts Management Inc. Brian Shigetomi, Atelier Pacific Architecture David Jerke Quarry Rock Developments 43 unit townhouse development 23539 Gilker Hill Rd. Michelle Baski The Staff Liaison introduced the project. The applicants made a presentation regarding the application. R/2016-008 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1. Consider removal of front entry exterior hall and enhance entry expression for each unit 2. Consider traffic calming and enhance hard scape elements along main roadway with particular attention to park frontage 3. Consider variation of facades on end units 4. Consider the balance of materials from front of building to back 5. Consider refinement of grading for play area 6. Provide further grading details for overall site plan, including retaining w2, I information 7. Consider accessibility around site, in particular around play area 8. Consider mailbox location in regards to car access 9. Consider more interest in rubber surface area of playground 10. Consider further detail in rain garden, incorporating lawn drains 11. Consider removal of the handicap stall to further enhance play area 12. Consider switching amenity areas 3 and 4 and increasing the number of garden plots 13. Provide lighting plan CARRIED ADP Minutes June 14, 2016 Page 3 of 3 6.2 Development Permit No: 2016-115-DP (Resubmission) Applicant: Falcon Village Joint Venture Project Architect: Wes Friesen, Points West Architecture Project Landscape Architect: Meredith Mitchell, M2 Landscaping Owners: City of Maple Ridge Proposal: Mixed Use Building Location: 227 Street and 119 Avenue File Manager: Amelia Bowden The applicants addressed the concerns raised at the previous Advisory Design Panel meeting. R/2016-009 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1. Consider glazing for amenity area towards parking area 2. Consider signage banding for retail 3. Consider lighting alternatives in lieu of painting walls and ceilings white for CPTED compliance in parking areas 4. Consider adequate warning signage for underground storage off of access ramp to lower level of parking 5. Consider angling wall in lobby entry from parking area for further visual enhancement of main entry 6. Consider stronger fac_;;ade articulation on south fac_;;ade 7. Consider further security measures for lobby entry 8. Consider addition of wood trellis above the ramp for underground parking CARRIED 7. REQUEST FOR PRELIMINARY COMMENTS ON APPLICATION RECEIVED -Nil 8. CORRESPONDENCE 9. ADJOURNMENT It was moved and seconded Chair /ss That the meeting be adjourned at 6:01 p.m.