Loading...
HomeMy WebLinkAboutADP 2016-07-12 minutes.pdfCity of Maple Ridge ADVISORY DESIGN PANEL The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the Blaney Room at Maple Ridge Municipal Hall, 11995 Haney Place, Maple Ridge, British Columbia, on Tuesday, July 12, 2016 at 4:00 pm. COMMITTEE MEMBERS PRESENT Blair Arbuthnot, Chair Roger Amenyogbe Andrew Igel Mark Lesack, Vice Chair STAFF MEMBERS PRESENT Sunny Schiller Landscape Architect Architect Architect Architect Committee Clerk Adrian Kopystynski Staff Liaison, Acting Manager of Developmental and Environmental Services REGRETS Kyoung Bae Park Landscape Architect Note: Mark Lesack was absent at the beginning of the meeting as he is employed by Ankenman Associates Architects, the project architect for Item 4.1. 1. Call To Order The Chair called the meeting to order at 4:07 pm. 2. Agenda Adoption R/2016-010 It was moved and seconded That the agenda dated July 12, 2016 be adopted. 3. Minutes Approval R/2016-011 It was moved and seconded That the Minutes of June 14, 2016 be approved. CARRIED CARRIED • ADP Minutes July 12, 2016 Page 2 of4 4. Projects 4.1 Development Permit No: 2016-129-DP Applicant: Project Architect: Emily Kearns, Ankenman Associates Architects Inc. Ankenman Associates Architects Inc. Landscape Architect: M2 Landscape Architecture Owners: 0784903 BC Ltd. Proposal: Location: Mixed Use Commercial/ Rental Apartment Building 11225 240 Street File Manager: Adrian Kopystynski The Staff Liaison provided an overview of the proposed project. The project team made a presentation of the project plans. R/2016-012 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1. Consider stronger corner element feature for greater street presence on 240th and Kanaka 2. Consider the signage at the corner to be brought forward from building facade and bring additional interest to remaining signage for the exterior facing frontages with perpendicular treatments 3. Consider stronger presence for the breeze way entry facade with additional detailing 4. Consider additional glazing for north and south staircase facades 5. Consider alternate treatments for venting with gable ends 6. Support retaining wall detailing to the catch in place concrete with architectural finish 7. Confirm adjacent trail connections are aligned Note: Mark Lesack joined the meeting at 4:50 pm . 4.2 Development Permit No: Applicant: Project Architect: Landscape Architect: Owners: Proposal: Location: File Manager: 2016-222-DP Harry Evans, Z.E.I. Project Management Donald Nicolson Meredith Mitchell (M2) Bucci Investment Corporation Fagade Improvement and Landscaping Updates 22709 Lougheed Highway Amelia Bowden CARRIED • ADP Minutes July 12, 2016 Page 3 of 4 The Staff Liaison provided an overview of the proposed project. The project team made a presentation of the project plans. R/2016-013 It was moved and seconded 4.3 That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1. Consider increasing the column base height for entry signage 2. Provide further information on all facades and ensure consistency of treatments and materials 3. Consider additional accent within concrete finishing areas with coloured concrete 4. Confirm suitable pedestrian circulation on frontage sidewalk with column placement to ensure no pinch points to pedestrian flows 5. Consider providing additional on site trees within frontage area 6. Consider table and chairs that are not fixed Development Perm it No: Applicant: Project Architect: Landscape Architect: Owners: Proposal: Location: File Manager: 2016-142-DP Fariba Gharaei, Architect AIBC Urban Design Group M2 Landscape Architecture Dynasty Property Corp CARRIED Exterior Renovation for conversion of existing A&W drive through restaurant to Carl's Jr. drive through restaurant. 20468 Lougheed Highway, Maple Ridge Diana Hall R/2016-014 It was moved and seconded That the application be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow-up: 1. Provide a pedestrian connection from the sidewalk into site 2. Consider a top cap of stone on frontage pilaster creating an inverted U shaped fa<tade treatment 3. Consider shade louvres on windows 4. Consider west fa<tade treatment with varying the stone finish height 5. Provide further information on new signage and ensure it is reflective of proposed materials. A monument type sign is supported. 6. Confirm all existing trees are retained CARRIED ., ADP Minutes July 12, 2016 Page 4 of 4 5. REQUEST FOR PRELIMINARY COMMENTS ON APPLICATION RECEIVED -Nil 6. CORRESPONDENCE -Nil 7. ADJOURNMENT It was moved and seconded That the meeting be adjourned at 6:17 p.m. =fu Chair /ss