Loading...
HomeMy WebLinkAboutADP 2015-05-12 minutes.pdfCity of Maple Ridge ADVISORY DESIGN PANEL The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel held in the Blaney Room at Maple Ridge Municipal Hall, 11995 Haney Place, Maple Ridge, British Columbia, on Tuesday, May 12, 2015, at 4:00 pm. COMMITTEE MEMBERS PRESENT Roger Amenyogbe Johnny Leung Mark Lesack Kyoung Bae Park Blair Arbuthnot STAFF MEMBERS PRESENT Sunny Schiller Adrian Kopystynski REGRETS Architect Architect Architect Landscape Architect Landscape Architect Committee Clerk Planner II 1. CALL TO ORDER AND INTRODUCTIONS The Staff Liaison called the meeting to order at approximately 4:00 pm. It was decided to begin with Item 5.2 Election of 2015 Chair and Vice-Chair. R15-007 It was moved and seconded That Blair Arbuthnot be appointed Advisory Design Panel Chair. CARRIED R15-008 It was moved and seconded That Mark Lesack be appointed Advisory Design Panel Vice-Chair. CARRIED Blair Arbuthnot chaired the meeting following the election. 2. AGENDA ADOPTION R15-009 It was moved and seconded That the Agenda be amended to have item 5.2 as the first item of business and adopted as amended. CARRIED Advisory Design Panel Minutes Page 1 of 3 Maple Ridge Advisory Design Panel -Tuesday, May 12, 2015 3. MINUTES APPROVAL R15-010 It was moved and seconded That the Minutes of March 10, 2015 be approved. CARRIED 4. PROJECTS 4.1 Development Permit No: 2015-041-DP R15-011 Applicant: Project Architect: Project Landscape Architect: Owners: Proposal: Location: File Manager: Kent Fawcett, Spire Construction Helen Besharat Al Tanzer MCF Holdings Ltd. A two-storey concrete tilt-up industrial building for office space for a freight broker company, with some warehouse space. 20070 1138 Ave. Michelle Baski The Project Architect, Landscape Architect, Owners and Applicant were introduced. The Staff Liaison provided an overview of the proposed project. The project team made a presentation of the project plans. It was moved and seconded That application 2015-041 DP be supported and the following concerns be addressed as the design develops and be submitted to Planning staff for follow up: 1. Consider expanding the footprint of the bio-swale to accommodate a rain garden. 2. Consider a 8 cm or greater caliper tree as the "feature tree" in the front of the site. 3. Consider installing a wheelchair-friendly picnic table in the employee outdoor amenity area. 4. Provide a design detail in the plans showing roof top mechanical screening and any screening of at-grade utility metres/connections. 5. Include a let-down at the plaza entry area to increase accessibility. 6. Enhance the hardscape detail in the surfacing treatment for a wider walkway along the building by adding some decorative surface treatment in place of the wheel-stops. 7. Consider extending the retaining wall eastward to the east property line and adding architectural detailing to the south exposed face. 8. Consider relocating the southern catch basin. 9. Consider further strengthening the design of the entrance area, including a wider red band element forming part of the entry canopy. CARRIED Maple Ridge Advisory Design Panel Minutes Page 2 of 3 Maple Ridge Advisory Design Panel -Tuesday, May 12, 2015 5. NEW BUSINESS & UNFINISHED BUSINESS 5.1 Review of ADP Applicant Checklist The Staff Liaison provided printed copies of the Applicant checklist and reviewed the content and format with Panel members. Members were asked to make any suggestions for improving the document at the next meeting. 5.2 Election of 2015 Chair and Vice-Chair Item previously dealt with as Item 1. 6. PRESENTATIONS -Nil 7. CORRESPONDENCE -Nil 8. 9. Chair /ss NEXT MEETING Applicant deadline: Maple Ridge Advisory Design Panel Minutes Tuesday, June 9, 2015 Tuesday, May 19, 2015 Page 3 of3