Loading...
HomeMy WebLinkAbout2024-04-16 Committee of the Whole Agenda and Reports.pdfCity of Maple Ridge COMMITTEE OF THE WHOLE AGENDA April 16, 2024 11:00 AM Virtual Online Meeting including Council Chambers Committee of the Whole is the initial venue for review of issues. No voting takes place on bylaws or resolutions. A decision is made to send an item to Council for debate and vote or to send an item back to staff for more information or clarification before proceeding to Council. The meeting is live streamed and recorded by the City of Maple Ridge. For virtual public participation during Community Forum register by going to the Public Portal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon for the select meeting 1.CALL TO ORDER 1.1 Territory Acknowledgement The City of Maple Ridge carries out its business on the traditional and unceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen (qʼʷa:n̓ƛʼәn̓) First Nation. 2.APPROVAL OF AGENDA 3.MINUTES 3.1 Adoption of Minutes – April 2, 2024 4.DELEGATIONS/STAFF PRESENTATIONS 5.PLANNING AND DEVELOPMENT SERVICES Note:  • Owners and/or Agents of development applications on this agenda may be present to answer Council questions pertaining to their item at the conclusion of Staff presentations for that item. • The following items have been numbered to correspond with the Council Agenda where further debate and voting will take place, upon Council decision to forward them to that venue. 5.1 2022­229­VP, 11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue To permit the future subdivision of approximately 37 single­family lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Development Variance Permit, 11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue” be forwarded to the next Regular Council Meeting. 5.2 2021­131­VP, 23103 136 Avenue, Development Variance Permit To permit the future subdivision of 20 lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Development Variance Permit, 23103 136 Avenue” be forwarded to the next Regular Council Meeting. 5.3 2023­208­RZ, 12035 Glenhurst Street, RS­1 to R­4 To permit the future subdivision of two lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Second Reading, Zone Amending Bylaw No. 7958­2023, 12035 Glenhurst Street” be forwarded to the next Regular Council Meeting. 6.ENGINEERING SERVICES 7.CORPORATE SERVICES 8.PARKS, RECREATION, AND CULTURE 8.1 Engagement Phase1 Report  – Recreation Feasibility Study Review of engagement results which includes feedback from residents, community and user groups and other interested parties. RECOMMENDATION:  That the staff report dated April 16, 2024, titled “Engagement Phase1 Report  – Recreation Feasibility Study” be forwarded to the next Regular Council Meeting. 9.ADMINISTRATION 10.COMMUNITY FORUM 11.NOTICE OF CLOSED MEETING 11.1        The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(i) – the receipt of advice that is subject to solicitor­client privilege, including communications necessary for that purpose; •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report];  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT City of Maple RidgeCOMMITTEE OF THE WHOLEAGENDAApril 16, 202411:00 AMVirtual Online Meeting including Council ChambersCommittee of the Whole is the initial venue for review of issues. No voting takes place on bylaws orresolutions. A decision is made to send an item to Council for debate and vote or to send an item backto staff for more information or clarification before proceeding to Council. The meeting is live streamedand recorded by the City of Maple Ridge.For virtual public participation during Community Forum register by going to the PublicPortal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon forthe select meeting1.CALL TO ORDER1.1 Territory AcknowledgementThe City of Maple Ridge carries out its business on the traditional andunceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen(qʼʷa:n̓ƛʼәn̓) First Nation.2.APPROVAL OF AGENDA3.MINUTES3.1 Adoption of Minutes – April 2, 20244.DELEGATIONS/STAFF PRESENTATIONS5.PLANNING AND DEVELOPMENT SERVICESNote: • Owners and/or Agents of development applications on this agenda may bepresent to answer Council questions pertaining to their item at the conclusion of Staff presentations for that item. • The following items have been numbered to correspond with the Council Agenda where further debate and voting will take place, upon Council decision to forward them to that venue. 5.1 2022­229­VP, 11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue To permit the future subdivision of approximately 37 single­family lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Development Variance Permit, 11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue” be forwarded to the next Regular Council Meeting. 5.2 2021­131­VP, 23103 136 Avenue, Development Variance Permit To permit the future subdivision of 20 lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Development Variance Permit, 23103 136 Avenue” be forwarded to the next Regular Council Meeting. 5.3 2023­208­RZ, 12035 Glenhurst Street, RS­1 to R­4 To permit the future subdivision of two lots. RECOMMENDATION: That the staff report dated April 16, 2024, titled “Second Reading, Zone Amending Bylaw No. 7958­2023, 12035 Glenhurst Street” be forwarded to the next Regular Council Meeting. 6.ENGINEERING SERVICES 7.CORPORATE SERVICES 8.PARKS, RECREATION, AND CULTURE 8.1 Engagement Phase1 Report  – Recreation Feasibility Study Review of engagement results which includes feedback from residents, community and user groups and other interested parties. RECOMMENDATION:  That the staff report dated April 16, 2024, titled “Engagement Phase1 Report  – Recreation Feasibility Study” be forwarded to the next Regular Council Meeting. 9.ADMINISTRATION 10.COMMUNITY FORUM 11.NOTICE OF CLOSED MEETING 11.1        The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(i) – the receipt of advice that is subject to solicitor­client privilege, including communications necessary for that purpose; •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report];  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT City of Maple RidgeCOMMITTEE OF THE WHOLEAGENDAApril 16, 202411:00 AMVirtual Online Meeting including Council ChambersCommittee of the Whole is the initial venue for review of issues. No voting takes place on bylaws orresolutions. A decision is made to send an item to Council for debate and vote or to send an item backto staff for more information or clarification before proceeding to Council. The meeting is live streamedand recorded by the City of Maple Ridge.For virtual public participation during Community Forum register by going to the PublicPortal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon forthe select meeting1.CALL TO ORDER1.1 Territory AcknowledgementThe City of Maple Ridge carries out its business on the traditional andunceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen(qʼʷa:n̓ƛʼәn̓) First Nation.2.APPROVAL OF AGENDA3.MINUTES3.1 Adoption of Minutes – April 2, 20244.DELEGATIONS/STAFF PRESENTATIONS5.PLANNING AND DEVELOPMENT SERVICESNote: • Owners and/or Agents of development applications on this agenda may bepresent to answer Council questions pertaining to their item at the conclusionof Staff presentations for that item.• The following items have been numbered to correspond with the CouncilAgenda where further debate and voting will take place, upon Councildecision to forward them to that venue.5.1 2022­229­VP, 11070 Lockwood Street, and 25024, 25038, and 24984 112AvenueTo permit the future subdivision of approximately 37 single­family lots.RECOMMENDATION:That the staff report dated April 16, 2024, titled “Development Variance Permit,11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue” beforwarded to the next Regular Council Meeting.5.2 2021­131­VP, 23103 136 Avenue, Development Variance PermitTo permit the future subdivision of 20 lots.RECOMMENDATION:That the staff report dated April 16, 2024, titled “Development Variance Permit,23103 136 Avenue” be forwarded to the next Regular Council Meeting.5.3 2023­208­RZ, 12035 Glenhurst Street, RS­1 to R­4To permit the future subdivision of two lots.RECOMMENDATION:That the staff report dated April 16, 2024, titled “Second Reading, Zone AmendingBylaw No. 7958­2023, 12035 Glenhurst Street” be forwarded to the next RegularCouncil Meeting.6.ENGINEERING SERVICES7.CORPORATE SERVICES8.PARKS, RECREATION, AND CULTURE8.1 Engagement Phase1 Report  – Recreation Feasibility StudyReview of engagement results which includes feedback from residents, communityand user groups and other interested parties.RECOMMENDATION: That the staff report dated April 16, 2024, titled “Engagement Phase1 Report  –Recreation Feasibility Study” be forwarded to the next Regular Council Meeting.9.ADMINISTRATION 10.COMMUNITY FORUM 11.NOTICE OF CLOSED MEETING 11.1        The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(i) – the receipt of advice that is subject to solicitor­client privilege, including communications necessary for that purpose; •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report];  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT Document: 3761911 CITY OF MAPLE RIDGE COMMITTEE OF THE WHOLE MEETING MINUTES APRIL 2, 2024 The Minutes of the Committee of the Whole Meeting held virtually and hosted in Council Chambers on April 2, 2024 at 11:00 am at City Hall, 11995 Haney Place, Maple Ridge, British Columbia for the purpose of transacting regular City business. PRESENT Elected Officials Mayor D. Ruimy Councillor K. Carreras Councillor O. Dozie (Virtual) Councillor J. Dueck Councillor S. Schiller Councillor J. Tan Councillor A. Yousef ABSENT Appointed Staff S. Hartman, Chief Administrative Officer Other Staff as Required R. Alvarado, Planning Technician M. Best, Interim Director of Planning C. Bevacqua, Clerk 3 R. Brummer, Manager of Arts, Culture and Events A. Grochowich, Manager of Community Planning C. Howes, Acting Deputy Corporate Officer J. Khaira, Manager of Engineering Design & Construction Z. Lifshiz, Director of Strategic Development, Communications and Public Engagement C. Martin, Director of Recreation Services M. McMullen, Manager of Development & Environmental Services D. Olivieri, Manager of Corporate Planning and Consultation T. Thompson, Director of Finance T. Westover, Director Economic Development Note: These minutes and the video of this meeting are posted on the City’s Web Site at: https://mapleridge.primegov.com/public/portal Note: Councillor Dozie attended the meeting virtually. 1. CALL TO ORDER – 11:01 am Councillor K. Carreras, Chair called the meeting to order and provided the territory acknowledgement. 2. APPROVAL OF THE AGENDA R/2024-CW-022 Moved and seconded THAT the agenda of the Committee of the Whole Meeting of April 2, 2024, be approved as circulated. CARRIED Committee of the Whole Meeting Minutes April 2, 2024 Page 2 of 3 Document: 3761911 3. MINUTES 3.1 Adoption of Minutes R/2024-CW-023 Moved and seconded THAT the minutes of the Committee of the Whole Meeting of March 5, 2024, be adopted. CARRIED 4. DELEGATIONS/STAFF PRESENTATIONS - NIL 5. PLANNING AND DEVELOPMENT SERVICES 5.1 2022-326-RZ, 12050 York Street, RS-1 to RT1 To allow for the future construction of a duplex. The Manager of Development & Environmental Services provided a summary presentation and answered questions of Council. R/2024-CW-024 Moved and seconded That the staff report dated April 2, 2024, titled “Second Reading, Zone Amending Bylaw No. 7902-2023, 12050 York Street” be forwarded to the next Regular Council Meeting. CARRIED 6. ENGINEERING SERVICES - NIL 7. CORPORATE SERVICES 7.1 2024-2028 Financial Plan – Engagement Phase #2 Results Community priorities and feedback from the second phase of public engagement. Manager of Corporate Planning and Consultation provided a summary presentation and answered questions of Council. R/2024-CW-025 Moved and seconded That the staff report dated April 2, 2024, titled “2024-2028 Financial Plan Engagement Phase #2 Results” be forwarded to the next Regular Council Meeting. CARRIED Committee of the Whole Meeting Minutes April 2, 2024 Page 3 of 3 Document: 3761911 8. PARKS, RECREATION, AND CULTURE - NIL 9. ADMINISTRATION – NIL 10. COMMUNITY FORUM – NIL 11. NOTICE OF CLOSED MEETING 11.1 Resolution to Exclude the Public R/2024-CW-026 Moved and seconded That, pursuant to Section 90 of the Community Charter, this meeting be closed to the public as the subject matter being considered relates to the following: 90(1)(c) labour relation and or employee negotiations; and 90(1)(l) discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report]. CARRIED 12. ADJOURNMENT – 1:48 pm ____________________________________ Councillor K. Carreras, Chair Certified Correct _______________________________________________ C. Howes, Acting Deputy Corporate Officer ~ Maple Ridee - TO: FROM: SUBJECT: His Worship Mayor Dan Ruimy and Members of Council Chief Administrative Officer Development Variance Permit MEETING DATE: FILE NO: MEETING: April 16, 2024 2022-229-VP cow 11070 Lockwood Street, and 25024, 25038, and 24984 112 Avenue EXECUTIVE SUMMARY: Development Variance Permit application (2022-229-VP) has been received in conjunction with an application to rezone the subject properties with a density bonus under Section 402.8 of Zoning Bylaw No. 7600-2019 and to subdivide the subject properties in order to permit the future subdivision of approximately 37 single-family lots. The requested variances are to: 1. To reduce the following: a. The Lot Width of: i. Lot 9 from 12 metres to 11 metres; ii. Lot 10 from 12 metres to 11 metres; iii. Lot 14 from 12 metres to 11.72 metres; iv. Lot 15 from 12 metres to 11.46 metres; v. Lot 16 from 12 metres to 11.46 metres; and vi. Lot 17 from 13.5 metres to 13.14 metres; b. The Lot Depth of: i. Lot 6 from 24 metres to 23.07 metres; ii. Lot 21 from 24 metres to 23.86 metres; and iii. Lot 22 from 24 metres to 23.72 metres; c. Reduce the Rear Yard Setback of: i. Lot 21 from 6 metres to 4.48 metres, and Lot 22 from 6 metres to 2.97 metres; and ii. Lot 23 from 6 metres to 4.28 metres; 2. Reduce the size of the corner truncations required for Lots 17 and 34 from 5 metres by 5 metres (Sm x Sm) to 3 metres by 3 metres (3m x 3m) to reduce the associated road dedications required; 3. Allow the existing above-ground utility poles along the south side of 112 Avenue to remain in place and not be converted to underground utilities; and 2022-229-VP Page 1 of 7 4. Allow a double street frontage exemption under Section 512(2) of the Local Government Act and Section IV.2 of Subdivision and Development Servicing Bylaw No. 4800-1993 for proposed Lot 37. It is recommended that Development Variance Permit 2022-229-VP be approved. Council considered rezoning application 2020-237-RZ and granted first reading for Zone Amending Bylaw No. 7844-2022 on May 24, 2022. Council granted first and second reading for Official Community Plan Amending Bylaw No. 7942-2023 on July 4, 2023, and second reading for Zone Amending Bylaw No. 7844-2022 on July 4, 2023. This application was presented at Public Hearing on July 18, 2023, and Council granted third reading on July 25, 2023. Council will be considering final reading for rezoning application 2020-237-RZ on April 23, 2024. RECOMMENDATION: That the Corporate Officer be authorized to sign and seal 2022-229-VP respecting the properties located at 11070 Lockwood Street, and 24984, 25024 and 25038 112 Avenue. DISCUSSION: a) Background Context Applicant: Epic NE Albion Homes Ltd. Legal Descriptions: LOT 4 PLAN NWP1363 SECTION 11 TOWNSHIP 12 NEW WESTMINSTER LAND DISTRICT EXC: FIRSTLY: PCL A (EP16432) & SECONDLY: PT DEDICATED RD ON PL 29924 OCP: PARCEL A PLAN NWP1363 SECTION 11 TOWNSHIP 12 GROUP 1 NEW WESTMINSTER LAND DISTRICT (EP 16432) LOT 4 LOT 28 PLAN NWP34098 PART NW1/4 SECTION 11 TOWNSHIP 12 GROUP 1 NEW WESTMINSTER LAND DISTRICT LOT 29 PLAN NWP34098 PART NW1/4 SECTION 11 TOWNSHIP 12 GROUP 1 NEW WESTMINSTER LAND DISTRICT Existing: Conservation, Single-Family Residential, Suburban Residential and Townhouse Proposed: Conservation, Park, Single-Family Residential and Townhouse Within Urban Area Boundary: Yes, except the southeastern-most corner of 25038 112 Avenue 2022-229-VP Page 2 of 7 Area Plan: 0CP Major Corridor: Zoning: Existing: Proposed: Surrounding Uses: North: South: East: West: Existing Use of Property: Proposed Use of Property: Site Area: Access: Servicing Requirement: Flood Plain: 2022-229-VP Yes, Albion Area -North East Albion Land Use Concept Plan, except the southeastern-most corner of 25038 112 Avenue Yes (112 Avenue) RS-3 (Single Detached Rural Residential) RS-1B (Single Detached (Medium Density) Residential) with a density bonus to apply the R-1 (Single Detached (Low Density) Urban Residential) zoning provisions RS-2 (Single Detached Suburban Residenital) RS-3 (Single Detached Rural Residential) RM-1 (Low Density Townhouse Residential) Use: Zone: Designation: Use: Zone: Designation: Use: Zone: Designation: Use: Zone: Designation: Single-Family Residential and Vacant R-1 (Single Detached (Low Density) Urban Residential) R-2 (Single Detatched (Medium Density) Urban Residential) R-3 (Single Detatched (Intensive) Urban Residential) RM-1 (Low Density Townhouse Residential) Conservation, Single-Family Residential and Townhouse Single-Family Residential and Vacant RS-3 (Single Detached Rural Residential) Single-Family Residential and Suburban Residential Single-Family Residential RS-3 (Single Detached Rural Residential) Conservation and Single-Family Residential Single-Family Residential RS-3 (Single Detached Rural Residential) Conservation, Single-Family Residential and Townhouse Single-Family Residential and Vacant Conservation, Multi-Family Residential, Park and Single- Family Residential 7.383 ha (18.244 acres) 110 Avenue, 112 Avenue and Lockwood Street Urban Standard No Page 3 of 7 Fraser Sewer Area: Yes 2020-237-RZ -Rezoning Concurrent or Previous Applications: 2022-229-DP -Watercourse Protection and Natural Features Development Permit 2022-230-DP -Wildfire Protection Development Permit 2020-237-SD -Subdivision b) Project Description: The development site is located within the North East Albion Area south of 112 Avenue, east of Lockwood Street and north of 110 Avenue. The development site is influenced by two tributaries of Kanaka Creek named KA6 and KA4. The development site slopes from the southeast to the northwest with a mixture of coniferous and deciduous trees. As shown in the subdivision sketch plan attached as Appendix C, the proposal consists of the following: 1. 102 RM-1-zoned townhouse units; 2. 37 single-family RS-1B-zoned lots utilizing the Albion Area Density Bonus to permit the subdivision of lots between the 371 sqm and 557 sqm in area, as per the R-1 (Single Detached (Low Density) Urban Residential) zoning provisions; 3. a remnant lot that will be zoned RS-2 (Single Detached Suburban Residential), as it lies outside of the Urban Area Boundary; 4. a conservation/park site to remain under the existing RS-3 (Single Detached Rural Residential) Zone; and 5. the Northern Neighborhood Park. c) Variance Analysis: Maple Ridge Zoning Bylaw No 7600-2019 and Subdivision and Development Services Bylaw No. 4800-1993 establish general minimum and maximum regulations for single family developments. A Development Variance Permit allows Council some flexibility in the approval process. The requested variances and rationale for support are described below: 1. Maple Ridge Zoning Bylaw No 7600-2019, Part 6 Section 601.4 as applicable to RS-1B- zoned properties with a density bonus under Section 402.8 to reduce the following: 2022-229-VP a. the Lot Width of: i. Lot 9 from 12 metres to 11 metres; ii. Lot 10 from 12 metres to 11 metres; iii. Lot 14 from 12 metres to 11.72 metres; iv. Lot 15 from 12 metres to 11.46 metres; v. Lot 16 from 12 metres to 11.46 metres; and vi. Lot 17 from 13.5 metres to 13.14 metres, to support the establishment of deep lots, while conserving ecologically sensitive lands associated with the KA4 Creek to the north and accommodating the road dedications Page 4 of 7 2022-229-VP required for 110 Avenue to south in alignment with the following Official Community Plan Bylaw No. 7060-2014 ("0CP") Policies: 10-9, which states that The siting of development... should avoid impacts to watercourses, reduce the risk of erosion in the area, minimize visual disruption to the neighbourhood and protect the visual character of the landscape (Chapter 10, Page 8); 10-10, which states that Natural vegetation should be retained where possible to enhance the character of the area. Significant treed slopes or natural vegetation will need to be retained in order to minimize disruption to watercourses and to minimize erosion (Chapter 10, Page 8); 10-21, which states that Development in the North East Albion Area is to be conducted in such a manner as to mitigate impact on the environment by increasing connections for wildlife, preserving existing hydrological processes, protecting fish and fish habitat, [and] minimizing the potential for stream erosion, preventing surface flooding, and ensuring major storm conveyance systems are capable of conveying significant flows and minimize damage to life and properties under extreme storm conditions (Chapter 10, Page 10); and 10-23, which states that For sites identified on North East Albion Schedule 2, additional floorspace or a reduction in permissible lot size may be supported if environmentally sensitive areas are protected and permanently preserved beyond what is required through the land dedication process (Chapter 10, Page 11); and 10-33, which establishes a proposed road network, including the section of 110 Avenue that is to be dedicated as a part of this development (See Chapter 10, Pages 11 and 26); and b. the Lot Depth of: i. Lot 6 from 24 metres to 23.07 metres; ii. Lot 21 from 24 metres to 23.86 metres; and iii. Lot 22 from 24 metres to 23.72 metres, to accommodate challenging setback geometry associated with conserving ecologically sensitive lands associated with the KA4 creek tributary as park and accommodating the road dedications in alignment with 0CP Policies 10-9, 10-10, 10- 21 and 10-23, as outlined above; c. the Rear Yard Setback of: i. Lot 21 from 6 metres to 4.48 metres, and Lot 22 from 6 metres to 2.97 metres, in order to accommodate the proposed cul-de-sac and associated impacts to the Front Lot Line geometry (i.e., the south sides) of proposed Lots 21 and 22, while conserving ecologically sensitive lands associated with the KA4 creek tributary in alignment with 0CP Policies 10-9, 10-10, 10-21 and 10-23, as outlined above; and Page 5 of 7 ii. the Rear Yard Setback of Lot 23 from 6 metres to 4.28 metres to accommodate trail alignment along the Rear Lot Line, in connection with the development of a network of trails and multi-use pathways as per the following 0CP Policies: 10-25, which states that: Maple Ridge will connect the North of 112 Avenue precinct, including the trailhead to Kanaka Creek Regional Park, to the co-located school and park site in the south via a 'Spine Trail', that will serve as an important stormwater feature and protect and celebrate the water resources of the area (Chapter 10, Page 11-12); and 10-43, which states that: The North East Albion Area Plan sets out a network of trails and multi-use pathways to link the residential areas with the community amenities. These trails and pathways will act as a greenway and buffer to the sensitive environmental areas while creating an attractive public realm for residents (Chapter 10, Page 12). 2. A variance to Subdivision and Development Services Bylaw No. 4800-1993, Schedule D - Design Criteria Manual, Section 3. 7 to reduce the size of the corner truncations required for Lots 17 and 34 from 5 metres by 5 metres (5m x 5m) to 3 metres by 3 metres (3m x 3m). This will slightly reduce the associated road dedications required. The developer's civil engineer has demonstrated that the required services can be accommodated in a reduced truncation and such a reduction would support the development of 37 single-family homes. 3. A variance to Subdivision and Development Services Bylaw No. 4800-1993, Schedule A - Services and Utilities to waive the requirement to convert overhead utilities on 112 Avenue to underground wiring, in accordance with Council Policy 9.05 -Conversion of Existing Overhead Utility Wiring to Underground Wiring, which specifies that: The requirement to provide underground wiring on a highway right-of-way serviced by existing overhead utility systems to be waived on the condition that the overhead utility fronting the development is classified as BC Hydro 3 Phase, and the developer will service the development with underground dips off the overhead line and deposit with the City sufficient funds to achieve the required undergrounding in the future prior to subdivision approval. 4. A variance to allow a double street frontage exemption under Section 512(2) of the Local Government Act and Section IV.2 of Subdivision and Development Servicing Bylaw No. 4800- 1993 for proposed Lot 37. A No-Build Restrictive Covenant on Lot 37 is to be established effective until the future subdivision of Lot 37, in order to promote more efficient use of available residential land within the City, by recognizing the potential of Lot 37 to consolidate with the property to its east and be further subdivided into two parcels in alignment with applicable 0CP policies. d) Citizen/Customer Implications: In accordance with the Development Procedures Bylaw No. 5879-1999, notice of Council consideration of a resolution to issue a Development Variance Permit was mailed to all owners or 2022-229-VP Page 6 of 7 CONCLUSION: The proposed variances outlined in Section C(1) of this report are supported by the Planning Department, because they support the development of 37 single-family homes in accordance with the density permitted under the Albion Area Plan, while accommodation of site constraints including KA4 creek tributary, abutting roads and cul-de-sacs, and trail alignment in following with OCP Policies 10-9, 10-10, 10-21, 10-25, 10-23 and 10-43 as outlined in Section C of this Report. Similarly, the proposed variance outlined in Section C(2) of this report is supported by the Planning and Engineering Departments, because the developer's civil engineer has demonstrated that the required services can be accommodated in a reduced truncation and such a reduction would support the development of 37 single-family homes. This proposed variance is supported by the Director of Engineering in alignment with Subdivision and Development Services Bylaw No. 4800- 1993, Schedule D -Design Criteria Manual Section 3.1. The proposed variance outlined in Section C(3) of this report is supported by the Planning and Engineering Departments, because it is in compliance with Council Policy 9.05. The proposed variance outlined in Section C(4) of this report is supported by the Planning Departments, because permitting the establishment of Lot 37 as a parcel with double street frontage with a No-Build Restrictive Covenant on its title promotes more efficient use of available residential land within the City, by recognizing the potential of Lot 37 to consolidate with the property to its east and be further subdivided into two parcels in alignment with applicable OCP policies. It is therefore recommended that this application be favourably considered and the Corporate Officer be authorized to sign and seal Development Variance Permit 2022-229-VP. "Original Signed by Mark McMullen" Prepared by: Mark McMullen Manager of Development & Environmental Services The following appendices are attached hereto: Appendix A -Subject Map Appendix B -Ortho Map Appendix C -Subdivision Sketch Plan 2022-229-VP "Original Signed by Marlene Best" Reviewed by: Marlene Best, RPP, MBA Interim Director of Planning "Original Signed by Scott Hartman" Concurrence: Scott Hartman Chief Administrative Officer Page 7 of 7 ............ ------ 10941 Legend Appendix A -stream --• Ditch Centreline ------Edge of Marsh --Indefinite Creek N -Lake or Reservoir F?~~j Marsh Scale: 1 :3,000 ~ Active Applications (RZ/SD/DPNP) ROAD APPENDIX A 24984, 25024/38 112 AVENUE & 11070 LOCKWOOD STREET PLANNING DEPARTMENT 1 ~1:r:a■ mapleridge.ca FILE: 2020-237-RZ DATE: Aug 17, 2020 BY:PC Scale: 1 :2,500 APPENDIX 8 APPENDIX B: 24984, 25024/38 112 AVENUE & 11070 LOCKWOOD STREET PLANNING DEPARTMENT l ~IUil■ FILE: 2020-237-RZ DATE: Aug 17, 2020 mapleridge.ca BY: PC Appen~d~i_x_c ___________ ,~,2~~~A-~7nwue,-----~.---~-------~--- Rood Dedication ~ ,.fJOlJ APPENDIX C 110th . J. Pc! A Road Dedication ... ~-.'? ... &!'!'..15" 10 m of rood dedication from 24990 110 Ave. u•4,•~· IIL5II • . ... ~ .. Future 110th : Avenue 2 I**~ D\IP Depth Park 29 Park ,., S; a -·1 1fL----7 "'s I I i o; :! 1, l ll l_.<Ci'J,;,'A,1~J 25 l ~ 26 ; ~ ~ f"-m~ l .cn-111.'f' \L_u14-' _____ J L-----~:: :1 01,,,. fllQ) , .... 10 m of rood dedication from Lot F PIO 009-29~.fOJl <o ~ Lu Client: EPIC Homes Project: 24984, 25024 And 25038 112th Avenue; And 11070 Lockwood St. Maple Ridge, BC Drawing Title: Survey Sketch Plan Of Proposed 39 Lot Subdivision {SFH) And Townhouse Site Project (With Proposed 20 Lots) -8u,7ding Envelope: Bx/2 m Area: 371.0 m2 l'rfdth: 12.D m (IJ.5 m com~) Depth: 24.0 m ~ FrMt: 5.5 m Rear: 6.0 m Int, Side: 1.2 m /[xi. Side; 3.0 m // //,, .... SCALE I : 500 R-1 Lots Lu Preliminary subdivisiOl'I pion and subject lo chongcs. Poper Size: 34" x 22· (D siu) Dote: ,Ame 23. 2020 ffeviscd: FdJroary 5, 202,f Fk MRl7-827sk_SOIJTH_4() Lo/s_and_TH $Jle_l1EVIO_big 39 ~ Maple Ridge - TO: FROM: SUBJECT: His Worship Mayor Dan Ruimy and Members of Council Chief Administrative Officer Development Variance Permit 23103 136 Avenue EXECUTIVE SUMMARY: MEETING DATE: April 16, 2024 FILE NO: 2021-131-VP MEETING: CoW Development Variance Permit application (2021-131-VP) has been received in conjunction with a rezoning application to create a 20-lot subdivision based on R-2 [Single Detached (Medium Density) Urban Residential] zoning. The requested variance(s) is to: • To reduce the lot widths on proposed Lots 1-3, 9-16 and 18 from 11 metres to a minimum of 10.5 metres, and proposed Lots 19 -20 from 11 metres to a minimum of 9.5 metres. • To reduce lot depth on irregularly shaped proposed Lot 18 from 27.0 metres to 3.9 metres. Council considered rezoning application 2021-131 -RZ and granted first reading for Zone Amending Bylaw No. 7725-202 7 on April 13, 2021. Council granted first and second reading for Official Community Plan Amending Bylaw No. 7839-2022 on April 12, 2022, and second reading for Zone Amending Bylaw No. 7725-202 7 on April 12, 2022. This application was presented at Public Hearing on May 17, 2022, and Council granted third reading on May 24, 2022. Council will be considering final reading for associated rezoning application 2021-131-RZ on April 23, 2024. It is recommended that Development Variance Permit 2021-131-VP be approved. RECOMMENDATION: That the Corporate Officer be authorized to sign and seal 2021-131-VP respecting property located at 23103 136 Avenue. 2021-131-VP Page 1 of 5 DISCUSSION: a) Background Context Applicant: Legal Description: OCP: Existing: Proposed: Within Urban Area Boundary: Area Plan: OCP Major Corridor: Zoning: Existing: Proposed: Surrounding Uses: North: South: East West Existing Use of Property: Proposed Use of Property: Site Area: Access: Servicing Requirement: 2021-131-VP Gary Lycan Lot 1 Section 32 Township 12 NWD Plan EPP 70286 Except Plan EPP75644 Civic and Conservation Medium Density Residential Yes Silver Valley No A-2 (Upland Agricultural) R-2 (Single Detached (Medium Density) Urban Residential) Use: Zone: Designation: Use: Park A-2 Upland Agricultural Civic and Conservation Rural Residential Zone: Designation: RS-3 Single Detached Rural Residential Low I Medium Density Residential Use: Zone: Designation: Use: Rural Residential A-2 Upland Agricultural Civic and Conservation Urban Residential Zone: R-2 [Single Detached (Medium Density) Urban Residential] Designation: Medium Density Residential Vacant Urban Residential 1.152 ha (2.85 acres) Urban Standard Page 2 of 5 Flood Plain: Fraser Sewer Area: b) Project Description: No Yes This development proposal is for a 20 -lot subdivision within the Silver Valley Area under R-2 Single Detached (Medium Density) Urban Residential zone, with road dedication connecting through 136th Avenue and 230A Street. This is Phase 2 of a larger development completed under application RZ/087 /08. The proposed lot sizes and layout reflect this previous application, which is located on the west side of 230A Street. In 2012, the School District made a final decision not to acquire this site for school development, thereby allowing this portion of the Phase 2 site to be developed for single- family residential lots with the subject current OCP and rezoning amendment bylaws. It should be noted that following the School District decision, the City of Maple Ridge acquired the north end of the Phase 2 site to create the Silver Valley Gathering Place. The acquisition of this community space provided a civic focus, and helped ensure that the original objectives of the Silver Valley Area Plan were met. c) Variance Analysis: The Zoning Bylaw establishes general minimum and maximum regulations for single family development. A Development Variance Permit allows Council some flexibility in the approval process. Lot Width Variance Maple Ridge Zoning Bylaw No 7600-2079, Part 6, Section 602.4 1 b.(ii): For a lot without lane access, to reduce the lot widths on proposed Lots 1-3, 9-16 and 18 from 11 metres to a minimum of 10.5 metres, and proposed Lots 19 and 20 from 11 metres to a minimum of 9.5 metres. Proposed Lots 19 and 20 are wedge shaped, and significantly wider at the rear property line. Lot width is calculated at the front building setback, which in the R-2 Zone is 3.0 metres from the front lot line. For this reason, proposed Lots 19 and 20 have calculated lot widths of 9.63 and 10.01 metres respectively, but the rear property line for each of them is over 15 metres. The applicant has demonstrated that all proposed lots will have an acceptable building footprint, and all proposed lots are larger than the minimum parcel size of 315 square metres in the R-2 Zone. The reduced widths of the other lots subject to the variance are also consistent with the adjacent Phase 1 development under application RZ/087 /08. Approximately 25% of the R-2 Zoned lots under application RZ/087 /08 have lot widths of less than 11 .0 meters. 2021-131-VP Page 3 of 5 The goal of neighbourhood stability is a priority under the Maple Ridge Official Community Plan. OCP policy 3-2 states: Neighbourhoods are considered to be physically stable areas. New development within neighbourhoods will be consistent with this concept and will respect and reinforce the existing physical characteristics of buildings, streetscapes and open space patterns. The streetscapes and open space patterns have been enhanced by extensive park acquisition, offering its residents recreational opportunities in addition to a stable pattern of residential development. Lot Depth Variance Maple Ridge Zoning Bylaw No 7600-2079, Part 6, Section 602.4 1 c)ii For a lot without lane access, to reduce lot depth on irregularly shaped proposed Lot 18 from 27.0 metres to 3.9 metres. Proposed Lot 18 includes an irregularly shaped, remnant area that will eventually be consolidated with the parcel to its east. The remnant will eventually be subdivided off and consolidated with the adjacent parcel to its east, thereby improving its development potential. A no-build covenant has been registered on this portion to retain its development potential. An explanation of how lot depth is calculated in the Maple Ridge Zoning Bylaw is provided on page 2 of Appendix C. d) Citizen/Customer Implications: In accordance with the Development Procedures Bylaw No. 5879-7999, notice of Council consideration of a resolution to issue a Development Variance Permit was mailed to all owners or tenants in occupation of all parcels, any parts of which are adjacent to the property that is subject to the permit. CONCLUSION: The proposed variance for lot width is supported because of its consistency with the neighbourhood context under previous application RZ/087 /08. Overall, this proposal completes and enhances the established neighbourhood pattern with park development, meeting many of the goals of the Silver Valley Area Plan. 2021-131-VP Page 4 of 5 It is therefore recommended that this application be favourably considered and the Corporate Officer be authorized to sign and seal Development Variance Permit 2021-131-DVP. "Original Signed by Mark McMullen for Diana Hall" Prepared by: Diana Hall, BA, MA Planner 2 "Original Signed by Scott Hartman" Concurrence: Scott Hartman Chief Administrative Officer The following appendices are attached hereto: Appendix A -Subject Map Appendix B -Ortho Map "Original Signed by Marlene Best" Approved by: Marlene Best, RPP, MBA Interim Director of Planning Appendix C -Proposed Subdivision plan indicating required variances 2021-131-VP Page 5 of 5 22839 h'. 13660 22833 w m _J 13650 22829 c5 13640 22823 13630 22817 13620 22813 22811 N Scale: 1 :2,500 Legend -Stream I-' (/) 13712 / I 13548 ti5 13542 ; 13536 ---Ditch Centreline --Indefinite Creek . -River Centreline (Topographic) 1111 Lake or Reservoir APPENDIX A SIL: I I I I 13672 I I I I I I I I I 13616 "' I ~ I ~ 13602(PUM 136AVE. 13589 13547 13527 23103 136 AVENUE PIO: 030-125-022 PLANNING DEPARTMENT I~ ■ mapleridge.ca ' I l I ' 13586 I ' I I I ' I ' 13546 I I ' I FILE: 2021-131-RZ/SD DATE: Mar 17, 2021 BY: PC Scale: 1 :2,500 23103 136 AVENUE PIO: 030-125-022 PLANNING DEPARTMENT 1~•- FILE: 2021-131-RZ/SD DATE: Mar 17, 2021 mapleridge.ca BY: PC 1- 136A AVENUE I 1 _____________ _. Variance Requests Requested variances for Lots 1 -3, 9-16, and 18-20 I APPENDIX C PROP. LOT 18 FOR OS TO rnE EAST A 1 I j 2J8 ,, s! -,i --1----- 8 f i g( LOT A , __ :l-----mnn,7-· I 3 .r . --r-------------- 1 2 _J __ ' ,r •• --- 1 ... i3.2Jm 20.31 231'!." How lot depth is calculated (Zoning Bylaw Excerpt) LOT DEPTH means the lesser of the average of the lengtl1s of the side Lot Lines. exclud ing the Panhandle portion of a Lot or the length of a line running through the center point of the Front Lot Line to the cente r point of the. Rear Lot Une. Refer to Section 407.1 (Building Envelope) and Section 407.2 (Minimum Lot Area and Dimensions} of this Bylaw. (Bylaw ,92s.2023) Lot Depth: fa l Lot Depth equals (al+ (b)-;-2 Or Ler.gth of I.CJ Wh1che•,er Is less Front Roac Frontag-e Cer,tre Point of Front Lot line I I I (C) ' Centre Point of Rear Lot Line (bl Centre Point of Frnnt Lot Lint' Centre Point of Re;;r lot L.,r,e Maple Ridge Zoning Bylaw No. 7600-2019' Part 2 -Page 18 Interpretations and nefinitions Due to the remnant attached to proposed Lot 18, the lot depth calculation must include this wide narrow portion. This remnant will eventually be subdivided off and consolidated with the adjacent lands to pro- vide road frontage to this parcel. A no-build covenant has been registered on this portion to ensure that it remains available to this adjacent parcel to its east for development. ~ Maple Ridge - TO: FROM: SUBJECT: His Worship Mayor Dan Ruimy and Members of Council Chief Administrative Officer Second Reading MEETING DATE: April 16, 2024 FILE NO: 2023-208-RZ MEETING: CoW Zone Amending Bylaw No. 7958-2023 12035 Glenhurst Street EXECUTIVE SUMMARY: An application has been received to rezone the subject property located at 12035 Glenhurst Street from RS-1 (Single Detached Residential) to R-4 (Single Detached (Infill) Urban Residential), to permit a future subdivision of two lots. Council granted first reading to Zone Amending Bylaw No. 7958-2023 on September 5, 2023. This rezoning application is being considered for second reading only as the application was received prior to July 25, 2023 when Development Procedures Bylaw No. 5879-7999 was amended to require a complete rezoning application for consideration of first and second reading. As the application was received before November 30, 2023, the application requires a Public Hearing. This application is in compliance with the Official Community Plan (OCP). Pursuant to Council Policy 6.3 7, this application is subject to the Community Amenity Contribution (CAC) Program at a rate of $9,200.00 per single family lot, for an estimated total amount of $9,200.00, or such rate applicable at third reading of this application. RECOMMENDATIONS: 1. That Zone Amending Bylaw No. 7958-2023 be given second reading, and be forwarded to Public Hearing; 2. That the following terms and conditions be met prior to final reading: i) Registration of a Rezoning Servicing Agreement as a Restrictive Covenant and receipt of the deposit of a security, as outlined in the Agreement; ii) Road dedication on Glenhurst Street as required; iii) Registration of a Restrictive Covenant for Stormwater Management; 2023-208-RZ Page 1 of 6 iv) Removal of existing building; v) If the Director of Waste Management from the Ministry of Environment determines that a site investigation is required based on the submitted Site Disclosure Statement, a rezoning, development, or development variance permit cannot be approved until a release is obtained for the subject property; vi) In addition to the Ministry of Environment Site Disclosure Statement, a disclosure statement must be submitted by a Professional Engineer advising whether there is any evidence of underground fuel storage tanks on the subject property. If so, a Stage 1 Site Investigation Report is required to ensure that the subject property is not a contaminated site; and, vii) That a voluntary contribution, in the amount of $9,200.00 for the additional lot or such rate applicable at third reading of this application, be provided in keeping with the Council Policy 6.31 with regard to Community Amenity Contributions. DISCUSSION: 1. Background Context: Applicant: Legal Description: OCP: JIMMY LEE Lot 35 Section 21 Township 12 New Westminster District Plan 20944 Existing: Urban Residential Proposed: Urban Residential Within Urban Area Boundary: Yes OCP Major Corridor: No Zoning: Existing: Proposed: Surrounding Uses: North: South: East: 2023-208-RZ RS-1 (Single Detached Residential) R-4 (Single Detached (Infill) Urban Residential) Use: Zone: Designation: Use: Zone: Designation: Use: Single-Family Dwelling RS-1 (Single Detached Residential) Urban Residential Single-Family Dwelling RS-1 (Single Detached Residential) Urban Residential Single-Family Dwelling Page 2 of 6 West: Existing Use of Property: Proposed Use of Property: Site Area: Access: Servicing Requirement: Flood Plain: Fraser Sewer Area: 2. Project Description: Zone: Designation: Use: Zone: RS-1 (Single Detached Residential) & RS-3 (Single Detached Rural Residential) Urban Residential Single-Family Dwelling RS-1 b (Single Detached (Medium Density) Residential Designation: Urban Residential Single-Family Dwelling Single-Family Dwelling 0.117 ha (0.29 acres) Glenhurst Street Urban Standard No Yes The subject property located at 12035 Glenhurst Street is zoned RS-1 (Single Detached Residential) and is 0.117 ha (0.29 acres) in size. The property is a rectangular, relatively flat lot. The existing single-family dwelling is required to be removed as a requirement of the rezoning approval. The property has 40 trees, most of them around the periphery, particularly, the northern portion of the lot. The majority of these trees will remain as part of the development. (see Appendices A and B). The subject property is designated Urban Residential and the proposed development is in compliance with the Official Community Plan (see Appendix C). The applicant proposes to rezone the subject property from RS-1 (Single Detached Residential) to R-4 (Single Detached (Infill) Urban Residential) (see Appendix D) to permit the future subdivision of two lots (see Appendix E). The subject site is bounded by single-family residential properties. The proposed lots will have access from Glenhurst Street. The final subdivision layout must be approved by the Approving Officer. 3. Planning Analysis: i) Official Community Plan: The Official Community Plan (OCP) designates the subject property as Urban Residential - Neighbourhood Residential, and development of the property is subject to the Neighbourhood Residential Infill Policies 3-19 to 3-21 of the OCP. These policies require that development be compatible with the surrounding neighbourhood, with particular attention given to site design, 2023-208-RZ Page 3 of 6 setbacks, and lot configuration with the existing pattern of development in the area. Under this designation, and subject to Policy 3-19 (1)(a)ii, a rezoning from RS-1 to R-4 is supportable. ii) Zoning Bylaw: The current application proposes to rezone the property located at 12035 Glenhurst Street from RS-1 to R-4 (see Appendix D) to permit the subdivision of two lots (see Appendix E). The minimum lot area for the proposed R-4 zone is 450.0 m2 (4,844 sq. ft.). Proposed Lot A will be 509.67 m2 (5,486 sq. ft.) in size and proposed Lot B will 624.46 m2 (6,721 sq. ft.) in size. The minimum lot width for the proposed R-4 zone is 12.0 m (39 ft.) and the minimum lot depth is 24.0 m (79 ft). Both lots meet the minimum requirements for the R-4 zone. iii) Off-Street Parking and Loading Bylaw: According to the Maple Ridge Off-Street Parking and Loading Bylaw No. 4350-7990, two parking spaces per dwelling unit are required. The applicant is providing the required parking spaces in the garages. One parking space per dwelling unit is required to be roughed-in and capable of providing level 2 charging for electric vehicles, which is being provided by the applicant. The applicant is also providing each dwelling unit with a bicycle rack for storage in the garages. iv) Proposed Variances: A Development Variance Permit application has been received for this project and involves the following relaxations: Maple Ridge Subdivision & Development Servicing of Land Bvlaw No. 4800-7993 7. To relax the requirement for converting the overheard utility lines along Glenhurst Street to underground. City staff is in support of this variance and will take cash in lieu of undergrounding the utility lines. The requested variance will be the subject of a future Council report. v) Development Permits: A development permit is not required, given that the proposed development is for two single- family residential lots. 2023-208-RZ Page 4 of 6 vi) Advisory Design Panel: A Development Permit is not required; therefore, this application does not need to be reviewed by the Advisory Design Panel. vii) Development Information Meeting: A Development Information Meeting is not required for this application because it is in compliance with the OCP and proposes less than five dwelling units, as per Council Policy 6.20. viii) Parkland Requirement: As there are less than three lots being created, the applicant will not be subject to the park dedication requirements of Section 510 of the Local Government Act prior to subdivision approval. 4. Environmental Implications: An arborist report has been provided in accordance with the Tree Protection and Management Bylaw No. 7733-2075. A tree permit will be required for the removal, protection and/or compensation of trees. All Engineering servicing and building design shall be coordinated with the approved tree retention/protection, landscaping, and stormwater management plan. 5. Interdepartmental Implications: i) Engineering Department: The Engineering Department has indicated that the following servicing upgrades will be required through the Rezoning Servicing Agreement: • Road dedication as required to meet the design criteria of the Subdivision and Development Bylaw No. 4800-7 993. • Utility servicing as required to meet the design criteria of the Subdivision and Development Bylaw No. 4800-7 993. • Frontage upgrades to the applicable road standard or consider cash in lieu due to the mid-block location. 6. School District No. 42 Comments: Pursuant to Section 476 of the Local Government Act, consultation with School District No. 42 is required. A referral was sent to School District No. 42 and they provided a response noting the catchment schools and their capacities, on October 27, 2023 which is attached to this report as Appendix F. 2023-208-RZ Page 5 of 6 CONCLUSION: It is recommended that second reading be given to Zone Amending Bylaw No. 7958-2023, and that application 2023-208-RZ be forwarded to Public Hearing. "Original Signed by Rosario Alvarado" Prepared by: Rosario Alvarado Planning Technician "Original Signed by Scott Hartman" Concurrence: Scott Hartman Chief Administrative Officer The following appendices are attached hereto: Appendix A -Subject Map Appendix B -Ortho Map Appendix C -OCP Map Appendix D -Zone Amending Bylaw No. 7958-2023 Appendix E -Site Plan Appendix F -School District 42 letter 2023-208-RZ "Original Signed by Marlene Best" Reviewed by: Marlene Best, RPP, MBA Interim Director of Planning Page 6 of 6 "' ~ ~ "' "' 0 '" ,,. "' "' "' "' "' '" '" '" '" ~ "' "' "' "' 121A AVE I-(J) \~ N ~ "' ., 0 "' '" "' M "' "' "' N '" '" ~ "' "' 12071 \ 0, "' "' '" "' 11991 11987 I/ 11975 11963 11951/ 11949 11950 ERA\ E 11923 ~2020~066~VP ~-: ~ ;,(' )'xXXXXX)(X><·,_ ~.,,,,_,,.,_,,.,,,_ ___ _ l>>9$'2020-066-RZW◊ 11909 )<'>)< xxx x x x x x x xVx ) Legend Stream ---i7 12180 12170 12160 ~2160 12151 12148 12141 I-(J) ,_ ___ ____, I-"2130 ,_ __ __, 12131 (J) C!l N M N 12150 12140 l- 1---~---12-12-7---1 ~ 12130 12120 12110 2100 12090 ::c z ,_ ___ __,w 12123 r------ 12101 12093 12079 ...J (!) 2120 2110 2106 2096 2092 lv\('>(VV '>l" 2_Q21-.555_-RZ "'-"'""-VVVYVI ,__12_080 _ _,~UBJECT PROPERTY f 2058 12070 12060 •2050 2032 12050 12040 2020 12036 12021 2004 2030 "'"" I 12177 12165 12157 12149 \ 12141 12131 12121 12111 12103 12097 12085 12073 12061 12051 12041 12033 12023 12013 12005 12003 0, "' l h2184 12176 12166 \12156 \12146 12138 12128 12118 12108 12100 12090 12080 12070 12058 12046 12036 12028 12018 12008 APPENDIX A 0, ., ~ I 12 010 '" !:' '-.___ __ _,_~,__.,__ _____ --j ::c )> ~ 11998 ::c 0 ;:o z m en -f ~ /4952 I 11948 11936 11918 11908 DEWDNEY TRUNK RD .\ / rvvv'I ~ ~ M "1' ;;! ~ ~ ~ P<,Xr"y"}_ ('J ~ ('J ~ r-3 ~ ~ 11983 2020,:,0,§j~RZ _ _ '>< y YI YIY..~V~ 11997 2020-os1:s~} ~~ ~ "'"'"' f---'-----J 11991 \ 11971 11972114 ,_ __ _, 11987 I 11961 I-(/) 11981 "' 0, 0, " 11964 0 ~ I-,,. "' '" ,,. ,,. ,,. ,,. " (/) 11958 ~ '" '" '" '" '" 11943 0:: "' "' "' "' "' ::, 11977 SANDPIPER AVE ::c z 11940 w I-...J (!) 11969 (J) ~ "' 0 ~ "' 0 '<I' ~ ;;: "' ~ 11935 ,,. " 11928 11961 M '" "' '" '" ~ '" 11917 N "' "' "' "' "' 11953 11918 11915 .... 12035 GLENHURST STREET ACTIVE DEVELOPMENTS IN AREA PLANNING DEPARTMENT N ~ Active Applications (RZ/SD/DPNP) -Lake or Reservoir l ~l■Ji.■ mapleridge.ca Scale: 1 :2,500 FILE: 2023-208-SD/RZ DATE: Jun 29, 2023 BY:AH Scale: 1 :2,500 APPENDIX B 12035 GLENHURST STREET ORTHO PLANNING DEPARTMENT l~IDIJIII FILE: 2023-208-SD/RZ DATE: Jun 29, 2023 mapleridge.ca BY:AH I-' ~ N M N N Scale: 1 :2,500 Legend Agricultural -Park DJ Urban Residential -Commercial l_'.__j Conservation 11915 APPENDIX C 12035 GLENHURST STREET LAND USE PLANNING DEPARTMENT l ~lhtll■ mapleridge.ca FILE: 2023-208-SD/RZ DATE: Jun 29, 2023 BY:AH CITY OF MAPLE RIDGE BYLAW NO. 7958-2023 APPENDIX D A Bylaw to amend Schedule 'A' Zoning Map forming part of Zoning Bylaw No. 7600-2019 as amended WHEREAS, it is deemed expedient to amend Maple Ridge Zoning Bylaw No. 7600-2019 as amended; NOW THEREFORE, the Municipal Council of the City of Maple Ridge enacts as follows: 1. This Bylaw may be cited as "Maple Ridge Zone Amending Bylaw No. 7958-2023." 2. That parcel or tract of land and premises known and described as: LOT 35 SECTION 21 TOWNSHIP 12 NEW WESTMINSTER DISTRICT PLAN 20944 and outlined in heavy black line on Map No. 2030, a copy of which is attached hereto and forms part of this Bylaw, is hereby rezoned to R-4 (Single Detached (Infill) Urban Residential). 3. Maple Ridge Zoning Bylaw No. 7600-2019 as amended and Map 'A' attached thereto are hereby amended accordingly. READ a first time the day of READ a second time the day of PUBLIC HEARING held the day of READ a third time the day of ADOPTED the day of PRESIDING MEMBER ,20 ,20 , 20 ,20 ,20 CORPORATE OFFICER I-' (/) ~ N 0..\ B '.J / 12080 I 12074 RP 87279 LMP 874 EP 85306 ) I I \ LMP 81 P 85304 25 LMS 92 \ P 85304 12071 P 83364 3 ~ = = = <XJ <XJ ~ C\I 11991 ~ LMP 43782 ,. "' "" co C ~ ~Ren i;!Ren ~ ~>----11~98=7~ LMP43743 ~ G ~ H Bco D 11950 LMP 13828 LMS 1445 1 P 16841 0..-~---l/ A 11975 CJ) CJ) t::- 2 11963 ~ /195/ 11949 30 P 22024 A 14 11------l 12141 12160 1 25 13 l1-------; 12131 12150 I 26 12 g1 1---------t ,-.-~"'r.-1 '<t 12127 12140 ii:1 ';J; 27 11 w 2 --_J 0.. 12123 12130 I 28 10 1----- 12120 st I 00 39 9 ~ Sl 12101 12110 CCJ 1--~-----l 8 0..1 0.. 40 7 I 1-----~1~20~9~3.., ~2100 I ::J: 31 CJ) 6 :g1 O 12079 12090 f6 H>-D..1----==-, 32 5 fu1 12067 12080 1------12-0-59--; 4 12070 I I 33 12051 3 I 34 12060 ::1 _ 2 ~ -EPP ---,-12050 col 35 48058 ,. / r----9 '<t 12040 1 -:;!" '"""" / A ~ ~ 36 112036 co 12021 k2030 B ~ LMP 38174 LMP 10775 1 ~ 12010 1 ~ I-' (/) f--C/J Cl'. ::, I z UJ ...J (') t;; t:; 12148 -_ EE6I119_ 16 6912157 2130 2120 15 68 12149 \ 67 \ 12141 14 66 ~2110 12131 13 65 12121 ,_12~1~06~------t co 64 12111 12 ~2096 11 "2092 10 12076 9 ~ 63 12103 62 12097 61 .1201& -EP67419 6012073 g; 12066 59 12061 I z ~ "' 8 12058 7 ~ 51? N 5~2041 0.. -.5.6 -- ~2050 r -12033- 12032 42 I P 23580 I 512023 RW 29421 h1-~5~4~--i P 23580 12013 41 *PP095 53 12020 12005 ~ r-==---,------i---__:.:==-i ~ 12004 t--12003 "' P 2p944 ~ 1 o.. Rem Rem co :3 12166 82 ~ I'-- 83 o.. 12156 \ 84 12146 I 85 12138 86 12128 12118 87 88~ 12108 89 12100 12090 90 91 12080 «I 12070 93 o.. 12058 94 12046 96 12028 12018 97 12008 0.. Rem 75A (") r 4 3 I:; I~ 2 ~ ~ ...___ P 1023 W1/2 B.C. TEL \_ LMP 575 ~ l_j ~ " ~ LMP 37887 \ / '-----=--'----------I DEWDNEY TRUNK RD. LMP 575 RW71471 \ I ' " 'f;": I~ ,"C ;·~ (~"'~~: ! 20 ~~ ~i ~,2'1:_ ~ &! ~ P 80 54 17 ~ 11983 p H(232 >--~-, O o._ 2 11980 11997 2 3 I EP 80@. 5 I:: ~ -I ~ P19998 11991 \ P 71!170 ~ ~ 1 '1319998 ; 6 11971 11972174 3 P7903 /4 I ~ 1 EPS 8022 ~-~'---,--P~6__,9_0~,0--,--'j 4 g 1~2 11987 29 30 31 32 33 3• 952 0.. I~ ~ 15 11961 1,; 11964 22 11981 :g '<t 3 8 11948 ~ 11936 4 0.. I 4 I 5)! t, 11958 5 ;:'; 0:: ~ !:'" \(\j ~ 23 ~ ~ 11977 UJ -=--~-~ ~ 6 <'J 11940 24 o._ :,_ 11943 o.. 14 SANDPIPER AVE. MAPLE RIDGE ZONE AMENDING Bylaw No. Map No. From: To: MAPLE RIDGE British Columbia 7958-2023 2030 RS-1 Single Detached Residential R-4 Single Detached (Infill) Urban Residential D N SCALE 1 :2,500 APPENDIX E T TERRA NOBIS CONSUL TING INC. #203-15585 24 AVENUE, SURREY, BC, V4A 2J4 ::: ii! ::, .c C Ql c3 "' (") 0 N LOTS ZONING LOT SIZE MIN. LOT WIDTH LOT DEPTH EMAIL: INFO@TERRANOBIS.COM PHONE: 604.946.3007 PERMIT TO PRACTICE #: 1000490 EXISTING PROPOSED 1 2 RS-1 R-4 1170.87 m2 LOT A: 509.67 LOT B: 624.46 24.39 LOT A: 13.08 m LOT B: 12.38 42.67 LOT A: 41.17 m LOT B: 41 .17 fa $ 12060 <".l 0 a: ts -I L.C --- 12050 12040 vt-----------------"" g LEGAL DESCRIPTION: ~ LOTS 351 SECTION 21 , TOWNSHIP 12, NEW ] WESTMINSTER DISTRICT, PLAN 20944 m2 m2 m m m m 41.55 41.17 12051 12021 .E.b.fil:! SCALE: 1 :500 1.5 PR. ROAD DEDICATION 1-w 12050 wf----a:: I--en I--en a: :::> :c z w 12032 ...J1----c, 12020 ) ~ ~1---.--------,----r----r-----...L.----------------------------------~ ~ :0 0 z t--+-------+---+-__,. ______________ _. e't--t-------+---+---+---------------1 TITLE : SUBDIVISION LAYOUT 12035 GLENHURST STREET, ~l--+------1---1---1----------------1------------~ MAPLE RIDGE MGG ENTERPRISES INC. w > ffit-:-1_-+:2""3'""A"°'U,-::,G-,2"'02""3,--+--cJL--t-PGc--+~R..,.0-AD--D..,.ED~l..,.CA~T~IO~N-U_P_D_A=TE-------I ~ 0. 30 MAY 2023 JL PG FOR APPLICATION t No DATE BY CK REVISIONS DESCRIPTION EMAIL: CHARNPANDHER@HOTMAIL.COM SCALE: AS SHOWN SEAL "q" ~ M 0 M N REV DATE: 23 AUG 2023 1. DESTROY All PRINTS BEARING PREVIOUS REVISION NUMBER 4 October 27, 2023 City of Maple Ridge 11995 Haney Place Maple Ridge, BC V2X 6A9 Attention: Rosario Alvarado Re: File: 2023-208-RZ Legal: Lot 35, Section 21, Township 12, Pian NWP20944 Location: 120335 GLENHURST Street From: RS-1 (Single Detached Residential) To: R-4 (Single Detached (Infill) Urban Residential) APPENDIX F ~ School District 42 Maple Ridge & Pitt Meadows Learning Today, Leading Tomorrow The proposed application would affect the student population for the catchment areas currently served by Harry Hooge Elementary and Thomas Haney Secondary School. Harry Hooge Elementary School has an operating capacity of 402 students. For the 2022- 23 school year the student enrolment at Harry Hooge Elementary School is 480 students (119% utilization) Including 139 students from out of catchment. Thomas Haney Secondary School has an operating capacity of 1200 students. For the 2022- 23 school year the student enrolment at Thomas Haney Secondary is 1090 students (91 % utilization) including 550 students from out of catchment. Based on the density estimates for the various land uses at build out the following would apply: • For the construction of 2.0 lots, the estimated number of school age residents 1. Sincerely, Maryam Falla hi Maryam Fallahi Digitally signed by Maryam Fallahi Date: 2023.10.27 10:55:49 -07'00' Manager, Facilities Planning The Board of Education of School District No. 42 (Maple Ridge -Pitt Meadows) cc: Richard Rennie, Secretary Treasurer Louie Girotto, Director, Facilities David Vandergugten, Assistant Superintendent Rebecca Lyle, Executive Coordinator School District No. 42 I Maple Ridge -Pitt Meadows 22225 Brown Avenue Maple Ridge, BC V2X 8N6 Phone: 604.463.4200 I Fax: 604.463.4181 � Maple Ridee - TO: FROM: His Worship Mayor Dan Ruimy and Members of Council Chief Administrative Officer MEETING DATE: FILE NO: MEETING: SUBJECT: Engagement Phase 1 Report -Recreation Feasibility Study EXECUTIVE SUMMARY: April 16, 2024 01-0640-30 Committee of the Whole The City's 2024 Strategic Work Plan includes a key objective to conduct an aquatics feasibility study for a second aquatics facility, in alignment with the Parks, Recreation and Culture (PRC) Master Plan adopted by Council in 2023. The Recreation Feasibility Study is a multi-faceted analysis that encompasses a service level assessment, extensive community engagement along with site specific assessments to support the conceptual design and high-level costing for a facility at Hammond Community Park. The first phase of public engagement aimed to provide multiple opportunities for residents, user groups and stakeholders to share input, ideas and challenges related to current and future recreation facility needs that will guide the conceptual development of future program spaces and activities. Public engagement was conducted from January 23 through to February 23, 2024, and key engagement activities included four open houses, a general public survey, user group and community stakeholder surveys, and several focus group sessions. The What We Heard summary report (Attachment A) and presentation provides Council with an overview of the engagement results and key findings. Overall, there was notable community support and excitement for a new facility and for recreation amenities to keep pace with the growth of the city. Participants indicated the desire for amenities such as aquatics facilities with a focus on leisure and therapy, increased arena space, and increased fitness and general recreation spaces such as walking tracks, climbing walls, children's play spaces and youth focussed spaces. This first round of engagement results along with the site assessments and service demand analysis will inform the next phase of work to develop the building programs models and facility concept design. RECOMMENDATION: For information only. DISCUSSION: a)Background Context: The research and feasibility analysis for a new aquatics facility is led by the project team of hcma architecture + design. The feasibility scope of work includes two phases of community engagement with the second phase anticipated to be conducted in June 2024, a service level assessment of current and future long-term recreation needs of the community, and site analysis including geotechnical, archeological and traffic assessments. This information will inform the development of the scale and type of facility and create 3-4 design concepts supplemented with a cost analysis. Doc #3769543 Page 1 of 3 The schedule for the feasibility scope of work is detailed below. WEARE HERE 2:J24 JAN--FEB -MAR --APR 20'.2-1--MAY --JUN --JUL -AUG ---FALL COMMUNITY ENGAGEMENT • PHASE 1 online inteviews open survey houses EXISTING SITE & SERVICE DEMAND ANALYSIS geotech + archaeology studies FACILITY PROGRAM CONCEPT DESIGN - TEST SITE LAYOUT council transportation cost meeting analysis estimate COMMUNITY ENGAGEMENT- PHASE 2 During this first phase of community engagement, residents had the opportunity to input and provide feedback, through Engage Maple Ridge, by completing the general public survey. The survey asked participants to provide information on current and future anticipated use of facilities and included an open comment space for additional feedback. Additional engagement opportunities were provided through open houses, stakeholder meetings, user group and community group targeted surveys, and virtual stakeholder sessions. There were over 2500 community touchpoints providing quantitative and qualitative information. The Engagement Summary lnfographic (Attachment B) provides a snapshot of the engagement participation. The accompanying presentation provides a fulsome overview of the engagement outcomes with the main themes summarized as follows: • Survey respondents shared their preference for an aquatics facility that supports leisure and recreation, swim lessons, and rehabilitation and therapy needs. Their top requested amenities are hot tubs, lazy rivers, and waterslides • Survey respondents shared their preference for an arena facility that has an increase in availability for training, competition, and community programs. They also noted a preference for increased access to drop-in and leisure skate, a walking track and improved areas such as changerooms and food services. b) Desired Outcome: For the public engagement results to provide reliable data to inform the facility and site requirements and the conceptual design options within the future recreation facility. c) Strategic Alignment: The recreation feasibility study aligns with Council's Strategic Plan (2023-2026) priorities as follows: • Engaged, Healthy Community o Provide a diversity of inclusive and accessible recreation opportunities. o Build and celebrate community pride, strengthening community connections to foster a sense of belonging. o Improve community engagement with the City. • Liveable Community Doc #3769543 o Develop infrastructure that positions the City to provide accessible and sustainable services while accommodating growth. Page 2 of 3 • The Parks. Recreation and Culture Master Plan (2023) includes the following: o Undertake a feasibility analysis for a new aquatics facility to serve the community. o Expand the supply of arenas in the city by 2 sheets, with 1 sheet developed in the near term in order to meet ice and dry floor needs o Include walking and running tracks, indoor children's play space in a new facility. o Include fitness spaces and amenities in future arena and aquatics facility development. o Ensure that community-wide needs for meeting spaces, program rooms, social gathering space, and office space are considered as part of future arenas and aquatic facility planning. o Review the infrastructure upgrade planned for the Hammond Community Centre site. d) Citizen/Customer Implications: Residents will have a further opportunity to share feedback during the second phase of community engagement on the proposed design concept options that are a result of the initial engagement, completed technical studies, program demand analysis and site analysis. e) Business Plan/Financial Implications: The Feasibility Study is funded through the Capital budget in alignment with the 2024 Bus iness Planning Framework. The final recreation feasibility study results are anticipated to be presented to Council in the fall 2024. CONCLUSION: The phase 1 community engagement process resulted in substantial feedback from residents, community and user groups, and other interested parties that together will inform the building program models and design phases of the feasibility analysis. There were areas of significant support and areas of concern, and these results will be embedded into the second phase of engagement and in the final feasibility report. Prepared by: Christa Balatti Manager of Special Projects Reviewed by: Valoree Richmond, M ~fSLA, Director of Facilities, Pa¥and Properties Concurrence: Scott Hartman Director of Recreation Services Chief Administrative Officer Attachments: A) Recreation Feasibility Study -Phase 1 Engagement Summary 'What We Heard' B) Engagement Summary lnfographic Doc #3769543 Page 3 of 3 CITY OF MAPLE RIDGE RECREATION FEASIBILITY STUDY PHASE 1 ENGAGEMENT SUMMARY Ill ♦:CORNERSTONE ~ Maple Ridee APPENDIX A Recreation Feasibility Study -Phase 1 Engagement Summary The City of Maple Ridge respectfully acknowledges that we are on the traditional territories of the Katzie (qicay) and Kwantlen (q 'll'a:nJi. 'an) First Nations 2 Recreation Feasibility Study -Phase 1 Engagement Summary TABLE OF CONTENTS EXECUTIVE SUMMARY .............................................................................................................. 4 ENGAGEMENT QUICK FACTS. . .. 7 WHAT WE HEARD SUMMARY INFOGRAPHIC ....... 8 INTRODUCTION .......................... . . ............................................................ 9 11 1.2 1.3 1.4 PROJECT CONTEXT AND GOALS. PROJECT APPROACH AND SCHEDULE .. COMMUNITY ENGAGEMENT -PHASE 1 APPROACH. COMMUNITY ENGAGEMENT SUMMARY REPORT STRUCTURE ............. . 2 COMMUNITY ENGAGEMENT OUTCOMES ... 9 ..... 9 ............................... 11 ................................ 12 . 13 2 .1 FUTURE AQUATIC FACILITY PREFERENCES ................................................................................ 13 2.2 FUTURE ARENA FAC ILITY PREFERENCES ................................ .. ........................................ 15 2.3 OTHER THEMES .. . .... .... .. . . ... .. .. ... .. ..... .. .... ... .. .... .... ... .. .. .. . 17 2.4 SUPPORT FOR A NEW RECREATION CENTRE .............................. .. 2.5 GENERAL RECREATION PERSPECTIVES ............................... .. 3 ENGAGEMENT CONCLUSIONS .. ..... 18 ...... 18 .. 19 3 Recreation Feasibility Study -Phase 1 Engagement Summary EXECUTIVE SUMMARY In January 2024, the City of Maple Ridge began an extensive engagement process to support and inform subsequent stages of the Recreation Feasibility Study. The Study focuses on the proposed development of a new multi-use recreational facility at Hammond Community Park. The goal of the engagement process was to: • gather insights on the communit/s current use of recreation facilities, as well as any challenge; and • obtain information on preferences and priorities for future program spaces and activities in the proposed recreation facility. The robust engagement process adhered to the "consult" level of the International Association for Public Participation (IAP2) and included four key activities: 1. Public Survey -focused on understanding the community's current recreation use patterns and identifying how the City can improve recreation opportunities in the future. The public survey garnered 2,358 responses. 2. Recreation and Community Organization User Group Surveys -focused on understanding how the organizations interact with recreation facilities and identifying their service challenges related to infrastructure. These surveys garnered 183 responses. 3. Open Houses -a series of open houses were held at key locations, including Maple Ridge Public Library, Maple Ridge Leisure Centre, Planet Ice Arena, and a neighbours-only open house at Hammond Community Centre. The intent of the open houses was to increase Study awareness, capture sentiments related to current and future recreation use patterns and to identify project related concerns. The open houses drew hundreds of participants and resulted in over 600 captured sentiments. 4. Stakeholder Interview Sessions -17 community, rental-user group, and city department stakeholder sessions were held to understand program, service, and operational challenges and opportunities related to recreation infrastructure within the City. Key engagement outcomes are summarized below and organized into four categories: aquatics, arenas, general recreation and other. Aquatics According to public survey respondents: The current most popular aquatic activities are drop-in swimming (67% reporting regular participation), swim lessons (40% reporting regular participation) and aquatic amenity use (sauna, steam room and hot tub, 34% reporting regular participation). The most important activities to consider for a future aquatic facility, as reported by the community, are: 4 Recreation Feasibility Study -Phase 1 Engagement Summary 1. leisure and recreation activities 2. swim lessons, and 3. rehabilitation activities. The least important aquatic activity noted by respondents was competitive sport and training. 25% of respondents identified that a new recreation facility should consider the inclusion of an outdoor aquatic amenity. The community would like to see new aquatic infrastructure that includes features such as: hot tubs (69% of respondents) lazy rivers (62% of respondents), and waterslides (57% of respondents). This feedback highlights the community's desire for a future aquatic facility that focuses on providing spaces to accommodate leisure and recreation, skill development and rehabilitation and therapy activities. It underscores the importance of prioritizing a leisure-oriented aquatic facility over a competitive sport-oriented facility. Arenas According to public survey respondents: , The current most popular arena activities are public skating (51% reporting regular participation), ice hockey (32% reporting regular participation) and skating lessons (23% reporting regular participation). The most prominent challenge experienced by the community today is related to the insufficient supply of prime-time ice and dry floor access. Requests for increased access to ice was the third most prominent theme (230 responses) identified in the survey comment section. The most important activities to consider for a future arena facility, as reported by the community are: 1. skill development 2. competitive sports 3. community programming (drop-in and leisure programs). The community would like to see new arena infrastructure include an indoor walking track (surrounding the arena) and improved arena support areas (fitness spaces, changerooms, spectator seating, food options etc). This feedback suggests that community members are not only in need of an increased supply of ice and dry floor facilities but also improvements and enhancements to arena amenities that support leisure and recreational uses. 5 Recreation Feasibility Study -Phase 1 Engagement Summary General Recreation In addition to aquatic and arena needs and preferences identified through the public survey, several other perspectives and desires regarding future recreational facilities were identified: There's a perceived shortage of City-operated fitness and training areas (indoor cardio and weightlifting). 31% of respondents indicated a new facility should include a fitness area. The community wou ld like to see a new facility include indoor wa lking tracks (30% of respondents), a climbing wal l (18% of respondents), children's play spaces (17% of respondents) and youth focused spaces (17% of respondents). Other Themes Although the purpose of the engagement was to understand priorities for future spaces and activities and not to ask for input on facility location, the results of the open-ended question provided some notable findings on this theme. Of the 2,358 survey respondents, 257 (10. 9%) expressed concern about the loss of baseball diamonds as a result of site development, and 172 (7.3%) expressed direct opposition to the proposed location. Similarly, the public survey and engagement process did not specifically ask whether there was support for a new recreation centre; however, a significant number of survey respondents (698, which accounts for 30% of all survey respondents) expressed their support and enthusiasm for a new recreation facility in Maple Ridge. While the information presented above primarily originated from the public survey data, similar themes were observed in the open houses and stakeholder engagement sessions. The information collected in these more qualitative engagement activities paralleled the perspective that there is an acute shortage of aquatic, arena, and recreational amenities in the City of Maple Ridge. A detailed summary of each engagement activity and the key themes can be found within the Appendix. How will this information be used in the next phase? The outcomes of this engagement will directly inform the Service Demand Analysis which projects the current and long-term community recreation needs (program, service and infrastructure). The Service Demand Analysis is slated to be completed in April 2024. The findings of this Study will provide facility program recommendations that will then be used in the concept design (site test-fits) and project costing that are projected to take place between April-May 2024. In June 2024, the second stage of the public engagement process will take place, that will report out on the findings of this engagement and how it has informed the feasibility Study. It will be used to verify what we have heard and obtain further feedback. ~ (c Iii 6 2358 total responses Maple Ridge residents 3 Surveys fi>'ublic survey User .greure>. survey C@mm1,mity @1'€>blfa $Lir.vey 2541 responses Proposed Site Other: 4.1% 4 Open Houses 3 Publ ic 1 HeimmoRd !nvite-@nly 649 comments V4R lo.3% Prefer not to disclose: 3.4% :)• •*• ••• -total 7 aquatics , 1 arena 13 other user user user groups groups groups 20 11 not-for-profit 2 government assoc1at1ons agencies total 1 community 3 responses assoc1at1ons other from Stakeholder Sessions 6 city-e1ffiliate0 gro ups 11 e0mmuRity gF@l:.lps 17 total sessions lDl ~· 6 sessions with 11 sessions _with city staff and. community committees of council·, user groups •• {30%} • • (10 9%} •• {73%} 698 257 172 Recreation Feasibility Study -Phase 1 Engagement Summary 1 INTRODUCTION 1.1 Project Context and Goals The City of Maple Ridge (the City) has undertaken recent planning initiatives to understand the arts, culture and recreation needs and wants of the growing community. In the 2023 Parks, Recreation, and Culture Master Plan, the City identified a pressing need for new aquatic and arena facilities, ranking these among the top 5 recreation capital investment priorities. In response to these investment priorities, the City identified the need to complete a Recreation Feasibility Study which aims to: • Assess the current state of recreation within the City with a focus on aquatic and arena services and infrastructure. • Estimate the future demand of recreation with a focus on aquatic and arena services and infrastructure. • Quantify the facility and site requirements to meet future demands. • Assess the suitability of a preferred site location to support a new recreation centre. • Explore site and facility conceptual design options at the preferred site location. • Recommend the most beneficial path forward for the City. City staff completed a site identification analysis and assessed several City-owned sites and privately- owned properties, ranked them against a set of selection criteria including overall site size, approximate land costs, potential servicing cost impacts proximity to areas of increasing population, and access to transit and a major transportation route. Hammond Community Park ranked the highest through the assessment and has therefore been put forth as the preferred site for assessment within the Recreation Feasibility Study. 1.2 Project Approach and Schedule hcma architecture and planning (hcma) in partnership with contracted specialty consultants has been contracted to complete the Feasibility Study. The approach to complete the Study has been organized into six key stages of work, detailed in Figure 1 below. Each stage is designed to build sequentially on the previous stage and inform the stage that comes after it. 20:24 JAN FE B MAR WtAl(t; HERE APR MAY JU N JU L AUG '.~0?4 FA LL COMMUNITY ENGAGEMENT -PHASE 1 EXISTING SITE & SERVICE DEMAND ANALYSIS FACILITY PROGRAM CONCEPT DESIGN - TEST SITE LAYOUT COMMUNITY ENGAGEMENT - PHASE 2 FEASIBILITY STUDY online inteviews open geotech + council transportation cost survey houses archaeology meeting analysis estimate 9 l. Community Engagement - Phase l 2. Existing Site and Service Demand Analysis 3. Facility Program Development 4. Concept Design - Test Site Layout 5. Community Engagement - Phase 2 Recreation Feasibility Study -Phase 1 Engagement Summary This stage of work focuses on engagement with community, recreation and community organization user groups, and City staff to collect information and perspectives related to the current and future recreational programs, services and recreational needs of Maple Ridge. A variety of engagement was completed including, interviews, surveys, open houses and focus group sessions. A detailed overview and assessment of the engagement completed is provided within this report, Phase l Engagement Summary. This stage of work was led by Cornerstone Planning Group (Cornerstone). This stage of work includes several site and service demand assessments. • Site geotechnical assessment -led by GeoPacific • Site archaeological Study -led by Katzie Development Limited Partnership. • Site transportation and parking analysis -led by Binnie Civil Engineering Consultants. • Topographical Survey -led by Bennett Land Surveying • Current state recreation service assessment -led by Cornerstone. • Future recreation demand analysis -led by Cornerstone. The outcome of this stage of work includes a detailed assessment of the proposed site and a summary of the current and future demand of recreation activities within the City. Using the outcomes of the future recreation demand analysis, a facility program is produced. The program provides an architectural roadmap for the types and sizes of spaces that are required in a new recreation centre to meet the projected demand of the community. The program will also identify the functional relationship between spaces and/or zones of use. Dependent on the outcomes of the demand analysis there may be the need to develop multiple facility programs. The concept design stage of work focuses on the development of possible facility and site layout scenarios. Concepts will be prepared at a building massing level and using the findings from the site assessments and facility program. This stage of work will include the preparation of Class D capital cost estimates. Phase 2 of engagement focuses on presenting back to the community and project stakeholders the key outcomes of the existing site and service demand analysis, facility program and concept design work. 10 Recreation Feasibility Study -Phase 1 Engagement Summary Engagement activities will include a public survey, open houses and focus group interview sessions. Following a similar approach to the Phase 1 engagement, the project team will prepare a Phase 2 Engagement Summary. 6. Reporting Final reporting will see the culmination of all previous project work into a single document, the Feasibility Study. The project commenced in December 2023 and is anticipated to wrap up in the fall of 2024. This report offers a summary of the Phase 1 Community Engagement, which marks the initial stage of the Study Further details on this process are provided below. 1.3 Community Engagement -Phase 1 Approach The initiatives within the engagement plan were intended to provide residents with information and resources to participate in numerous engagement activities. These included survey and open house household post card distribution, newspaper ads, facility poster campaign, pop up banner displays, digital TV screen promotion at civic facilities, tent card and sign distribution to local businesses and transit shelter ads . In additional digital outreach included social media all-platform posts, three Mayor's videos, Facebook events and digital paid ads in the local newspaper. Several engagement activities have been completed as part of Phase 1 engagement. A multi-faceted approach has been undertaken to promote broad public and stakeholder engagement. The following table summarizes the engagement activities completed . Activity J Details Participation Public Survey Active Jan. 23 -Feb . 23, 2024 2,358 respondents Recreation User Group Survey Active Jan. 23 -Feb. 23, 2024 162 respondents Community Organization User Active Jan. 23 -March 1, 2024 20 respondents Group Survey Open House -General Public Library -Jan. 31 , 2024 330 comments Public Leisure Centre -Feb . 11, 2024 captured Planet Ice -Feb. 15, 2024 Open House -Hammond Hammond Community Centre -Feb. 3, 2024 379 comments Community captured ~ (c Iii -11 Recreation Feas ibil ity Study -Phase 1 Engagement Summary Activity I Details Participation I Targeted Stakeholder Jan. -Feb . 2024 11 sessions Interviews and W orkshops Participating Stakeholders included: Participating Stakeholders included: Ridge Meadows Flames Junior Hockey, Maple Ridge Skating Club, Ridge Meadows Minor Hockey, Ridge Meadows Speed Skating, Rick Hansen Foundation, Ridge Meadows Child Development Centre, Mapl e Ridge Pitt Meadows Katzie Seniors Network, Haney Neptunes Aquatics Club, Ridge Meadows Swim Club, Ridge Meadows Minor Lacrosse, Burrards Senior Women's Box Lacrosse, Fraser Valley Regional Library, Ridge Meadows Minor Baseball, Hammond Caretaker, School District 42 -Maple Ridge & Pitt Meadows, Meadowridge School, Racquetball BC, Squash BC, Golden Ears Pickleball, Aquafit Participant-Champions, Maple Ridge Burrards, GSL Properties (Planet Ice), Local Immigration Partnership, Greg Moore Youth Centre participants Committee of Council Dec. 2023 -Feb. 2024 6 sessions Workshops Participating Stakeholders included: Agricultural Advisory Committee, Public Art Steering Committee, Economic Development Advisory Committee, Transportation Advisory Committee, Environmental Advisory Committee, Parks, Recreati on & Culture Advisory Committee, Social Policy Advisory Committee, Municipal Advisory Committee on Accessibility and Inclusiveness 1.4 Community Engagement Summary Report Structure This document, the Phase 1 Community Engagement Summary, has been structured to provide a concise overview of key information in the main body, with comprehensive details of engagement activities contained within the Appendix. The subseq uent section outlines the organization of the report: Main Body: • Community Engagement Outcom es: Identifies predominant themes arising from diverse community engagement initiatives, encompassing public surveys, recreation user group su rveys and interviews, community organ ization user group surveys and interviews, as well as open houses and stakeholder interviews with recreation-affiliated user groups. • Conclusion: A summary of overarching themes derived from all engagement activities conducted in Phase 1. 12 Recreation Feasibility Study -Phase 1 Engagement Summary 2 COMMUNITY ENGAGEMENT OUTCOMES Considerable efforts have been made to collect community feedback using several engagement tools and activities. This section summarizes the key themes and findings from the engagement process, which includes a blend of both quantitative and qualitative information. It aims to provide details regarding the community's overall support for the recreation facility, prominent concerns raised by the community, and what the community would like to see in a new recreation facility. 2 .1 Future Aquatic Facility Preferences Most Popular Activity, as selected by survey respondents: 1. Drop In Swim -67% of respondents reported regular participation 2. Swim Lessons -40% of respondents reported regular participation 3. Sauna, steam room and hot tub -34% of respondents reported regular participation Most Important Activities, as ranked by survey respondents: 1. Leisure and recreation swims 2. Skill development {swim lessons) 3. Rehabilitation and therapy Top Requested Amenities, as selected by survey respondents: 1. Hot tubs -69% of respondents requested increased access to hot tubs 2. Lazy rivers -62% of respondents requested increased access to lazy rivers 3. Waterslides-57% of respondents requested increased access to waterslides 4. 25% of respondents identified that a new recreation facility should consider the inclusion of an outdoor aquatic'amenity. Across all methods of engagement, including stakeholder interviews, survey data, and open houses, we heard that community members feel that the demand for aquatic facilities and programming in Maple Ridge surpasses the current supply. Community members also expressed concern about the shortage of City-led aquatic programming. 13 Recreation Feasibility Study -Phase 1 Engagement Summary Specifically, community members noted long waitlists for swim lessons and inadequate availability of drop-in swimming sessions. The desire for enhanced access to both indoor and outdoor aquatic amenities, coupled with a call for more leisure-oriented features, was a recurring theme among community feedback. Respondents highlighted hot tubs, lazy rivers, and water slides as the three most sought after aquatic amenities. This reinforces the community's desire for leisure and recreation-focused facilities. Results from the survey indicate that drop-in swimming was the most popular aquatic facility activity, with more than two-thirds of respondents reporting regular participation. Swim lessons and use of sauna, steam room, and hot tubs were reported as the second and third most popular aquatic activities with 40% and 34% of respondents reporting regular participation respectively. Survey respondents were also asked to rank a list of aquatic activities in order of importance, with 1 being the most important and 6 being the least important. Survey respondents ranked the activities as follows: 1. Leisure and recreational swimming 2. Skill development 3. Rehabilitation and therapy 4. Personal fitness 5. Socializing 6. Competitive sport/training These results can be visualized as follows: Personal Fitness Socializing Leisure and Recreational Swimming Competitive Sport/Training Skill Development Rehabilitation +Therapy 14 Recreation Feasibility Study -Phase 1 Engagement Summary These results from the survey are consistent with the opinions expressed during interviews and open houses with stakeholders. It confirms that the community prefers aquatic facilities that provide leisure activities, recreation, and opportunities for skill development. This emphasizes the importance of including leisure-oriented amenities in a future facility. Although some stakeholders suggested having a competition-oriented pool, there wasn't a strong demand for a SO-meter pool. In fact, competitive sport/training was ranked as the least important activity by survey respondents This underscores the importance of prioritizing a leisure-oriented aquatic facility over a competitive sport-oriented facility. 2 .2 Future Arena Facility Preferences t~ \,j I ' ' Most Popular Activity, as per selected by survey respondents 1. Public skating-51% of respondents reported regular participation 2. Hockey -32% of respondents reported regular participation 3. Skate lessons -23% of respondents reported regular participation Most Important Activities, as ranked by survey respondents: 1. Drop-in and leisure skating 2. Walking track around arena 3. Improved support spaces Similarly to the aquatic infrastructure, community perspectives suggest that the demand for arena infrastructure and programming in Maple Ridge surpasses the current supply. A prevalent theme was the significant limitation of ice availability, especially during peak usage times. Increased access to more ice time was the third most prominent theme identified in the open-ended comment section of the survey. Less frequently, but still a recurring theme, were demands for more dry floor options. Community ice programming, encompassing public skating, stick and puck, and learn-to-skate sessions, face considerable demand that exceeds the City's capacity, primarily due to competing demands from sports user groups and the restricted availability of ice sheets. Many ice and dry floor sport user groups have reported a consistent year-over- 15 Recreation Feasibility Study -Phase 1 Engagement Summary year increase in participation, further exacerbating the challenge of meeting demand. Community perspectives indicate there is a need for multiple arenas, highlighting the benefits of twin-sheet layouts over single sheets. Results from the survey indicate that more than half of survey respondents indicated frequent visits to Maple Ridge's arenas as ice users and 28% reported frequent visits as dry floor users. Public skating emerged as the most popular arena activity, with 51% of respondents reporting regular participation. Hockey and skate lessons closely followed, with 32% and 23% of respondents, respectively, reporting regular participation. Survey respondents were asked to rank a list of arena priorities in order of importance, with 1 being the most important and 7 being the least important. Survey respondents ranked the priorities as follows: 1. More drop-in and leisure skating 2. Walking track around arenas 3. Improve support areas in arena 4. Increase group rental ice time 5. Increase drop-in dry floor time 6. Increase group rental dry floor time 7. Introduce inclusive programming These results can be visualized as follows: More drop-in and leisure skating Introduce inclusive programming .· • Walking track around arenas Increase group rental dry floor time .j Increase drop-in dry floor time Improve support sreas Increase group rental ice time These results emphasize a clear desire for leisure arena spaces and programming within the comm unity. This suggests that community members are not only in need of an expanded supply of ice and dry floor facilities but also improvements and enhancements to arena 16 Recreation Feasibility Study -Phase 1 Engagement Summary amenities and support spaces. In response to these community perspectives, a future recreation facility should incorporate additional spaces such as walking tracks, fitness areas, and flexible event spaces to enhance community enjoyment and wellbeing. 2 .3 Other themes Although the public survey and engagement process did not specifically target capturing proposed location concerns, notable findings emerged: 257 survey comments were received that expressed concern associated with the loss of the baseball diamonds, of wh ich 59% originated from the V2X postal code in west Maple Ridge, where the site is located. 172 survey comments were received in opposition to the proposed site, with 87% submitted by residents of the V2X postal code in west Maple Ridge, where the site is located. Additionally, concerns related to parking and traffic were raised by 63 (2 .6% of survey respondents) and 58 (2.5% of survey respondents) respective ly, with 93% and 73% of these originating from the V2X postal code in west Maple Ridge, where the site is located. The following concerns emerged specifically from the Hammond Community Open house (represented by 132 attendees): • Some neighbours felt a large institutional building would not align with the look and feel of predominantly single-family residences in the neighbourhood. Some residents favoured improving existing infrastructure to maintain alignment with the neighbourhood character. • Some residents felt excluded from the city's planning process for a new recreation center and would have preferred a forum- style format for voicing concerns. • Residents have a strong connection to Larry Walker's legacy and the relationship between Hammond Community and baseball. Some have concerns about the city's commitment to replace the current baseball fields 17 Recreation Feasibility Study -Phase 1 Engagement Summary 2 .4 Support for a New Recreation Centre One of the key themes emerging from the public engagement process was the notable level of support for the development of a new recreation facility in Maple Ridge . Support or excitement for a new facility was the top received comment in the open-ended comment section of the survey. Generally, participants indicated that the city was overdue for new recreation facilities, noting that as the city has continued to grow, recreation amenities had not kept pace with the expanding population. This sentiment was echoed in specific requests for amenities, such as increased arena space for ice and dry floor activities, expanded aquatic facilities with a focus on leisure amenities, increased fitness and general recreation spaces and increased provision of multipurpose and outdoor recreation spaces. Specifically, 698 survey comments were received in support of a new recreation facility. Of these, 50% originated from the V2X postal code. Furthermore, 39 (1 6%) comments expressed support for Hammond Community Park as the selected site, with 87% from residents within the V2X postal code area. 2 .5 Genera l recreation perspectives In addition to aquatic and arena needs and preferences identified through the public survey, several other perspectives and desires regarding future recreational facilities were identified: There's a perceived shortage of City-operated fitness and training areas (indoor cardio and weightlifting). 31% of respondents indicated a new facility should include a fitness area. The community would like to see a new facility include indoor walking tracks (30% of respondents), climbing wall (18% of respondents), children's play spaces (17% of respondents) and youth focused spaces (17% of respondents). 18 Recreation Feasibility Study -Phase 1 Engagement Summary 3 ENGAGEMENT CONCLUSIONS Phase 1 of community engagement in support of the Recreation Feasibility Study included several engagement activities aimed at capturing perspectives, needs, desires and considerations that will inform later stages of analysis. The following engagement snapshot summarizes the engagement completed between January 2024 and March 2024. 3 Surveys Publi€ s_urvey User group survey eemrrilJlnity gr.oufi) survey 2541 responses 4 Open Houses 3 Public 1 Hamrn@nd lnvite-0nly 649 ~omments Stakeholder Sessions 6 city-affiliated ~r~ups 11 c@mmunity gr@u s l7 total sessions Following the assessment of the engagement results, several conclusions can be made. They are • There is acknowledgment throughout the community that there is an existing shortage of recreation and community spaces to support the current population. Demand will continue to increase as the City grows and the gap in provision of recreation and community spaces will further increase. The community identified a wide range of recreation and community space needs for a new facility . • Overall, the results indicate a clear need for more aquatic, arena, and recreation facilities that prioritize recreation, leisure, and rehabilitation and therapy and should be welcoming and accessible to the entire community. • Notable support and excitement for a new recreation facility in Maple Ridge was identified, with 30% of all survey respondents indicating their enthusiasm in the open-ended comment section of the survey. This constituted the top received comment in the open-ended comment section of the survey. Of these, 50% originated from the V2X postal code area where the site is located. Furthermore, 39 (1 .6%) comments expressed support for Hammond Community Park as the selected site, with 87% of the 1.6% originating from residents within the V2X postal code area. • The community and project stakeholders identified the desire and project need for meaningful engagement with local first nations. The findings of the Phase 1 Engagement will be presented to Council in April 2024 and will be used to inform the Service Demand Analysis. The Service Demand Analysis is slated to be completed in April 2024. Facility program recommendations, site assessments, concept design and project costing are projected to take place between April-May 2024. A secondary public engagement process, aimed to present the findings of the analysis', verify what we have heard and obtain feedback on our findings is projected to take place in June 2024. 19 2358 total responses Maple Ridge residents 3 Surveys F'£Jblie: survey User ,gr@blf;:) surv,ey C©mmU nity grr@blf;:) survey 2541 responses Proposed Site Other: 4.1% 4 Bpen Mouses 3 Public 1 Hem1TI1Dfld lnvit-e-©.Aly 649 comments V4R 16.3% Prefer not to disclose: 3.4% =>• • •*• ••• -total 7 aquatics 11 arena 13 other user user user groups groups groups 20 11 not-for-profit 2 government assoc1at1ons agencies total 1 community 3 responses other assoc1at1ons from Sta~eholder Sessiens 6 city-affiliated groups 11 community ~~01s1ps 17 total sessions 11h ~ 6 sessions with city staff and 11 sessions _with community , committees of _council' user groups APPENDIX B •• {30%} • • {10. 9%} •• {73%) 698 257 172