Loading...
HomeMy WebLinkAboutADP 2023-03-22 Agenda.pdfCity of Maple Ridge ADVISORY DESIGN PANEL AGENDA – REGULAR MEETING Wednesday, March 22, 2023 at 4:00 pm Meeting Access Information Advisory Design Panel (ADP) meetings are held virtually viz Zoom Teleconference. Members of the ADP and the public are asked to join the meeting remotely using the following access information: Join the meeting from your computer, tablet or smartphone https://mapleridge-ca.zoom.us/j/89080343910 Or join the meeting using your phone Dial: 1-778-907-2071 Meeting ID: 890 8034 3910 1.CALL TO ORDER 2.APPROVAL OF THE AGENDA 3.ADOPTION OF MINUTES – January 18, 2023 4.NEW AND UNFINISHED BUSINESS 5.QUESTION PERIOD 6.PROJECTS 6.1 Development Permit No: 2019-393-RZ 4:15 PM Applicant: Kevin Key Project Architect Kirsten Sutton Project Landscape Architect: Paul Whitehead Proposal: Six dwelling units in the form of Courtyard Housing Location: 20786 River Road File Manager: Rene Tardif 7.CORRESPONDENCE 8.ADJOURNMENT Next Meeting: April 12, 2023 Agenda Items Submission Deadline: March 22, 2023 QUESTION PERIOD Question Period provides the public with the opportunity to ask questions or make comments on subjects that are of concern to them. Each person will be given 2 minutes to speak. Up to ten minutes in total is allotted for Question Period. City of Maple Ridge Advisory Design Panel Meeting Minutes January 18, 2023 The Minutes of the Regular Meeting of the Maple Ridge Advisory Design Panel (ADP) held via Zoom teleconference on Wednesday, January 18, 2023 at 4:00 pm. PANEL MEMBERS PRESENT Jose Gonzalez, Chair Landscape Architect BCSLA Sang Kim, Vice Chair Architect AIBC Jaswinder Gabri Architect AIBC Lindsey Salter Architect AIBC Niall McGarvey Landscape Architect BCSLA STAFF MEMBERS PRESENT Wendy Cooper Staff Liaison, Planner 2 Arsh Dhillon Committee Clerk PANEL MEMBERS ABSENT 1.CALL TO ORDER – 4:10pm 2.APPROVAL OF AGENDA R/2023-ADP-001 It was moved and seconded That the agenda for the January 18, 2023 Advisory Design Panel Regular Meeting be approved as circulated with amendment to remove projects 2020-066-DP and 2021-270- DP, and add project 2021-101-DP. CARRIED UNANIMOUSLY 3.ADOPTION OF MINUTES R/2023-ADP-002 It was moved and seconded That the minutes for the November 16, 2022 Advisory Design Panel meeting be adopted. CARRIED UNANIMOUSLY 4.NEW AND UNFINISHED BUSINESS 4.1. Introductions to the Maple Ridge Advisory Design Panel The Advisory Design Panel members introduced themselves. 4.2. 2023 Chair and Vice Chair Elections 3.0 Advisory Design Panel Minutes January 18 2023 Page 2 of 3 R/2023-ADP-003 It was moved and seconded That Jose Gonzalez be appointed as Chair of the Advisory Design Panel for 2023. R/2023-ADP-004 It was moved and seconded That Sang Kim be appointed as Vice Chair of the Advisory Design Panel for 2023. 5. QUESTION PERIOD 6. PROJECTS 6.1. Development Permit No: 2021-101-DP / 21938, 21952, 21964, 21976 and 21988 Lougheed Highway The Chair welcomed the project team to the meeting and introduced the members of the ADP. The Staff Liaison provided a brief overview of the project. The project team presented the development plans and answered questions from the Panel. R/2023-ADP-005 It was moved and seconded That the application be supported as the following concerns be addressed as the design develops and submitted to Planning staff for follow up. Architectural Comments: • Consider moving loading bay close to back entrance and elevator • Consider electric car charging stations installed in parking garage • Consider providing direct daylight and ventilation to in-board bedroom • Consider incorporating rooftop amenity • Consider providing a dedicated garbage staging area, ideally beside the lane or current loading bay can act as garbage staging • Consider providing accessible path from the loading bay to the building • Given the anticipated bike movement through the building, ensure corridor widths and door widths are appropriate for ease of maneuverability Landscape Comments: • Explore more visitor bike parking at east pedestrian entrance • Explore use of collected stormwater for irrigation and toilet flushing • Consider introducing accent colour to emphasize main building entrance • Consider opportunities provide a friendlier pedestrian interface along south lane. For example, bermed planters, wider stairs to outdoor amenity and building accesses • Consider incorporating additional uses of outdoor amenity to increase usability of space. For example, kids play area. CARRIED 7. CORRESPONDENCE - NIL 8. ADJOURNMENT There being no further business, the meeting adjourned at 6:15 p.m. Advisory Design Panel Minutes January 18 2023 Page 3 of 3 The next regular meeting of the Advisory Design Panel will be held on Wednesday, February 15, 2023. Wendy Cooper, Acting Chair Jose Gonzalez, Chair /ad Page 1 of 5 City of Maple Ridge TO: Advisory Design Panel MEETING DATE:March 22, 2023 FILE NO: 2019-393-DP SUBJECT: 20786 River Road PURPOSE: An Advisory Design Panel (the “ADP”) submission has been received for the above cited application and property to permit a construction of six dwelling units in the form of courtyard housing. The proposed buildings will replace the vacant site. The subject property is under application for rezoning from RS-1 (Single Detached Residential) to RT-2 (Ground-Oriented Residential Infill) to support the development of courtyard housing. The rezoning application being processed in conjunction with this proposal was given First Reading by Council on March 10, 2020. The proposal was granted Second Reading by Council on June 22, 2021, however, after Public Hearing and at Third Reading, Council referred it back to staff to deal with issues that were raised by neighbourhood residents. This proposal was brought to the ADP previously on March 17, 2021, however, since then the applicant has modified the proposal to now include six units instead of eight. Also, the site plan and landscape plan have changed and now require a subsequent review by the ADP. BACKGROUND: Applicant: Kevin Key Legal Description: Lot 37 District Lot 277 Group 1 NWD Plan 31152 OCP: Existing: Urban Residential Proposed: Urban Residential Zoning: Existing: RS-1 (Single Detached Residential) Proposed: RT-2 (Ground-Oriented Residential Infill) Surrounding Uses: North: Use: Residential Zone: RS-1 (Single Detached Residential) Designation: Urban Residential South: Use: Maple Ridge Elementary School Zone: P-1 (Park and School) Designation: Institutional East: Use: Maple Ridge Elementary School Zone: P-1 (Park and School) Designation: Institutional West: Use: Residential Zone: RS-1 (Single Detached Residential) 6.1 Page 2 of 5 Designation: Single-Family & Compact Residential (Hammond Area Plan) Existing Use of Property: Residential Proposed Use of Property: Residential Site Area: 0.20 HA. (0.5 acres) Access: River Road Servicing requirement: Urban Standard DEVELOPMENT PERMIT AREA: The development permit application made to the City prompting this submission to the ADP is subject to the Key Guidelines of the Ground Orientated Residential (GORI) Infill Guidelines Development Permit. As no checklist exists for the GORI Guidelines and as the housing form closely resembles intensive single-family residential, the applicant has provided a checklist for the Intensive Residential Development Permit Area Guidelines. The proposed RT-2 zone provides for the infill of ground-oriented residential buildings within established residential neighbourhoods in a form that will be incremental and sensitive to the existing and emerging context. This RT-2 zone allows for dwelling units to be in one building with shared party walls to create triplexes or fourplexes. Dwelling units may also be arranged individually or attached and clustered around a shared open space, in a courtyard residential housing form. Proposed characteristics for triplex, fourplex and courtyard housing, include: • Importance of respecting the neighbourhood context, in terms of size, scale and massing; • Appear as a ‘single family’ house in terms of residential character; • Encouraging building articulation to create a comfortable scale and interesting streetscape; • Providing useable private outdoor space for each unit; • Encouraging sustainable and permeable landscaping on site; and • Provide shared site accesses to limit impacts of parking on the development. Key Guidelines: The following is a brief description and assessment of the proposal’s compliance with the applicable Key Development Permit Guidelines: • Incremental and sensitive integration of RT-2 Ground Oriented Residential Infill Zone projects into existing neighbourhoods. • Consider similarity of scale, massing and appearance to a detached single-family dwelling, and avoid replicating townhouse or rowhouse housing form. • Ground-oriented infill developments are expected to relate to the height and location of existing single detached neighbours and sensitively transition to neighbouring properties by stepping massing down, where applicable. • Dwelling units must be in one building with shared party walls or as a stacked unit to create triplexes or fourplexes. • Access to public roads to be in accordance with the Maple Ridge Design Criteria Manual. A secondary driveway may be approved by the Engineering Department, where it supports key guidelines concepts. Page 3 of 5 • Design and construction of new buildings located within designated floodplains to be in accordance with Provincial legislation and the Zoning Bylaw. • Effectively utilize the site context to create uniqueness, orient entrances towards the street, and use landscaping and screening to create private or semiprivate yard spaces. • Encourage permeability of rainfall and meet City of Maple Ridge stormwater management requirements and best management practices. • Contribute to a more sustainable community and neighbourhood, design for health and wellbeing, use green infrastructure, adaptations for climate change and resiliency. The proposed six unit courtyard housing development is designed to be of a similar scale to the adjacent single family houses, and is meant to integrate well with the surrounding neighbourhood. The development proposes six individual units, with each unit featuring a separate ground floor entrance, which gives it the appearance of single family housing. The developments form and character are similar in scale to the overall neighbourhood and respects the massing of the existing neighbourhood. The River Road elevation of the development reads as two single family units, while the bulk of the massing of both units is contained primarily on the first and second floors. This elevation integrates well overall with the single family streetscape along this portion of River Road. The outdoor amenity area has been located to the south and allows for the retention of a significant offsite cedar tree (OS- 1), in the south west corner of the site. The applicant’s response to the applicable, detailed Design Guidelines for the Section 8.7 Multi-Family: Ground Orientated Residential Infill Development Permit Guidelines are attached in Appendix F of this report. PLANNING COMMENTS: 1. Proposal: An application has been received for the property located at 20786 River Road for a courtyard housing development consisting of six dwelling units in the built form of six single family units clustered as courtyard housing. An internal drive aisle will provide access to the garage of each unit. All six units will feature side-by-side parking garages, as well as two visitor parking spaces will be provided. Special surface treatment will be applied over the portion of the drive aisle crossing the courtyard area. 1. Context: The subject property is 0.20 HA. (0.5 acres) in size and is located in the general urban area, on the eastern border of the Hammond area. The subject property and surrounding lots are characterized by low (i.e. single storey and basement) single family dwellings. Maple Ridge Elementary School borders the site to the south and east. The subject property is relatively flat with a few trees along its edges and in the back yard. Page 4 of 5 2. OCP and Zoning Compliance: The development site is currently designated Urban Residential. The proposed RT-2 (Ground- Oriented Residential Infill) Zone is consistent with this designation. This property is at the periphery of the Hammond Area Plan and the lands to the west are designated Single-Family and Compact Residential, which envisions a similar density and infill-housing form. The subject property is under application for rezoning from RS-1 (Single Detached Residential) to RT-2 (Ground-Oriented Residential Infill) to support the development of courtyard housing. The rezoning application being processed in conjunction with this proposal was given First Reading by Council on March 10, 2020. The proposal was granted Second Reading by Council on June 22, 2021, however, after Public Hearing and at Third Reading Council referred it back to staff to deal with issues that were raised by neighbourhood residents. During the Public Hearing, residents raised concerns about the number of units, traffic, parking and the height of the proposed units, which would negatively impact the privacy of nearby houses and the school. The subject site is being rezoned to RT-2 (Ground-Oriented Residential Infill) and Development Data Sheet (Appendix E) analyses the compliance of the project with the applicable zone regulations. The proposal has a density (Floor Space Ratio) of 0.74 which complies with the maximum density of 0.75 FSR. The following variances will be required: • Reduction in the Front Lot Line setback from 6.0 metres to 4.5 metres; • Reduction in the Rear Lot Line setback from 7.5 metres to 4.5 metres; • Reduction in the Interior Side (East) setback from 2.25 metres to 2.0 metres; and • Increase in the allowable Building Height from 8.0 metres to 9.3 metres. 3. Parking and bicycle storage: The Maple Ridge Off-Street Parking and Loading Bylaw No. 4350 – 1990 requires that triplexes, fourplexes and courtyard residential developments are to provide two off-street parking spaces per dwelling unit. The proposed courtyard meets these requirements by providing a total of 12 parking spaces, two spaces per unit and two for visitor parking. Bicycle parking can be accommodated in the accessory detached garage for each unit and also with outdoor bike parking located in the amenity area to the south. The required parking for the proposed use is analyzed in the Development Data Sheet (Appendix E) 4. Environmental, Sustainability & Stormwater Management: This project’s site proposal will have to conform to the City’s three tier stormwater management requirements. Because the subject property is within the Fraser River Escarpment, no infiltration is permitted. 5. Issues requiring comments from ADP: • Please comment on the courtyard layout. • How does the ADP feel about the integration with the surrounding neighbourhood and with the Elementary School to the south and east? • Does the ADP think that the materials and massing of the buildings are reflective of single family housing? Page 5 of 5 6. Garbage/Recycling: Garbage and recycling may be stored in the garage of each unit; however, the collection location will have to be determined with the individual waste hauler. 7. Works along abutting roads: • The applicant will be required to install new curb and gutter and letdown along River road. • River Road will require 5 metres of dedication and widening across the frontage to reflect the width that is established across the frontage of Maple Ridge Elementary School. • Sanitary sewer will need to be extended to the east of property line of the site. • A new service connection may need to be provided to the site. • Street trees and installation of LED street lights required along River Road. 8. Off Site Upgrades, Utilities and Services: • Developers engineer will be required to review condition and capacity of sewer and may require a replacement in order to support proposed development. • Any upgrades are required downstream to support the proposed development will be the responsibility of the developer. • Any upgrades to the water main to be determined by applicant. Calculations are to be submitted to the City’s Engineering Department. • All 3rd party utilities to be provided via underground conduit. CONCLUSION: The Planning Department requests that the Advisory Design Panel provide comments on the development proposal, specifically with respect to the suitability and design of façade materials, building articulation, and landscaping of this development, and integration with the surrounding single-family neighbourhood. ______________________________________________ Prepared by: Rene Tardif The following appendices are attached hereto: Appendix A Subject map Appendix B Explanatory letter from Architect (and Landscape Architect if applicable) Appendix C ADP Submission Form Appendix D ADP Applicant Checklist Appendix E Development Data Sheet Appendix F DP Area Guidelines Checklist Appendix G Architectural and Landscaping Plans DATE: Nov 15, 2019FILE: 2019-393-RZ 20786 RIVER ROADPID: 006-579-868 City of PittMeadows District ofLangley Di s t r i c t o f M i s s i o n FRASER R. ^ PLANNING DEPARTMENT RIVER ROAD 115 AVE. STONEY AV E . 20 9 S T . GR A V E S S T . 20 9 S T . 20 7 A S T . GOLF LANE 117 AVE. 11469 20745 208 2 4 20 8 1 0 20 6 8 3 11454 11499 20 7 5 0 20 8 0 6 208 3 2 20 7 3 5 11 7 1 8 20 7 1 9 11509 208 0 1 11693 11475 20 7 1 3 20 7 6 7 20 6 9 0 208 4 5 11700 208 0 4 208 1 5 208 3 3 11674 11672 208 4 1 11664 20 8 0 2 11690 11697 11440 20 7 3 6 20 8 1 5 208 2 1 20 7 3 5 11685 20 6 9 1 11643 11709 208 2 7 20 8 9 8 20 9 0 5 20 7 7 1 20 8 2 0 11674 11673 11669 11593 11684 11493 20 7 5 0 20 7 0 5 20 7 6 0 20 7 1 6 20 7 9 7 208 4 2 20 7 6 5 11653 11481 20 7 3 9 20 8 7 5 20 8 6 5 20 8 5 8 2072 5 20 7 2 5 20 8 3 5 208 5 5 11445 20 9 1 0 20 7 6 9 20 7 1 0 20 7 2 1 20 7 2 0 20 7 5 6 208 0 9 20 6 8 0 20 8 8 5 208 4 9 11484 11673 208 4 6 20 7 9 5 20 6 9 7 11631 11 6 7 0 20 7 5 2 20 8 4 3 20 8 2 6 20 9 0 3 20 8 1 8 11460 208 0 8 20 8 6 4 20 6 8 5 11 7 1 7 1145511475 208 1 6 11659 11644 11444 11465 20 8 2 3 11502 11661 20 8 5 7 11474 20 7 6 6 11534 20 8 0 5 11494 11714 20 8 5 9 11654 20 6 8 1 20 8 5 9 11512 20 8 4 4 20 7 6 0 20 7 5 6 11675 11499 20 8 2 0 20 7 8 7 20 8 0 5 20 7 1 2 20 6 7 0 11569 20 6 7 5 20 8 5 0 208 5 8 20 8 0 9 20 7 6 3 20 7 2 5 20 8 6 5 20 7 5 6 20 8 4 7 20 7 8 0 20 9 1 2 11664 20 7 4 0 20 8 2 9 20 8 3 1 11653 20 8 8 6 208 6 8 20 7 8 6 11708 20 6 8 8 11580 11588 208 5 2 11480 20 8 3 0 20 8 5 1 20 7 5 5 20800 11470 20 7 7 2 20 7 4 0 20 6 9 9 11470 20 6 9 2 20 7 5 5 208 7 0 2 0 7 1 6 11712 11485 20 7 4 5 11450 11495 11522 20 8 9 5 20 9 1 3 208 2 8 11682 11465 208 3 8 11 4 5 5 / 5 9 20 7 3 2 20 7 2 6 20 8 2 3 11637 20 7 1 8 208 1 2 11548 20 7 7 6 20 8 3 8 20 7 4 4 20 7 1 5 11645 20 7 7 7 1162 8 11485 11610 11489 20837 20 7 2 0 20 8 1 7 208 2 0 20 7 9 6 11464 20 8 1 3 SUBJECT PROPERTY ´ Scale: 1:2,500 BY: PC Appendix A PROJECT CONTEXT & DESIGN RATIONALE 20786 River Road - rezoning to RT-2 Ground-oriented Residential Infill - 2019-393 -RZ ______________________________________________________________________________________ The intention is of this housing supply is to provide a choice for an owner specifically desiring a dwelling that does not share walls or ceilings, but avoids a high land cost component. They also desire more private balcony, patio and yard space than typically available in townhouse form, and a variety in private or semi-private spaces, to adapt to noise and solar exposure. Rather than a fee simple small lot size of 4000 sqft, these are bareland strata lots of about 2500 sqft., individually set in a compact village cluster. Refer to the DP Guideline Checklist for details and calculations of various features. From the perspective of the public domain, the most significant feature are the pair of street front homes. Replication was purposely avoided and while mirrored in floorplan for construction benefits, each has distinct roof and window treatments, as well as differentation in frontage landscaping. Initial exterior paint will also be different. Orientation of front facades are perpendicular to the street, not to side lot lines, which are bounded by paved surfaces on east (school parking lot) and west (panhandle driveway). Soon after construction and plant growth, these two dwellings will soon not appear out of place to similar homes in the neighborhood. Within this courtyard community there are a distinctive mix of unit sizes of the SFDs are in three different styles, variations of Craftsman. Type A (street front) The primary design goal for two units was to have them read like Craftsman two-story and half, but with garage entries concealed on the building sides, along the courtyard driveway, away from the street. The main pedestrian entrance is from a pathway through the front yard from the public sidewalk along River Road. Front stairs rise to a covered porch with double doors into an Entry Foyer with 9 ft ceiling height. The front of the house has two rooms and are the most ‘public' spaces with visitors. Both are corner rooms and have tall windows on two sides, including views over the front yard and across the street: - formal Living Room (with a vaulted 14 ft ceiling) for guests. It is separated from the Family Room to allow different furnishing and uses. - Home Office (also with 9ft ceiling). It is located to be separate from other activities and noises in the house, and it also prevents business visitors from going through other rooms. Main Floor is up a half flight of stairs to a large open area contains the Kitchen, a Dining area (next to a balcony), and Family Room with three sets of windows. There is another Flex room which can be used for guests, gaming, TV or another office. Top Floor is the most private level, up a full flight of stairs (with landing halfway), and a Master Bedroom (with 5-piece bath and large walk-in closet), two other Bedrooms and a common full Bathroom. At grade, the Garage level has another Flex Room, and a full Bathroom. Appendix B Type B: East side towards school grounds The goal was to maximize the open plan on Main floor, on a relatively small footprint. Floorplans are identical, and are side-by-side (not mirrored, as with other house types). Access is through an elevated front porch, into a vaulted entry. Main Floor has Kitchen, Living and Dining area (with adjacent balcony), and room. Off the Family room is a Flex room (with door and closet), which can be used for an office or small bedroom. Top Floor to bedrooms is up a full flight of stairs, and a large rooftop deck of 415 sqft is accessed from the end of the Top floor corridor. The Garage level has a Flex Room, with separate exterior door, through a covered patio. Type C: west side The design goal is to lower the proportions and limit overlooks into neighbouring properties. These two are the smallest units, but still have a habitable floor area of 1734 sqft, plus another 1069 sqft enclosed for the Garage and crawlspace Storage areas. Similar to Type A, the floorplans are identical, but mirrored. Main Floor is accessed up front stairs and porch leads to a 9ft high entry foyer. A large, combined open area contains the Kitchen, Living and Dining area (next to a balcony). Master Bedroom is on a separate floor (which also has a small bathroom for guests), and is accessed up stairs off the entry corridor. Off that bedroom is a 65 sqft Flex space which could be a dressing room, or an office space. Top Floor is up a half flight of stairs above the Master level and has two Bedrooms, a Flex Room, a full common Bathroom as well as the Laundry closet. This could be the ‘kids floor' for privacy and to isolate noise. The Garage level has a few steps up to the Main floor and a half flight down to the Basement level which contains a very large storage area (with windows) as well as the mechanical & utility space. As the site is within the Fraser River Escarpment area, Tier A policy requires the site to be lined so that stormwater is captured and directed to the drainage main along River Road. The paving on the central driveway is permeable. New landscape plantings are emphasized on the perimeters, to maximize groundwater availability where possible. New planting on the west side, adjacent to the panhandle driveway, will complement the existing row of Beech trees. Five (5) street trees are being planted on the turf boulevard between the public sidewalk and street, which will narrow the entrance of the central driveway.. Lawns surrounding each dwelling will allow residents the future option of additional floral and shrub planting, or private garden space (in addition to the southern communal planting areas). The primary gathering area is at the south, most distant from the arterial road, and adjacent to a quiet sector of the schoolgrounds. The communal garden is also in the south, to maximize solar gain. CONTEXT (see appendix for site & surrounding photos) With the exception of the new, unusually large house adjacent to the west, with Meditteranean & Colonial influences, the predominant form in the neighbourhood are 1970s bungalows & splits, primarily white, with light accent shades (e.g. grey). It is expected that as these dwellings become obsolete, they will be replaced with more modern, contemporary forms, and will have larger floorspaces than existing. The site is adjacent to a school which has approximately 19,000 sqm of greenspace as well as a playground and outdoor sports facilities. The site is also within a block of the Hammond Stadium grounds and a Golf Course. The site is very flat, and vacant, a SFD was demolished 8 years ago. Most of the vegetation is on the perimeter and will be removed. A depth of five metres of the existing parcel will be dedicated for road RoW purposes, and will create a badly needed public street parking. The adjacent sides of the site are paved, to the east by a school parking lot, and to the west with a panhandle driveway. To the south is grassed schoolgrounds. ______________________________________________________________________________________ TheCity schedule makingy ADPsubm ADPthro Applicati Nameof Filenum Address CurrentZ Seekingt Architect Submissi Architect Landscap OtherPro Note.:Th developm takenfro bulletin, Major perth build GroupA(Pa GroupB(Pa GroupCRes GroupD&E GroupF(F1 Adv ofMapleRid esforsubmis yoursubmiss missionpack oughyourFil ionInforma Applicant ber ofsite Zone toappearbe tInformatio onwillbep t peArchitect ofessional(S heArchitects mentstothe omAIBCBull clickhere. Occupancy hecurrent ingcodes art3) art3) sidential E :Part3) isoryDes dgeAdvisory ssiondeadlin sion,contact kageforyou leManagerw tion: _________ _________ _________ _________ eforetheAD on: resentedto _________ _________ StateName sarerequire eADPthata letin31Build PublicAssem Hospital,San Homeforthe Aged Institutional Hotelorsim Commercial Industrial signPane yDesignPan nedatesand tyourFileM urproject.Fo wellinadva __________ __________ __________ ___Propose DPonthisda ADPby: __________ __________ &Role)____ edtoprepar reintheMa dingsRequir Use mbly natorium,or e ilaroccupancy elSubmis nel(ADP)me dforthemin Managertoe orwardyour nceofthed ___________ _____ ___________ edZone____ ate________ ___________ ___________ __________ replansand ajorOccupan ringtheServ Type services о anyo exce о anyb exce о allsc о anyb capa о anyb о anyb о anyb о anyb о anyb ssionReq eetsmonthly nimumsubm establishwh rcompletes deadlinedate __________ __________ __________ __________ ________ _______ ___________ toattenda ncycategori vicesofanA esofBuildingor sofanarchitect oneͲstoreybuild eeding9morgro buildingofmore eeding235m²;a chools,anysize building(exclud acityexceeding1 buildingwithgro buildingcontain buildingcontain buildingwithgro buildingwithgro uestForm y. Refertot missionrequ atconstitute ubmissionp e. __ __ __ __ __________ ndtopresen escitedinth Architect.Fo rPartsofBuildin tundersection6 Act. dingwithanuns ossareaexceed ethanonestore and ingveterinaryh 12beds ossareaexceed ning5ormored ning11ormoreg ossareaexceed ossareaexceed m heattached irements.Be esacomplet packagefort ____ ntall heTablebel rtheentire ngrequiringthe 60oftheArchit supportedspan ing275m²; eywithgrossare ospital)witha ing470m² wellingunits guestrooms ing470m² ing470m²  efore te the ow e ects ea Kevin Key - KeyPlan Development Mgmt 2019-393-RZ 20786 River Road RS-1 RT-2 March 22, 2023 (Designer) Kirsten Sutton - D3 Paul Whitehead - Greenway Kevin Key - Development Manager Appendix C Appendix D DEVELOPMENT DATA SHEET Existing /Proposed Zone _____________ Date Prepared __________ Proposed (Complies or state variance needed) Required Development Data Minimum Required or Maximum Allowed LOT AREA* (in square metres) Gross Total Less Road Widening / Truncations Less Park Net Total LOT COVERAGE (in % of net lot area) Total Site Coverage SETBACKS (in metres) Front Rear Side #1 (N,S,E, or W) Side #2 (N,S,E, or W) Side #3 (N, S, E or W) SETBACKS – Underground Structures (in metres) Front Rear Side #1 (N,S,E, or W) Side #2 (N,S,E, or W) Side #3 (N, S, E or W) BUILDING HEIGHT (in metres/storeys) Principal Accessory NUMBER OF RESIDENTIAL UNITS Bachelor One Bedroom Two Bedroom Three Bedroom + Total GROSS FLOOR AREA (in square metres) Residential Retail Commercial Office Commercial Other Commercial (Type _________________) Institutional Industrial TOTAL GROSS FLOOR AREA * If the development site consists of more than one lot, lot dimensions pertain to the entire site. Appendix E Proposed (Complies or variance needed?) OTHER – state YES or NO for each. If YES describe on separate sheet. Heritage Site Tree Survey/Assessment Provided Watercourse/Steep Slopes Covenants, Stat ROW & Easements I hereby certify that all the above information is true and correct. I acknowledge that any error or omissions are the sole responsibility of the undersigned and not the Development and Environmental Services Department. Prepared by: ___________________________ __________________________________ Print Name (Please print form and sign above) NOTE: To be prepared by an Architect for ADP Submission or by an owner/agent (applicant) for Development Application. Required Development Data Minimum Required or Maximum Allowed DENSITY # of units/ha (gross) # of units/ha (net) Gross Floor Area Floor Space Ratio (net) AMENITY SPACE (area in square metres) Common Activity Area Useable Open Space PARKING (number of spaces) Residential and Multi-Residential Uses Multi-Residential Town Centre (Bach Units) Multi-Residential Town Centre (1 Bdr Units) Multi-Residential Town Centre (Added Bdr) Commercial Uses Educational & Assembly Uses Institutional Use Industrial Use Business Park Uses Comprehensive Other Number of spaces for visitors TOTAL NUMBER OF PARKING SPACES Number of total for disabled Number of total (and %) small cars % Number of total (and %) tandem spaces % TOTAL OFF STREET LOADING SPACE(S) BICYCLE PARKING (number of spaces) Short Term Bicycle Parking Long Term Bicycle Parking 1 Intensive Residential Development Permit Area Guidelines Checklist Pursuant with Section 8.8 of the Official Community Plan, residential developments in certain zones of above a certain density will be assessed against the form and character guidelines established by Council and summarised below. This checklist is to be prepared by the architect of record for the project to demonstrate the proposed design was developed in accordance with the form and character guidelines. Please assess and describe the compliance of the proposed design of the project with respect to the Key Guideline Concepts and with the Form and Character Guidelines. Description of the Key Guideline Concepts should be suitable for File Managers to quote in Development Permit Application Reports to Council. For the Form and Character Guidelines, clearly describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. This checklist is to accompany Development Permit Applications. 8.8.1 Key Guideline Concepts Describe how this project and the design complies 1.Neighbourhood cohesiveness and connectivity should be maintained through the design of varied yet compatible buildings, in materials used and in architectural styles, in landscapes and in recreational areas, and by facilitating a range of transportation choices. 2.A vibrant street presence is to be maintained through a variety of housing styles, by maintaining street parking and by directing garage structures and offstreet parking to the rear of a property accessible by a lane. Appendix F 2 Guidelines 8.8.1 A Building Design, Massing and Siting Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. The existing neighbourhood should, where appropriate, provide a design reference for new development to reinforce neighbourhood stability. Unity, symmetry, and proportion should be the guiding principles of any architectural vernacular. 2. Attention should be paid to general architectural style and detailing, scale, finishing materials, character and materials of facades and roof treatment and treatment of entranceways. 3. Provide visual variety along streetscapes by varying individual unit designs. Avoid significant repetition either within a row of houses, or between adjacent rows of houses. Identical designs should not be repeated within three adjacent properties. 4. Buildings should front abutting streets. Main entrances should face the street, be clearly visible, and be directly accessed from the public sidewalk. Entrances should reinforce proximity to grade level and should avoid two-storey features. 5. The use of porches or verandas to define entries and create exterior living space is encouraged. 6. Building setbacks from roadways will generally be less than is typical of lower density residential development. As much as possible, entries and main living spaces should be elevated by approximately 1 meter from the fronting street grade to ensure privacy can be maintained. 3 Building Design, Massing and Siting (Con’t) Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 7. The presence of garage doors along roadways should be minimized in order to enhance the pedestrian experience. Where front facing garage doors are unavoidable, the impact of garage doors on the public realm will be mitigated by: a) designing residential units with enough width to include attractive entrances and windows between garages; b) recessing garage doors a minimum of 0.6 metres (2 ft.) behind the main building façade; c) providing interior spaces that overlook the street; d) limiting the width of the garage door to no more than 50% of the building width, as seen from the fronting road. Where severe grade limitation allows the garage to be located within the basement level, this maximum width limitation need not apply; and e) separating and orienting unit entrances to the street. 8. Buildings should be designed and located on a site to: a) preserve and incorporate natural features or views; b) minimize impacts on natural features and agricultural lands; and c) accommodate natural grades to ensure minimal grading is required. 9. Developments adjacent to treed slopes, ravines and watercourses must respect natural vegetation, use natural landscaping to retain soils on the site and may require additional setbacks as established by agencies having jurisdiction. Creeks and ravines are encouraged to be retained in their natural state. Buildings and structures should be integrated into natural slopes and other significant features. 4 Building Design, Massing and Siting (Con’t) Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 10. New developments are encouraged to incorporate Low Impact Development (LID) techniques into their site planning. Consider employing techniques such as rain gardens, vegetated swales, separation of impervious surfaces, installing below surface infiltration beds and tree box filters, and redirecting water from drain pipes into vegetated areas. 8.8.1 B Landscaping and Open Space Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. Recreation space should be provided within a 2 to 5 minutes walking distance of a residence. This is equivalent to desirable maximum distance of 200 meters to an absolute maximum of 400 meters. 2. The design of recreational spaces should reflect the anticipated needs of the residential population and should have sun exposure year-round. 3. Recreation areas should be easily observed by nearby residences and should be sited so as to not conflict with the enjoyment of private outdoor space. 5 Landscaping and Open Space (Con’t) Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 4. Whenever possible, measures should be taken to retain existing trees and vegetation on the development site. 5. Street trees should be required as a component of all new development. 6. Simplicity in landscape materials is desirable and should be encouraged for screening purposes. Landscaping should provide definition for pedestrian corridors, delineate private or semi- private space from public space, and provide adequate screening for private outdoor space. The scale and location of planting material should be consistent with the scale massing of adjacent buildings and seek to complement them. 7. Landscaping should: a) provide definition for pedestrian corridors; b) delineate private and semi private space from public space; c) provide adequate screening between private outdoor spaces; d) present a pleasing street image; e) provide suitable buffering between public road and privacy areas; f) soften the transition between adjacent land uses; g) provide a buffer between residential and nonresidential land uses; and h) create interesting views and focal points into and out of the site. 6 Landscaping and Open Space (Con’t) Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 8. Energy efficiency and conservation should be considered in the design of landscaped areas and in the selection of plant material. This can be accomplished through: a) The use of native and/or drought- resistant species; b) designing the landscaping to moderate the effect of wind; c) providing shade in summer; d) allow daylight into buildings; and e) allow natural drainage to occur throughout the site. 8.8.1 C. Safety Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. Design developments to maximize opportunities for natural surveillance, allowing people to easily view what is happening around them during the course of everyday activities. Crime Prevention through Environmental Design principles and techniques are encouraged. 8.8.1 D. Fencing Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. Front and exterior side yard landscape screens or fences are encouraged as a means of defining public and private space. Notwithstanding the requirements of the Zoning Bylaw, fences in front yards should be reduced somewhat in height from the maximum permitted. 7 Fencing (Con/t) Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 2. Fences that are adjacent to a street should be somewhat transparent (such as a picket type) rather than solid board, and should be in combination with landscaping along the street edge. 3. Chain link fences are to be avoided, and are discouraged along street frontages. 4. Any fencing should be provided in combination with landscaping on the street side. 8.8.1 E. Vehicle Access, Parking & Circulation Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. On public roads parking is to be accommodated on streets and to the rear of residences accessed by a lane, where possible. Where parking garages are oriented towards the street, the garage width should not exceed 50% of the total building width. 2. On private roads, parking is to be accommodated within garages/carports and driveways or discrete parking areas. Parking garages should not exceed 50% of the building width nor project forward. Parking areas should accommodate alternative uses such as play areas. This is best achieved with the use of alternative materials to those used on roadways. As much as possible visitor parking or common parking areas should be several small sites rather than a few larger sites 8 Vehicle Access, Parking & Circulation Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 3. Public roads and lanes should: a) provide efficient circulation for service vehicles and encourage vehicles to maintain appropriate speed through physical design. b) provide sufficient access for emergency response vehicles to all buildings on a site. c) conform to the existing grades as closely as possible and be aligned to run parallel to natural contours to ensure minimal disruption of slopes and vegetation. d) encourage pedestrian connections to adjacent properties. 4. Private Roads should provide efficient circulation, encourage appropriate speed through physical design, and accommodate pedestrian use through the use of alternative paving materials, such as patterned concrete or paving stones, or with grade changes. 5. Parking should be accommodated on- site within garages or discrete parking areas and to the rear of residences accessed by a lane, where possible. 6. Consider the use of permeable parking pavers or shallow concrete swales with rolled edges as an alternative treatment for surface drainage. 9 8.8.1 F. Lighting Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. Street lighting is required on public streets and should be provided for all private streets within a development. 2. Lighting is to be pedestrian focused and as such should be located at a maximum height of 4 meters and at lesser intervals than standard davit streetlights. 3. Care should be taken to ensure that lighting does not pose a nuisance to adjacent residences, pedestrians, or motorists by way of glare. 8.8.1 G. Universally Accessible Design Describe how the proposed design complies with each of the listed guidelines, or describes why a guideline is not complied with or why it is inapplicable. 1. Whenever possible, pedestrian access for all areas of a site should be designed to be accessible to disabled persons. Careful consideration should be given to the proximity of pathways to private space, ensuring sufficient separation to avoid conflicts. Project Information To be completed by the Architect on record for this project: File Number ________________________ Date prepared: _______________________ Architect ________________________ ___________________________ Print Name Signature DN DN DN DN UP DN UP DN DN DN DN DN DN DN DN DN UP DN DN DN UP DN Proposed Driveway River Road La n e 38.94 m 51 . 7 2 m 40.21 m 19.68 m 41 . 5 3 m Public Sidewalk 19.84 m 19.93 m 19.95 m 2.00 m 1.34 m 2.09 m 2.15 m 4.59 m 4. 5 0 m 3.00 m 3.00 m 5. 5 0 m 7.05 m 1.02 m 3.01 m 1.03 m A1 C1 C2 B1 B2 A2 2.54 m 3.02 m 2.55 m 4.53 m 3.02 m 1.21 m 64.90' 19.78 m 64.99' 19.81 m 64.39' 19.63 m 64.70' 19.72 m 64.74' 19.73 m 65.09' 19.84 m 64.54' 19.67 m 64.48' 19.65 m 64.13' 19.55 m 64.66' 19.71 m 64.48' 19.65 m 64.33' 19.61 m 64.90' 19.78 m 64.62' 19.70 m 64.76' 19.74 m 64.53' 19.67 m 64.43' 19.64 m 64.50' 19.66 m 64.97' 19.80 m 64.91' 19.79 m 64.30' 19.60 m 65.24' 19.88 m 65.07' 19.83 m 64.17' 19.56 m Rotated 0.99° South PL Square EXISTING ZONING: UNIT YIELD:6 Residential Units RS-1 CIVIC ADDRESS:20786 River Road, Maple Ridge PROPOSED ZONING:RT-2 (Ground Oriented Residential Infill) NET SITE AREA:19,532ft2 (1,814.6m2) GROSS SITE AREA:21,711.9ft2 (2,017.1m2) REQUIRED/ALLOWED NET DENSITY (FSR) PRIVATE OUTDOOR AREA BUILDING AREA:GROSS NET PROPOSED BUILDING SETBACKS: min. FRONT (River Road) REAR (SOUTH) INTERIOR SIDE (WEST) INTERIOR SIDE (EAST) BUILDING HEIGHT: PARKING 0.75 (1,360.9m2 / 14,649ft2) LOT COVERAGE: max. RESIDENTIAL (2 PER UNIT) VISITOR 6.0m 7.5m 2.25m 1.5m (Less than 40% Wall Length) 45% (816.6m2 / 8,789.4ft2) 8.0m 2 x 6 = 12 Not Required 2.25m 1.5m (Less than 40% Wall Length) 0.74 (1,350.1m2 / 14,532ft2) 1,519.2m2 (17,127ft2) 4.5m 4.5m, 5.5m 3.0m 36% (658.8m2 / 7,091.4ft2) A Units: 8.7m B Units:9.3m C Units:7.64m 2 x 6 = 12 2 2.0m 1,360.9m2 (14,649 ft2)1,350.1m2 (14,532ft2) 6x45m2 = 270m2 (2906ft2)518m2 (5580ft2) www.d3design.ca Scale Project number Date Drawn by Checked by As indicated 20 2 3 - 0 2 - 2 7 1 0 : 4 4 : 3 3 A M A1 Site Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 1" = 10'-0"1 Site www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 7 1 0 : 4 4 : 4 4 A M A2 Street Elevation 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 Street Elevation www.d3design.ca Scale Project number Date Drawn by Checked by 20 2 3 - 0 2 - 2 7 1 1 : 4 1 : 0 7 A M A3 A1 3D Views 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 KS KS No. Description Date UP UP DN DNUP Range Refrigerator DN UPDN DN Storage 16'-9" x 10'-4" MEC 11'-10" x 6'-10" 2668 24" x 24" HH7'-0" SH5'-0" 24" x 24" HH7'-0" SH5'-0" 4' - 3 " 12 ' - 4 " 18'-1"7'-4"13'-2" 38'-7" 8' - 2 " 8'- 5 " 2'-2"8'-0"7'-9"20'-8" 3' - 0 " REC Room 10'-0" x 12'-6" Garage 20'-0" x 20'-0" Mud Room 4'-10" x 6'-9" Bathroom 8'-2" x 5'-0" Closet 4'-10" x 2'-0" 2668 2668 2668 4068 16 070 24" x 36" HH7'-0" SH4'-0" 24" x 36" HH7'-0" SH4'-0" 24" x 36" HH7'-0" SH4'-0" 24" x 36" HH7'-0" SH4'-0" 2668 Patio 7'-0" x 15'-0" 21 ' - 2 " 1'- 9 3 / 8 " 10'-8"5'-11"20'-6" 37'-1" 13 ' - 6 1 / 2 " 5' - 4 7 / 8 " 4' - 0 " 18 ' - 1 1 3 / 8 " R @ 0'-7 23/32"7 R @ 0'-6 27/32"7 7'-0"9'-3"6'-8"21'-2" 15'-11" 15 ' - 0 " 16'-7" Family Room 20'-6" x 10'-6" Dining 8'-6" x 7'-3" Balcony 7'-0" x 15'-0" Pantry 3'-10" x 3'-7" Bathroom 5'-0" x 7'-6"Flex/ Guest Bedroom 9'-0" x 9'-0" 2668 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 46" HH6'-10" SH3'-0" 2668 2668 2668 2668 1968 Kitchen 15'-3" x 11'-0" 8'-6"6'-9"7'-10 1/2"13'-3 1/2" 21'-2"15'-11"1'-6" 9' - 8 " 11 ' - 6 " 1' - 9 3 / 8 " 21 ' - 2 " 7'-0"16'-7"20'-6" 37'-1" 18 ' - 1 1 3 / 8 " 15 ' - 0 " Laundry Closet 38'-7" 2'-2"WIC 8'-1" X 5'-3" Bedroom 1 14'-9" x 8'-10" Cl o s e t 2' - 0 " X 5 ' - 6 " Bathroom 5'-0"X 8'-10" Ensuite 9'-7" x 6'-11" Bedroom 2 11'-7" X 10'-7" Cl o s e t 2'- 0 " X 7 " - 3 ' Principal Bedroom 11'-4" x 12'-0" 2668 2668 2668 2668 30" x 46" HH7'-0" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 24" x 24" HH6'-8" SH4'-8" 30" x 46" HH7'-0" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 5068 4068 2668 9'- 6 " 11 ' - 8 " 1' - 9 3 / 8 " 21 ' - 2 " 12'-0 1/2"4'-6 1/2"5'-6"2'-4 1/2"12'-7 1/2" 4'- 0 " 5' - 1 1 " 13 ' - 0 3 / 8 " 18 ' - 1 1 3 / 8 " 8'-6"7'-5"5'-4 1/2"2'-4 1/2"13'-5" 28'-7" 16'-7"20'-6" 37'-1" R @ 0'-7 1/2"16 V a u lt e d 2668 2668 Living Room 16'-10" x 11'-0" Office 8'-6" x 7'-0" Closet 2'-11" x 2'-0" 5868 66" x 96" HH10'-0" SH2'-0" 66" x 96" HH10'-0" SH2'-0" 66" x 96" HH10'-0" SH2'-0" 66" x 96" HH10'-0" SH2'-0" R @ 0'-6 27/32"7 R @ 0'-7 1/2"8 12 ' - 4 " 1'- 6 " 11'-1" 18'-1"7'-4"13'-2" 4'-0"9'-2" 8' - 2 " R @ 0'-6 27/32"7 Entry Porch 7'-6" x 7'-0" 3' - 0 " 11'-6"9'-2" 20'-8" 6'-8" 2'-2"8'-2 1/2"7'-6 1/2" 38'-7" www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 8 3 : 4 1 : 5 6 P M A4 A1, Floor Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 KS KS No. Description Date 3/16" = 1'-0"1 A1-Storage 3/16" = 1'-0"2 A1-Garage/Basement 3/16" = 1'-0"4 A1-Main Floor 3/16" = 1'-0"5 A1-Upper Floor 3/16" = 1'-0"3 A1-Entry/Living DN UP UP DN DN 290 SF Storage 105 SF MEC MEC : 105 SF Storage : 290 SF 409 SF Entry Floor 44 SF Entry Porch Entry Porch : 44SF Entry Floor : 409 SF 438 SF Garage 307 SF Basement Garage : 438 SF Balcony : 105 SF Basement : 307 SF 105 SF Balcony 751 SF Main Floor 105 SF Balcony Balcony : 105 SF Main Floor : 751 SF W/D 781 SF Upper Floor Upper Floor : 781 SF www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 7 1 1 : 4 1 : 0 8 A M A5 A1, Area Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 KS KS No. Description Date 3/16" = 1'-0"1 A1-Storage 3/16" = 1'-0"3 A1-Entry/Living 3/16" = 1'-0"2 A1-Garage/Basement 3/16" = 1'-0"4 A1-Main Floor 3/16" = 1'-0"5 A1-Upper Floor Total : Garage + MEC/Storage : 833 SF Covered Porch : 44 SF Balcony : 210 SF Floor Space : 2,248 SF Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A1, Roof Peak 30.81 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m C. H . 2. 4 4 m C.H. 2.74 m C.H. 2.44 m Type-A, Garage Ceiling 22.07 m Line of Building Below Grade A1 Underside of Truss : 27.64 m A1, Midpoint 29.22 m A1, Average Grade 19.72 m A1 Building Height : 9.50 m C.H. 2.44 m 1.52 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A1, Roof Peak 30.81 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A1, Midpoint 29.22 m A1, Average Grade 19.72 m A1 Underside of Truss : 27.64 m C.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m A1 Building Height : 9.50 m Line of Building Below Grade 1.52 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A1, Roof Peak 30.81 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A1, Midpoint 29.22 m A1, Average Grade 19.72 mC.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m A1 Building Height : 9.50 m A1 Underside of Truss : 27.64 m 1.52 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A1, Roof Peak 30.81 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A1, Midpoint 29.22 m A1, Average Grade 19.72 m A1 Underside of Truss : 27.64 m C.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m A1 Building Height : 9.50 m Line of Building Below Grade 1.52 m 1.22 m www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 2023-02-27 10:44:47 AM A6 A1 Elevation 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 A1, Front Elevation 3/16" = 1'-0"2 A1, Left Elevation 3/16" = 1'-0"3 A1, Rear Elevation 3/16" = 1'-0"4 A1, Right Elevation www.d3design.ca Scale Project number Date Drawn by Checked by 20 2 3 - 0 2 - 2 7 1 1 : 4 1 : 5 7 A M A7 A2, 3D Views 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 KS Checker No. Description Date UP UPDN DN Refrigerator Range Washer Dryer UP DN DN DN UP MEC 11'-10" x 6'-10" Storage 16'-9" x 10'-4" 2668 13'-2"7'-4"18'-1" 38'-7" 12 ' - 4 " 4' - 3 " 8' - 2 " 8' - 5 " R @ 0'-7 23/32"7 20'-8"7'-9"8'-0"2'-2" 3' - 0 " Garage 20'-0" x 20'-0" Mud Room 4'-10" x 6'-9" Closet 4'-10" x 2'-0" REC Room 10'-0" x 12'-6" Bathroom 8'-2" x 5'-0" 16 070 2668 4068 57" x 60" HH8'-0" SH3'-0" 2668 2668 24" x 24" HH5'-0" SH3'-0" 24" x 24" HH5'-0" SH3'-0" Patio 7'-0" x 15'-0" 1'- 9 3 / 8 " 21 ' - 2 " 20'-6"5'-11"10'-8" 37'-1" R @ 0'-6 27/32"7 R @ 0'-7 23/32"7 18 ' - 1 1 3 / 8 " 21'-2"6'-8"9'-3"7'-0" 2668 4' - 0 " 5'- 4 7 / 8 " 13 ' - 6 1 / 2 " 15'-11" 16'-7" 15 ' - 0 " Kitchen 15'-3" x 11'-0" Dining 8'-6" x 7'-3" Balcony 7'-0" x 15'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 2668 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 46" HH6'-10" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" 30" x 60" HH8'-0" SH3'-0" Flex / Guest Bedroom 9'-0" x 9'-0" Pantry 3'-10" x 3'-7" Bathroom 7'-6" x 5'-0" 2668 2668 2668 1968 2668 Family Room 20'-6" x 10'-6" 21'-2"15'-11"1'-6" 13'-3 1/2"7'-10 1/2"6'-9"8'-6" 9' - 8 " 11 ' - 6 " 1' - 9 3 / 8 " 21 ' - 2 " 20'-6"16'-7"7'-0" 37'-1" 15 ' - 0 " 18 ' - 1 1 3 / 8 " 38'-7" 2'-2" Prinicpal Bedroom 11'-4" x 12'-0" 30" x 54" HH6'-8" SH2'-2" 30" x 54" HH6'-8" SH2'-2" 30" x 36" HH6'-8" SH3'-8" 30" x 36" HH6'-8" SH3'-8" 30" x 54" HH7'-8" SH3'-2" 30" x 54" HH7'-8" SH3'-2" 30" x 54" HH7'-8" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 30" x 46" HH7'-0" SH3'-2" 2668 4068 5068 2668 WIC 8'-1" x 5'-3" Bedroom 1 14'-9" x 8'-10" Bedroom 2 11'-7" x 10'-7" Ensuite 9'-7" x 6'-11" Bathroom 5'-0" x 8'-10" 2668 2668 Cl o s e t 2'- 0 " x 5 ' - 6 " Cl o s e t 2'- 0 " x 7 ' - 3 " 30" x 46" HH6'-0" SH2'-2" 13'-5"2'-4 1/2"5'-4 1/2"7'-5"8'-6" 13 ' - 0 3 / 8 " 5' - 1 1 " 4'- 0 " 18 ' - 1 1 3 / 8 " 12'-7 1/2"2'-4 1/2"5'-6"4'-6 1/2"12'-0 1/2" 9' - 6 " 11 ' - 8 " 1' - 9 3 / 8 " 21 ' - 2 " 20'-6"16'-7" 28'-7" 37'-1" R @ 0'-7 1/2"16 Office 8'-6" x 7'-0" Closet 2'-11" x 2'-0" Living Room 16'-10" x 11'-0"2668 1968 5868 30" x 84" HH7'-10 5/8" SH0'-10 5/8" 42" x 84" HH7'-10 5/8" SH0'-10 5/8" 30" x 84" HH7'-10 5/8" SH0'-10 5/8"30" x 60" HH6'-8" SH1'-8" 30" x 60" HH6'-8" SH1'-8" 57" x 60" HH6'-8" SH1'-8" 66" x 96" HH8'-10 5/8" SH0'-10 5/8" R @ 0'-6 27/32"7 Entry Porch 7'-6" x 7'-0" 9'-2"4'-0" 8' - 2 " 12 ' - 4 " V a u lt e d R @ 0'-6 27/32"7 R @ 0'-7 1/2"8 13'-2"7'-4"18'-1" 9'-2"11'-6" 20'-8" 6'-8" 7'-6 1/2"8'-2 1/2"2'-2" 3' - 0 " 38'-7" www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 8 3 : 4 5 : 5 0 P M A8 A2, Floor Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 A2-Storage 3/16" = 1'-0"2 A2-Garage/Basement 3/16" = 1'-0"4 A2-Main Floor 3/16" = 1'-0"5 A2-Upper Floor 3/16" = 1'-0"3 A2-Entry/Living 290 SF Storage 105 SF MEC MEC : 105 SF Storage : 290 SF 391 SF Entry Floor 44 SF Entry Porch Entry Porch : 44SF Entry Floor : 391 SF 438 SF Garage 307 SF Garage Floor Garage : 438 SF Balcony : 105 SF Garage Floor : 307 SF 105 SF Balcony 751 SF Main Floor 105 SF Balcony Balcony : 105 SF Main Floor : 751 SF 781 SF Upper Floor Upper Floor : 781 SF www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 7 1 1 : 4 1 : 5 9 A M A9 A2, Area Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Kim Checker No. Description Date 3/16" = 1'-0"1 A2, Storage 3/16" = 1'-0"3 A2-Entry/Living 3/16" = 1'-0"2 A2-Garage & Basement 3/16" = 1'-0"4 A2-Main Floor 3/16" = 1'-0"5 A2-Upper Floor Total : Garage + Storage/MEC : 833 SF Covered Porch : 44 SF Balcony : 210 SF Floor Space : 2,230 SF Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A2, Roof Peak 29.13 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A2, Average Grade 19.72 m A2 Underside of Truss : 27.58 m A2, Midpoint 28.35 m C. H . 2. 4 4 m C. H . 2. 4 4 m C.H. 2.74 m C.H. 2.44 m A2 Building Height : 8.63 m Line of Building Below Grade 1.52 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A2, Roof Peak 29.13 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A2, Average Grade 19.72 m A2, Midpoint 28.35 m A2 Underside of Truss : 27.58 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m A2 Building Height : 8.63 m Line of Building Below Grade 1.22 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A2, Roof Peak 29.13 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A2, Average Grade 19.72 m A2, Midpoint 28.35 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m A2 Underside of Truss : 27.58 m A2 Building Height : 8.63 m 1.52 m 1.22 m Type-A, Entry 20.85 m Type-A, Main Floor 22.37 m Type-A, Garage 19.63 m Type -A, Basement 18.10 m Type-A, Upper Floor 25.42 m A2, Roof Peak 29.13 m Type-A, Basement Ceiling 20.54 m Type-A, Main Floor Ceiling 25.11 m Type-A, Upper Floor Ceiling 27.86 m Type-A, Garage Ceiling 22.07 m A2, Average Grade 19.72 m A2, Midpoint 28.35 m Line of Building Below Grade C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m A2 Building Height : 8.63 m A2 Underside of Truss : 27.58 m 1.52 m 1.22 m www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 2023-02-27 12:06:45 PM A10 A2 Elevation 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 A2, Front Elevation 3/16" = 1'-0"2 A2, Left Elevation 3/16" = 1'-0"3 A2, Rear Elevation 3/16" = 1'-0"4 A2, Right Elevation Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) 9" Wood Shakes at Roof Accents 8X8 Wood Posts at Balcony Support Aluminum Guardrail (Typ. Railings) 8X8 Wood Posts with Bottom Pillar at Entrance Support 9" Wood Shakes at Bumpout Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) Hardie Board & Batten at Roof Accents 8X8 Wood Posts with Bottom Fillar at Entrance Support Aluminum Guardrail (Typ. Railings) 8X8 Wood Posts at Balcony Support www.d3design.ca Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 2023-02-27 10:44:52 AM A11 Type-A Materials 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 1/4" = 1'-0"1 A1, Front Elevation with Materials 1/4" = 1'-0"2 A2, Front Elevation with Materials www.d3design.ca Scale Project number Date Drawn by Checked by 20 2 3 - 0 2 - 2 8 2 : 3 7 : 3 7 P M A12 Type B 3D Views 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 KS Checker No. Description Date UP UP DN DN DN UP UP DN UP DN Garage 20'-0" x 21'-0" Bathroom 7'-8" x 5'-0" Basement Balcony 6'-11" x 13'-8"MEC 5'-7" x 6'-3" Rec Room 13'-1" x 16'-7" 36" x 48" HH7' -0" SH3' -0" 2680 2680 3068 2668 3068 2668 57" x 72" HH7' -0" SH1' -0" 57" x 72" HH7' -0" SH1' -0" Closet 5'-6" x 2'-0" Patio 6'-1" x 14'-11" 16 070 7' - 7 " 22 ' - 4 " 20' - 8"6' - 2 3/4"6' - 8"6' - 11" 12 ' - 0 " 17 ' - 1 1 " 29 ' - 1 1 " R @ 0' -6 27/32"7 3068 2668 7' - 7 1/2"17' - 2 1/2"14' - 1 1/2" 31' - 4" 13 ' - 8 1 / 4 " 5' - 4 3/4" 33' - 6 3/4"Typ. Glass Railing for Type B Unit Safety Railing, Ref. to A16 for Details Entry Porch 4'-0" x 7'-7" Entry 5'-0" x 6'-11" 24" x 60" HH10' -9" SH5' -9" 3068 R @ 0' -7 23/32"7 3' - 7 1/2"4' - 0"5' - 8" 7' - 7 " 22 ' - 4 " R @ 0' -7 1/2"8 R @ 0' -6 27/32"7 7' - 7 1/2"31' - 4" Family Room 13'-4" x 11'-0" Office/Flex 9'-0" x 9'-7" DINING 8'-9" x 12'-2" LIVING 17'-1" x 16'-4" PWD 6'-4" x 5'-0" Kitchen 9'-8" x 12'-2"Main Balcony 6'-11" x 13'-10" Pantry 4'-0" x 6'-0" 64" x 24" HH4' -0 11/16" SH2' -0 11/16" 57" x 60" HH8' -0" SH3' -0" 30" x 46" HH8' -0" SH4' -2" 30" x 46" HH8' -0" SH4' -2" 2468 2468 36" x 48" HH8' -0" SH4' -0" 57" x 72" HH8' -0" SH2' -0" 57" x 72" HH8' -0" SH2' -0" 57" x 72" HH8' -0" SH2' -0" Closet R @ 0' -7 1/2"16 9' - 8 1/4"4' - 4 1/2"19' - 6"6' - 11" 3068 2668 2668 7' - 7 " 12 ' - 0 1 / 2 " 10 ' - 3 1 / 2 " 22 ' - 4 " 9' - 2 " 12 ' - 0 " 17 ' - 1 1 " 29 ' - 1 1 " 13 ' - 8 1 / 4 " 4' - 0"31' - 4" R @ 0' -7 1/2"8 1' - 2"7' - 7 1/2" 33' - 6 3/4" 5' - 4 3/4" Typ. Glass Railing for Type B Unit Safety Railing, Ref. to A16 for Details Principal Bedroom 13'-5" x 11'-0" Bedroom 2 10'-0" x 13'-5" Bathroom 5'-0" x 10'-0" Bedroom 1 14'-0" x 10'-0" Laundry 5'-0" x 6'-8" WTC 5'-0" x 9'-7" Ensuite 8'-0" x 9'-7" 30" x 46" HH6' -8" SH2' -10" 30" x 46" HH6' -8" SH2' -10" 57" x 60" HH6' -8" SH1' -8" 36" x 65" HH9' -9 1/2" SH4' -4 1/2" 36" x 48" HH6' -8" SH2' -8" 36" x 48" HH6' -8" SH2' -8" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" 34' - 6 1/2" 8' - 8 1/2"5' - 4 1/2"5' - 4 1/2"15' - 1" 22 ' - 4 " 10 ' - 3 1 / 2 " 12 ' - 0 1 / 2 " 9' - 2 " 26' - 11" 1' - 2"7' - 7 1/2"15' - 10 1/2"11' - 0 1/2" 10 ' - 8 " 2' - 4 1 / 2 " 2' - 4 1 / 2 " 14 ' - 6 " 29 ' - 1 1 " 2668 2668 2668 2680 2668 2668 2680 2680 26802680 2680 Closet Closet R @ 0' -7 23/32"14 R @ 0' -7 1/2"16 Roof Deck 14'-1" x 28'-7" Roof Deck Landing 5'-10" x 6'-9" 24" x 36" HH5' -6" SH2' -6" 29 ' - 1 1 " 15' - 4" 2668 R @ 0' -7 23/32"14 8' - 1 1 / 2 " Wall/Floor Line Roof Overhang Line Typ. Glass Railing for Type B Unit Safety Railing, Ref. to A16 for Details www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 8 3 : 3 7 : 5 3 P M A13 Type B Floor Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 KS Checker No. Description Date 3/16" = 1'-0"1 Type-B Basement 3/16" = 1'-0"2 Type-B Entry 3/16" = 1'-0"3 Type-B Main Floor 3/16" = 1'-0"4 Type-B Upper Floor 3/16" = 1'-0"5 Type-B Roof Deck UP UP UP DN UP DN UP 468 SF Garage 468 SF Basement 95 SF Balcony 43 SF Crawlspace MEC/Storage : 63 SF Crawlspace : 43 SF Garage : 468 SF Balcony : 95 SF Balcony : 96 SF Basement : 468 SF 63 SF MEC/Storage 96 SF Balcony 1054 SF MAIN FLOOR 95 SF Main Floor Balcony Main Floor Balcony : 95 SF Main Floor : 1,054 SF 30 SF Entry Porch 84 SF Entry Entry Porch : 30 SF Entry : 84 SF 986 SF UPPER FLOOR Upper Floor : 986 SF 411 SF Roof Deck 122 SF Enterance Roof Deck : 411 SF Enterance : 122 SF www.d3design.ca Scale Project number Date Drawn by Checked by As indicated 20 2 3 - 0 2 - 2 8 2 : 3 7 : 3 9 P M A14 Type B Area Plan 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 Type-B Basement & Garage 3/16" = 1'-0"3 Type-B Main Floor 3/16" = 1'-0"2 Type-B Entry 3/16" = 1'-0"4 Type-B Upper Floor Total : Garage + Storage/Crawlspace : 574 SF Covered Porch : 30 SF Balcony: 286 SF Roof Deck : 411 SF Floor Space : 2,714 SF 1/8" = 1'-0"5 Type-B Roof Deck Type-B, Basement 19.78 m Type-B, Entry 21.00 m Type-B, Main Floor 22.52 m Type-B, Upper Floor 25.57 m Type-B, Rooftop Deck 28.32 m Type-B, Roof Peak 31.14 m 1. 5 2 m 1. 2 2 m Type-B, Upper Floor Ceiling 28.01 m Type-B, Main Floor Ceiling 25.27 m Type-B, Basement Ceiling 22.22 m C. H . 2. 4 4 m C.H. 2.74 m C.H. 2.44 m Type-B, Midpoint 30.74 m B1 Average Grade 19.73 m B2 Average Grade 19.72 m Type-B, Rooftop Deck Ceiling 30.45 m C.H. 2.13 m B2 Building Height : 11.02 m B1 Building Height : 11.01 m Type-B Underside of Truss : 30.35 m Type-B, Basement 19.78 m Type-B, Entry 21.00 m Type-B, Main Floor 22.52 m Type-B, Upper Floor 25.57 m Type-B, Rooftop Deck 28.32 m Type-B, Roof Peak 31.14 m Type-B, Upper Floor Ceiling 28.01 m Type-B, Main Floor Ceiling 25.27 m Type-B, Basement Ceiling 22.22 m Type-B, Midpoint 30.74 m B1 Average Grade 19.73 m B2 Average Grade 19.72 m Type-B, Rooftop Deck Ceiling 30.45 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.13 m B2 Building Height : 11.02 m B1 Building Height : 11.01 m 1.22 m 1.52 m Type-B Underside of Truss : 30.35 m Type-B, Basement 19.78 m Type-B, Entry 21.00 m Type-B, Main Floor 22.52 m Type-B, Upper Floor 25.57 m Type-B, Rooftop Deck 28.32 m Type-B, Roof Peak 31.14 m Type-B, Upper Floor Ceiling 28.01 m Type-B, Main Floor Ceiling 25.27 m Type-B, Basement Ceiling 22.22 m Type-B, Midpoint 30.74 m B1 Average Grade 19.73 m B2 Average Grade 19.72 m Type-B, Rooftop Deck Ceiling 30.45 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.13 m B1 Building Height : 11.01 m B2 Building Height : 11.02 m 1.52 m 1.22 m Type-B Underside of Truss : 30.35 m Type-B, Basement 19.78 m Type-B, Entry 21.00 m Type-B, Main Floor 22.52 m Type-B, Upper Floor 25.57 m Type-B, Rooftop Deck 28.32 m Type-B, Roof Peak 31.14 m Type-B, Upper Floor Ceiling 28.01 m Type-B, Main Floor Ceiling 25.27 m Type-B, Basement Ceiling 22.22 m Type-B, Midpoint 30.74 m B1 Average Grade 19.73 m B2 Average Grade 19.72 m Type-B, Rooftop Deck Ceiling 30.45 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.13 m B2 Building Height : 11.02 m B1 Building Height : 11.01 m 1.52 m 1.22 m Type-B Underside of Truss : 30.35 m www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 2023-02-28 3:02:29 PM A15 Type-B Elevation 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 Type-B, Front Elevation 3/16" = 1'-0"2 Type-B, Left Elevation 3/16" = 1'-0"3 Type-B, Rear Elevation 3/16" = 1'-0"4 Type-B, Right Elevation Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) 9" Wood Shakes at Bumpout 6X6 Wood Posts at Enterance Support Glass Railing (Typ. Type-B Safety Railings) 4X4 Wood Posts at Rear Support Hardie Board and Batten at Roof Accents 9" Wood Shakes at Garage Front and Entrance Bottom Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) 9" Wood Shakes at Bumpout 6X6 Wood Posts at Enterance Support Glass Railing (Typ. Type-B Safety Railings) 4X4 Wood Posts at Rear Support 9" Wood Shakes with Bottom Hardie Waterboard at Roof Accents 9" Wood Shakes at Garage Front and Entrance Bottom www.d3design.ca Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 2023-02-28 3:02:30 PM A16 Type-B Materials 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 28, 2023 Min Checker No. Description Date 1/4" = 1'-0"1 B1, Front Elevation with Materials 1/4" = 1'-0"2 B2, Front Elevation with Materials www.d3design.ca Scale Project number Date Drawn by Checked by 20 2 3 - 0 2 - 2 7 1 1 : 4 6 : 3 3 A M A17 Type C 3D Views 1599 20786 River Rd, Maple Ridge Golden Ridge Properties Oct 27th, 2022 Min Checker No. Description Date UP DN DN UP DN DN DN UP DN DN Garage 19'-8" x 20'-0" Storage 19'-5" x 27'-0" Mech 11'-10" x 6'-8" 36" x 48" HH7' -0" SH3' -0" 24" x 24" HH2' -4 1/4" SH0' -4 1/4" 24" x 24" HH2' -4 1/4" SH0' -4 1/4" 24" x 24" HH2' -4 1/4" SH0' -4 1/4" 3068 3068 3068 16 070 R @ 0' -6 27/32"7 R @ 0' -7 1/2"8 24' - 4 3/4"21' - 5 3/8" 20 ' - 4 " 3' - 8 1 / 8 " 19' - 8 3/4"4' - 0" 5' - 3 " 14 ' - 9 " 7' - 4 " 21 ' - 4 " 7' - 8 " 4' - 8 " 33 ' - 8 " 7' - 6 1/4"12' - 11"3' - 11 1/4"21' - 5 5/8" 29 ' - 0 " 16' - 10 1/4" 45' - 10 1/8" Kitchen 9'-9" x 13'-5" Dining 10'-7" x 13'-5" Living Room 20'-1" x 18'-11" Entry Corridor 16 -6" x 3'-8" Balcony 6'-6" x 19'-3" Entry Porch 4'-2" x 7'-8" Storage 3'-5" x 2'-2" Pantry 3'-4" x 1'-10" 48" x 66" HH7' -6" SH2' -0" 48" x 66" HH7' -6" SH2' -0" 48" x 66" HH7' -6" SH2' -0" 48" x 66" HH7' -6" SH2' -0" 24" x 60" HH6' -8" SH1' -8" 3068 2668 5068 Patio 6'-7" x 14'-0" 20' - 8"4' - 1"21' - 1 1/8" 45' - 10 1/8" 48" x 66" HH7' -6" SH2' -0" R @ 0' -7 1/2"8 R @ 0' -7 23/32"7 33 ' - 8 " 14 ' - 5 " 19 ' - 3 " 7' - 6 1/4"16' - 10 1/4"21' - 5 5/8"6' - 6 1/4" R @ 0' -7 23/32"7 4' - 8 " 7' - 8 " 21 ' - 4 " 29 ' - 0 " 4' - 2" Ensuite 8'-10" x 8'-5" WTC/Flex 6'-7" x 8'-5" Powder 3'-9" x 6'-9" Master Bedroom 13'-5" x 11'-2"48" x 66" HH8' -0" SH2' -6" 48" x 66" HH8' -0" SH2' -6" 36" x 48" HH8' -0" SH4' -0" 2668 2668 2668 Closet 2'-0" x 6'-11" 2668 R @ 0' -7 1/2"8 R @ 0' -7 1/2"8 9' - 1 1 / 2 " 12 ' - 2 1 / 2 " 21 ' - 4 " 9' - 6"7' - 4 1/2"7' - 10 1/2" 16' - 10 1/2" 2668 2668 7' - 6 1 / 2 " 4' - 2" Bedroom 1 9'-9" x 10'-10" Bedroom 3 9'-10" x 12'-10" W/D 3'-8" x 3'-6" Bathroom 8'-6" x 5'-0"Cl o s e t 2' - 0 " x 5 ' - 0 " Flex 6'-10" x 10'-10" Bedroom 2 9'-10" x 12'-6" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" 48" x 52" HH6' -8" SH2' -4" Room 5'-4" x 2'-0" Room 5'-4" x 2'-0" 26682668 2668 2668 40684068 2668 2668 2068 20685' - 0 " 9' - 3 1 / 2 " 18 ' - 8 1 / 2 " 8' - 10 1/2"2' - 4 1/2"10' - 2 1/8"7' - 11" 29' - 4 1/8" 11 ' - 6 " 8' - 2 3 / 4 " 13 ' - 1 1 1 / 4 " 33 ' - 8 " 7' - 10 1/2"10' - 6 5/8"10' - 11" 21' - 5 5/8" www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 7 1 1 : 4 6 : 3 4 A M A18 Type C Floor Plans 1599 20786 River Rd, Maple Ridge Golden Ridge Properties Oct 27th, 2022 Min Checker 3/16" = 1'-0"1 Type - C Garage/Storage 3/16" = 1'-0"2 Type - C Main Floor 3/16" = 1'-0"3 Type - C MBR Floor 3/16" = 1'-0"4 Type - C Upper Floor No. Description Date UP DN UP DN DN UP DN 467 SF Garage 100 SF Crawlspace/MEC 742 SF Storage Garage : 467 SF Crawlspcae (MEC) : 100 SF Garage Entry : 63 SF Storage : 742 SF 63 SF Garage Entry 935 SF Main Floor 32 SF Entry Porch 126 SF Balcony Entry Porch : 32 SF Balcony : 126 SF Balcony : 94 SF Main Floor : 935 SF 94 SF Balcony 465 SF Main Bedroom Floor Main Bedroom Floor : 465 SF 842 SF Upper Floor Upper Floor : 842 SF www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 20 2 3 - 0 2 - 2 7 1 1 : 4 6 : 3 4 A M A19 Type C Area Plan 1599 20786 River Rd, Maple Ridge Golden Ridge Properties Oct 27th, 2022 Min Checker No. Description Date 3/16" = 1'-0"1 Type - C Garage/Storage 3/16" = 1'-0"2 Type - C Main Floor 3/16" = 1'-0"3 Type - C MBR Floor 3/16" = 1'-0"4 Type - C Upper Floor Garage + Crawlspace / Storage : 1,309 SF Covered Porch : 32 SF Balcony : 220 SF Floor Space : 2,305 SF Type -C, Main Floor 21.00 m Type-C, Upper Floor 24.05 m Type-C, Basement 18.26 m Type-C, Upper Floor Ceiling 26.49 m Type-C, MBR Floor 22.52 m Type-C, Garage 19.78 m Type-C, Roof Peak 28.36 m C.H. 2.44 m Type-C, Main Floor Ceiling 23.74 m Type-C, Garage Ceiling 22.22 m Type-C, MBR Floor Ceiling 25.27 m Type-C, Basement Ceiling 20.70 m C.H. 2.74 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m Type-C Underside of Truss : 26.16 m Type-C, Midpoint 27.26 m C2, Average Grade 19.72 m C1 Average Grade 19.63 m C1 Building Height : 7.63 m C2 Building Height : 7.54 m Line of Building Below Grade Type -C, Main Floor 21.00 m Type-C, Upper Floor 24.05 m Type-C, Basement 18.26 m Type-C, Upper Floor Ceiling 26.49 m Type-C, MBR Floor 22.52 m Type-C, Garage 19.78 m Type-C, Roof Peak 28.36 m Type-C, Main Floor Ceiling 23.74 m Type-C, Garage Ceiling 22.22 m Type-C, MBR Floor Ceiling 25.27 m Type-C, Basement Ceiling 20.70 m Type-C Underside of Truss : 26.16 m Type-C, Midpoint 27.26 m C2, Average Grade 19.72 m C1 Average Grade 19.63 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C1 Building Height : 7.63 m C2 Building Height : 7.54 m Line of Building Below Grade Type -C, Main Floor 21.00 m Type-C, Upper Floor 24.05 m Type-C, Basement 18.26 m Type-C, Upper Floor Ceiling 26.49 m Type-C, MBR Floor 22.52 m Type-C, Garage 19.78 m Type-C, Roof Peak 28.36 m Type-C, Main Floor Ceiling 23.74 m Type-C, Garage Ceiling 22.22 m Type-C, MBR Floor Ceiling 25.27 m Type-C, Basement Ceiling 20.70 m Type-C Underside of Truss : 26.16 m Type-C, Midpoint 27.26 m C2, Average Grade 19.72 m C1 Average Grade 19.63 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C1 Building Height : 7.63 m C2 Building Height : 7.54 m Line of Building Below Grade Type -C, Main Floor 21.00 m Type-C, Upper Floor 24.05 m Type-C, Basement 18.26 m Type-C, Upper Floor Ceiling 26.49 m Type-C, MBR Floor 22.52 m Type-C, Garage 19.78 m Type-C, Roof Peak 28.36 m Type-C, Main Floor Ceiling 23.74 m Type-C, Garage Ceiling 22.22 m Type-C, MBR Floor Ceiling 25.27 m Type-C, Basement Ceiling 20.70 m Type-C Underside of Truss : 26.16 m Type-C, Midpoint 27.26 m C2, Average Grade 19.72 m C1 Average Grade 19.63 m C.H. 2.44 m C.H. 2.74 m C.H. 2.44 m C.H. 2.44 m C.H. 2.74 m C2 Building Height : 7.54 m C1 Building Height : 7.63 m Line of Building Below Grade www.d3design.ca Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 2023-02-27 10:44:59 AM A20 Type-C Elevation 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 3/16" = 1'-0"1 Type-C, Front Elevation 3/16" = 1'-0"2 Type-C, Left Elevation 3/16" = 1'-0"3 Type-C, Rear Elevation 3/16" = 1'-0"4 Type-C, Right Elevation Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) Decorative Roof Support at Entrance Aluminum Guardrail (Typ. Railings) 9" Wood Shake with Bottom Hardie Waterboard at Roof Accents 9" Wood Shakes at Garage Front and Entrance Bottom Asphalt Shingles (Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) Aluminum Guardrail (Typ. Railings) Hardie Board and Batten at Roof Accents 9" Wood Shakes at Garage Front and Enterance Bottom Decorative Roof Support at Entrance www.d3design.ca Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 2023-02-27 10:45:01 AM A21 Type-C Materials 1599 20786 River Road, Maple Ridge Golden Ridge Properties Feb 27, 2023 Min Checker No. Description Date 1/4" = 1'-0"1 C1, Front Elevation with Materials 1/4" = 1'-0"2 C2, Front Elevation with Materials Asphalt Shingles(Typ. All Roofs) 1X6 Wood Trim Around Windows & Doors 1X10 Hardie Waterboard at Enterance Floor Joins 1X8 Wood Trim on 1X12 Wood Fascia (Typ. All Sides) 1X6 Hardie Siding (Typ. Walls) 9" Wood Shakes at Roof Accents 8X8 Wood Posts at Balcony Support Aluminum Guardrail (Typ. Railings) 8X8 Wood Posts with Bottom Pillar at Entrance Support 9" Wood Shakes at Bumpout Dark With Shake Roof Accent (A1, B2, C1) Light With Board and Batten Roof Accent (A2, B1, C2) Body Trim Doors Body Trim Doors SW2812-Rookwood Jade SW7571-Casa Blanca SW6208-Pewter Green SW6394-Sequin SW7005-Pure White SW6250-Granite Peak Sample-1 Colour No. SW7571-Casa Blanca SW6208-Pewter Green SW7005-Pure White SW6250-Granite Peak Sample-2 Colour No.SW2811-Rookwood Blue Green SW2833-Roycroft Vellum SW0065-Vogue Green SW7694-Dromedary Camel SW6147-Panda White SW6032-Dutch Cocoa Sample-3 Colour No. SW6199-Rare Gray SW7524-Dhurrie Beige Sample-4 Colour No. SW7619-Labradorite SW7049-Nuance SW7602-Indigo Batik SW7662-Evening Shadow Sample-5 Colour No. SW0031-Dutch Tile Blue SW6394-Sequin Sample-6 Colour No. SW0066-Cascade Green (Current) SW6694-Glad Yellow SW2833-Roycroft Vellum SW0065-Vogue Green SW7049-Nuance SW7602-Indigo Batik SW6147-Panda White SW6032-Dutch Cocoa SW0077-Classic French Gray SW6174-Andiron SW0077-Classic French Gray SW6174-Andiron www.d3design.ca Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 2022-07-14 4:50:55 PM A9 Colour Samples 1599 20786 River Road, Maple Ridge Golden Ridge Properties July 14th, 2022 Min Checker No. Description Date 1/4" = 1'-0"1 Colour Sample 1/4" = 1'-0"2 Colour Samples WM 19.93 19.99 19.67 19 .68 19.91 19 .91 19 .90 19.81 19 .83 19.86 19 .98 19.74 19.89 19.88 19.95 20.00 20 .02 19.98 20.21 20 .16 20.14 20 .11 20.09 19.80 20 .04 20 .02 19.95 19.91 19.91 20 .00 20 .02 19 .8019.88 19.90 19 .89 19.93 19.95 19.94 19.99 20 .0 1 20 .07 19 .87 19 .82 20.1019.99 19.89 20 .11 20.17 19.94 19.99 20.16 20.20 20 .14 20.12 19.77 19.83 19.81 19.77 19.88 19 .72 19.82 19.8719.75 19 .66 19.63 19.73 19 .75 19.72 19 .72 19.73 19.74 19.74 19.94 19.67 20.10 19.63 19.75 19 .72 19.72 19.66 19.64 19.60 19 .69 19.72 19.48 19 .60 19.55 19.70 19 .61 19.7519.67 19.54 19 .50 19 .58 19.68 19 .62 19 .68 19.50 19 .67 19.58 19.67 19.81 19.66 19 .77 19.65 19 .66 19 .72 19 .59 19 .76 19.58 19 .68 19 .79 19.72 19 .76 19.83 19.62 19 .49 19.72 19 .69 19 .87 19.75 19.66 19.56 19.61 19 .64 19.74 19 .82 19.74 19 .72 19.68 19 .61 19.66 19 .73 19.65 19.58 19 .57 19.74 19 .90 20.02 19.83 19.77 19.75 19.76 19.67 19 .69 19 .59 19 .57 19.67 19 .54 19 .80 19.58 19 .74 19 .76 20.02 19.75 20.19 20.25 19 .83 19.92 19.84 20.00 19.75 20 .04 20 .08 19.77 19.62 19.65 19.78 PLAN 54678 RIVER ROAD PLAN 31152 POSTING PLAN EPP92807 2017.1 m? PLAN LMP5112 PLAN LMP5112 20.23 gutterlin e manhole rim asphalt drive manhole rim sidewal k letdown as p h a l t d r i v e w a y asphalt driveway 0.95Ø conifer 0.7Ø conifer 0.95Ø conifer 0.6Ø conifer 0.25Ø conifer 0.9Ø conifer 0.55Ø conifer 0.8Ø conifer 0.25Ø conifer 0.2+0.12Ø decid 0.7Ø decid0.25Ø conifer 0.4Ø conifer 0.2Ø conifer0.3Ø conifer 0.25Ø conifer 0.2+0.25Ø conifer0.3Ø conifer 0.95+0.65Ø conifer 3X0.16Ø decid breaklin e hedge & shrub catch basin catch basin power pole power pole water valve water meter water valve he d g e t r e e s 0.76Ø conifer 5.1 6 7 51 .7 1 6 43 .6 4 1 3.1 5 0 105°3 2 ' 1 7 " 40.185 90°59'33" 38.936 chain link fence ch a i n l i n k f e n c e container 0° 5 4 ' 1 8 " 00 ° 5 7 ' 3 5 " 46 .7 9 1 O V E R A L L 56 .8 8 3 O V E R A L L Maple Ridge Elementary School 13 .1 0 6 19.68 19.95 0.4Ø conifer 0.42Ø conifer 0.3Ø conifer 368 C 37 D A 1250sf B 1250sf B 1250sf C 1000sf A 1250sf C 1000sf DN DN DN DN UP DN UP DN DN DN DN DN DN DN DN DN UP DN DN DN UP DN Rotated 0.99° South PL Square 19.68 m Public Sidewa l k 19.84 m 19.93 m 19.95 m A1 C1 C2 B1 B2 A2 River Road amenity area PMT 0.25Ø conifer 0.4Ø conifer 0.2Ø conifer 0.3Ø conifer 0.25Ø conifer 0.2+0.25Ø conifer 0.3Ø conifer 0.95+0.65Ø conifer 0.4Ø conifer 0.42Ø conifer 0.3Ø conifer Hs Hs Hs HsHs sign bikes 10'20'40' 2m 5m 10m 0' DRAWING TO SCALE WHEN PRINTED ON ARCH D (36" x 24") SHEET PRELIMINARY ONLY NOT FOR CONSTRUCTION Site and Landscape Plan L-1.0 20786 River Road Maple Ridge BC 1. SCALE 1 : 150 DRAWING NUMBER DRAWING PROJECT CLIENT ISSUE/REVISIONDATE 2202 DRAWN PROJECT NUMBER PACW # All drawings remain the property of Greenway Landscape Architecture. Use for any purpose and reproduction only by written consent. Greenway Landscape Architecture 2280 Park Crescent Coquitlam BC V3J 6T4 T 604 461 9120 E paul@greenwayla.ca Paul Whitehead RBCSLA Registered Landscape Architect #246 NORTH Townhome Development Mar 21.22 Street trees to City standards Small growing species due to overhead utilities Grass boulevard FOR REVIEW 1 Landscape with Impermeable liner 1cm = 10cm landscape treatment lawn or tree/shrub planting Growing medium soil depth for storm water management requirements 300 in lawn areas 450 in planting beds 750 for trees 3m radius for each tree Impermeable liner under landscape, continuous Refer to civil drawings. Filter fabric between gravel and sand. Slope liner to gravel trench subgrade 100Ø Perf Drain Pipe Inside 400 wide gravel trench, perpendicular to slope 25mm angular gravel, clear crush or river pebble. Connect to lawn basin - refer to civil Coarse sand choker layer 100 depth Non-woven filter fabric? PLANT LIST - 20786 River Road Townhomes August 24, 2022 SYMBOL TOTAL BOTANICAL NAME COMMON NAME SIZE SPACING TREES Acer palmatum Osakazuki Green Japanese Maple 2.5m tall multi-stem Acer rubrum Armstrong Armstrong Maple (columnar)6cm Cal, WB Acer truncatum Norwegian Sunset Norwegian Sunset Shantung Maple 6cm Cal, WB Cornus Kousa Satomi Red Flowering Kousa Dogwood 6cm Cal, WB Parrotia Persica Inges Ruby Vase Ruby Vase Persian Ironwood 6cm Cal, WB - selection to be confirmed with City 1.8m std street tree Picea omorika Serbian Spruce 3.5m tall Thuja occidentalis Smaragd Emerald Green Cedar 2.0m tall SHRUBS Azalea japonica Gumpo Pink Dwarf Pink Azalea #2 pot 750 o.c. Euonymus alata Compacta Dwarf Burning Bush #2 pot 900 o.c. Gaultheria shallon Salal #1 pot 500 o.c. Hydrangea macrophylla Big Leaf Hydrangea #1 pot 750 o.c. Pieris japonica compacta Dwarf Pieris #1 pot 800 o.c. Polystichum munitum Western Sword Fern #1 pot 600 o.c Rhododendron 'Ramapo'Dwarf Red Rhodo #1 pot 750 o.c Rhododendron Vulcan Red Vulcan Rhododendron #5 pot 900 o.c Sarcococca H. Humilis Himalayan Sweet Box #1 pot 450 o.c. Skimmia j. macrophylla M + F Skimmia (male and female)#5 pot 900 o.c. Spiraea x Bumalda Gold Flame Gold Flame Spirea #1 pot 900 o.c. Vaccinium ovatum Evergreen Huckleberry #2 pot 900 o.c. GROUND COVERS AND PERENNIALS Arctostaphylos uva-ursi VJ Vancouver Jade Kinnikinick #1 pot 500 o.c Pachysandra terminalis Japanese Spurge 10cm pot 450 o.c Calamagrostis Hameln Fountain Grass #1 pot 500o.c. Hemerocallis 'Happy Returns'Happy Returns Daylily #1 pot 500 o.c Hosta sieboldiana 'Elegans'Elegans Plantain Lily #1 pot 500 o.c Rudbeckia fulgida 'Goldstrum'Black-Eyed Susan #1 pot 450 o.c NOTES: 1) In case of discrepancy between plant numbers on this list and on the plan, the plan shall prevail. 2) All planting shall be in accordance with BCSLA/BCLNA Landscape Standard, latest edition. 3) Tree planting: 750mm soil continuous for 10m2 area, with watering dish. 4) All planting beds: 600mm depth growing medium, mulch with 75mm of decomposed hem/fir bark. 5) Lawn areas: 300mm depth growing medium with sand based sod turf. Calluna vulgaris Pink Heather #1 pot 450 o.c. Potentilla fruiticosa Red Ace Red Ace Shrubby Cinquefoil #1 pot 650 o.c. 4 Stipa tenuissima Mexican Feather Grass #1 pot 300 o.c 15 Taxus x Media Brownii Brown's Yew 1.2m tall, B&B 500 o.c. Astilbe chinensis Chinese Astilbe #1 pot 450 o.c Buxus Winter Gem Winter Gem Boxwood #2 pot 450 o.c. Echinacea purpurea 'Magnus'Magnus Purple Coneflower #1 pot 450 o.c Rf He Hs Au Pt 2 Furnishings Not to scale Table and bench seating Rutherford with portable frame, as manufactured by Wishbone Site Furnishings or alternate. Synthetic wooden slats (tan) and metal frame (dark grey) Secure to paving with SS anchor bolts. 2.Mar 01.23 ADVISORY DESIGN PANEL Communal amenity area Garden boxes with aggregate pathways patio with picnic/activity table bicycle rack visitor Cedar hedge Fence - existing Proposed sidewalk 1.5m wide concrete Off site improvements to be confirmed Project address / ID sign Resident yards Patio Planting beds Lawn visitor lane PMT proposed location to be confirmed with BC Hydro New property line Refuse staging area for rolling bins Concrete paving 4.5m front yard setback Exisiting trees - Cedar, Douglas Fir, Spruce Retain off-site cedar and any onsite cedar & sitka trees as recommended by arborist, or replant with (species) as necessary. Root protection as directed by arborist Adjust planting to avoid roots Manhole covers and catch basins refer to civil drawings Unit paving for lane and parking Various patterns and colours to delineate spaces, project entry, and enhance aesthetics of the drive aisle. lawn lawn lawn lawn lawn lawn lawn lawn lawn lawn Fence - existing Existing trees hedge of columnar Dawyck Beech picnic/activity table water vault detention tank refer to civil drawings LOCATION PLAN SCALE 1:5000 Chilliwack Courtenay Surrey THE WEDLER GROUP t: 1.604.588.1919 | f: 1.604.588.1910 | surrey@wedler.com #202 - 10216 - 128th Street, Surrey, BC V3T 2Z3 CITY OF MAPLE RIDGE 20786 RIVER ROAD MAPLE RIDGE %C Abbotsford DRAWING INDEX DESCRIPTION WEDLER DRAWING No. COVER GENERAL NOTES ONSITE SERVICING PLAN LORNE AVE M A P L E C R GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP 208-20423 DOUGLAS CRESCENT LANGLEY, BC, V3A 4B6 ONSITE STORM WATER MANAGEMENT PLAN OFFSITE SANITARY OFFSITE ROAD WORKS OFFSITE STORM WATER MANAGEMENT PLAN RESIDENTIAL DEVELOPMENT 20786 RIVER ROAD, MAPLE RIDGE, BC PROJECT: CLIENT: 113 AVE BATTLE AVE 114 AVE WESTFIELD AVE RIVER RD WEST THORNE AVE 20 5 S T WA R E S E L Y S T DA R T F O R D S T 20 7 S T WA R E S E L Y S T 20 7 S T MI L L E R S T M E L V I L L E S T 20 5 S T 115 AVE 115A AVE 116 AVE DENIZA AVE DALE DR WALNUT CR 118 AVE CAMWOOD AVE 118 AVE MCFARLANE AVE 117 AVE STONE Y A V E RIVER R O A D 20 9 S T GR A V E S S T 20 8 S T 20 9 S T ST E E V E S S T 21 0 S T 21 1 S T BE S T S T LOUGHEED HIG H W A Y S19-0305/B-01 S19-0305/B-02 S19-0305/B-03 S19-0305/B-05 S19-0305/B-06 S19-0305/B-07 ONSITE KEY PLAN ESC PLAN STAGE 1 ESC PLAN STAGES 2 & 3 S19-0305/B-08 S19-0305/B-09 S19-0305/B-10 ONSITE GRADING PLAN S19-0305/B-04 ISSUED FOR SUBMISSION PROJECT: S19-0305/B SITE NOTE: INSPECTIONS ARE REQUIRED FOR ALL WORKS SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL NOTIFY WEDLER ENGINEERING LLP. AT LEAST ONE FULL WORKING DAY (24 HOURS) PRIOR TO REQUIRING AN INSPECTION. EVEN THOUGH INSPECTIONS MAY BE PERFORMED BY OTHER ENGINEERS OR MUNICIPAL INSPECTORS, THE CONTRACTOR MUST STILL HAVE INSPECTIONS COMPLETED BY WEDLER, AS WEDLER IS REQUIRED TO CERTIFY THE WORKS. FAILURE BY THE CONTRACTOR TO REQUEST INSPECTIONS FROM WEDLER WILL RESULT IN THE CONTRACTOR BEING REQUIRED TO EXPOSE ALL BURIED OR CONCEALED WORKS WHICH HAVE NOT BEEN INSPECTED BY WEDLER, AT THE CONTRACTOR'S EXPENSE, OR MAY RESULT IN CONTRACTOR HAVING TO RECONSTRUCT THE WORKS AT THE CONTRACTOR'S EXPENSE. BYREVISIONDATENo. OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 2021-02-24GENERAL NOTES 1001 GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP 208-20423 DOUGLAS CRESCENT, LANGLEY BC S S S S S 10 0 0 12 0 0 14 0 0 W W W W W W 150Ø 150Ø 20 . 1 m 2 0 0 Ø P V C S T O R M @ 2 % 18 , 5 0 0 L 100Ø S T M W W W W W W 12 . 5 m 1 0 0 Ø P V C S A N @ 2 % 13 . 4 m 1 0 0 Ø P V C S A N @ 4 . 2 2 % D D 150Ø 150Ø 150Ø D 14 . 8 m 1 0 0 Ø P V C S A N @ 2 % 50 Ø P V C W A T ( D O M E S T I C ) 10 0 Ø 50 Ø 50Ø 100Ø 50Ø 100Ø 50Ø 100Ø 50Ø 100Ø 10 0 Ø P V C W A T ( F I R E ) 50Ø 100Ø 100Ø 100Ø 100Ø 100Ø 100Ø 50Ø 100Ø 100Ø 11.06m P A R K I N G 19.03 m P A R K I N G 18.52m P A R K I N G S S S S 6. 8 m 1 0 0 Ø P V C SA N @ 2 % UNIT A1 UNIT A2 UNIT C2 UNIT C1 UNIT B1 UNIT B2 PROP. 2 0 0 Ø P V C S A N @ 2 . 0 % 12 . 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 3, 8 5 0 L 6. 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 7 , 1 0 0 L 4. 6 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 1 2 , 5 0 0 L 19.90 19.81 19.83 19.86 19.98 19.74 19.89 19.88 19.95 20.00 20.02 19.98 20.21 20.16 20.1420.10 20.11 20.08 19.80 19.94 19.98 20.04 20.02 19.9519.91 19.91 20.0020.02 19.80 19.8819.90 19.89 19.9319.95 19.94 19.99 20.01 20.07 19.87 19.82 20.10 19.99 19.89 19.95 19.95 20.11 20.17 19.94 19.99 20.16 20.20 20.14 20.12 19.83 19.80 19.77 19.88 19.7219.82 19.75 19.66 19.63 19.73 19.76 19.72 19.72 19.73 19.74 19.74 19.94 19.67 20.10 19.63 19.75 19.72 19.72 19.66 19.64 19.60 19.78 19.69 19.72 19.48 19.60 19.55 19.70 19.61 19.7519.67 19.54 19.50 19.58 19.6819.62 19.68 19.50 19.67 19.58 19.67 19.81 19.6619.77 19.65 19.66 19.72 19.59 19.76 19.58 19.68 19.79 19.72 19.76 19.83 19.62 19.49 19.72 19.69 19.87 19.75 19.66 19.56 19.61 19.64 19.74 19.82 19.74 19.72 19.68 19.62 19.66 19.73 19.65 19.58 19.57 19.74 19.90 20.02 19.83 19.76 19.75 19.7619.67 19.69 19.59 19.57 19.67 19.54 19.68 19.80 19.58 19.74 19.76 20.02 19.76 20.19 20.24 19.83 19.92 19.84 20.00 19.75 20.04 20.08 19.77 19.62 19.65 19.99 19.91 19.93 19.67 19.68 19.91 20.23 X X X X X X X X X X X D 19.87 19.90 20.04 19.94 19.97 19.87 19.97 19.99 20.00 20.08 20.07 20.13 19.86 19.74 19.74 19.97 20.05 20.01 20.10 20.09 20.08 20.11 20.25 20.10 19.94 19.77 19.54 19.54 19.67 19.93 19.79 19.79 21.24 SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. EX. POWER POLE TO BE RELOCATED TO EAST OF DRIVEWAY LOT C PLAN 5112 LOT 368 PLAN 54768 MAPLE RIDGE ELEMENTARY SCHOOL LOT 37 PLAN 31152 LOT D PLAN 5112 BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26KEY PLAN 20786 RIVER ROAD 02 10 REFER TO LANDSCAPING DRAWINGS FOR LANDSCAPING DETAILS (TYP.) ONSITE WATER METER AND DCV VAULT INSTALL NEW DRIVEWAY INSTALL NEW DRIVEWAY PROP. FLOW CONTROL MH PROP. OIL/GRIT SEPARATOR PROP. ONSITE DETETION TANK S S S S S W W W W W W 150Ø 150Ø 20 . 1 m 2 0 0 Ø P V C S T O R M @ 2 % 18 , 5 0 0 L 100Ø S T M W W W W W W 12 . 5 m 1 0 0 Ø P V C S A N @ 2 % 13 . 4 m 1 0 0 Ø P V C S A N @ 4 . 2 2 % D D 150Ø 150Ø 150Ø D 14 . 8 m 1 0 0 Ø P V C S A N @ 2 % 50 Ø P V C W A T ( D O M E S T I C ) 10 0 Ø 50 Ø 50Ø 100Ø 50Ø 100Ø 50Ø 100Ø 50Ø 100Ø 10 0 Ø P V C W A T ( F I R E ) 50Ø 100Ø 100Ø 100Ø 100Ø 100Ø 100Ø 50Ø 100Ø 100Ø 11.06m P A R K I N G 19.03 m P A R K I N G 18.52 m P A R K I N G S S S S 6. 8 m 1 0 0 Ø P V C SA N @ 2 % UNIT A1 UNIT A2 UNIT C2 UNIT C1 UNIT B1 UNIT B2 PROP. 2 0 0 Ø P V C S A N @ 2 . 0 % 12 . 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 3, 8 5 0 L 6. 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 7 , 1 0 0 L 4. 6 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 1 2 , 5 0 0 L X X X X X X X X X X X D 1.45%-2.00% -6. 4 2 % 1.45%-2.00% -6. 4 2 % SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. CAP EXISTING WATER SERVICES (TYP.x3) PROP. OIL/GRIT SEPARATOR PROP. CONCRETE BARRIER CURB AND GUTTER RELOCATE CATCH BASIN TO PROP. CURB (TYP.x2) TIE INTO EX. CONCRETE SIDEWALK PROP. 6.0m WIDE CONCRETE DRIVEWAY AS PER C.O.M.R STD DWG. C7 LOT C PLAN 5112 LOT 368 PLAN 54768 MAPLE RIDGE ELEMENTARY SCHOOL LOT 37 PLAN 31152 LOT D PLAN 5112 BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26SERVICING PLAN 20786 RIVER ROAD 03 10 REFER TO SHEET 04 FOR DETAILS OF OFFSITE WORKS REFER TO ARBORIST REPORT FOR TREE REMOVAL & RETENTION (TYP) FLOW CONTROL MH DETENTION TANK 39.3m3 OF DETENTION WILL BE PROVIDED WITH THE RELEASE RATE OF 0.78L/s EX. POWER POLE TO BE RELOCATED TO EAST SIDE OF DRIVEWAY WATER METER REFER TO LANDSCAPING DRAWINGS FOR LANDSCAPING DETAILS (TYP.) 6.17 P R O P . WAT S R V C 19.57 P R O P . S A N S R V C CAP EX. LAWN BASIN LEAD AT MAIN (TYP. x2) S19-0305/B 6. 5 2.0 WATER SERVICE - PROFILE H: 1:500 V: 1:50 0.6m MIN 1.0 1.5 1.0 1.2m 2. 5 6.0 D S W ONSITE SANITARY MAIN - PROFILE H: 1:500 V: 1:50 ONSITE STORM MAIN - PROFILE H: 1:500 V: 1:50 0. 2 4 1 m CL R . 0. 6 0 3 m CL R . FINISHED GROUND FINISHED GROUND FINISHED GROUND 17.278 P R O P . S T M S R V C 18 . 4 6 m P R O P . S A N REMOVE EX. LAWN BASIN AND DISPOSE OF OFFSITE (TYP. x2) CAP AND ABANDON EX. SERVICE AT MANHOLE S S S S S 10 0 0 12 0 0 14 0 0 11.06m P A R K I N G 19.03 m P A R K I N G 18.52m P A R K I N G 19.90 19.81 19.83 19.86 19.98 19.74 19.89 19.88 19.95 20.00 20.02 19.98 20.21 20.16 20.1420.10 20.11 20.08 19.80 19.94 19.98 20.04 20.02 19.9519.91 19.91 20.0020.02 19.80 19.8819.90 19.89 19.9319.95 19.94 19.99 20.01 20.07 19.87 19.82 20.10 19.99 19.89 19.95 19.95 20.11 20.17 19.94 19.99 20.16 20.20 20.14 20.12 19.83 19.80 19.77 19.88 19.7219.82 19.75 19.66 19.63 19.73 19.76 19.72 19.72 19.73 19.74 19.74 19.94 19.67 20.10 19.63 19.75 19.72 19.72 19.66 19.64 19.60 19.78 19.69 19.72 19.48 19.60 19.55 19.70 19.61 19.7519.67 19.54 19.50 19.58 19.6819.62 19.68 19.50 19.67 19.58 19.67 19.81 19.6619.77 19.65 19.66 19.72 19.59 19.76 19.58 19.68 19.79 19.72 19.76 19.83 19.62 19.49 19.72 19.69 19.87 19.75 19.66 19.56 19.61 19.64 19.74 19.82 19.74 19.72 19.68 19.62 19.66 19.73 19.65 19.58 19.57 19.74 19.90 20.02 19.83 19.76 19.75 19.7619.67 19.69 19.59 19.57 19.67 19.54 19.68 19.80 19.58 19.74 19.76 20.02 19.76 20.19 20.24 19.83 19.92 19.84 20.00 19.75 20.04 20.08 19.77 19.62 19.65 19.99 19.91 19.93 19.67 19.68 19.91 20.23 X X X X X X X X X X X D 19.87 19.90 20.04 19.94 19.97 19.87 19.97 19.99 20.00 20.08 20.07 20.13 19.86 19.74 19.74 19.97 20.05 20.01 20.10 20.09 20.08 20.11 20.25 20.10 19.54 19.54 19.67 19.93 19.79 19.79 1.45%-2.00% -6. 4 2 % SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. EX. POWER POLE TO BE RELOCATED TO EAST OF DRIVEWAY LOT C PLAN 5112 LOT 368 PLAN 54768 MAPLE RIDGE ELEMENTARY SCHOOL LOT 37 PLAN 31152 LOT D PLAN 5112 BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26GRADING PLAN 20786 RIVER ROAD 04 10 REFER TO LANDSCAPING DRAWINGS FOR LANDSCAPING DETAILS (TYP.) ONSITE ROADWAY - TYPICAL SECTION N.T.S VARIES 6 TO 9.5m 2.85 1.85 0.35 1.5P ℄ ONSITE ROADWAY - PROFILE SCALE: H 1:500 V 1:50 EXISTING GROUND ELEV. PROP. ONSITE ROAD ELEV. CHAINAGE ON BASELINE 150Ø 150Ø 20 . 1 m 2 0 0 Ø P V C S T O R M @ 2 % 18 , 5 0 0 L 100Ø S T M D D 150Ø 150Ø 150Ø D 11.06m P A R K I N G 19.03 m P A R K I N G 18.52m P A R K I N G UNIT A1 UNIT A2 UNIT C2 UNIT C1 UNIT B1 UNIT B2 12 . 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 3, 8 5 0 L 6. 5 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 7 , 1 0 0 L 4. 6 m 2 0 0 Ø P V C S T M @ 0 . 7 5 % 1 2 , 5 0 0 L X X X X X X X X X X X D SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. PROP. OIL/GRIT SEPARATOR ONSITE STORMWATER MANAGEMENT TIER A LOT WILL BE GRADED AND STORM RUNOFF WILL BE DIRECTED TO THE NEAREST LANDSCAPE BUFFER WHERE 50% MAR WILL BE RE-USED. 50% MAR = 36.72mm SITE AREA = 1800m2 TIER A VOLUME = 36.72mm X 1800m² = 66.10m³ TOPSOIL VOID RATIO = 0.23 LANDSCAPE AREAS: 0.6m DEPTH = 290m2X0.6m = 174.0m³ 0.3m DEPTH = 420m22X0.3m = 126.0m³ TOTAL TOPSOIL VOLUME = 174.0m³+126.0m³ = 300m³ EFFECTIVE TOPSOIL VOLUME = 300m³X0.23 = 69m³ TIER A VOLUME REQUIREMENT 66.10m³ < PROPOSED EFFECTIVE TOPSOIL VOLUME 69.0m³. THEREFORE, TIER A REQUIREMENTS ARE SATISFIE& TIER B OVERFLOW FROM TIER A WILL BE COLLECTED, DETAINED UNDERGROUND, AND RELEASED AT THE 1:2 YEAR FORESTED FLOW RATE 1:2 YEAR FORESTED FLOW RATE = 0.00078m3/S REQUIRED DETENTION VOLUME = 39.33m3 TIER C(MINOR)STORM EVENTS EXCEEDING TIER B WILL BE COLLECTED AND THE 1:10 YEAR FLOW WILL BE RETAINED UNDERGROUND AND RELEASED AT THE 2-YEAR PRE-DEVELOPMENT FLOW RATE. TIER C(MAJOR) STORM EVENTS EXCEEDING TIER C-MINOR RAINFALL EVENTS SHALL BE SAFELY DIRECTED AWAY FROM PROPERTY AND TOWARD THE EXISTING 100 YEAR FLOW ROUTE, ALONG RIVER ROAD. LOT C PLAN 5112 LOT 368 PLAN 54768 MAPLE RIDGE ELEMENTARY SCHOOL LOT 37 PLAN 31152 LOT D PLAN 5112 BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26ONSITE SWCP 20786 RIVER ROAD REFER TO ARBORIST REPORT FOR TREE REMOVAL & RETENTION (TYP) FLOW CONTROL MH DETENTION TANK 39.3m3 OF DETENTION WILL BE PROVIDED WITH THE RELEASE RATE OF 0.78L/s REFER TO LANDSCAPING DRAWINGS FOR LANDSCAPING DETAILS (TYP.) 17.30 P R O P . S T M S R V C S19-0305/B NOTE: THIS PROPERTY IS AFFECTED BY THE FRASER RIVER ESCARPMENT AREA, THEREFORE INFILTRATION IS NOT ALLOWED. LANDSCAPE BUFFERS OUTSIDE FOUNDATION WILL NEED TO BE PROVIDED WITH IMPERMEABLE LINERS. SITE PLAN 1:150 Meters 1050 05 10 EX. LAWN BASIN LEADS TO BE ABANDONED 0+ 0 6 0 0+ 0 8 0 0+ 1 0 0 0+ 1 2 0 0+ 1 4 0 0+ 1 6 0 ST A : 0 + 1 3 9 . 8 9 RI M : 2 0 . 1 4 PR S1 1050Ø W 1 8 . 1 0 200Ø PVC S A N ST A : 0 + 0 9 9 . 3 3 RI M : 1 9 . 9 5 EX B257 1050Ø W 1 7 . 2 9 E 1 7 . 2 9 D 14 . 5 m 2 0 0 Ø P V C S T O R M SSS W 08 0 0 10 0 0 12 0 0 14 0 0 16 0 0 200Ø PVC SAN S PR S1 EX B257 12 . 6 m 1 0 0 Ø P V C S A N I T A R Y RIVER ROAD SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT LANGLEY, BC 2019 NOV 26SANITARY SEWER RIVER ROAD S19-0305/B 1.SANITARY SEWER SHALL BE CONSTRUCTED TO MMCD 2009 EDITION AND CITY OF MAPLE RIDGE SUPPLEMENTARY SPECIFICATIONS. 2.SANITARY SEWER MAINS SHALL BE PVC SDR35 PIPE. 3.FOR TYPICAL TRENCH, SEE MMCD-G4 AND MMCD-G5. BACKFILL TO BE IMPORTED GRANULAR BACKFILL PER GEOTECHNICAL REPORT. 4.ALL SANITARY SEWER CONNECTIONS SHALL BE MIN. 100mm DIAMETER PVC SDR28 PIPE C/W INSPECTION CHAMBER (MMCD STD. DWG. "S9") AT A 300mm OFFSET FROM PROPERTY LINE AND INSTALLED AS PER MMCD-S7. 5.SOME EXISTING UTILITY SERVICE CONNECTIONS NOT SHOWN FOR CLARITY. 6.UTILITY CROSSINGS TO BE SUPPORTED DURING CONSTRUCTION. 7.TOPOGRAPHIC SURVEY COMPLETED BY MURRAY & ASSOCIATES. ELEVATION 19.411 GEODETIC DATUM. 8.THIS PLAN SHOWS HORIZONTAL GROUND LEVEL MEASURED DISTANCES. PRIOR TO THE COMPUTATION OF NAD 83 UTM COORDINATES MULTIPLY BY THE COMBINED SCALE FACTOR OF 0.9995887. 9.THE LOCATION OF UNDERGROUND EXISTING UTILITIES ARE INDICATED IN THE PUBLIC ROAD ALLOWANCE ONLY AND ARE SHOWN APPROXIMATE. ONLY UTILITIES WITHIN RIGHT-OF-WAY ARE SHOWN. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. BC ONE-CALL PROVIDES UNDERGROUND UTILITY LOCATIONS (1-800-474-6886) 10.BASEMAP WAS IMPORTED FROM CITY OF MAPLE RIDGE GIS COORDINATE GEOMETRY. ACCURACY IS ESTIMATED AT ±0.1m. NOTES EX. RD. ℄ ELEV. CHAINAGE ON BASELINE (m) PROP. SANITARY GRADES, LENGTHS, AND INVERTS INSTALL NEW 1050Ø MANHOLE AS PER MMCD STD DETAIL S1 REMOVE EX. CAPPED STUB AND TIE INTO EX. MANHOLE. REBENCH AS REQUIRED. 06 10 5. 7 0 PR O P . S A N PR O P . 2 0 0 Ø P V C S T O R M SE R V I C E C R O S S I N G 0. 3 0 m CL R . PERMANENT PAVEMENT RESTORATION AS PER MMCD STD DETAIL G5 CAP AN ABANDON EX. SERVICE AT MANHOLE. REBENCH AS REQUIRED 0+ 0 6 0 0+ 0 8 0 0+ 1 0 0 0+ 1 2 0 0+ 1 4 0 0+ 1 6 0 1.17% 0.88% 0.54% 0.29% ST A : 0 + 0 7 5 . 6 1 EL E V : 1 9 . 7 2 ST A : 0 + 0 8 1 . 7 6 EL E V : 1 9 . 7 9 ST A : 0 + 1 1 8 . 9 3 EL E V : 1 9 . 9 9 ST A : 0 + 1 3 0 . 9 6 EL E V : 2 0 . 0 3 ST A : 0 + 1 4 3 . 4 7 EL E V : 2 0 . 1 4 19.6 0 19. 8 0 20.00 X D 14 . 5 m 2 0 0 Ø P V C S T O R M SSS W 06 4 0 08 0 0 10 0 0 12 0 0 14 0 0 16 0 0 200Ø PVC SAN S 12 . 6 m 1 0 0 Ø P V C S A N I T A R Y 100mm BRUSHED CONCRETE SIDEWALK/EXPOSED AGGREGATE BAND (MMCD 03 30 20) 80mm ASPHALT 100mm, 19mm MINUS GRANULAR BASE (MMCD 32 11 25) 300mm, 75mm MINUS CRUSHED GRANULAR SUB-BASE (MMCD 31 05 17 2.9) BARRIER CURB AS PER MMCD STD. DWG. C4 ROAD / SIDEWALK DETAIL N.T.S. TREATMENT (FULL DEPTH STRUCTURE) ·40mm ASPHALT SURFACE COURSE ·40mm ASPHALT BASE COURSE ·100mm OF 19mm MINUS CRUSHED GRAVEL ·300mm OF 75mm MINUS SUB-BASE TREATMENT (MILL AND OVERLAY) ·MILL FULL DEPTH OF EXISTING ASPHALT AND SUBGRADE AS NECESSARY TO MEET DESIGN GRADES TOPSOIL AND SOD ·REMOVE ALL EXISTING HARD SURFACE AND SOFT SURFACES. BACKFILL, REGRADE AND TIE-INTO EXISTING GRADE WITH NATIVE MATERIAL TO 150mm BELOW DESIGN GRADES. INSTALL 150mm THICK TOPSOIL AND SOD 1.PROOF ROLL BASE, ADD GRAVELS AS REQUIRED, RECOMPACT, AND RESHAPE AS REQ'D. PRIOR TO PAVING 2.CLEAN AND TACK-COAT ALL ASPHALT SURFACES INCLUDING JOINTS PRIOR TO PAVING. 3.COMPACTION FOR GRAVELS TO BE 95% M.P.D.. FOR MARSHALL MIX 97% (TYP.) 4.OVER-EXCAVATE (OPTIONAL) WHERE DIRECTED BY THE CONTRACT ADMINISTRATOR, EXCAVATE UNSUITABLE MATERIAL AND REPLALCE WITH IMPORTED BASE GRAVEL COMPACTED IN PLACE. 5.CONTRACTOR TO REPLACE ALL MANHOLE FRAMES AND LIDS; WATER VALVE BOXES AND COVERS WITHIN THE ROADWAY. 6.THE ADJUSTMENT OF MANHOLES, VALVE COVERS, AND ALL OTHER APPURTENANCES TO SUIT NEW ASPHALT GRADES IN INCIDENTAL TO ASPHALT PAVING. 7.ALL PAVEMENT MARKINGS TO BE REINSTATED IN THE PLACE OF WORK. CONTRACTOR IS RESPONSIBLE TO PERFORM PRE AND POST CONSTRUCTION SURVEY WORK ESSENTIAL FOR THE REINSTATEMENT OF PAVEMENT MARKINGS. 8.CONTRACTOR TO IDENTIFY ANY SURVEY MONUMENTS AND LEAD PLUGS THAT MAY BE DISTURBED DURING CONSTRUCTION AND ARRANGE WITH THE OWNER'S SURVEY DEPARTMENT 5 DAYS PRIOR TO CONSTRUCTION TO REFERENCE LOCATIONS BEFORE WORK COMMENCES. 9.CATCH BASINS RIM ELEVATIONS TO BE SET 30mm BELOW THE FINISHED GUTTERLINE GRADES AND ROAD SURFACE AREA TO BE SHAPED TO FORM A DISH AROUND THE INLET. NOTES: 150mm TOPSOIL AND SOD BOULEVARD 100mm GRANULAR BASE COMPACTED TO 95% M.P.D. 3.30 LANE 9.00 2.40 PRKG 4.20 3.30 9.00 18.00 R.O.W. EX. 3.30 LANE 4.20 FUT 1.50 WALK 5.80FUT 1.30 BLVD 3:1 MAX 11.60 PROP. PLEX. PL L R.O.W.C 'B ' C & G 'B ' C & G 1.30 BLVD 2.50% 1.50 WALK 2.00%2.00% FUT 2.40 PRKG EX. PL 2.40 BLVD RIVER ROAD BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2021 JAN 04ROADWORKS RIVER ROAD S19-0305/B EX. RD. ℄ ELEV. CHAINAGE ON BASELINE (m) PROP. GL ELEV. EX. GL ELEV. PAVEMENT STRUCTURE -MIN. 40mm ASPHALTIC CONCRETE SURFACE COURSE -MIN. 40mm ASPHALTIC CONCRETE BASE COURSE -MIN. 100mm OF 20mm MINUS CRUSH GRAVEL BASE TO 95% MODIFIED PROCTOR DENSITY -MIN. 300mm OF PIT-RUN SUB-BASE TO 95% MODIFED PROCTOR DENSITY -SUB-GRADE TO 95% MODIFIED PROCTOR DENSITY RIVER ROAD - TYPICAL SECTION N.T.S. TIE INTO EX. CONC. DRIVEWAY CROSSING AND CURB AT EXPANSION JOINT INSTALL NEW CONCRETE DRIVEWAY CROSSING AS PER CITY OF MAPLE RIDGE STD DETAIL DWG C7 PROP. CONCRETE SIDEWALK AND BARRIER CURB AND GUTTER AS PER MMCD STD DETAIL DRAWINGS C2 AND C4 RESPECTIVELY 20 7 8 0 R I V E R R O A D 20786 RIVER ROAD20772 RIVER ROAD 20769 RIVER ROAD 20777 RIVER ROAD 20787 RIVER ROAD 20797 RIVER ROAD 20805 RIVER ROAD REMOVE EX. CURB, SIDEWALK, AND DRIVEWAY CROSSINGS PROP. SANITARY EXTENSION, SEE SHEET 03 FOR DETAILS PROP. TOP INLET CATCH BASIN AS PER CoMR STD DETAIL DWG S11 TIE PROP CB IN TO EX. LEAD (TYP. x2) LEAD CONDITION TO BE REVIEWED BY CA PRIOR TO CONSTRUCTION 07 10 TIE PROP. SIDEWALK INTO EX. LETDOWN AT NEAREST EXPANSION JOINT PROP. GUTTER LINE 1.5m SIDEWALK 1.3m BLVD PR O P . 5 . 0 0 m R O A D D E D I C A T I O N RE-LOCATE EX. UTILITY POLE TO EAST SIDE OF PROP. DRIVEWAY CAP AND ABANDON EX. WATER SERVICES (TYP. x3) SURVEY PERFORMED BY PENG ZHAO (BCLS #931, COASTLINE LAND SURVEYING) ON MAY 20, 2019 BEFORE YOU DIG THE LOCATION OF THE EXISTING UTILITIES HAS BEEN SHOWN BASED ON AVAILABLE INFORMATION. THE ACCURACY AND COMPLETENESS OF THE DRAWING IN THIS RESPECT IS NOT GUARANTEED. THE EXACT LOCATION OF THESE UTILITIES AND SERVICES SHALL BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ALL CONFLICTS TO BE IMMEDIATELY REPORTED TO WEDLER ENGINEERING. PROP. STREET TREES. REFER TO LANDSCAPE ARCHITECT DRAWINGS FOR DETAILS o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o SRW E [ . P L A N L M P 2 8 3 5 0 ONSITE STORMWATER MANAGEMENT TIER A LOT WILL BE GRADED AND STORM RUNOFF WILL BE DIRECTED TO THE NEAREST LANDSCAPE BUFFER WHERE 50% MAR WILL BE RE-USED. 50% MAR = 36.72mm SITE AREA = 1800m2 TIER A VOLUME = 36.72mm x 1800m²= 66.10m³ TOPSOIL VOID RATIO = 0.23 LANDSCAPE AREAS: 0.6m DEPTH = 290m2x0.6m = 174.0m³ 0.3m DEPTH = 420m22x0.3m = 126.0m³ TOTAL TOPSOIL VOLUME = 174.0m³+126.0m³ = 300m³ EFFECTIVE TOPSOIL VOLUME = 300m³x0.23 = 69m³ TIER A VOLUME REQUIREMENT 66.10m³ < PROPOSED EFFECTIVE TOPSOIL VOLUME 69.0m³. THEREFORE, TIER A REQUIREMENTS ARE SATISFIE& TIER B OVERFLOW FROM TIER A WILL BE COLLECTED, DETAINED UNDERGROUND, AND RELEASED AT THE 1:2 YEAR FORESTED FLOW RATE 1:2 YEAR FORESTED FLOW RATE = 0.00078m3/s REQUIRED DETENTION VOLUME = 39.33m3 TIER C(MINOR)STORM EVENTS EXCEEDING TIER B WILL BE COLLECTED AND THE 1:10 YEAR FLOW WILL BE RETAINED UNDERGROUND AND RELEASED AT THE 2-YEAR PRE-DEVELOPMENT FLOW RATE. TIER C(MAJOR) STORM EVENTS EXCEEDING TIER C-MINOR RAINFALL EVENTS SHALL BE SAFELY DIRECTED AWAY FROM PROPERTY AND TOWARD THE EXISTING 100 YEAR FLOW ROUTE, ALONG RIVER ROAD. STORMWATER MANAGEMENT PLAN 1:1500 o o o o o o o o o o o o o o o OVERLAND FLOW DIRECTION MAJOR CATCHMENT BOUNDARY MINOR CATCHMENT BOUNDARY EXISTING STORM SEWER EXISTING MANHOLE LABELS CATCHMENT AREA (ID AND AREA) LEGEND BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26SWMP 20786 RIVER ROAD 08 10 S19-0305/B SITE W X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X D SILTATION CONTROL 1.ALL WORK IS TO BE UNDERTAKEN AND COMPLETED BY THE CONTRACTOR IN SUCH MANNER AS TO PREVENT THE RELEASE OF SEDIMENT LADEN WATER INTO ANY STORM SEWER, LAWN DRAIN, CATCH BASIN OR WATERCOURSE. 2.SILTATION WORKS SHALL BE INSTALLED BY THE CONTRACTOR PRIOR TO ANY WORK IN THE AREA FOR WHICH THE SILT CONTROL WORKS ARE INTENDED. ALL SILTATION CONTROLL WORKS SHALL BE INSPECTED AT TIME OF INSTALLATION BY WEDLER ENGINEERING LLP. 3.SILTATION CONTROL WORKS, INCLUDING FENCES, BERMS AND SETTLEMENT PONDS ARE TO BE MAINTAINED BY CONTRACTOR AT ALL TIMES TO ASSURE PROPER OPERATION. REPLACEMENT OF FENCES OR ROCK BERMS, THE JET VAC OF SEWERS AND THE CLEANING OF SUMPS MAY BE REQUIRED DURING THE COURSE OF CONSTRUCTION, AS DIRECTED BY WEDLER ENGINEERING LLP. 4.ALL SILTATION CONTROL WORKS ARE TO REMAIN IN PLACE UNTIL BUILDING ACTIVITIES ARE 90% COMPLETE AND VEGETATION ON EXPOSED AND DISTURBED AREAS HAS DEVELOPED TO PROVIDE ADEQUATE EROSION PROTECTION. 5.IMMEDIATELY UPON INSTALLATION, ALL CATCH BASINS AND LAWN DRAINS SHALL BE FITTED WITH AN APPROVED CATCH BASIN DONUT BY THE CONTRACTOR TO PREVENT SILT FROM ENTERING INTO ANY STORM SYSTEMS. 6.DURING CONSTRUCTION THE CONTRACTOR MAY NEED TO EMPLOY ADDITIONAL MEASURES (SUCH AS SURFACE SWALES, TRENCHES OR FILTER FABRIC FENCES) TO MINIMIZE SILT CONTAMINATED SURFACE RUNOFF, AS DIRECTED BY WEDLER ENGINEERING AND/OR THE ENVIRONMENTAL MONITOR. SEQUENCE OF CONSTRUCTION TO FACILITATE EROSION & SEDIMENT (ONSITE) 1.SILTATION FENCES TO BE PLACED WHERE ONLY SHALLOW POOLS CAN FORM OR WHERE SHEET OR OVERLAND FLOW IS EXPECTED, INSTALL SILT FENCES AS 'SMILES', BY THE DEVELOPER'S CONTRACTOR. 2.CONSTRUCT SITE ACCESS PAD AS PER DETAIL, THIS SHEET. 3.CLEARING AND GRUBBING OF SITE TO PROCEED FROM SOUTH TO NORTH. MAINTAIN WITHIN PROPERTY BOUNDARY, STOCKPILED MATERIAL TO BE COVERED WITH POLY SHEETING AND WEIGHTED DOWN. 4.IMMEDIATELY FOLLOWING STRIPPING OF TOPSOIL MOVE HEAVY TRACKING EQUIPMENT UP AND DOWN PERPENDICULAR TO THE SLOPE. 5.TEMPORARILY STABILIZE DISTURBED EARTH BY USING 19mm CRUSHED GRAVEL OR HAND-SPREAD (MIN. 25mm THICK) STRAW TO COVER 80-100% OF THE SOIL AND CONTROL SEDIMENT RUN-OFF. 6.INSTALL CUT-OFF DITCHES WITH ROCK BERMS. SITE ACCESS 1.CONSTRUCTION ACCESS TO SITE SHALL BE LIMITED TO ROCK PAD LOCATION ONLY. 2.FRACTURED ROCK ACCESS PAD SHALL BE SCARIFIED OR FORTIFIED WITH ADDITIONAL ROCK AS REQUIRED TO ENSURE THAT TRUCK WHEELS ARE KNOCKED CLEAN OF SEDIMENT. 3.THE CONTRACTOR SHALL REGULARLY CLEAN PAVED ROAD SURFACES OF ACCUMULATED SEDIMENTS AT THE END OF EACH WORK DAY, OR AS REQUIRED. PAVED SURFACES SHALL BE SWEPT, NOT FLUSHED. MONITORING OF SILT CONTROL MEASURES 1.WEDLER ENGINEERING LLP. OR AN ENVIRONMENTAL MONITOR, AS CHOSEN BY THE DEVELOPER, WILL MONITOR THE QUALITY OF DISCHARGE WATER THROUGHOUT THE COURSE OF THE PROJECT. 2.THE CONTRACTOR SHALL PERFORM REMEDIAL ACTION TO CORRECT DEFICIENCIES IN SILTATION CONTROL WORKS AS INSTRUCTED BY THE ENVIRONMENTAL MONITOR OR BY WEDLER ENGINEERING LLP. 3.WATER DISCHARGED FROM THE SITE SHOULD MEET THE CITY OF MAPLE RIDGE GUIDELINES: - TURBIDITY - SITE DISCHARGE TO BE ANALYZED FOR TSS WILL BE TRIGGERED BY READINGS OF OVER 20 NTU -25 mI/L DURING DRY WEATHER -75 mI/L DURING THE RAINY PERIOD - PH BETWEEN 6 AND 9. - AT A MINIMUM OF 1 PER WEEK AND WITHIN 24 HRS OF A SIGNIFICANT RAIN EVENT DURING THE PERIOD FROM OCT.16 - MAY 15. - AT A MINIMUM OF 1 EVERY 2 WEEKS AND WITHIN 24 HRS OF A SIGNIFICANT RAIN EVENT DURING THE PERIOD FROM MAY.15 - OCT.15. INSTALL ROCK ACCESS PAD, SEE DETAIL ON SHEET. INSTALL SILT FENCE SEE DETAIL ON THIS SHEET. COVER ALL STOCKPILED MATERIAL WITH POLY SHEETING AND SURROUND WITH SILT FENCE. POLY SHEETING TO BE WEIGHED DOWN (TYP.) ROAD SWEEPING TO BE IMPLEMENTED REGULARLY AND AS REQUIRED BY THE ESC SUPERVISOR OR THE DISTRICT OF MAPLE RIDGE AND DAILY DURING CONSTRUCTION. STAGE 1 - CLEARING AND GRUBBING 1:250 CONSTRUCTION IS NOT TO COMMENCE UNTIL ESC PERMIT HAS BEEN ISSUED IF DISCHARGE WATER QUALITY DOES NOT MEET THE REQUIRED GUIDELINES, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DEPLOYED AT THE OWNER'S EXPENSE. ADDITIONAL MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO, PORTABLE TREATMENT FACILITIES, STORM-KLEAR GEL-FLOC ETC. IF RH LEVELS IN DISCHARGE WATER ARE NOT BETWEEN 6 AND 9, THEN DISCHARGE WATER MUST BE TREATED WITH C02 GAS REGULATED THROUGH A DIFFUSER CAPABLE OF OPERATING UP TO 40L/s 1 1 1 1 0.50m 0. 4 5 m M I N SECTION PROFILE MAX. 15.0m WATER LEVEL (TYP.) DIRECTION OF FLOW. INVERT AND SIDES OF DITCH LINED WITH POLY SHEETING OR APPROVED ALTERNATE CRUSHED GRAVEL CHECK BERM. BURLAP ON UPSTREAM SIDE WITH MIN. 300mm OF WASHED RIVERSAND ON TOP. 25mm - 75mm CRUSHED GRAVEL CHECK BERM. CLASS B RIPRAP GEOTEXTILE FABRIC 25mm THICK FLOOD POOL 2.25m WASHED STONE FACING 1.5 MIN. 1. 5 M A X UNDISTURBED SOIL GEOTEXTILE FABRIC 1.0 1.2 MIN.45 0 m m 2:1 MA X 1:1 A SECTION A - A DITCH FLOW SILT FENCE DETAIL N.T.S. TIE BELT AMOCO 1380/2125 SILT STOP OR APPROVED EQUAL 50x50 WOOD STAKE OR STEEL POST @ MAX 2.0m SPACING BACKFILL FLOW 15 0 m m CUT-OFF DITCH N.T.S. SILT TRAP DETAIL N.T.S. CUT-OFF DITCH . SEE DETAIL ON THIS SHEET. SILTATION CHECK BERM AT MAX 15m SPACING (TYP.) ALL PONDING OF WATER ENCOUNTERED IN EXCAVATION TO BE PUMPED TO THE NEAREST CUT-OFF DITCH UPSTREAM OF SEDIMENT TRAP (TYP.) MAKE EVERY POSSIBLE EFFORT TO MINIMIZE AMOUNT OF SOIL TRANSPORTED FROM CONSTRUCTION TO ROADWAY. BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26ESC PLAN - STAGE 1 20786 RIVER ROAD 09 10 INSTALL SILT TRAP, SEE DETAIL ON THIS SHEET. S S S W W W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX W W W D S X X S S S W 10 0 0 12 0 0 14 0 0 W W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X W W W D S X X MAINTAIN ROCK ACCESS PAD. ENSURE SILT CONTROL FENCING IS IN PLACE AND IN OPERATING CONDITION AT ALL TIMES. COVER ALL STOCKPILED MATERIAL WITH POLY SHEETING AND SURROUND WITH SILT FENCE. POLY SHEETING TO BE WEIGHED DOWN (TYP.) ROAD SWEEPING TO BE IMPLEMENTED REGULARLY AND AS REQUIRED BY THE ESC SUPERVISOR OR THE DISTRICT OF MAPLE RIDGE AND DAILY DURING CONSTRUCTION. ROUGH GRADE EXCAVATED MATERIAL. TRACK COMPACT AND IMMEDIATELY HAND SPREAD STRAW OR STABILIZE USING CRUSHED GRAVEL. REFER TO CRITERA UNDER CLEARING STAGE. SITE ACCESS ALL LICENSED VEHICLES TO BE KEPT ON GRAVEL PAD (TYP.) STAGE 2 - ONSITE SERVICING 1:250 STAGE 3 - FINAL GRADING 1:250 ENSURE SILT CONTROL FENCING IS IN PLACE AND IN OPERATING CONDITION AT ALL TIMES. INSTALLATION AND REMOVAL OF TEMPORARY ESC MEASURES TO BE CO-ODRDINATED WITH ESC SUPERVISOR. DEPENDENT ON WEATHER CONDITIONS. OPERATION TO BE DONE IN CUT AND COVER MANNER IN FAVOURABLE WEATHER CONDITIONS. PAVE SITE, COMPLETE BUILDING CONSTRUCTION AND COMPLETE LANDSCAPING. ALL PONDING OF WATER ENCOUNTERED IN EXCAVATION TO BE PUMPED TO THE NEAREST CUT-OFF DITCH UPSTREAM OF SEDIMENT TRAP (TYP.) CUT-OFF DITCH. SEE DETAIL THIS SHEET. SILTATION CHECK BERM AT MAX 15M SPACING (TYP.) MAKE EVERY POSSIBLE EFFORT TO MINIMIZE AMOUNT OF SOIL TRANSPORTED FROM CONSTRUCTION TO ROADWAY. BYREVISIONDATENo. GOLDEN RIDGE PROPERTIES LTD. PARTNERSHIP OF DWG. No. SHEET DATE S/L I.P. X TEL HYD W/M GAS SAN STM Surrey www.wedler.com Chilliwack Courtenay THE WEDLER GROUP 1.604.792.0651 1.250.334.3263 1.604.588.1919 Abbotsford 1.604.746.0300 CITY O) 0APLE RIDGE ENGINEERING DEPART0ENT 208-20423 DOUGLAS CRESCENT, LANGLEY BC 2019 NOV 26ESC PLAN - STAGES 2 & 3 20786 RIVER ROAD 10 10 SILT FENCE DETAIL N.T.S. TIE BELT AMOCO 1380/2125 SILT STOP OR APPROVED EQUAL 50x50 WOOD STAKE OR STEEL POST @ MAX 2.0m SPACING BACKFILL FLOW 15 0 m m 805 - 271 Francis Way New Westminster BC V3L 0H2 Office 604-540-4122 ____________________________________________________________________ Mark McMullen February 21, 2023 Manager of Development and Environmental Services City of Maple Ridge 11995 Haney Place Maple Ridge, BC Canada V2X 6A9 re: 2019-393-RZ (20786 River Road) - Coordinated Assessment Strategy Statement The project consists of six (6) single detached dwelling units on strata lots, to be built on a vacant parcel, with road dedication and roadworks (including creation of street parking). Professional consultants of the coordinated team: Development Mgmt - KeyPlan (Kevin Key) Landscape Architecture - Greenway (Paul Whitehead) Arborist - Koome Urban Forestry (Kelly Koome) Building Designer - D3 Dimension Design (Kirsten Sutton) Engineering (Geotechnical) - EXP (Jonah Schwab) Engineering (Civil) - Wedler (Stanley Reid) I have reviewed consultant reports and drawings and to the best of my ability, find no incompatibilities with regard to recommendations, standards, policies, or guidelines resulting from the related work of the professional consultants. I confirm that project design details and environmental standards of the lot layout submitted, meet or exceed compliance with federal and provincial regulations which apply and meet or exceed compliance with municipal bylaws, policies and guidelines as identified and provided (or allowed and varied) by City staff or Council. Kevin Key KeyPlan Development Mgmt cc: project consultants, as listed above CONTEXT PHOTOS - Appendix A1 20786 River Road - 2019-393 -RZ Aerial view - southward CONTEXT PHOTOS - Appendix A2 20786 River Road - 2019-393 -RZ Frontage - east view Southeast corner - from schoolgrounds South lot line - looking north from schoolgrounds - shipping container to be relocated Panhandle driveway on west side - Beech trees