Loading...
HomeMy WebLinkAbout2024-06-18 Committee of the Whole Agenda and Reports.pdfCity of Maple Ridge COMMITTEE OF THE WHOLE AGENDA June 18, 2024 11:00 AM Virtual Online Meeting including Council Chambers Committee of the Whole is the initial venue for review of issues. No voting takes place on bylaws or resolutions. A decision is made to send an item to Council for debate and vote or to send an item back to staff for more information or clarification before proceeding to Council. The meeting is live streamed and recorded by the City of Maple Ridge. For virtual public participation during Community Forum register by going to the Public Portal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon for the select meeting 1.CALL TO ORDER 1.1 Territory Acknowledgement The City of Maple Ridge carries out its business on the traditional and unceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen (qʼʷa:n̓ƛʼәn̓) First Nation. 2.APPROVAL OF AGENDA 3.MINUTES 3.1 Adoption of Minutes – June 4, 2024 4.DELEGATIONS/STAFF PRESENTATIONS 5.PLANNING AND DEVELOPMENT SERVICES Note:  • Owners and/or Agents of development applications on this agenda may be present to answer Council questions pertaining to their item at the conclusion of Staff presentations for that item. • The following items have been numbered to correspond with the Council Agenda where further debate and voting will take place, upon Council decision to forward them to that venue. 5.1 2019­255­RZ, 12297 222 Street, 22175 and 22185 123 Avenue, RS­1 to CD­6­ 21 To rezone the subject properties from RS­1 (Single Detached Residential) to CD­ 6­21 (Medium Density Mixed Use Rental and Market Apartment Residential) zone, as amended, based on RM­2 zone, to accommodate an eight­storey rental apartment building with 106 rental residential units to be utilized by seniors and people with disabilities and a proposed group childcare facility accommodating approximately 47 children. RECOMMENDATION:  That the staff report dated June 18, 2024, titled “12297 222 Street and 22175 and 22185 123 Avenue; Rescindment and Amended Readings of Official Community Plan Amending Bylaw No. 7803­2021; and Zone Amending Bylaw No. 7812­2021 Amended Second Reading” be forwarded to the next Regular Council Meeting. 6.ENGINEERING SERVICES 6.1 Budget Increase for 123 Avenue Roadway and Utility Improvements Project (Laity St. to 216 St.) To obtain Council approval to increase the budget for the 123 Avenue Roadway and Utility Improvements Project to allow the project to proceed to construction. RECOMMENDATION: That the staff report date June 18, 2024, titled “Budget Increase for 123 Avenue Roadway and Utility Improvements Project (Laity St. to 216 St.)” be forwarded to the next Regular Council Meeting. 7.CORPORATE SERVICES 8.PARKS, RECREATION, AND CULTURE 9.ADMINISTRATION 10.COMMUNITY FORUM 11.NOTICE OF CLOSED MEETING 11.1 The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report]; •    Section 90(2)(b) – the consideration of information received and held in confidence relating to negotiations between the municipality and a provincial government or the federal government or both, or between a provincial government or the federal government or both and a third party;  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT City of Maple RidgeCOMMITTEE OF THE WHOLEAGENDAJune 18, 202411:00 AMVirtual Online Meeting including Council ChambersCommittee of the Whole is the initial venue for review of issues. No voting takes place on bylaws orresolutions. A decision is made to send an item to Council for debate and vote or to send an item backto staff for more information or clarification before proceeding to Council. The meeting is live streamedand recorded by the City of Maple Ridge.For virtual public participation during Community Forum register by going to the PublicPortal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon forthe select meeting1.CALL TO ORDER1.1 Territory AcknowledgementThe City of Maple Ridge carries out its business on the traditional andunceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen(qʼʷa:n̓ƛʼәn̓) First Nation.2.APPROVAL OF AGENDA3.MINUTES3.1 Adoption of Minutes – June 4, 20244.DELEGATIONS/STAFF PRESENTATIONS5.PLANNING AND DEVELOPMENT SERVICESNote: • Owners and/or Agents of development applications on this agenda may bepresent to answer Council questions pertaining to their item at the conclusion of Staff presentations for that item. • The following items have been numbered to correspond with the Council Agenda where further debate and voting will take place, upon Council decision to forward them to that venue. 5.1 2019­255­RZ, 12297 222 Street, 22175 and 22185 123 Avenue, RS­1 to CD­6­ 21 To rezone the subject properties from RS­1 (Single Detached Residential) to CD­ 6­21 (Medium Density Mixed Use Rental and Market Apartment Residential) zone, as amended, based on RM­2 zone, to accommodate an eight­storey rental apartment building with 106 rental residential units to be utilized by seniors and people with disabilities and a proposed group childcare facility accommodating approximately 47 children. RECOMMENDATION:  That the staff report dated June 18, 2024, titled “12297 222 Street and 22175 and 22185 123 Avenue; Rescindment and Amended Readings of Official Community Plan Amending Bylaw No. 7803­2021; and Zone Amending Bylaw No. 7812­2021 Amended Second Reading” be forwarded to the next Regular Council Meeting. 6.ENGINEERING SERVICES 6.1 Budget Increase for 123 Avenue Roadway and Utility Improvements Project (Laity St. to 216 St.) To obtain Council approval to increase the budget for the 123 Avenue Roadway and Utility Improvements Project to allow the project to proceed to construction. RECOMMENDATION: That the staff report date June 18, 2024, titled “Budget Increase for 123 Avenue Roadway and Utility Improvements Project (Laity St. to 216 St.)” be forwarded to the next Regular Council Meeting. 7.CORPORATE SERVICES 8.PARKS, RECREATION, AND CULTURE 9.ADMINISTRATION 10.COMMUNITY FORUM 11.NOTICE OF CLOSED MEETING 11.1 The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report]; •    Section 90(2)(b) – the consideration of information received and held in confidence relating to negotiations between the municipality and a provincial government or the federal government or both, or between a provincial government or the federal government or both and a third party;  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT City of Maple RidgeCOMMITTEE OF THE WHOLEAGENDAJune 18, 202411:00 AMVirtual Online Meeting including Council ChambersCommittee of the Whole is the initial venue for review of issues. No voting takes place on bylaws orresolutions. A decision is made to send an item to Council for debate and vote or to send an item backto staff for more information or clarification before proceeding to Council. The meeting is live streamedand recorded by the City of Maple Ridge.For virtual public participation during Community Forum register by going to the PublicPortal at https://mapleridge.primegov.com/public/portal and clicking on the microphone icon forthe select meeting1.CALL TO ORDER1.1 Territory AcknowledgementThe City of Maple Ridge carries out its business on the traditional andunceded territories of the Katzie (q̓ic̓әy̓) First Nation and the Kwantlen(qʼʷa:n̓ƛʼәn̓) First Nation.2.APPROVAL OF AGENDA3.MINUTES3.1 Adoption of Minutes – June 4, 20244.DELEGATIONS/STAFF PRESENTATIONS5.PLANNING AND DEVELOPMENT SERVICESNote: • Owners and/or Agents of development applications on this agenda may bepresent to answer Council questions pertaining to their item at the conclusionof Staff presentations for that item.• The following items have been numbered to correspond with the CouncilAgenda where further debate and voting will take place, upon Councildecision to forward them to that venue.5.1 2019­255­RZ, 12297 222 Street, 22175 and 22185 123 Avenue, RS­1 to CD­6­21To rezone the subject properties from RS­1 (Single Detached Residential) to CD­6­21 (Medium Density Mixed Use Rental and Market Apartment Residential) zone,as amended, based on RM­2 zone, to accommodate an eight­storey rentalapartment building with 106 rental residential units to be utilized by seniors andpeople with disabilities and a proposed group childcare facility accommodatingapproximately 47 children.RECOMMENDATION: That the staff report dated June 18, 2024, titled “12297 222 Street and 22175 and22185 123 Avenue; Rescindment and Amended Readings of Official CommunityPlan Amending Bylaw No. 7803­2021; and Zone Amending Bylaw No. 7812­2021Amended Second Reading” be forwarded to the next Regular Council Meeting.6.ENGINEERING SERVICES6.1 Budget Increase for 123 Avenue Roadway and Utility Improvements Project (LaitySt. to 216 St.)To obtain Council approval to increase the budget for the 123 Avenue Roadwayand Utility Improvements Project to allow the project to proceed to construction.RECOMMENDATION:That the staff report date June 18, 2024, titled “Budget Increase for 123 AvenueRoadway and Utility Improvements Project (Laity St. to 216 St.)” be forwarded tothe next Regular Council Meeting.7.CORPORATE SERVICES8.PARKS, RECREATION, AND CULTURE9.ADMINISTRATION10.COMMUNITY FORUM11.NOTICE OF CLOSED MEETING11.1 The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: •    Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report]; •    Section 90(2)(b) – the consideration of information received and held in confidence relating to negotiations between the municipality and a provincial government or the federal government or both, or between a provincial government or the federal government or both and a third party;  Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. 12.ADJOURNMENT Document: 3826229 CITY OF MAPLE RIDGE COMMITTEE OF THE WHOLE MEETING MINUTES JUNE 4, 2024 The Minutes of the Committee of the Whole Meeting held virtually and hosted in Council Chambers on June 4, 2024, at 11:00 am at City Hall, 11995 Haney Place, Maple Ridge, British Columbia for the purpose of transacting regular City business. PRESENT Elected Officials Mayor D. Ruimy Councillor K. Carreras Councillor O. Dozie (Virtual) Councillor J. Dueck Councillor S. Schiller Councillor J. Tan Councillor A. Yousef (Virtual) ABSENT Appointed Staff S. Hartman, Chief Administrative Officer C. Mushata, Corporate Officer Other Staff as Required M. Best, Interim Director of Planning C. Bevacqua, Clerk 3 S. Faltas, Director of Engineering A. Grochowich, Manager of Community Planning M. McMullen, Manager of Development & Environmental Services D. Olivieri, Manager of Corporate Planning and Consultation R. Ollenberger, Manager of Development Engineering T. Thompson, Director of Finance T. Westover, Director Economic Development Note: These minutes and the video of this meeting are posted on the City’s Web Site at: https://mapleridge.primegov.com/public/portal Note: Councillor Dozie and Councillor Yousef attended the meeting virtually. 1. CALL TO ORDER – 11:01 am Councillor S. Schiller, Chair called the meeting to order and provided the territory acknowledgement. 2. APPROVAL OF THE AGENDA R/2024-CW-042 Moved and seconded THAT the agenda of the Committee of the Whole Meeting of June 4, 2024, be approved as circulated. CARRIED Committee of the Whole Meeting Minutes June 4, 2024 Page 2 of 5 Document: 3826229 3. MINUTES 3.1 Adoption of Minutes R/2024-CW-043 Moved and seconded THAT the minutes of the Committee of the Whole Meeting of May 21, 2024, be adopted. CARRIED 4. DELEGATIONS/STAFF PRESENTATIONS 4.1 FortisBC Presentation Presentation supporting CleanBC and City of Maple Ridge Energy & Climate Goals Amber Sadgrove, Community Relations Manager & Mandy Assi, Senior Manager, Community& Indigenous Relations from FortisBC provided a presentation and answered questions of Council. ************************************************************* Councillor Dozie joined the meeting virtually at 11:27 am ************************************************************* 4.2 BC Hydro Presentation BC Hydro's plans for energy generation and capacity as communities across BC look to adopt the Zero Carbon Step Code. Ajay Kumar, Vice President, Asset Planning and Emily Shepard, Stakeholder Engagement Advisor Community Relations from BC Hydro provided a presentation and answered questions of Council. ************************************************ Recess 12:21 pm – Reconvened at 12:31 pm ************************************************* 5. PLANNING AND DEVELOPMENT SERVICES 5.1 Housing Legislation Amendments – Small Scale Multi Unit Housing (SSMUH) & Transit-Oriented Area (TOA) Regulatory Requirements To allow secondary suites or detached additional dwelling units in single family zones, three to six units of Small-Scale Multi-Unit Housing on single-detached or duplex residential lots, dependent on proximity to transit stations, and to reduce or eliminate parking requirements in certain areas The Manager of Community Planning provided a presentation and answered questions of Council. Committee of the Whole Meeting Minutes June 4, 2024 Page 3 of 5 Document: 3826229 R/2024-CW-044 Moved and seconded That the staff report dated June 4, 2024, titled “Housing Legislation Amendments – Small Scale Multi Unit Housing (SSMUH) & Transit-Oriented Area (TOA) Regulatory Requirements” be forwarded to the next Regular Council Meeting. CARRIED 5.2 Housing Legislation Amendments – Transit-Oriented Area (TOA) Designation Bylaw To designate prescribed transit-oriented area near transit hubs The Manager of Community Planning provided a presentation and answered questions of Council. R/2024-CW-045 Moved and seconded That the staff report dated June 4, 2024, titled “Housing Legislation Amendments – Transit-Oriented Area (TOA) Designation Bylaw” be forwarded to the next Regular Council Meeting. CARRIED 5.3 2021-571-VP, 12390 216 Street, Development Variance Permit To allow for a future two-lot subdivision. The Manager of Development & Environmental Services provided a presentation and answered questions of Council. R/2024-CW-046 Moved and seconded That the staff report dated June 4, 2024, titled “Development Variance Permit, 12390 216 Street” be forwarded to the next Regular Council Meeting. CARRIED 5.4 2024-134-DP/DVP, 10392 and 10393 240A Street, Development Permit & Development Variance Permit (Extension) To extend the date to commence construction by one year for 2017-510-DP/DVP. The Manager of Development & Environmental Services provided a presentation and answered questions of Council. Committee of the Whole Meeting Minutes June 4, 2024 Page 4 of 5 Document: 3826229 R/2024-CW-047 Moved and seconded That the staff report dated June 4, 2024, titled “Development Permit & Development Variance Permit (Extension), 10392 and 10393 240A Street” be forwarded to the next Regular Council Meeting. CARRIED 6. ENGINEERING SERVICES - NIL 7. CORPORATE SERVICES 7.1 Development Cost Charges Bylaw Update To increase rates to better reflect the current costs of infrastructure. The Director of Finance provided a presentation and answered questions of Council. R/2024-CW-048 Moved and seconded That the staff report dated June 4, 2024, titled “Development Cost Charge Bylaw Update” be forwarded to the next Regular Council Meeting. CARRIED 8. PARKS, RECREATION, AND CULTURE – NIL 9. ADMINISTRATION – NIL 10. COMMUNITY FORUM – NIL 11. NOTICE OF CLOSED MEETING 11.1 Resolution to Exclude the Public R/2024-CW-049 Moved and seconded The meeting will be closed to the public pursuant to Sections 90(1) of the Community Charter as the subject matter being considered is related to the following: • Section 90(1)(g) – litigation or potential litigation affecting the municipality • Section 90(1)(i) – the receipt of advice that is subject to solicitor-client privilege, including communications necessary for that purpose; Committee of the Whole Meeting Minutes June 4, 2024 Page 5 of 5 Document: 3826229 • Section 90(1)(l) – discussions with municipal officers and employees respecting municipal objectives, measures and progress reports for the purposes of preparing an annual report under section 98 [annual municipal report]; • Section 90(2)(b) – the consideration of information received and held in confidence relating to negotiations between the municipality and a provincial government or the federal government or both, or between a provincial government or the federal government or both and a third party; Any other matter that may be brought before the Council that meets the requirements for a meeting closed to the public pursuant to Sections 90(1) and 90(2) of the Community Charter or Freedom of Information and Protection of Privacy Act. CARRIED 12. ADJOURNMENT – 5.45 pm ____________________________________ Councillor S. Schiller, Chair Certified Correct _______________________________________________ C. Mushata, Corporate Officer 2019-255-RZ Page 1 of 13 TO: His Worship Mayor Dan Ruimy MEETING DATE: June 18, 2024 and Members of Council FILE NO: 2019-255-RZ FROM: Chief Administrative Officer MEETING: C o W SUBJECT: 12297 222 Street and 22175 and 22185 123 Avenue Rescindment and Amended Readings of Official Community Plan Amending Bylaw No. 7803-2021; and Zone Amending Bylaw No. 7812-2021 Amended Second Reading EXECUTIVE SUMMARY: An application was received to rezone the subject properties located at 12297 222 Street and 22175 and 22185 123 Avenue from RS-1 (Single Detached Residential) to CD-6-21 (Medium Density Mixed Use Rental and Market Apartment Residential) based on RM-2 zone, to accommodate a seven-storey rental apartment building with 104 rental residential units to be utilized by seniors and persons with various disabilities. A 36-space neighbourhood childcare centre was also proposed. On January 25, 2022, City Council granted third reading to Zone Amending Bylaw 7812-2021 and OCP Amending Bylaw 7803-2021 following a public hearing. Since receiving third reading, the subject rezoning application has been revised to address the constraints proposed by the Fortis BC Gas Statutory Right of Way that is crossing the properties at 22175 and 22185 123 Avenue. This report outlines the changes to the project which include the proposed FSR, building height, unit count, and parking along with some other minor revisions. The revised application is to rezone the subject properties from RS-1 (Single Detached Residential) to CD-6-21 (Medium Density Mixed Use Rental and Market Apartment Residential) zone, as amended, based on RM-2 zone, to accommodate an eight-storey rental apartment building with 106 rental residential units to be utilized by seniors and persons with disabilities. A group childcare facility accommodating approximately 47 children is now proposed. Further details about the revised application are provided in the following sections of this report. The subject properties at 12297 222 Street and 22185 123 Avenue are designated as Urban Residential and Conservation in the Official Community Plan (OCP). To accommodate this proposal an amendment to the Urban Residential and Conservation designations are required as per Map 1049 (see Appendix C). With the adjustment to the boundaries of the Urban Residential and Conservation areas approximately 40.83 M² have been added to the on-site Conservation areas. In addition to the OCP land use designation amendment, a text amendment to the OCP Chapter 3 is required to allow the development of an eight-storey apartment building in the Urban Residential Designation. Pursuant to Council Policy 6.31, this project is exempt from a Community Amenity Contribution (CAC) as the project is a mixture of affordable rental units, market rental units, and housing for persons with disabilities. To qualify for the CAC exemption, a Restrictive Covenant and a Housing Agreement are required as a condition of final reading. 2019-255-RZ Page 2 of 13 RECOMMENDATIONS: 1. That the Second and Third Reading of the Official Community Plan Amending Bylaw No. 7803-2021 be Rescinded. 2. That the Second and Third Reading of the Zone Amending Bylaw No. 7812-2021 be Rescinded. 3. That Official Community Plan Amending Bylaw No. 7803-2021 be considered in conjunction with the Capital Expenditure Plan and Waste Management Plan, as amended; 4. That it be confirmed that Official Community Plan Amending Bylaw No. 7803-2021 is consistent with the Capital Expenditure Plan and Waste Management Plan, as amended; 5. That Official Community Plan Amending Bylaw No. 7803-2021 be given second reading as amended and forwarded to Public Hearing; 6. That Zone Amending Bylaw No. 7812-2021 be given second reading as amended and forwarded to Public Hearing; 7. That the following terms and conditions be met prior to final reading: i) Registration of a Rezoning Servicing Agreement as a Restrictive Covenant and receipt of the deposit of a security, as outlined in the Agreement; ii) Amendment to Official Community Plan Schedules “A”, "B" and “C”; iii) Road dedication as provided as a lot to be transferred to the City along 123 Avenue under a Subdivision plan. iv) Park dedication to be provided as two fee simple lots to be transferred to the City under a Subdivision plan. v) Consolidation of the three subject properties; vi) Registration of a No-Build Until Development Permit “Scorched Earth” Covenant on the land’s developable areas. vii) Registration of a Restrictive Covenant for the Geotechnical Report, which addresses the suitability of the subject property for the proposed development; viii) Registration of a Restrictive Covenant for the protection of the Environmentally Sensitive areas on the subject property; ix) Registration of a Statutory Right Of Way for the access to the dedicated Parkland via the On-site Pathway; x) Registration of a Restrictive Covenant for Stormwater Management, including maintenance information; 2019-255-RZ Page 3 of 13 xi) Registration of a Restrictive Covenant for Tree Protection; xii) Registration of a Restrictive Covenant for Visitor Parking; xiii) Registration of a Restrictive Covenant and adoption of a Housing Agreement Bylaw to ensure the rental units proposed are retained in perpetuity as described in this report; xiv) Removal of existing buildings; xv) In addition to the site profile, a disclosure statement must be submitted by a Professional Engineer advising whether there is any evidence of underground fuel storage tanks on the subject properties. If so, a Stage 1 Site Investigation Report is required to ensure that the subject property is not a contaminated site. DISCUSSION: 1. Background Context: Applicant: JM Architecture (Joseph M Minton) Legal Description: Parcel “A” (Reference Plan 12909) Lot 5 Except: Firstly: Parcel “B” (Reference Plan 13374); Secondly: Parcel “D” (Explanatory Plan 13727); District Lot 396 Group 1 New Westminsiter District Plan 830; Lot 9 District Lot 396 Group 1 New Westminster District Plan 15728; and Lot 10 District Lot 396 Group 1 New Westminister District Plan 15728. OCP: Existing: Conservation and Urban Residential Proposed: Conservation and Urban Residential Zoning: Existing: RS-1 (Single Detached Residential) Proposed: CD-6-21, as amended, (Medium Density Mixed Use Rental and Market Apartment Residential) Surrounding Uses: North: Use: Single-Family Residential Zone: RS-1 (Single Detached Residential) Designation: Urban Residential and Conservation South: Use: Single-Family Residential Zone: RS-1 (Single Detached Residential) Designation: Urban Residential East: Use: Apartments Zone: RM-2 (Medium Density Apartment Residential) Designation: Low-Rise Apartment West: Use: Single-Family Residential Zone: RS-1 (Single Detached Residential) Designation: Urban Residential and Conservation Existing Use of Properties: Single-Family Residential 2019-255-RZ Page 4 of 13 Proposed Use of Properties: Apartments Site Area: 0.90 ha (2.23 acres) Access: 123 Avenue Servicing requirement: Urban Standard Accompanying Applications: 2020-309-DP 2. Background: As previously discussed, originally a rezoning application was received to rezone the subject properties from RS-1 (Single Detached Residential) to CD-6-21 (Medium Density Mixed Use Rental and Market Apartment Residential) based on the RM-2 zone to facilitate the development of a 7-storey apartment building that contained a mixture of 55 market rental and 49 affordable rental units, for a total of 104 rental residential dwelling units. The affordable residential units were targeted towards persons with disabilities, and seniors. Also, the original proposal proposed a group child care facility of approximately 269.4 M2 (2,900 sq.ft) accommodating approximately 36 children on the ground floor. The original application proposed 114 parking stalls requesting a variance of 77 parking stalls. Justification to support lower parking ratio was the affordable rental component of the project, and that rental units typically utilize lower parking needs than market units. The original proposal had the vehicle access crossing over the underground parkade structure partially located within the Fortis BC Gas Right of Way. The Fortis BC Gas ROW running east-west on the properties at 22175 and 22185 123 Avenue regulates a no-build zone over the SRW. Accordingly, a revised proposal has been submitted to address the Fortis BC Gas ROW restrictions. Besides the existing Fortis BC Gas Statutory Right of Way no-build zone regulations on the south side of the subject sites, the northern part of the subject sites are also characterized as forested steep ravines with two tributaries of the South Alouette River on the east and west sides of the site. As a result, a roughly L-shaped plateau of the land constitutes the developable portion of the subject sites. There are 4 to 5-storey multi-family apartment buildings to the east and single-family dwellings to the south, north and west. It is likely that with time, the existing single-family homes in the area will also redevelop with multi-family type development. The City is in receipt of one such application for property to the south. 3. Project Description: The revised subject application is for an 8-storey apartment building that will contain 52 rental market units and 54 affordable rental units, comprising a total of 106 units. Also, the revised application proposes a group childcare facility with approximately 328 M² of indoor area located on the second floor of the building with a separate access lobby from the ground level to be designed in compliance with Fraser Health requirements. It is estimated that the proposed indoor daycare area of 328 M² can accommodate approximately up to 47 children subject to the approval of Fraser Health. The subject application also includes an ancillary office space with an approximate area of 180 M² located on the ground level of the building. As shown in the table below, 54 rental units are proposed to be reserved out of the total 106 units for affordable rentals. As per the Housing Agreement that has been prepared for this application each affordable unit will be rented out at the affordable market rate, as determined by a market rent appraisal of similar units within Maple Ridge in accordance with the CMHC definition of Affordability 2019-255-RZ Page 5 of 13 effective at the time. The proposed 54 affordable rental units are targeted towards persons with disabilities, and seniors. The remainder of the proposed units will be 52 market rental units. The 52 market rate rental dwelling units are also targeted towards persons with disabilities, and seniors. All the proposed rental residential units are designed as per the CMHC Accessibility Design standard. The table below illustrates the unit’s distribution on each floor. The units shown in light blue in the table below are affordable rental dwelling units and the units shown in light yellow are market rate rental dwelling units. Building Floor Number of 1 bedroom units Number of 2 bedroom units Number of 3 bedroom units Number of Affordable rental units (out of total units in column to right) Total Units 2nd 13 0 1 14 14 3rd 17 2 1 20 20 4th 17 2 1 20 20 5th 6 13 1 None 20 6th 6 2 1 None 9 7th 6 13 1 None 20 8th 0 2 1 None 3 Total Units 65 34 7 54 106 The vehicle access to the building is off 222 Street. A total of 120 off-street parking spaces are provided on the site with 26 spaces located on the ground level and 94 stalls in the two levels of underground parking structure. Maple Ridge Off-Street Parking and Loading Bylaw No. 4350-1990, Electric Vehicle Charging Infrastructure requirements apply to the proposed development. Each residential parking space, and 50% of the visitor parking spaces, have roughed-in-infrastructure capable of providing Level 2 charging. In addition, the following attributes are included in the design of the building: • Insulated concrete forms for exterior and interior walls and floor systems; • Solar cladding to the façade of the building; and • Pitched roof system. Staff recommend that the additional charge stations for electric vehicles with the anticipated excess electricity generated by the solar panels be provided by the applicant for the future residents of the building. 4. Planning Analysis: i) Official Community Plan: The subject properties are located within the Urban Area Boundary west of the Town Centre Area Plan. The Official Community Plan (OCP) designates the subject properties at 12297 222 Street and 22185 123 Avenue Urban Residential and Conservation. Adjustments to the Urban Residential and Conservation OCP boundaries are required based on ground truthing conducted by environmental and geotechnical consultants in consultation with the Planning Department Staff (See Appendix C). The Official Community Plan (OCP) designates the subject property at 22175 123 Avenue Urban Residential and as mentioned above the subject properties at 12297 222 Street and 22185 123 2019-255-RZ Page 6 of 13 Avenue as Urban Residential and Conservation. In the Official Community Plan, the Urban Residential designation consists of two residential categories of Neighbourhood Residential and Major Corridor Residential. Currently, subject properties are not facing a Major Road Corridor. Thus, the properties are subject to the Neighbourhood Residential Infill policies. Accordingly, an Official Community Plan Text Amendment to the Schedule A, Chapter 3, Section 3-19 is required to allow a maximum height of eight storeys for the proposed senior and supportive housing consistent with policies 3-31, 3-32, 4-22, 4-25, and 4-36 as outlined below to accommodate this proposed rezoning: Official Community Plan Policies: • Policy 3 - 31 Maple Ridge supports the provision of rental accommodation and encourages the construction of rental units that vary in size and number of bedrooms. • Policy 3 - 32 Maple Ridge supports the provision of affordable, rental and special needs housing throughout the District. These two policies support the provision of the affordable rental accommodation for vulnerable groups of people in the community with varying dwelling unit size and number of bedrooms. A Restrictive Covenant and Housing Agreement will include the language necessary to secure portions of the building as market rental as well as, affordable rental housing for seniors and people with disabilities. • Policy 4 - 22 Maple Ridge encourages the development of accessible quality child care facilities throughout the community, and will encourage the provision of space for child care in all assisted rental housing projects developed under senior government programs. This policy supports the inclusion of the group child care centre into this market and non-market development. • Policy 4 - 23 Maple Ridge encourages the development of seniors’ care facilities throughout the community that are conveniently located near transit and other service. Seniors have been proposed as one of the target groups to house in the market rental and affordable rental component of the development. The development is conveniently located near services and transit on Dewdney Trunk Road. • 4 - 36 Maple Ridge supports the establishment of child-care facilities in Residential, Institution, Commercial and Industrial land use designations subject to compliance with District bylaws and regulations. This policy supports the inclusion of the proposed neighbourhood child care centre into this apartment residential development, as the subject properties are located with the Residential land use designations of the OCP. 2019-255-RZ Page 7 of 13 Housing Action Plan: On September 15, 2014 Council endorsed the Housing Action Plan (HAP) which identifies rental housing as a priority. The Housing Action Plan has several strategies contained within the documents. Strategy 4 – To Create New Rental Housing Opportunities Strategy 4 of the HAP provides guidance on how the City can support the development of new rental housing through incentives. One of these incentives is a reduction in parking requirements for the securing of rental units. The securing of the rental units would be through the use of a housing agreement secured through a restrictive covenant on the title of development land. Reducing the number of parking stalls required per dwelling unit improves affordability, lowers the construction cost per unit, and could potentially enable more dwellings per hectare. Reduced parking lowers the amount of costly underground parking and thus promotes the Housing Action Plan’s desire to facilitate the development of non-market and market rental housing. This strategy has already been applied in a number of other recent applications in the Town Centre. The application as presented could, with the parking reduction, increase the number of non-market and market units in the City which will aid in fulfilling the objectives of the Housing Action Plan. The CD zone has been drafted with the reduced parking in mind. ii) Zoning Bylaw: The proposal is to rezone the subject properties from RS-1 (One Family Urban Residential) to CD-6-21 zone, as amended, (Medium Density Mixed Use Rental and Market Apartment Residential) (Appendix D), to permit an 8-storey multi-family building with non-market and market rental dwelling units and neighourhood childcare centre. Appendix C of this report contains the proposed CD-6-21 zone that has been drafted for this project and reflects the: uses, density, lot coverage, setbacks and parking requirements for this proposed building. iii) Off-Street Parking and Loading Bylaw and Variances: The table below details parking for the proposed CD-6-21 zone, as amended, (Medium Density Mixed Use Rental and Market Apartment Residential) in comparison to the parking requirements for the RM-2 zone as per the City’s existing Off-Street Parking Bylaw No. 4350 – 1990 and as per the proposed under-review Off-Street Parking Bylaw. 2019-255-RZ Page 8 of 13 Category Current Bylaw Requirements (RM-2 and Other Uses) Proposed Bylaw Requirements (RM-2 and Other Uses) Proposed Parking Stalls Differences Vs Existing Bylaw Differences Vs Proposed Bylaw Residential Units 1.5 × 106 = 159 1*106=106 100 -59 -6 Visitor 0.2 × 106 = 21.2=22 0.2*106=21.2 =21 6 -16 -15 Group Child Care Centre 328.47/20= 16.4=17 1.0 space per employee, plus 3.0 spaces per 10 children 11 -6 Based on # of employees Ancillary Office 180.23/40=5.3=5 180.23/30=6 3 -2 -3 TOTAL 204 148 120 -84 24 plus spaces for group child care If the required number of stalls for the proposed market rental/non-market rental development is calculated as per the existing City’s Off-Street Parking Bylaw for RM-2 zone, the subject application is requesting a variance of 84 stalls. However, it should be mentioned that the existing City’s Off-Street Parking Bylaw does not have a specific required vehicle parking rate for market rental residential and affordable rental residential buildings. Typically, the required number of parking stalls for a rental building is lower than the required number of parking stalls for strata buildings. As mentioned above, the original application was requesting a variance of 77 parking stalls. The proposed Parking Bylaw which is now under review has a suggested parking requirement rate of 1.2 spaces per dwelling unit, combined residential and visitor, for non-market and rental dwelling units located outside of Town Center area. As per the proposed under-review Parking Bylaw the required number of stalls for the rental residential units including visitor stalls could be reduced from 181 to 127 stalls which, if in place today, would reduce the number of requested parking stalls variance for rental residential units including visitor stalls from 75 stalls to 21 stalls. As per the proposed under-review Off-Street Parking Bylaw, 1 space per employee plus 3 spaces per 10 children will be required for the childcare group center. The exact number of children and employees for the proposed group childcare center are unknown at this stage. The parking for the ancillary office use and group childcare center are included in the table above. While the total requested variance for parking stalls under the new Bylaw cannot be determined, the requested variance specifically for the rental residential component of the subject development could significantly decrease from 75 stalls to 21 stalls. Given the above. the proposed CD-6-21 zone includes site-specific parking requirements for a total of 120 stalls, of which 26 are located at grade. Given this, no variance to the City of Maple Ridge Off- Street Parking Bylaw No. 4350-1990 is required. 2019-255-RZ Page 9 of 13 iv) Proposed CD-6-21 Zone Based on the RM-2 Zone and Variances: The proposed CD-6-21 zone has been drafted to minimize the need of any variances associated with this application. Should any building variances be required they will be the subject of a future Council report at the Development Permit and Development Variance Permit stage. The table below illustrates the difference between the proposed CD-6-21 zone as amended and the RM-2 (Medium Density Apartment Residential) zone. Zone CD-6-21 as Amended RM-2 Differences Btw CD-6-21 as Amended and RM-2 Accessory Use Boarding Boarding Group Childcare Center is added to the Accessory Use and Home Occupation has been changed to Ancillary Commercial Ancillary Office Space Home Occupation Group Childcare Center NA Prohibited Use Short-Term Accommodation NA Height 32 metres 8 storeys 15 metres 4 storeys 15 metres increase 4 storeys increase Setbacks – Principal Buildings Front – 222 ST 5.5M 7.5M 2M reduction Rear – West 6.6M 7.5M 0.9M reduction Interior - North 42.5M 7.5M 35M increase is because of the covenanted area. Exterior – 123 Ave 13.5M 7.5M 6M increase is because of the covenanted area. Setbacks – Accessory Structure Front – 222 ST 5.5M 1.5M Rear – West 0.5M 0.0M Interior - North 42.6M 0.0M Exterior – 123 Ave 13.8M 1.5M Common Open Area 2,000 M2 1,632.27 M2 367.73 M2 increase Outdoor Amenity Area 340 M2 106 M2 234 M2 increase Indoor Amenity Area 510 M2 106 M2 404 M2 increase Staff confirms that a variance to the Subdivision and Development Bylaw No. 4800-1993 is required to reduce the required road dedication from 2.5m to 1.83m along 123 Avenue. The reduction in road dedication is required due to the Fortis transmission gas main. The requested variance is supported by the Engineering department as the applicant has demonstrated that all required services can be accommodated in the reduced road right-of-way. 2019-255-RZ Page 10 of 13 v) Development Permits: Pursuant to Section 8.7 of the OCP, a Multi-Family Development Permit application is required to ensure the current proposal enhances existing neighbourhoods with compatible housing styles that meet diverse needs and minimize potential conflicts with neighbouring land uses. The Multi-Family Development Permit application compliance with the Development Permit Design Guidelines and requirements will be assessed and processed after the final adoption of this Bylaw should Council support the proposed application. There will be a no-build covenant which requires issuance of the Development Permit by council before any building permit is issued. Pursuant to Section 8.9 of the OCP, a Watercourse Protection Development Permit application is required for all developments and building permits within 50 metres of the top of bank of all watercourses and wetlands. The purpose of the Watercourse Protection Development Permit is to ensure the preservation, protection, restoration and enhancement of watercourse and riparian areas. Pursuant to Section 8.10 of the OCP, a Natural Features Development Permit application is required for all development and subdivision activity or building permits for: • All areas designated Conservation on Schedule “B” or all areas within 50 metres of an area designated Conservation on Schedule “B”; • All lands with an average natural slope of greater than 15 percent; and • All floodplain areas and forest lands identified on Schedule “C” to ensure the preservation, protection, restoration, and enhancement of the natural environment and for development that is protected from hazardous conditions. vi) Advisory Design Panel: The subject revised application was reviewed by the Advisory Design Panel at the meeting on May 15, 2024 and the comments and resolutions contained in Attachment G were carried. The applicant submitted a revised application along with a written response memo to the Advisory Design Panel for review and comments (See Appendix G). The revised application will be reviewed by the Advisory Design Panel on June 19, 2024. Staff will provide the June 19th Advisory Design Panel comments in an Addendum to this report to Council on June 23, 2024. vii) Development Information Meeting: A Development Information Meeting in accordance with Council Policy 6.20 was held by the applicant on June 13, 2024, at the City of Maple Ridge Public Library from 5:30 PM to 7:45 PM. The Development Information Meeting advertisement was published by the applicant on May 31, 2024, and on June 7, 2024, in the City of Maple Ridge Pitt Meadows News. Mailout notifications were sent out to residents within 100 meters of the subject properties by the applicant in accordance with Policy No. 6.20. A summary of the main comments and discussions with the attendees at the Development Information Meeting was provided by the applicant (see Appendix H). 2019-255-RZ Page 11 of 13 5. Interdepartmental Implications: i) Engineering Department: • Road dedication in the amount of 1.83m along 123 Avenue is required. • Utility servicing as required to meet the design criteria of the Subdivision and Development Bylaw No.4800-1993. • Frontage upgrades to the applicable road standards. ii) Parks, Recreation and Culture Department: The Parks Department has reviewed the proposal and is seeking a registered-on title SROW giving the City the ability to have access to the pathways onsite, in order to access the City lands beyond. iii) Environment: A combined Watercourse Protection Development Permit and Natural Features DP (WPDP and NFDP) is required for this site due to the steep ravine banks and the two unnamed tributaries located on site, which flow into the S. Alouette River. The two tributaries are considered food and nutrient bearing watercourses at their headwaters which is located on this particular site. These tributaries flow into the Alouette River and are likely fish bearing in these lower elevation reaches or sections. A) Protection of these watercourses under the Streamside Protection Regulations (SPR) would normally be 15 metres from top of bank given these are food and nutrient bearing sections with limited space on site and historical development footprints up to top of bank. B) To accommodate the larger building and parking footprint, there are some significant setback variance requests that have been proposed with the new development. The setback reductions include a minor reduction from 15 metres to 13.5 metres from top of bank on the west side of the site. A larger setback reduction has been proposed on the east side which reduces the watercourse SPR setback from 15 metres down to 8.5 metres from top of bank. The northern portion of the site retains a full 10 metre setback from top of bank in addition to another 20 metres of space allocated to a naturalized playground area that will be designed to accommodate both play space and habitat opportunities for aquatic species. C) Appropriate compensation has been provided through in stream improvements and significant removal of historical debris, structures, invasive species to make up for proposed habitat losses and setback reductions on site. D) The setback reductions continue to meet federal and provincial senior environmental agency setback requirements under the Provincial Areas Protection Regulation (RAPR) and Water Sustainability Act (WSA) legislation and regulations. Submissions to the applicable environmental agencies have been required by the City. E) Habitat protection for watercourses and steep slopes will be provided in the form of dedication of protected conservation lands up to the top of bank. Beyond this the City will use restrictive covenants for protection of geotechnical areas and for watercourse setback protection. A post and rail fence will be established along the restrictive covenant line on both sides of the site adjacent to the proposed pathway. F) Ongoing maintenance and monitoring agreements will be required with the restrictive covenant areas with clear instructions for ongoing maintenance of the replanted and restored areas located within the restrictive covenant areas including the naturalized playground area. The maintenance will need to be done by a qualified professional and funding for the maintenance will be the responsibility of the future tenants and strata. 2019-255-RZ Page 12 of 13 G) Significant enhancement and restoration opportunities will be provided within both the restrictive covenant and dedicated protection areas. It will include cleanup of debris within protected habitat areas, removal of historical structures within setback areas, replanting and invasive plant management programs, in addition to in stream habitat complexing to support more functional habitat for aquatic species in addition to water quality improvements, improvement to flow rates and ongoing erosion concerns, as well as improvements to diversity of native vegetation. H) There is a five year monitoring and maintenance requirement associated with the enhancement and restoration related works after planting has been completed which will include a cost estimate and security deposit for these works. i) Building Department: The Building Department will review the geotechnical report and a peer-reviewed Geotechnical report at Development Permit stage. 2. School District No. 42 Comments: The revised application of 106 rental residential dwelling units has been reviewed with the School District in June 2024, and comments have been attached (see Appendix I). A summary of comments is below: The proposed application would affect the student population for the catchment areas currently served by Glenwood Elementary and Maple Ridge Secondary School. Glenwood Elementary School has an operating capacity of 383 students. For the 2023-24 school year the student enrolment at Glenwood Elementary School is 361 students (94% utilization) including 80 students from out of catchment. Maple Ridge Secondary School has an operating capacity of 1300 students. For the 2023-24 school year the student enrolment at Maple Ridge Secondary is 1169 students (90% utilization) including 715 students from out of catchment and 320 French Immersion students. Based on the density estimates for the various land uses at build out for the construction of 106 residential units, the estimated number of school age residents is 8. 3. Intergovernmental Issues: i) Local Government Act: An amendment to the OCP requires the local government to consult with any affected parties and to adopt related bylaws in compliance with the procedures outlined in Section 477 of the Local Government Act. The amendment required for this application, adjusting the Conservation and Residential designation boundaries, is considered to be minor in nature. It has been determined that no additional consultation beyond existing procedures is required, including referrals to the Board of the Regional District, the Council of an adjacent municipality, First Nations, the School District or agencies of the Federal and Provincial Governments. The amendment has been reviewed with the Financial Plan/Capital Plan and the Waste Management Plan of the Greater Vancouver Regional District and determined to have no impact. 2019-255-RZ Page 13 of 13 CONCLUSION: It is recommended that the second and third reading of the OCP Amending Bylaw No. 7803-2021 be rescinded. It is also recommended that the second and third reading of the Zone Amending Bylaw No. 7812-2021 be rescinded to accommodate the revised development proposal. Staff requests that an amended second reading be given to OCP Amending Bylaw No. 7803-2021 and Zone Amending Bylaw No. 7812-2021 and that application 2019-255-RZ be forwarded to Public Hearing. “Original Signed by Maryam Lotfi” _______________________________________________ Prepared by: Maryam Lotfi Planner “Original Signed by Marlene Best” _______________________________________________ Reviewed by: Marlen Best Director of Planning “Original Signed by Scott Hartman” _______________________________________________ Concurrence: Scott Hartman Chief Administrative Officer The following appendices are attached hereto: Appendix A – Subject Map Appendix B – Ortho Map Appendix C – OCP Amending Bylaw No. 7803-2021 Appendix D – Zone Amending Bylaw No. 7812-2021 Appendix E – Architectural Plans Appendix F – Landscape Plans Appendix G– ADP Design Comments and Responses Appendix H– Development Information Meeting Summary Appendix I – School District 42. Comments DATE: Sep 21, 2020FILE: 2019-255-RZ 12297 222 STREET, 22175/85 123 AVENUEPID'S; 011-921-935, 010-122-818 & 010-122-885 PLANNING DEPARTMENT SUBJECT PROPERTIES ´ Scale: 1:2,500 BY: PC 124 AVE Legend Stream Ditch Centreline Indefinite Creek River Centreline Appendix A APPENDIX A DATE: Sep 21, 2020FILE: 2019-255-RZ 12297 222 STREET, 22175/85 123 AVENUEPID'S; 011-921-935, 010-122-818 & 010-122-885 City of PittMeadows District ofLangley Di s t r i c t o f M i s s i o n FRASER R. ^PLANNING DEPARTMENT SUBJECT PROPERTIES Aerial Imagery from the Spring of 2018´ Scale: 1:2,500 BY: PC 124 AVE APPENDIX B CITY OF MAPLE RIDGE BYLAW NO. 7803-2021 A Bylaw to amend the Maple Ridge Official Community Plan Bylaw No. 7060-2014. WHEREAS, the Local Government Act provides that Council may revise the Official Community Plan; AND WHEREAS, Council deems it expedient to amend Schedules "A" & "B" & "C" to the Official Community Plan; NOW THEREFORE, the Council of the City of Maple Ridge enacts as follows: 1.This Bylaw may be cited for all purposes as "Maple Ridge Official Community Plan Amending Bylaw No. 7803-2021”. 2.The Maple Ridge Official Community Plan Bylaw No. 7060-2014 is hereby amended as follows: a. Under Schedule “A”, Chapter 3.1.4, Section 3.19 , the language will be amended to add: 3)Under the Urban Residential designation, Neighbourhood Residential Infill developments may permit an 8-storey building for seniors and supportive housing for people with disabilities as supported by Policies 3-31, 3-32, 4-22, 4-23, and 4-36 on the following site: Parcel “A” (Reference Plan 12909) Lot 5 Except: Firstly: Parcel “B” (Reference Plan 13374); Secondly: Parcel “D” (Explanatory Plan 13727); District Lot 396 Group 1 New Westminster District Plan 830; Lot 9 District Lot 396 Group 1 New Westminster District Plan 15728; and Lot 10 District Lot 396 Group 1 New Westminister District Plan 15728”. b.Schedule "B", Map No. 1049, a copy of which is attached hereto, is amended for the parcel or tract of land and premises known and legally described as: Parcel “A” (Reference Plan 12909) Lot 5 Except: Firstly: Parcel “B” (Reference Plan 13374); Secondly: Parcel “D” (Explanatory Plan 13727); District Lot 396 Group 1 New Westminster District Plan 830; Lot 9 District Lot 396 Group 1 New Westminster District Plan 15728; and Lot 10 District Lot 396 Group 1 New Westminister District Plan 15728. as outlined in heavy black line on Map No. 1049. APPENDIX C 3. Schedule “C”, Map No. 1050, a copy of which is attached hereto, is amended by adding and removing Conservation, for that parcel or tract of land and premises known as and legally described as: Parcel “A” (Reference Plan 12909) Lot 5 Except: Firstly: Parcel “B” (Reference Plan 13374); Secondly: Parcel “D” (Explanatory Plan 13727); District Lot 396 Group 1 New Westminsiter District Plan 830; Lot 9 District Lot 396 Group 1 New Westminster District Plan 15728; and Lot 10 District Lot 396 Group 1 New Westminister District Plan 15728; as outlined in heavy black line on Map No. 1050. 4. Maple Ridge Official Community Plan Bylaw No. 7060-2014, as amended, is hereby amended accordingly. READ a first time the 14th day of December, 2021. READ a second time the 14th day of December, 2021. PUBLIC HEARING held the 18th day of January, 2022. READ a third time the 25th day of January, 2022. SECOND AND THIRD READING rescinded and read a second time, as amended, day of ,2024 PUBLIC HEARING held the day of , 2024. READ a third time the day of , 2024 ADOPTED, the day of , 2024. ___________________________________ _____________________________ PRESIDING MEMBER CORPORATE OFFICER CITY OF MAPLE RIDGE BYLAW NO. 7812-2021 A Bylaw to amend the text of Maple Ridge Zoning Bylaw No. 7600-2019. WHEREAS, Council deems it expedient to amend Maple Ridge Zoning Bylaw No. 7600-2019, as amended; NOW THEREFORE, the Council of the City of Maple Ridge enacts as follows: 1.This Bylaw may be cited as “Maple Ridge Zone Amending Bylaw No. 7812-2021”. 2.Maple Ridge Zoning Bylaw No. 7600-2019, as amended, is hereby further amended by inserting the following CD Zone immediately following the last section in Part 10 and numbering Part 10 in sequential order accordingly: 1043 Zone CD-6-21 MEDIUM DENSITY MIXED USE RENTAL AND MARKET APARTMENT RESIDENTIAL 1043.1 PURPOSE 1.This zone provides for a Medium Density Mixed Use Rental and Market Rental Apartment Residential use with a maximum Building Height of eight (8) Storeys. 1043.2 PRINCIPAL USES 1.The following Principal Use Shall be permitted in this Zone: a.Apartment Residential secured by a Housing Agreement and Section 219 covenant registered on title to ensure that supportive housing units are occupied by people with a disability and senior citizens, of which a minimum 54 Apartment Residential units will be secured for affordable housing. 1043.3 ACCESSORY USES 1.The following shall be permitted as Accessory Uses to one of the permitted Principal Uses in this Zone; a.Ancillary Office Space; and b.Group Child Care Centre to a maximum of 325 m2 of indoor space that shall be located on the second floor of the building with 105 m2 of uncovered outdoor play area and 85 m2 of covered outdoor play area. The Group Child Care Centre to be in compliance with the Fraser Health requirements. APPENDIX D c. Boarding 2. Refer to Sections 401 and 402 of this Bylaw for additional information. 1043.4 PROHIBITED USES 1. The following uses shall be prohibited in this Zone: a. Short-Term Accommodations 1043.4 LOT AREA AND DIMENSIONS 1. Minimum Lot Area and dimensions shall be not less than; a. in Lot Area 1,300.0 square metres b. in Lot Width 30.0 metres c. in Lot Depth not applicable 2. Refer to Section 407 Building Envelope of the Bylaw for required minimum Building Envelope dimensions. 1043.5 DENSITY 1. Floor Space Ratio shall not exceed a base Density of 1.78 times the Lot Area. 1043.6 LOT COVERAGE 1. Not applicable 1043.7 SETBACKS 1. Minimum Setbacks for all Principal Building and Principal Structures shall be not less than: a. from a Front Lot Line (222 Street) 5.5 metres b. from a Rear Lot Line (West) 6.6 metres c. from an Interior Side Lot Line (North) 42.5 metres d. from an Exterior Side Lot Line (123 Avenue) 13.5 metres 2. An Underground Structure, for Off-Street Parking, will not extend more than 1.5 metres above the Average Finished Grade and the above grade area is to be landscaped to become a useable part of the yard area. Minimum setbacks for the Underground Structure shall be not less than: a. from a Front Lot Line 5.5 metres b. from a Rear Lot Line 0.5 metres c. from an Interior Side Lot Line 42.6 metres d. from an Exterior Side Lot Line 13.8 metres 3. Minimum Setbacks for all Buildings and Structures shall meet the requirements of Section 403 (Visual Clearance at Intersections) of this Bylaw. 1043.8 HEIGHT 1. Building Height for Principal Buildings and Principal Structures shall not exceed 32 metres nor 8 Storeys. 2. Building Height for Accessory Buildings and Accessory Structures shall not exceed 4.5 metres. 3. Refer to Section 403 (Building Height) of this Bylaw. 1043.9 LANDSCAPING 1. Landscaping and screening shall be provided in accordance with Section 405 (Landscaping, Screening and Fencing Requirements) of this Bylaw. 1043.10 PARKING AND LOADING 1. Off-Street Parking and Off-Street Loading shall be provided in accordance with Maple Ridge Off-Street Parking and Loading Bylaw No. 4350-1990 except as provided below: a. The location of Off-Street Parking shall be provided as per the Issued for Rezoning drawings approved by Council and consists of 120 stalls with 26 stalls located at grade and remainder concealed in an underground parking structure. 1043.11 OTHER REQUIREMENTS 1. Common Open Area(s) shall be provided on the Lot for Apartment Residential Use as based on the ratios as set out in Section 618.11 of Maple Ridge Zoning Bylaw No. 7600-2019, as amended, except as provided below. a) 2,000 square metres of Common Open Area(s) to be provided on site in total. 2. Outdoor Amenity Area(s) shall be provided on the Lot for Apartment Residential Use as based on the ratios as set out in Section 618.11 of Maple Ridge Zoning Bylaw No. 7600-2019, as amended, except as provided below. a) 340 square metres of Outdoor Amenity Area(s) to be provided on the site in total. 3. Private Outdoor Area(s) shall be provided for each Dwelling Unit at a minimum of 5.0% of the Dwelling Unit area or 4.6 square metres, whichever is greater. This area may form part of the Common Open Area requirement. 4. Indoor Amenity Area(s) shall be provided on the Lot for Apartment Residential Use as based on the ratios as set out in Section 618.11 of Maple Ridge Zoning Bylaw No. 7600-2019, as amended, except as provided below. a) 510 square metres of Indoor Amenity Area(s) to be provided on the site in total which includes four Studio Guest Units without any kitchen facilities and other common indoor facilities. 3. Those parcels or tracts of land and premises known and described as: Secondly: Parcel “D” (Explanatory Plan 13727); District Lot 396 Group 1 New Westminster District Plan 830; Lot 9 District Lot 396 Group 1 New Westminster District Plan 15728; and Lot 10 District Lot 396 Group 1 New Westminister District Plan 15728; and outlined in heavy black line on Map No. 1937 a copy of which is attached hereto and forms part of this Bylaw, are hereby rezoned to CD-6-21 Medium Density Mixed Use Rental and Market Apartment Residential. 4. Maple Ridge Zoning Bylaw No. 7600-2019, as amended and Map "A" attached thereto are hereby amended accordingly. READ a first time the 14th day of December, 2021. READ a second time the 14th day of December, 2021. PUBLIC HEARING held the 18th day of January, 2022. READ a third time the 25th day of January, 2022. SECOND AND THIRD READING rescinded and read a second time, as amended, day of ,2024 PUBLIC HEARING held the day of , 2024. READ a third time the day of , 2024 ADOPTED, the day of , 2024. PRESIDING MEMBER CORPORATE OFFICER 8.50 13.5 0 TOP OF BA N K TOP O F B A N K TO P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39 0 5 7 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207 208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 1 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.390 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15. 2 4 0 24. 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1.8 6 9 18.300 22.412 34.646 10 . 9 1 0 4.3 3 0 45.953 1.8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 L1 13.284 8.68 5 9.6 7 8 16 . 7 2 2 8.23 6 9.1 1 3 12 . 3 3 3 7.4 1 6 11 . 3 5 4 16 . 2 3 0 9. 7 6 6L2 L3 L4 L5 L6 L7 L8 L10 L1 1 5.98 3 2.7 3 6 L9 L1 2 7. 4 0 14 . 6 1 9.2 2 14 . 3 2 7. 2 5 8.7 5 8. 5 6 4.48 13.2 2 11. 4 8 8.29 6.01 5.65 4.54 17. 8 5 1.8 8 3.251.56 1.412.4 5 8.33 7.80 11. 0 1 5.61 5.80 11.9 3 17 . 5 6 4.11 11 . 2 1 5. 5 8 15 . 2 8 9.2 2 13 . 1 0 6. 1 5 8.7 5 9. 0 5 2. 9 6 3.9 0 4.69 5.74 2.37 CONSULTANT INFORMATIONCONSULTANT INFORMATION ARCHITECTARCHITECT BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON LANDSCAPE ARCHITECTLANDSCAPE ARCHITECT BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON CIVIL ENGINEERCIVIL ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON SURVEYORSURVEYOR BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON JM ARCHITECTURE INCJM ARCHITECTURE INC MAIN FLOOR - BLDG.#4 MAIN FLOOR - BLDG.#4 15243-91ST AVENUE 15243-91ST AVENUE SURREY, BC V3R 8P8SURREY, BC V3R 8P8 604 583 2003604 583 2003 JOE@JMARCHITECTURE.CAJOE@JMARCHITECTURE.CA JOE MINTENJOE MINTEN GREWAL & ASSOCIATIONGREWAL & ASSOCIATION UNIT 204, 15299-68TH AVENUE UNIT 204, 15299-68TH AVENUE SURREY, B.C. V3S 2C1SURREY, B.C. V3S 2C1 604-597-8567604-597-8567 LUCKY GREWALLUCKY GREWAL CORE CONCEPT CONSULTING LTD.CORE CONCEPT CONSULTING LTD. 220-2639 VIKING WAY,220-2639 VIKING WAY, RICHMOND | V6V 3B7RICHMOND | V6V 3B7 604 249 5040604 249 5040 JPEREZ@CORECONCEPTCONSULTING.COMJPEREZ@CORECONCEPTCONSULTING.COM JOSE B. PEREZJOSE B. PEREZ DONALD V. S.DONALD V. S. DUNCAN DUNCAN LANDSCAPE ARCHITECTLANDSCAPE ARCHITECT 603 - 220 ELEVENTH STREET603 - 220 ELEVENTH STREET 778-791-4323778-791-4323 DVSDUNCAN@GMAIL.COMDVSDUNCAN@GMAIL.COM DONALD DUNCANDONALD DUNCAN TRAFFIC ENGINEERTRAFFIC ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON ARBORISTARBORIST BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON GEOTECHNICAL ENGINEER GEOTECHNICAL ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON ENVIRONMENTAL ENGINEERENVIRONMENTAL ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON R.F. BINNIE & ASSOCIATES LTDR.F. BINNIE & ASSOCIATES LTD 4946 CANADA WAY4946 CANADA WAY BURNABY BC V5G 4H7BURNABY BC V5G 4H7 778 945 6067778 945 6067 KBULLIVANT@BINNIE.COMKBULLIVANT@BINNIE.COM KELLY BULLIVANTKELLY BULLIVANT ABLE GEOTECHNICAL LTD.ABLE GEOTECHNICAL LTD. 15580 79A 15580 79A SURREY BC V3S8R8SURREY BC V3S8R8 778 995 2404778 995 2404 TEGBIR@ABLEGEO.COMTEGBIR@ABLEGEO.COM TEGBIR BAJWATEGBIR BAJWA CSR ENVIRONMENTAL LTD.CSR ENVIRONMENTAL LTD. 206 - 3855 HENNING DRIVE,206 - 3855 HENNING DRIVE, BURNABY, BC V5C 6N3BURNABY, BC V5C 6N3 604.559.7100 604.559.7100 MAMOUD@CSRENVIRO.COMMAMOUD@CSRENVIRO.COM MAMOUD BASHIMAMOUD BASHI M2 LANDSCAPE ARCHITECTURE &ARBORICULTURE LTD. M2 LANDSCAPE ARCHITECTURE &ARBORICULTURE LTD. #220 - 26 LORNE MEWS#220 - 26 LORNE MEWS NEW WESTMINSTER, BC V3M 3L7NEW WESTMINSTER, BC V3M 3L7 604-783-3732604-783-3732 MEREDITH.MITCHELL@M2LA.COMMEREDITH.MITCHELL@M2LA.COM MEREDITH MITCHELLMEREDITH MITCHELL ELECTRICAL ENGINEERELECTRICAL ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON MECHANICAL ENGINEERMECHANICAL ENGINEER BUSINESS NAMEBUSINESS NAME MAILING ADDRESSMAILING ADDRESS TELEPHONE NUMBERTELEPHONE NUMBER EMAIL ADDRESSEMAIL ADDRESS CONTACT PERSONCONTACT PERSON LEADING ENGINEERINGLEADING ENGINEERING 2300-2850 SHAUGHNESSY STREET 2300-2850 SHAUGHNESSY STREET PORT COQUITLAM BC V3C 6K5PORT COQUITLAM BC V3C 6K5 604 500 8422604 500 8422 MIKE@LEADINGENG.CAMIKE@LEADINGENG.CA MIKE SHEFREIEMIKE SHEFREIE MEC ENGINEERING CONSULTING LTDMEC ENGINEERING CONSULTING LTD UNIT# 4 - 15243 -91 AVEUNIT# 4 - 15243 -91 AVE SURREY BCSURREY BC 604 581 6338604 581 6338 NAV.BRAR@MECENGINEERING.CANAV.BRAR@MECENGINEERING.CA NAV BRARNAV BRAR LOCATION MAPLOCATION MAP SITESITE 12297 222 ST / 22175, 22185 123 AVE MAPLE RIDGE BC. 222 MEADOWS WALK2018-15 22 2 M E A D O W S W A L K ISSUED FOR REZONING JUNE 14, 2024 TABLE OF CONTENT DP LEGAL DOCUMENTS LIST NO.DOCUMENT TITLE LD1 FORM C-GEOTECH REPORT LD2 FORM C-HABITAT PROTECTION LD3 FORM C- STORMWATER MANAGEMENT PLAN LD4 FORM C- TREE PROTECTION LD5 FORM C - VISITOR PARKING LD6 FORM C - HOUSING AGREEMENT LD7 ADP-ROAD DEDICATION PLAN LD8 ADP-SUBDIVISION PLAN LD9 SEARCH TITLE- SERCH PID 010-122-818 LD10 SEARCH TITLE- SERCH PID 010-122-885 LD11 SEARCH TITLE- SERCH PID 010-921-935 LD12 SURVEY PLAN CERTIFICATION (SUBDIVISION PLAN) LD13 SURVEY PLAN CERTIFICATION (ROAD DEDICATION) DP ARCHITECTURAL DRAWING LIST NO.SHEET TITLE DP-001 DRAWING LIST, SYMBOLS/ABBREVIATIONS, PROJECT DIRECTORY DP-002 CONTEXT DP-003 CONTEXT DP-004 DESIGN BRIEF DP-005 SHADOW ANALYSIS DP-006 STREETSCAPE DP-007 SITE SECTIONS DP-008 PROJECT DATA DP-100A SITE PLAN DP-100B SITE PLAN SHOWING DEDICATIONS DP-100C SITE_LEGAL LOTS & RETAINED TREES DP-100D SITE PLAN SHOWING BUILDING SETBACKS DP-100E SITE PLAN - FIRE TRUCK ACCESS DP-101 P2 FLOOR PLAN DP-102 P1 FLOOR PLAN DP-103 MAIN FLOOR DP-104 2nd FLOOR PLAN DP-105 3RD FLOOR PLAN DP-106 4TH FLOOR PLAN DP-107 5TH FLOOR PLAN DP-108 6TH FLOOR PLAN DP-109 7TH FLOOR PLAN DP-110 8TH FLOOR PLAN DP-111 ROOF PLAN DP-200 SOUTH ELEVATION DP-201 EAST ELEVATION DP-202 WEST ELEVATION DP-203 NORTH ELEVATION DP-300 BUILDING SECTION A - A DP-301 BUILDING SECTION B - B DP-400 ENLARGED UNIT PLANS DP-401 ENLARGED UNIT PLANS DP- 900 3D VIEWS DP- 901 MATERIAL BOARD DP- 902 3D VIEWS WITH REVIT VIEWS SUPPORTING DOCUMENTSSUPPORTING DOCUMENTS D-01 - SURVEY PLAND-01 - SURVEY PLAN D-02 - ENVIRONMENTAL IMPARCT ASSESSMENT REPORTD-02 - ENVIRONMENTAL IMPARCT ASSESSMENT REPORT D-03 - CHANGE APPROVAL & NOTIFICATIOND-03 - CHANGE APPROVAL & NOTIFICATION D-04 - UNDERGROUND OIL STORAGE TANK REPORTD-04 - UNDERGROUND OIL STORAGE TANK REPORT D-05 - SITE DISCLOSURE STATEMENTD-05 - SITE DISCLOSURE STATEMENT D-06 - ARBORIST REPORTD-06 - ARBORIST REPORT D-07 - WATER & SANITARY REVIEW REPORTD-07 - WATER & SANITARY REVIEW REPORT D-08 - GEOTECHNICAL REPORTD-08 - GEOTECHNICAL REPORT D-09 - EROSION REPORTD-09 - EROSION REPORT D-10 - AUTOTURN ANALYSISD-10 - AUTOTURN ANALYSIS D-11 - WASTE COLLECTION VEHICLE AUTOTURN ANALYSISD-11 - WASTE COLLECTION VEHICLE AUTOTURN ANALYSIS D-12 - ENERGY REPORTD-12 - ENERGY REPORT D-13 - GARBAGE ROOM DRAWINGSD-13 - GARBAGE ROOM DRAWINGS DP CIVIL DRAWING LIST NO.SHEET TITLE 20040-3 KEY PLAN 20040-4 ROADWORKS -123 AVE 20040-5 ROADWORKS - 222 ST. 20040-7 LOT GRADING PLAN 20040-8 SERVICING PLAN 20040-9 STORMWATER MANAGEMENT PLAN 20040-10 STORMWATER MANAGEMENT PLAN 20040-11 STORMWATER MANAGEMENT PLAN DP SHORING DRAWING LIST NO.SHEET TITLE 1 KEY PLAN 2 SHORING EAST & WEST ELEVATIONS 3 SHORING-SOUTH SECTION 4 NOTES DP LANDSCAPE DRAWING LIST NO.SHEET TITLE L1 NOTES & KEYS L2 HARD SITE PLAN L3 PRESERVE AREA GRADING & WATER MANAGEMENT PLAN L3-10 SECTIONS L4 OVERALL PLANTING PLAN L4-01 PLANTING PLAN L4-02 PLANTING PLAN L4-03 PLANTING PLAN L4-04 PLANTING PLAN L5-01 DETAILS L5-02 DETAILS L5-03 DETAILS APPENDIX E 8.50 13. 5 0 TOP OF B A N K TOP O F B A N K TO P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39057 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1. 8 6 9 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1. 8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 L1 13.284 8.6 8 5 9.6 7 8 16 . 7 2 2 8.23 6 9. 1 1 3 1 2 . 3 3 3 7 . 4 1 6 11 . 3 5 4 16 . 2 3 0 9. 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 5.9 8 3 2.7 3 6 L9 L1 2 7. 4 0 14 . 6 1 9.2 2 14 . 3 2 7. 2 5 8. 7 5 8. 5 6 4.4 8 13.2 2 11 . 4 8 8.29 6.01 5.65 4.5 4 17 . 8 5 1.8 8 3.25 1.56 1.41 2. 4 5 8.3 3 7.80 11 . 0 1 5.6 1 5.80 11.9 3 17 . 5 6 4.1 1 1 1 . 2 1 5. 5 8 15 . 2 8 9.2 2 13 . 1 0 6. 1 5 8. 7 5 9. 0 5 2 . 9 6 3. 9 0 4.69 5.7 4 2.37 123 AVE123 AVE 22 2 A V E 2 2 2 A V E 4 2 1 3 5 6 7 8910 EXISTING EXISTING HOUSE HOUSE Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1" = 40'-0" 6/ 1 3 / 2 0 2 4 4 : 1 7 : 1 2 P M DP-0022018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK CONTEXT 5 1 2 3 4 6 7 8910 1212 2 28-08-2020 ISSUED FOR DP SP 2 28-08-2020 ISSUED FOR DP SP 3 15-03-2021 REISSUED FOR DP TJ 3 15-03-2021 REISSUED FOR DP TJ 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 8 29-04-2024 REISSUED FOR DP JG 8 29-04-2024 REISSUED FOR DP JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 10 04-06-2024 ISSUED FOR REZONING JG 10 04-06-2024 ISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 8.50 13.5 0 TOP OF B A N K TOP O F B A N K TO P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39057 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1. 8 6 9 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1. 8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 L1 13.284 8.6 8 5 9.6 7 8 16 . 7 2 2 8.23 6 9. 1 1 3 1 2 . 3 3 3 7 . 4 1 6 11 . 3 5 4 16 . 2 3 0 9 . 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 5.9 8 3 2.7 3 6 L9 L1 2 7. 4 0 14 . 6 1 9. 2 2 14 . 3 2 7. 2 5 8. 7 5 8. 5 6 4.4 8 13.2 2 11 . 4 8 8.29 6.0 1 5.65 4.5 4 17 . 8 5 1. 8 8 3.25 1.56 1.41 2. 4 5 8.3 3 7.80 11 . 0 1 5.6 1 5.80 11.9 3 17 . 5 6 4.1 1 1 1 . 2 1 5 . 5 8 15 . 2 8 9. 2 2 13 . 1 0 6. 1 5 8. 7 5 9. 0 5 2 . 9 6 3. 9 0 4.69 5.74 2.37EXISTING EXISTING HOUSE HOUSE 123 AVE123 AVE GA S L I N E GA S L I N E EAS E M E N T EAS E M E N T 5 7 89 3 4 22 2 A V E 2 2 2 A V E Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1" = 40'-0" 6/ 1 3 / 2 0 2 4 4 : 1 7 : 1 3 P M DP-0032018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK CONTEXT 5 1 2 3 4 6 7 89 12 12 3 15-03-2021 REISSUED FOR DP TJ 3 15-03-2021 REISSUED FOR DP TJ 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 8 29-04-2024 REISSUED FOR DP JG 8 29-04-2024 REISSUED FOR DP JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 10 04-06-2024 ISSUED FOR REZONING JG 10 04-06-2024 ISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG DESIGN BRIEF Natural habitat enhancement and neighbourhood revitalization 01. The site is located northwest of the intersection of 222 St and 123 Ave. It is a consolidation of 3 lots, 12297 222 ST, 22175 123 AVE and 22185 123 AVE, which are currently single family lots . Two water courses flow through the north portion of the property and drain into Alouette river. The development highly respects the existing environmental setting. The habitat enhancement is provided along with the new development. The enhancement not only sets the conservation zone, but also will improve the creek flow by increasing the creek depth and cleaning the lock blocks in the creek. As an urban infill development, the new development introduces 106 units in total of mixed 1-bedroom, 2-bedroom and 3-bed room unit. The new development will significantly change the appearance of the cul-de-sac area at the end of the 222 St. Fit in the town center north view area02. The east side of 222 ST is mostly multi-residential buildings. There are two 4-Storey apartments on the opposite side of the site in 222 ST built in recent years. The new apartment is a transition from the town center to the west residential area. Also, it is a combination of natural environment and urban residential development. The shorter wing of the L shape build forms a smaller façade towards 123 Ave, the longer wing tapers into the natural green space. Balconies for each unit help breakdown the building mass in several parts with some play in the exterior cladding materials Two major exterior cladding materials are smooth face concrete block veneer and corrugated metal cladding. The smooth face concrete block veneer wall provides the quality of the building, the metal cladding provides a fresh modern style look. Both materials can be found in the nearby neighbor buildings. The building roof is a combination of various smaller size pitch roofs. It creates a dynamic outline of the building. The building height is also broken into various height because of the roof forms. Due to the restriction of the site, the building setback varies in different direction. The building setback is 15.63 meters at south due to the gas line easement, is 42.2 meters to provide the environmental protection. The main entrance sits in the courtyard at the end of 222 St. A 7m wide driveway leading into a courtyard provides the sense of security and privacy. The underground parking driveway is located at the west side of the building. So the entire street façade is formed by residence units. It highly reduces the negative impact from underground entrance and blank walls. Energy efficiency and environmental design03. The building construction aims at achieving high standard of energy efficiency. The exterior wall assembly core is insulated concrete forms (ICF) wall from first floor to top floor. The ICF wall core provides much higher R value than the code requirement. The selection of window size provides the tenant sufficient natural light and maintains a lower window-to-wall ratio to prevent heat loss. The balconies are framed to avoid thermo bridges and the new construction will focus on building airtightness in details. The mechanical system is designed to use high efficiency heat recovery ventilator and decentralized ventilation systems. The site is paved by permeable material and maximizes the landscape area to control the stormwater runover. Meanwhile, the roof water is collected for reuse purpose. Tenant friendly living environment04. As a rental building, the new apartment not only provides various units to fit tenants in different ago groups, but also provide a lot of amenity spaces for tenant convenience. The amenity spaces include: Meeting room, theater room, fitness center, guest-room suites and plenty of storage rooms. In addition, the existing house is to be renovated to a daycare specifically serve the apartment families. The site grading is to minimize the slope of walkways. The main entrance lobby is lowered to the street level, the walkway has maximum slope of 5%. The width is minimized to 5 feet wide all around the building. The waterway conservation area is strictly protected by fencing. Meanwhile, the new site also provides enough outdoor usable open space for the tenants. These usable open spaces are carefully chosen so no existing trees will be cut down and no existing environment been disturbed. The walkway and parking lot are lighted to enhance the safety. The building is designed to avoid dead corners. The unit windows and balconies provide surveillance to the surrounding. Windows are provided at the end of the building corridors and in the staircases. CPTED05. Natural Surveillance is achieved through open and visual connection from within the building and from the site generally. Tenants and building manager are continuously on the site. Lighting shall be chosen for both way finding and security of the property; only down lighting is proposed to protect the night sky. Surveillance cameras will also be installed to monitor the entrance lobby, ground parking area and rear door close to the underground entry ramp. Territorial Reinforcement is achieved by a well-maintained site, clearly defined site entry and exit treatments, water feature and landscaping. Natural Access Control is limited in part by the configuration of the site. The vehicle access to the underground parking is from 222 St to west passing through the ground parking lot and entre. The visitor or drop off is through 222 St to the courtyard. No long-term parking is allowed in courtyard area. Pedestrian access is led by street sidewalk to courtyard and to the main entrance lobby. The entrance lobby is flashing with street level without any steps and steep slope. Maintenance schedules shall be formulated at the start of operations to ensure the property, building and landscaping are kept in a pristine condition. The property manager shall commission a groundskeeper to maintain the landscape in such a condition that all areas of the site remain visible and free of potential vandalism. Shrubs and trees that require pruning shall be pruned each year and weekly or monthly upkeep shall be maintained throughout the year. On-site lighting shall be durable LED fixtures within easy reach of standard commercial grade maintenance equipment. Lighting shall provide good coverage to ensure no part of the site is left in an unsafe condition. Lighting operations shall be set to a seasonal time schedule. Camera surveillance shall also be within easy reach of commercial grade maintenance equipment. 123 AVE123 AVE 22 2 A V E 2 2 2 A V E SRWSRW PROPERTY LINEPROPERTY LINE TO P O F B A N K TO P O F B A N K TOP OF BANKTOP OF BANK 13. 5 M S E T B A C K 13. 5 M S E T B A C K 8.5 M S E T B A C K 8.5 M S E T B A C K DEDICATED DEDICATED PARK LANDPARK LAND DEDICATED DEDICATED PARK LANDPARK LAND FORTIS GAS ROWFORTIS GAS ROW BUILDING BUILDING FOOTPRINTFOOTPRINT BUILDABLE BUILDABLE AREAAREA 22 2 A V E T O D O W N C E N T E R 22 2 A V E T O D O W N C E N T E R SITESITE Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 7 : 1 8 P M DP-0042018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK DESIGN BRIEF MITREX ACTIVE SOLAR CLADDING + ACTIVE SOLAR RAIL + SOLAR PANELS ON ROOF INTEGRATED CONCRETE FORM WALL (R28) + GREEN SPACE & APARTMENT IN THE AREA BUILDING SITTING / VIEW CONCEPT ELEVATION CONCEPT REDUCE THE ROOF MASS AND SIZE SOLAR PANELS ON ROOF BALCONIES ACTING AS THERMAL BREAKS USE OF SHADING SYSTEMS ENERGY-EFFICIENT BUILDING ENVELOPES AMENITIES FOR TENANTS AMENITY LOCKERS / STORAGE GUESTROOMS OFFICE/ MEETING ROOM GYM 12 12 3 09-03-2021 ISSUED FOR CLIENT TJ 3 09-03-2021 ISSUED FOR CLIENT TJ 4 15-03-2021 REISSUED FOR DP TJ 4 15-03-2021 REISSUED FOR DP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 7 22-04-2024 REISSUED FOR DP & ADP JG 8 29-04-2024 REISSUED FOR DP JG 8 29-04-2024 REISSUED FOR DP JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 10 04-06-2024 ISSUED FOR REZONING JG 10 04-06-2024 ISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 6/ 1 3 / 2 0 2 4 4 : 1 7 : 1 9 P M DP-0052018-15 W.H Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SHADOW ANALYSIS JUNE 21 @ 10:00 AM JUNE 21 @ 12:00 PM JUNE 21 @ 2:00 PM SEPTEMBER / MARCH 21 @ 10:00 AM SEPTEMBER / MARCH 21 @ 12:00 PM SEPTEMBER / MARCH 21 @ 2:00 PM DECEMBER 21 @ 10:00 AM DECEMBER 21 @ 12:00 PM DECEMBER 21 @ 2:00 PM 1 20-08-2021 REISSUED FOR ADP WH 1 20-08-2021 REISSUED FOR ADP WH 2 17-02-2023 REISSUED FOR DP JG 2 17-02-2023 REISSUED FOR DP JG 3 02-08-2023 REISSUED FOR DP JG 3 02-08-2023 REISSUED FOR DP JG 9 9 4 22-04-2024 REISSUED FOR DP & ADP JG 4 22-04-2024 REISSUED FOR DP & ADP JG 5 29-04-2024 REISSUED FOR DP JG 5 29-04-2024 REISSUED FOR DP JG 6 29-05-2024 REISSUED FOR ADP REVIEW JG 6 29-05-2024 REISSUED FOR ADP REVIEW JG 7 04-06-2024 ISSUED FOR REZONING JG 7 04-06-2024 ISSUED FOR REZONING JG 8 12-06-2024 REISSUED FOR REZONING JG 8 12-06-2024 REISSUED FOR REZONING JG 09 14-06-2024 REISSUED FOR REZONING JG 09 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m MAIN FLOOR 29.19 m REA R - E X I S T I N G P R O P E R T Y L I N E REA R - E X I S T I N G P R O P E R T Y L I N E 222 ST222 ST 2ND FLOOR 34.68 m 6.63M TO EXISTING PROPERTY LINE FR O N T - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E 5.54M TO EXISTING PROPERTY LINEROOF PEAK 63.44 mMIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m [3 . 4 7 m ] 11 ' - 4 5 / 8 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [5 . 4 9 m ] 18 ' - 0 " [1 . 4 7 m ] 4' - 9 7 / 8 " [3 1 . 7 6 m ] 104 ' - 2 5 / 8 " 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m MAIN FLOOR 29.19 m UNDERGROUND ENTRANCE UNDERGROUND ENTRANCE GATEGATE 123 A V E , S I D E - P R O P O S E D P R O P E R T Y L I N E 123 A V E , S I D E - P R O P O S E D P R O P E R T Y L I N E 123 A V E , S I D E - E X I S T I N G P R O P E R T Y L I N E 123 A V E , S I D E - E X I S T I N G P R O P E R T Y L I N E NO R T H - E X I S T I N G P R O P E R T Y L I N E NO R T H - E X I S T I N G P R O P E R T Y L I N E 2ND FLOOR 34.68 m 42.55M TO EXISTING PROPERTY LINE RO A D D E D I C A T I O N RO A D D E D I C A T I O N 13.55M13.55M TO PROPOSED PROPERTY LINETO PROPOSED PROPERTY LINE 15.38M15.38M TO PROPOSED EXISTING LINETO PROPOSED EXISTING LINE ROOF PEAK 63.44 mMIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m [1 . 4 7 m ] 4' - 9 7 / 8 " [5 . 4 9 m ] 18 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 4 7 m ] 11 ' - 4 5 / 8 " [3 1 . 7 6 m ] 10 4 ' - 2 5 / 8 " Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/16" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 7 : 4 3 P M DP-0062018-15 TJ JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK STREETSCAPE 1/16" = 1'-0"1 SOUTH ELEVATION-STREETSCAPE 1/16" = 1'-0"2 WEST ELEVATION -STREETSCAPE 1 20-08-2021 REISSUED FOR ADP TJ 1 20-08-2021 REISSUED FOR ADP TJ 2 17-02-2023 REISSUED FOR DP JG 2 17-02-2023 REISSUED FOR DP JG 3 02-08-2023 REISSUED FOR DP JG 3 02-08-2023 REISSUED FOR DP JG 123 AVE123 AVE 4 15-02-2024 REISSUED FOR DP JG 4 15-02-2024 REISSUED FOR DP JG 10 10 5 22-04-2024 REISSUED FOR DP & ADP JG 5 22-04-2024 REISSUED FOR DP & ADP JG 6 29-04-2024 REISSUED FOR DP JG 6 29-04-2024 REISSUED FOR DP JG 7 29-05-2024 REISSUED FOR ADP REVIEW JG 7 29-05-2024 REISSUED FOR ADP REVIEW JG 8 04-06-2024 ISSUED FOR REZONING JG 8 04-06-2024 ISSUED FOR REZONING JG 9 12-06-2024 REISSUED FOR REZONING JG9 12-06-2024 REISSUED FOR REZONING JG 10 14-06-2024 REISSUED FOR REZONING JG 10 14-06-2024 REISSUED FOR REZONING JG 8.50 13.5 0 TOP OF B A N K TOP O F B A N K TO P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39 0 5 7 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207 208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 .9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1.8 6 9 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1.8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 L1 13.284 8.68 5 9.6 7 8 16 . 7 2 2 8.23 6 9. 1 1 3 12 . 3 3 3 7. 4 1 6 11 . 3 5 4 16 . 2 3 0 9. 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 5.9 8 3 2.7 3 6 L9 L1 2 7. 4 0 14 . 6 1 9.2 2 14 . 3 2 7. 2 5 8. 7 5 8. 5 6 4.4 8 13.2 2 11 . 4 8 8.29 6.01 5.65 4.5 4 17 . 8 5 1. 8 8 3.25 1.56 1.41 2. 4 5 8.33 7.80 11 . 0 1 5.61 5.80 11.9 3 17 . 5 6 4.1 1 11 . 2 1 5. 5 8 15 . 2 8 9.2 2 13 . 1 0 6. 1 5 8. 7 5 9. 0 5 2 . 9 6 3. 9 0 4.69 5.74 2.37 13.50 8.50 10.00 10.00 HIGH W A T E R M A R K HI G H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 1 0 M W I D E R A P R S E T B A C K HI G H W A T E R M A R K HIG H W A T E R M A R K HIG H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 10 M W I D E R A P R S E T B A C K TOP OF B A N K TOP O F B A N K TO P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39 0 5 7 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207 208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1.8 6 9 22.412 34.646 10 . 9 1 0 4.3 3 0 45.953 1.8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 0.279ha 0.171ha L1 13.284 8.68 5 9.6 7 8 16 . 7 2 2 8.23 6 9. 1 1 3 12 . 3 3 3 7. 4 1 6 11 . 3 5 4 16 . 2 3 0 9.7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 L 1 3 5.98 3 2.7 3 6 L9 L1 26.86 7.74 11.14 12 . 7 3 9.2 9 4.97 12. 5 8 5.2 9 4.2 5 4.97 3 . 3 9 1.0 4 15 . 8 8 4.5 1 5. 1 2 4. 6 7 9.6 3 11 . 9 3 4. 2 6 5. 7 0 5. 6 7 6. 5 4 2. 6 2 2.7 5 10.60 8.64 15.02 15 . 1 2 7.78 5.8 8 13. 4 0 7.2 5 8.05 3.04 3.4 5 3. 1 8 6. 9 5 8.8 4 13 . 5 7 15 . 2 8 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m P2 FLOOR 22.33 m 222 ST222 ST EXISTING GRADEEXISTING GRADE RAMPRAMP RAMPRAMP NEIGHBOUR HOUSENEIGHBOUR HOUSE MAIN FLOOR 29.19 m 2ND FLOOR 34.68 m PARKING - P1PARKING - P1 PARKING - P2PARKING - P2 RESIDENTIALRESIDENTIAL ENTRANCE, OFFICE & PARKINGENTRANCE, OFFICE & PARKING RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RE A R - E X I S T I N G P R O P E R T Y L I N E RE A R - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E 5.54M TO EXISTING PROPERTY LINE 6.63M TO EXISTING PROPERTY LINE ROOF PEAK 63.44 mMIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m [3 . 4 7 m ] 11 ' - 4 5 / 8 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [5 . 4 9 m ] 18 ' - 0 " [3 . 6 6 m ] 12' - 0 " [3 . 2 0 m ] 10' - 6 " [3 1 . 7 6 m ] 10 4 ' - 2 5 / 8 " 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m P2 FLOOR 22.33 m 123 AVE123 AVE EXISTING GRADEEXISTING GRADE ENTRANCE, OFFICE & PARKINGENTRANCE, OFFICE & PARKING MAIN FLOOR 29.19 m EXISTING BUILDINGEXISTING BUILDING PARKINGPARKING PARKINGPARKING 2ND FLOOR 34.68 m RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL RESIDENTIALRESIDENTIAL IP G A S L I N E IP G A S L I N E 123 A V E , S I D E - P R O P O S E D P R O P E R T Y L I N E 123 A V E , S I D E - P R O P O S E D P R O P E R T Y L I N E 123 A V E , S I D E - E X I S T I N G P R O P E R T Y L I N E 123 A V E , S I D E - E X I S T I N G P R O P E R T Y L I N E NO R T H - E X I S T I N G P R O P E R T Y L I N E NO R T H - E X I S T I N G P R O P E R T Y L I N E RO A D D E D I C A T I O N RO A D D E D I C A T I O N 42.55M TO EXISTING PROPERTY LINE ROOF PEAK 63.44 mMIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m [3 . 2 0 m ] 10 ' - 6 " [3 . 6 6 m ] 12 ' - 0 " [5 . 4 9 m ] 18' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 4 7 m ] 11 ' - 4 5 / 8 " [3 1 . 7 6 m ] 10 4 ' - 2 5 / 8 " 123 AVE123 AVE 22 2 A V E 2 2 2 A V E 2222 11 11 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 7 : 4 7 P M DP-0072018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE SECTIONS 1/16" = 1'-0"2 SC-EW CROSS SECTION 2 1/16" = 1'-0"1 SC-NS CROSS SECTION 14 14 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 30-11-2023 REISSUED FOR DP JG 7 30-11-2023 REISSUED FOR DP JG 8 15-02-2024 REISSUED FOR DP JG 8 15-02-2024 REISSUED FOR DP JG 9 22-04-2024 REISSUED FOR DP & ADP JG 9 22-04-2024 REISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG 10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 6/ 1 3 / 2 0 2 4 4 : 1 7 : 4 8 P M DP-0082018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK PROJECT DATA ABOVE CODE ANALYSIS IS BASED ON BCBC 2018 & WILL BE UPDATED ONCE BCBC 2024 DURING THE PROGRESS OF THE PROJECT. 2323 TOTAL 106 7029 SF (653.01 SQ.M.) TYPE G 3 BEDROOM 1154.06 SF 108.00 SF 7 756 SF TYPE F 2 BEDROOM 930.91 SF 70.00 SF 6 420 SF TYPE E 2 BEDROOM 892.00 SF 64.00 SF 6 384 SF TYPE D 3 BEDROOM 1356.82 SF 79.00 SF 4 316 SF TYPE C 2 BEDROOM 1149.26 SF 61.00 SF 18 1098 SF TYPE B 1 BEDROOM 678.41 SF 79.00 SF 5 395 SF TYPE A 1 BEDROOM 574.63 SF 61.00 SF 60 3660 SF UNIT TYPEUNIT TYPE UNIT AREAUNIT AREA OUTDOOR AMENITYOUTDOOR AMENITY # OF UNITS# OF UNITS TOTAL OUTDOOR AMENITY PERTOTAL OUTDOOR AMENITY PER UNIT TYPEUNIT TYPE UNIT MATRIXUNIT MATRIX RENTAL APARTMENTRENTAL APARTMENT 5252 AFFORDABLE RENTAL APARTMENTAFFORDABLE RENTAL APARTMENT 5454 COLOR LEGENDCOLOR LEGEND TOTALTOTAL PLEASE NOTE: STUDIO GUEST UNITS WILL ONLY BE USED BY THE RESIDENTS.PLEASE NOTE: STUDIO GUEST UNITS WILL ONLY BE USED BY THE RESIDENTS. TOTALTOTAL 6060 55 1818 44 66 66 77 106106 8TH FLOOR 0 0 --1 1 1 3 7TH FLOOR 6 0 9 2 1 1 1 20 6TH FLOOR 6 0 --1 1 1 9 5TH FLOOR 6 0 9 2 1 1 1 20 4TH FLOOR 15 2 0 0 1 1 1 20 3RD FLOOR 15 2 0 0 1 1 1 20 2ND FLOOR 12 1 0 0 0 0 1 14 FLOORFLOOR TYPE A 1BR TYPE B 1BR TYPE C 2BR (2LV) TYPE D 2BR (2LV) TYPE E 2BR TYPE F 2BR TYPE G 3BR TOTALTOTAL QUANTITY OF UNIT TYPESQUANTITY OF UNIT TYPES UNIT COUNT (AFFORDABLE/MARKET)UNIT COUNT (AFFORDABLE/MARKET) THE DWELLING UNITS ARE DESIGNED TO CMHC ACCESSIBILITY DESIGN STANDARDS WHICH CALL FOR 100% OF THE UNITS TO BE UNIVERSALLY ACCESSIBLE. THERE IS NO REQUIREMENT WITHIN BC BUILDING CODE TO DESIGN THE INTERIOR OF THE UNITS TO AN ACCESSIBILITY STANDARD. 101 - 110101 - 110 55 1111 44 11 55 3 yd33 yd3 4 - 4 yd34 - 4 yd3 360 LITRE CART360 LITRE CART 240 LITRE CART240 LITRE CART CUBIC YARD BIN (SIZE)CUBIC YARD BIN (SIZE) NUMBER OFNUMBER OF RESIDENTIALRESIDENTIAL UNITSUNITS (2 RESIDENTS(2 RESIDENTS PER UNIT)PER UNIT) MIXEDMIXED CONTAINTERSCONTAINTERS NEWSPAPERS &NEWSPAPERS & MIXED PAPERSMIXED PAPERS (WITHOUT(WITHOUT CARDBOARD BIN)CARDBOARD BIN) NEWSPAPERS &NEWSPAPERS & MIXED PAPERSMIXED PAPERS (WITH CARDBOARD(WITH CARDBOARD BIN)BIN) GLASSGLASS COMPOSTABLECOMPOSTABLE ORGANICS (HIGHORGANICS (HIGH PARTICIPATION)PARTICIPATION) CARDBOARDCARDBOARD BINBIN GARBAGEGARBAGE GARBAGE AND RECYLCING AREAGARBAGE AND RECYLCING AREA EXTERIOR LOT LINE - 123 AVE 13.88 M INTERIOR LOT LINE - NORTH 42.69 M REAR LOAT LINE - WEST 0.50 M FRONT LOT LINE - 222 ST.5.59 M ANCILLARY BUILDING - PARKING STRUCTURE SETBCAKSANCILLARY BUILDING - PARKING STRUCTURE SETBCAKS 13 02-08-2023 ISSUED FOR COORDINATION JG 13 02-08-2023 ISSUED FOR COORDINATION JG 14 18-08-2023 RE-ISSUED FOR DP JG 14 18-08-2023 RE-ISSUED FOR DP JG 15 30-11-2023 RE-ISSUED FOR DP JG 15 30-11-2023 RE-ISSUED FOR DP JG 16 15-02-2024 RE-ISSUED FOR DP JG 16 15-02-2024 RE-ISSUED FOR DP JG 17 22-04-2024 RE-ISSUED FOR DP & ADP JG 17 22-04-2024 RE-ISSUED FOR DP & ADP JG 18 29-04-2024 RE-ISSUED FOR DP JG 18 29-04-2024 RE-ISSUED FOR DP JG 19 29-05-2024 REISSUED FOR ADP REVIEW JG 19 29-05-2024 REISSUED FOR ADP REVIEW JG 20 04-06-2024 ISSUED FOR REZONING JG 20 04-06-2024 ISSUED FOR REZONING JG 21 07-06-2024 ISSUED FOR CITY REVIEW JG 21 07-06-2024 ISSUED FOR CITY REVIEW JG 22 12-06-2024 REISSUED FOR REZONING JG 22 12-06-2024 REISSUED FOR REZONING JG NO OF CHILDREN FOR DAYCARENO OF CHILDREN FOR DAYCARE TOTAL DAYCARE FLOOR AREA IS 328.47 SQ.M. ( 3535.62 SQ. FT.) NO OF CHILDREN IT CAN ACCOMMODATE = 3535.62 / 75 = 47 CHILDREN. 23 14-06-2024 REISSUED FOR REZONING JG 23 14-06-2024 REISSUED FOR REZONING JG ELEVATOR ELEVATOR LOBBYLOBBY ANCILLARY OFFICE ANCILLARY OFFICE SPACE SPACE ENTRANCE ENTRANCE LOBBYLOBBY MAILMAIL ROOMROOM PMTPMT EXISTING HOUSE TO BE REMOVEDEXISTING HOUSE TO BE REMOVED EXISTING BUILDING TO BE DEMOLISHED EXISTING BUILDING TO BE DEMOLISHED TOP OF BANKTOP OF BANK 8.50 M SETBACK FROM T.O.BANK8.50 M SETBACK FROM T.O.BANK TOP OF BANKTOP OF BANK NEW LOCATION NEW LOCATION FOR FIRE HYDRANTFOR FIRE HYDRANT PROPERTY LINE 97.026MPROPERTY LINE 97.026M27.1627.1627.2527.2527.527.50027.0027.0026. 5 0 2 6 . 5 026.0026.0026.0026.0026.0026.0027.2527.25 29.1829.18 TREE TO BE REMOVEDTREE TO BE REMOVED TREES TO BE TREES TO BE RETAINEDRETAINED EX I T P A T H O N G R A D E EX I T P A T H O N G R A D E EX I T P A T H O N G R A D E EX I T P A T H O N G R A D E GARBAGE PICK UP ROUTEGARBAGE PICK UP ROUTE 29.3429.34 123 AVE123 AVE 22 2 S T 2 2 2 S T SID E W A L K SID E W A L K SIDEWALKSIDEWALK GA S L I N E E A S E M E N T GA S L I N E E A S E M E N T PROPERTY LINE 48.96 MPROPERTY LINE 48.96 M SID E W A L K SID E W A L K 29.3029.30 FLOOR ABOVEFLOOR ABOVEFLOOR ABOVEFLOOR ABOVE 29.8229.82 IP GAS LINEIP GAS LINE IP GAS LINEIP GAS LINE DI W A T E R DI W A T E R SAN.SAN. PROPOSED PROPERTY LINEPROPOSED PROPERTY LINE 29.3629.36 29.1429.14 29.9029.9029.8829.88 29.6829.68 29.4829.4829.7829.78 29.6829.6829.7129.71 29.4829.48 29.8629.86 27.1927.19 27.4427.44 26.9626.96 29.3429.34 29.1829.18 1.5M WIDE GRAVEL 1.5M WIDE GRAVEL PATHPATH TREE PROTECTION TREE PROTECTION FENCE (TEMPORARY)FENCE (TEMPORARY) TREE PROTECTION FENCE (TEMPORARY)TREE PROTECTION FENCE (TEMPORARY) TREES TO BE RETAINEDTREES TO BE RETAINED TREE TO BE REMOVED TO ACCOMODATE CRANETREE TO BE REMOVED TO ACCOMODATE CRANE FIRE HYDRANTFIRE HYDRANT SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN.SAN. SAN . S A N . SA N . S A N . SA N . S A N . SA N . S A N . WW WW WW WW WW WWWWWWWWWWWWWWWWWWWW RAMP UP 1.17M RAMP UP 1.17M @ 9.47 %@ 9.47 % DDDDDDDDDD DD DD DD DD DD SSSS WATER SERVICE CONNECTIONWATER SERVICE CONNECTION PROPOSED CATCH BASINPROPOSED CATCH BASIN PROPOSED STORM SERVICE CONNECTIONPROPOSED STORM SERVICE CONNECTION PROPOSED CATCHBASINPROPOSED CATCHBASIN 1.5M WIDE CONCRETE PAVER EXIT PATH1.5M WIDE CONCRETE PAVER EXIT PATH AMENITY AREAAMENITY AREA REFER TO DP-103B FOR REFER TO DP-103B FOR BOUNDARY OF OUTDOOR AMENITY BOUNDARY OF OUTDOOR AMENITY AREA AND MEASUREMENTAREA AND MEASUREMENT CIP CONCRETE WALKCIP CONCRETE WALK PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M MID-SLOPE STORMWATER DIVERSION SWALEMID-SLOPE STORMWATER DIVERSION SWALE MID-SLOPE STORMWATER MID-SLOPE STORMWATER DIVERSION SWALEDIVERSION SWALE EXISTING BUILDING EXISTING BUILDING TO BE DEMOLISHEDTO BE DEMOLISHED 29.1729.17 DO W N T O U N D E R G R O U N D P A R K I N G DO W N T O U N D E R G R O U N D P A R K I N G PRO P E R T Y L I N E 8 2 . 9 8 8 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PR O P E R T Y L I N E 8 3 . 0 0 M PR O P E R T Y L I N E 8 3 . 0 0 M EXISTING PROPERTY LINEEXISTING PROPERTY LINE STRSTR PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M 29.1829.18 SHORT TERM BIKE STORAGESHORT TERM BIKE STORAGE 17 BIKES17 BIKES PRO P E R T Y L I N E 3 9 . 6 3 M PRO P E R T Y L I N E 3 9 . 6 3 M 27.6527.65 27.9727.97 DAYCARE DAYCARE LOBBYLOBBY ELEVATORELEVATOR ELEVATORELEVATOR ELEVATORELEVATOR EXITEXIT 66 FDCFDC 33 22 44 11 11 1010 22 EL. 29.19MEL. 29.19M DAYCARE DAYCARE ENTRANCEENTRANCE 44 66 22 11 22 52335233 11 EL. 29.19MEL. 29.19M S R W S R W UNDISTURBED PART AFTER TOP OF BANK,UNDISTURBED PART AFTER TOP OF BANK, REMEDIATION WILL BE CARRIED OUT IF ANY DISRUPTION REMEDIATION WILL BE CARRIED OUT IF ANY DISRUPTION CAUSED DURING CONSTRUCTIONCAUSED DURING CONSTRUCTION UNDISTURBED PART AFTER TOP OF BANK,UNDISTURBED PART AFTER TOP OF BANK, REMEDIATION WILL BE CARRIED OUT IF ANY DISRUPTION REMEDIATION WILL BE CARRIED OUT IF ANY DISRUPTION CAUSED DURING CONSTRUCTIONCAUSED DURING CONSTRUCTION 28.2028.20 EASEMENT TO ACCESS THE DEDICATED PARKLANDEASEMENT TO ACCESS THE DEDICATED PARKLAND 29.0129.01 28.9628.96 25.9825.98 29.1829.18 EL. 29.19MEL. 29.19M 29.1829.18 RAMP @ 7.0 %RAMP @ 7.0 % 25.9325.93 @ 1.0 %@ 1.0 % RA M P @ 1 3 . 8 2 % RA M P @ 1 3 . 8 2 % @ 1.0 %@ 1.0 % STORM WATER TANK BELOWSTORM WATER TANK BELOW RAMP UP 0.36M RAMP UP 0.36M @ 6.00 %@ 6.00 % 28.0128.0129.1829.18 DR I V E A I S L E @ 2 . 0 0 % DR I V E A I S L E @ 2 . 0 0 % 29.1829.18 29.1829.18 29.0029.00 55 PROPOSED SANITARY SERVICE PROPOSED SANITARY SERVICE CONNECTIONCONNECTION EXISTING FIRE HYDRANT TO BE EXISTING FIRE HYDRANT TO BE RELOCATED AS SHOWNRELOCATED AS SHOWN SHORT TERM SHORT TERM BIKE STORAGEBIKE STORAGE 4 BIKES4 BIKES 66 MAI N T E N A N C E P A T H MAI N T E N A N C E P A T H 77 7 9 7 7 7 9 PROPOSED STREETLIGHTSPROPOSED STREETLIGHTS PLEASE SEE SHEET#100A FOR SITE PROPOSED & EXSITING SETBACKSPLEASE SEE SHEET#100A FOR SITE PROPOSED & EXSITING SETBACKS 77 99 44 33 RESIDENCERESIDENCE OFFICEOFFICE OFFICEOFFICE VISITOR VISITOR RESIDENCERESIDENCE RESIDENCERESIDENCE RESIDENCERESIDENCE RESIDENCERESIDENCE RESIDENCE RESIDENCE OFFICEOFFICE VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR DAYCAREDAYCARE DAYCAREDAYCARE DAYCAREDAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCAREDAYCARE DAYCAREDAYCARE 29.1829.18 SH O R T T E R M B I K E SH O R T T E R M B I K E STO R A G E 1 0 B I K E S STO R A G E 1 0 B I K E S PROPERTY LINE 97.026MPROPERTY LINE 97.026M PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PR O P E R T Y L I N E 8 3 . 0 0 M PR O P E R T Y L I N E 8 3 . 0 0 M PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M PRO P E R T Y L I N E 3 9 . 6 3 M PRO P E R T Y L I N E 3 9 . 6 3 M NEW LOCATION NEW LOCATION FOR FIRE HYDRANTFOR FIRE HYDRANT FIRE HYDRANTFIRE HYDRANT 1500MM WIDE SIDEWALK1500MM WIDE SIDEWALKEL. 29.19MEL. 29.19M EL. 27.65MEL. 27.65M 25 0 0 2 5 0 0 18 0 0 1 8 0 0 600600 2 bike 2 bike stallsstalls [6 . 1 6 m ] 20 ' - 2 5 / 8 " [9 . 1 1 m ] 29 ' - 1 0 3 / 4 " ORGANIC ORGANIC COMPOST COMPOST RESIDENCE ENTRYRESIDENCE ENTRY 55 88 1111 33 33 55 NOTE:NOTE: TREES TO BE REMOVEDTREES TO BE REMOVED TREES TO BE RETAINEDTREES TO BE RETAINED Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1 : 250 6/ 1 3 / 2 0 2 4 4 : 1 7 : 5 3 P M DP-100A2018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE PLAN 22 22SITE PLANSCALE: 1:250 13 02-08-2023 ISSUED FOR COORDINATION JG 13 02-08-2023 ISSUED FOR COORDINATION JG 14 18-08-2023 RE-ISSUED FOR DP JG 14 18-08-2023 RE-ISSUED FOR DP JG 15 30-11-2023 RE-ISSUED FOR DP JG 15 30-11-2023 RE-ISSUED FOR DP JG 16 15-02-2024 RE-ISSUED FOR DP JG 16 15-02-2024 RE-ISSUED FOR DP JG 17 22-04-2024 RE-ISSUED FOR DP & ADP JG 17 22-04-2024 RE-ISSUED FOR DP & ADP JG 18 29-04-2024 RE-ISSUED FOR DP JG 18 29-04-2024 RE-ISSUED FOR DP JG 19 29-05-2024 REISSUED FOR ADP REVIEW JG 19 29-05-2024 REISSUED FOR ADP REVIEW JG 20 04-06-2024 ISSUED FOR REZONING JG 20 04-06-2024 ISSUED FOR REZONING JG 21 12-06-2024 REISSUED FOR REZONING JG 21 12-06-2024 REISSUED FOR REZONING JG 22 14-06-2024 REISSUED FOR REZONING JG 22 14-06-2024 REISSUED FOR REZONING JG 13.50 8.50 HIGH W A T E R M A R K H I G H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 1 0 M W I D E R A P R S E T B A C K H I G H W A T E R M A R K HIG H W A T E R M A R K HIG H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 10 M W I D E R A P R S E T B A C K TOP OF B A N K TOP O F B A N K T O P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39057 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1. 8 6 9 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1. 8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 0.279ha 0.171ha L1 13.284 8.6 8 5 9.6 7 8 16 . 7 2 2 8.2 3 6 9 . 1 1 3 1 2 . 3 3 3 7 . 4 1 6 11 . 3 5 4 16 . 2 3 0 9. 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 L 1 3 5.9 8 3 2.7 3 6 L9 L 1 26.86 7.74 11.1 4 12 . 7 3 9.2 9 4.9 7 12 . 5 8 5.2 9 4.2 5 4.97 3 . 3 9 1.0 4 15 . 8 8 4. 5 1 5 . 1 2 4 . 6 7 9.6 3 11 . 9 3 4 . 2 6 5 . 7 0 5. 6 7 6 . 5 4 2 . 6 2 2. 7 5 10.60 8.64 15.0 2 15 . 1 2 7.7 8 5.8 8 13 . 4 0 7.2 5 8.0 5 3.04 3. 4 5 3 . 1 8 6 . 9 5 8.8 4 13 . 5 7 15 . 2 8 13.50 8.50 HIGH W A T E R M A R K H I G H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 1 0 M W I D E R A P R S E T B A C K H I G H W A T E R M A R K HIG H W A T E R M A R K HIG H W A T E R M A R K 10 M W I D E R A P R S E T B A C K 10 M W I D E R A P R S E T B A C K TOP OF B A N K TOP O F B A N K T O P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39 0 5 7 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207 208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 1 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.390 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1. 8 6 9 18.300 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1. 8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 0.544ha 0.279ha 0.171ha L1 13.284 8.6 8 5 9.6 7 8 16 . 7 2 2 8.23 6 9. 1 1 3 1 2 . 3 3 3 7 . 4 1 6 11 . 3 5 4 16 . 2 3 0 9 . 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 L 1 3 5.9 8 3 2.7 3 6 L9 L 1 26.86 7.74 11.1 4 12 . 7 3 9.2 9 4.9 7 12 . 5 8 5.2 9 4.2 5 4.9 7 3 . 3 9 1.0 4 15 . 8 8 4. 5 1 5 . 1 2 4 . 6 7 9.6 3 11 . 9 3 4 . 2 6 5 . 7 0 5. 6 7 6 . 5 4 2 . 6 2 2. 7 5 10.60 8.64 15.02 15 . 1 2 7.7 8 5.8 8 13 . 4 0 7.2 5 8.05 3.04 3. 4 5 3 . 1 8 6 . 9 5 8.8 4 13 . 5 7 15 . 2 8 22 2 S T 2 2 2 S T PROPERTY LINE 48.96 MPROPERTY LINE 48.96 M PROPOSED PROPERTY LINEPROPOSED PROPERTY LINE EXISTING PROPERTY LINEEXISTING PROPERTY LINE SURVEY NOTE:SURVEY NOTE: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION OBTAINEDTHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION OBTAINED FROM: GREWAL & ASSOCIATES PROFESSIONAL LAND SURVEYORSFROM: GREWAL & ASSOCIATES PROFESSIONAL LAND SURVEYORS DATED: APRIL 28, 2022 (SHOWING PROPERTY LINE)DATED: APRIL 28, 2022 (SHOWING PROPERTY LINE) AUGUST 02, 2022 (SHOWING RESTRICTIVE COVENANT) AUGUST 02, 2022 (SHOWING RESTRICTIVE COVENANT) SEPTEMBER 19, 2022 (SHOWING ROAD DEDICATION) SEPTEMBER 19, 2022 (SHOWING ROAD DEDICATION) WHILE A REASONABLE EFFORT HAS BEEN MADE TO VERIFY THE WHILE A REASONABLE EFFORT HAS BEEN MADE TO VERIFY THE INFORMATION IT REMAINS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORMATION IT REMAINS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOT DIMENSIONS & TOPOGRAPHIC INFORMATION PRIOR TO VERIFY ALL LOT DIMENSIONS & TOPOGRAPHIC INFORMATION PRIOR TO START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES BECOME EVIDENT START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES BECOME EVIDENT NOTIFY THE ARCHITECT IMMEDIATELY. NOTIFY THE ARCHITECT IMMEDIATELY. 123 AVE123 AVE IP GAS LINEIP GAS LINE AMENITY AREAAMENITY AREA SEE 2/DP-103B FOR SEE 2/DP-103B FOR BOUNDARY AND AREABOUNDARY AND AREA PART OF TRAIL LEADS TO THE AMENITY PART OF TRAIL LEADS TO THE AMENITY AREA TOWARDS THE NORTH OF THE AREA TOWARDS THE NORTH OF THE PROPERTYPROPERTY CANTILEVER AREA OF BUILDING AT MAIN CANTILEVER AREA OF BUILDING AT MAIN FLOORFLOOR SO F T S C A P E SO F T S C A P E EG R E S S R O U T E EG R E S S R O U T E SOFTSCAPESOFTSCAPE BUILDING LINE ABOVEBUILDING LINE ABOVE BUILDING LINE ABOVEBUILDING LINE ABOVE HARDSCAPEHARDSCAPE (PMT)(PMT)BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BUILDING LINE ABOVEBUILDING LINE ABOVE B U I L D I N G L I N E A B O V E B U I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E LEGAL LOTLEGAL LOT LEGAL LOTLEGAL LOT LEGAL LOT 1LEGAL LOT 1 (ROAD DEDICATION) LEGAL LOT (ROAD DEDICATION) LEGAL LOT GA S L I N E E A S E M E N T GA S L I N E E A S E M E N T 15 2 4 0 1 5 2 4 0 REST OF THE TRAIL IS PART OF EGRESS REST OF THE TRAIL IS PART OF EGRESS PER BCBC 2018.PER BCBC 2018. 1.5M. MAINTENANCE ACCESS PATH1.5M. MAINTENANCE ACCESS PATH RESTRICTIVE COVENANT RESTRICTIVE COVENANT RESTRICTIVE COVENANT RESTRICTIVECOVENANT RESTRICTIVECOVENANT RESTRICTIVECOVENANT RESTRICTIVECOVENANT 1.5M. MAINTENANCE 1.5M. MAINTENANCE ACCESS PATHACCESS PATH 13 . 5 M . 1 3 . 5 M . 8.5 M . 8 . 5 M . FOR 1 . 5 0 M M A I N T E N A N C E P A T H FOR 1 . 5 0 M M A I N T E N A N C E P A T H FO R 1 . 5 0 M M A I N T E N A N C E P A T H FO R 1 . 5 0 M M A I N T E N A N C E P A T H RESTRICTIVE COVENANT FOR RESTRICTIVE COVENANT FOR PERVIOUS AMENITY AREA PERVIOUS AMENITY AREA 2382.75 SQ.FT.2382.75 SQ.FT. SOFTSCAPESOFTSCAPE BUILDING LINE ABOVEBUILDING LINE ABOVE RESTRICTIVE COVENANT RESTRICTIVE COVENANT RESTRICTIVE COVENANT 13.5 M.13.5 M. 8.5 M.8.5 M. Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1 : 250 6/ 1 3 / 2 0 2 4 4 : 1 7 : 5 6 P M DP-100B2018-15 JG JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE PLAN SHOWING DEDICATIONS 1 30-11-2023 ISSUED FOR DP JG 1 30-11-2023 ISSUED FOR DP JG 7 7 SITE PLAN SHOWING DEDICATIONS1 OUTDOOR AMENITY BOUNDARY2 2 22-04-2024 REISSUED FOR DP & ADP JG 2 22-04-2024 REISSUED FOR DP & ADP JG 3 29-04-2024 REISSUED FOR DP JG 3 29-04-2024 REISSUED FOR DP JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 5 04-06-2024 ISSUED FOR REZONING JG 5 04-06-2024 ISSUED FOR REZONING JG 6 12-06-2024 REISSUED FOR REZONING JG 6 12-06-2024 REISSUED FOR REZONING JG 7 14-06-2024 REISSUED FOR REZONING JG 7 14-06-2024 REISSUED FOR REZONING JG 8.50 13. 5 0 TOP OF B A N K TOP O F B A N K T O P O F B A N K TO P O F B A N K TO P O F B A N K PP X24943 (PARK DEDICATION)(PARK DECICATION) 123rd AVENUE 22 2 n d S T R E E T EX. PLAN 13727 PLAN BCS3060 PL A N 39057 PLAN 15728 PL A N B C P 4 8 4 2 9 PLAN EPS3472 PL A N BC P 4 8 4 2 9 2 REM PCL "D" 11 87 207208 209 210 211 212 STRATA 6 223 PA R K STRATA 2 3 4 57 . 0 3 2 25 . 9 5 6 24 . 3 8 9 24.387 13 . 4 1 0 24.564 S R/W PLAN 18394 15 . 2 4 0 24 . 3 9 3 30.687 60 . 3 3 7 20 . 7 9 5 6.982 1. 8 6 9 22.412 34.646 10 . 9 1 0 4. 3 3 0 45.953 1. 8 3 0 3.917 31.536 9.281 6.291 4.509 5.549 L1 13.284 8.6 8 5 9.6 7 8 16 . 7 2 2 8.2 3 6 9 . 1 1 3 1 2 . 3 3 3 7 . 4 1 6 11 . 3 5 4 16 . 2 3 0 9 . 7 6 6 L2 L3 L4 L5 L6 L7 L8 L10 L 1 1 5.9 8 3 2.7 3 6 L9 L 1 2 7. 4 0 14 . 6 1 9. 2 2 14 . 3 2 7 . 2 5 8. 7 5 8 . 5 6 4.4 8 13. 2 2 11 . 4 8 8.29 6.0 1 5.65 4.5 4 17 . 8 5 1. 8 8 3.25 1.56 1.41 2 . 4 5 8.3 3 7.80 11 . 0 1 5.6 1 5.80 11. 9 3 17 . 5 6 4.1 1 1 1 . 2 1 5 . 5 8 15 . 2 8 9. 2 2 13 . 1 0 6. 1 5 8. 7 5 9 . 0 5 2 . 9 6 3. 9 0 4.69 5.7 4 2.37 22 2 S T 2 2 2 S T EXISTING PROPERTY LINEEXISTING PROPERTY LINE SURVEY NOTE:SURVEY NOTE: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION OBTAINEDTHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION OBTAINED FROM: GREWAL & ASSOCIATES PROFESSIONAL LAND SURVEYORSFROM: GREWAL & ASSOCIATES PROFESSIONAL LAND SURVEYORS DATED: APRIL 28, 2022 (SHOWING PROPERTY LINE)DATED: APRIL 28, 2022 (SHOWING PROPERTY LINE) AUGUST 02, 2022 (SHOWING RESTRICTIVE COVENANT) AUGUST 02, 2022 (SHOWING RESTRICTIVE COVENANT) SEPTEMBER 19, 2022 (SHOWING ROAD DEDICATION) SEPTEMBER 19, 2022 (SHOWING ROAD DEDICATION) WHILE A REASONABLE EFFORT HAS BEEN MADE TO VERIFY THE WHILE A REASONABLE EFFORT HAS BEEN MADE TO VERIFY THE INFORMATION IT REMAINS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORMATION IT REMAINS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL LOT DIMENSIONS & TOPOGRAPHIC INFORMATION PRIOR TO VERIFY ALL LOT DIMENSIONS & TOPOGRAPHIC INFORMATION PRIOR TO START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES BECOME EVIDENT START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES BECOME EVIDENT NOTIFY THE ARCHITECT IMMEDIATELY. NOTIFY THE ARCHITECT IMMEDIATELY. 123 AVE123 AVE IP GAS LINEIP GAS LINE SO F T S C A P E SO F T S C A P E EGRESS ROUTEEGRESS ROUTE SOFTSCAPESOFTSCAPE BUILDING LINE ABOVEBUILDING LINE ABOVE BUILDING LINE ABOVEBUILDING LINE ABOVE HARDSCAPEHARDSCAPE (PMT)(PMT) BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BUILDING LINE ABOVEBUILDING LINE ABOVE B U I L D I N G L I N E A B O V E B U I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E ACCESS TO LOT 4 ACCESS TO LOT 4 AC C E S S T O L O T 1 AC C E S S T O L O T 1 LEGAL LOTLEGAL LOT LEGAL LOTLEGAL LOT PROPERTY LINE 48.96 MPROPERTY LINE 48.96 M PROPOSED PROPERTY LINEPROPOSED PROPERTY LINE LEGAL LOT 1LEGAL LOT 1 LEGAL LOT LEGAL LOT 152 4 0 1 5 2 4 0 GA S L I N E E A S E M E N T GA S L I N E E A S E M E N T RESTRICTIVE COVENANT RESTRICTIVE COVENANT RESTRICTIVE COVENANT RESTRICTIVECOVENANT RESTRICTIVE COVENANT RESTRICTIVECOVENANT 10.8 8 M 1 0 . 8 8 M TO P R O P O S E D P R O P E R T Y L I N E TO P R O P O S E D P R O P E R T Y L I N E 13 . 5 5 M 1 3 . 5 5 M TO P R O P O S E D P R O P E R T Y L I N E TO P R O P O S E D P R O P E R T Y L I N E 15 . 3 8 M 1 5 . 3 8 M TO E X I S T I N G P R O P E R T Y L I N E TO E X I S T I N G P R O P E R T Y L I N E 00 PROPERTY LINE 97.026MPROPERTY LINE 97.026M PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PR O P E R T Y L I N E 8 3 . 0 0 M PR O P E R T Y L I N E 8 3 . 0 0 M PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M PRO P E R T Y L I N E 3 9 . 6 3 M PRO P E R T Y L I N E 3 9 . 6 3 M Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1 : 250 6/ 1 3 / 2 0 2 4 4 : 1 7 : 5 8 P M DP-100C2018-15 JG JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE_LEGAL LOTS & RETAINED TREES 1 30-11-2023 ISSUED FOR DP JG 1 30-11-2023 ISSUED FOR DP JG TREES TO BE RETAINEDTREES TO BE RETAINED 7 7 2 22-04-2024 REISSUED FOR DP & ADP JG 2 22-04-2024 REISSUED FOR DP & ADP JG 3 29-04-2024 REISSUED FOR DP JG 3 29-04-2024 REISSUED FOR DP JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 5 04-06-2024 ISSUED FOR REZONING JG 5 04-06-2024 ISSUED FOR REZONING JG 6 12-06-2024 REISSUED FOR REZONING JG 6 12-06-2024 REISSUED FOR REZONING JG 7 14-06-2024 REISSUED FOR REZONING JG 7 14-06-2024 REISSUED FOR REZONING JG BUILDING LINE ABOVEBUILDING LINE ABOVE BUILDING LINE ABOVEBUILDING LINE ABOVE BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BUILDING LINE ABOVEBUILDING LINE ABOVE B U I L D I N G L I N E A B O V E B U I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E BU I L D I N G L I N E A B O V E LEGAL LOT 1LEGAL LOT 1 13 . 5 5 M 1 3 . 5 5 M TO P R O P O S E D P R O P E R T Y L I N E TO P R O P O S E D P R O P E R T Y L I N E PARKLANDPARKLAND LEGAL LOT 3LEGAL LOT 3 PARKLANDPARKLAND LEGAL LOT 4LEGAL LOT 4 ROAD DEDICATION-LEGAL LOT 2ROAD DEDICATION-LEGAL LOT 2 EX I S T I N G P R O P E R T Y L I N E EX I S T I N G P R O P E R T Y L I N E EX I S T I N G P R O P E R T Y L I N E EX I S T I N G P R O P E R T Y L I N E EXISTING PROPERTY LINEEXISTING PROPERTY LINE EXISTING PROPERTY LINEEXISTING PROPERTY LINE PROPOSED PROPERTY LINEPROPOSED PROPERTY LINE EX I S T I N G P R O P E R T Y L I N E EX I S T I N G P R O P E R T Y L I N E PROP O S E D P R O P E R T Y L I N E PROP O S E D P R O P E R T Y L I N E PR O P O S E D P R O P E R T Y L I N E PR O P O S E D P R O P E R T Y L I N E 123 AVE123 AVE 22 2 S T 2 2 2 S T 97.51 M97.51 M 9751697516 81 . 1 2 M 8 1 . 1 2 M 81 1 2 3 8 1 1 2 3 1.8 6 M 1 . 8 6 M 18 6 9 1 8 6 9 58855885 37 . 7 9 M 3 7 . 7 9 M 37 7 9 5 3 7 7 9 5 1.8 3 M 1 . 8 3 M 18 3 0 1 8 3 0 82 . 9 8 M 8 2 . 9 8 M 829 8 1 8 2 9 8 1 39 . 6 3 M 3 9 . 6 3 M 39 6 3 0 3 9 6 3 0 48.94 M48.94 M 4894848948 PROPERTY LINE 97.026MPROPERTY LINE 97.026M PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PRO P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PR O P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PR O P E R T Y L I N E 8 3 . 0 0 M PR O P E R T Y L I N E 8 3 . 0 0 M PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M PR O P E R T Y L I N E 3 9 . 6 3 M PR O P E R T Y L I N E 3 9 . 6 3 M 42 . 5 5 M 4 2 . 5 5 M TO E X I S T I N G P R O P E R T Y L I N E TO E X I S T I N G P R O P E R T Y L I N E 6.63 M6.63 M TO EXISTING PROPERTY LINETO EXISTING PROPERTY LINE 10.8 8 M 1 0 . 8 8 M TO E X I S T I N G P R O P E R T Y L I N E TO E X I S T I N G P R O P E R T Y L I N E 15.6 8 M 1 5 . 6 8 M TO E X I S T I N G P R O P E R T Y L I N E TO E X I S T I N G P R O P E R T Y L I N E 10.48 M10.48 M TO EXISTING PR O P E R T Y L I N E TO EXISTING PR O P E R T Y L I N E 5.54 M5.54 M TO EXISTING PROPERTY LINETO EXISTING PROPERTY LINE 15.12 M15.12 M TO EXISTI N G P R O P E R T Y L I N E TO EXISTI N G P R O P E R T Y L I N E Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1 : 250 6/ 1 3 / 2 0 2 4 4 : 1 8 : 0 1 P M DP-100D2018-15 JG JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE PLAN SHOWING BUILDING SETBACKS 1 15-02-2024 ISSUED FOR DP JG 1 15-02-2024 ISSUED FOR DP JG 8 8 2 22-04-2024 ISSUED FOR DP & ADP JG 2 22-04-2024 ISSUED FOR DP & ADP JG 3 29-04-2024 REISSUED FOR DP JG 3 29-04-2024 REISSUED FOR DP JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 4 29-05-2024 REISSUED FOR ADP REVIEW JG 5 03-06-2024 REISSUED FOR DP JG 5 03-06-2024 REISSUED FOR DP JG 6 04-06-2024 ISSUED FOR REZONING JG 6 04-06-2024 ISSUED FOR REZONING JG 7 12-06-2024 REISSUED FOR REZONING JG 7 12-06-2024 REISSUED FOR REZONING JG 8 14-06-2024 REISSUED FOR REZONING JG8 14-06-2024 REISSUED FOR REZONING JG 25002500 25002500 55 0 0 5 5 0 0 H/ C STANDARD STANDARD PARKING STALLPARKING STALL 550 0 5 5 0 0 13001300 HANDICAP HANDICAP PARKING STALLPARKING STALL SC SAMLL CAR SAMLL CAR PARKING STALLPARKING STALL 24002400 490 0 4 9 0 0 BIKE STALLBIKE STALL 600600 18 0 0 1 8 0 0 PMTPMT PROPERTY LINE 97.026MPROPERTY LINE 97.026M EX I T P A T H O N G R A D E EX I T P A T H O N G R A D E 123 AVE123 AVE 22 2 S T 2 2 2 S T SID E W A L K SID E W A L K PROPERTY LINE 48.96 MPROPERTY LINE 48.96 M SID E W A L K SID E W A L K FLOOR ABOVEFLOOR ABOVE IP GAS LINEIP GAS LINE PROPOSED PROPERTY LINEPROPOSED PROPERTY LINE PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M DO W N T O U N D E R G R O U N D P A R K I N G DO W N T O U N D E R G R O U N D P A R K I N G PR O P E R T Y L I N E 8 2 . 9 8 8 M PR O P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PRO P E R T Y L I N E 8 3 . 0 0 M PRO P E R T Y L I N E 8 3 . 0 0 M EXISTING PROPERTY LINEEXISTING PROPERTY LINE PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M PR O P E R T Y L I N E 3 9 . 6 3 M PR O P E R T Y L I N E 3 9 . 6 3 M PRINCIPLE PRINCIPLE ENTRANCEENTRANCE DIS T A N C E B E T W E E N P R I N C I P L E DIS T A N C E B E T W E E N P R I N C I P L E EN T R A N C E T O F I R E T R U C K EN T R A N C E T O F I R E T R U C K FDCFDC 38.90 M 3 8 . 9 0 M 40800 M M 40800 M M DISTAN C E F R O M F D C T O F I R E H Y D R A N T DISTAN C E F R O M F D C T O F I R E H Y D R A N T SPRINKLERED SPRINKLERED (8-STOREY)(8-STOREY) DAYCARE DAYCARE ENTRANCEENTRANCE FIRE LANEFIRE LANE EMERGENCY FIRE EMERGENCY FIRE VEHICLE ACCESSVEHICLE ACCESSFIRE TRUCKFIRE TRUCK EL. 29.19MEL. 29.19M S R W S R W 28.2028.20 29.0129.01 28.9628.96 29.1829.18 RAMP @ 7.0 %RAMP @ 7.0 % @ 1.0 %@ 1.0 % RA M P @ 1 3 . 8 2 % RA M P @ 1 3 . 8 2 % @ 1.0 %@ 1.0 % 28.0128.0129.1829.18 EXISTING FIRE HYDRANT TO BE EXISTING FIRE HYDRANT TO BE RELOCATED AS SHOWNRELOCATED AS SHOWN MAI N T E N A N C E P A T H MAI N T E N A N C E P A T H 777 9 7 7 7 9 PROPERTY LINE 97.026MPROPERTY LINE 97.026M PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 3 5 . 3 0 3 M PR O P E R T Y L I N E 8 2 . 9 8 8 M PR O P E R T Y L I N E 8 2 . 9 8 8 M PROPERTY LINE 10.06 MPROPERTY LINE 10.06 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PRO P E R T Y L I N E 3 9 . 6 2 5 M PROPERTY LINE 38.518MPROPERTY LINE 38.518M PRO P E R T Y L I N E 8 3 . 0 0 M PRO P E R T Y L I N E 8 3 . 0 0 M PROPERTY LINE 48.951 MPROPERTY LINE 48.951 M PR O P E R T Y L I N E 3 9 . 6 3 M PR O P E R T Y L I N E 3 9 . 6 3 M NEW LOCATION NEW LOCATION FOR FIRE HYDRANTFOR FIRE HYDRANT FIRE HYDRANTFIRE HYDRANT 1500MM WIDE SIDEWALK1500MM WIDE SIDEWALKEL. 29.19MEL. 29.19M EL. 27.65MEL. 27.65M 2 bike 2 bike stallsstalls14 9 1 3 1 4 9 1 3 [6 . 1 6 m ] 20' - 2 5 / 8 " [9 . 1 1 m ] 29 ' - 1 0 3 / 4 " RESIDENCE ENTRYRESIDENCE ENTRY Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 8 : 0 5 P M DP-100E2018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SITE PLAN - FIRE TRUCK ACCESS 14 4 15-03-2021 REISSUED FOR DP TJ 4 15-03-2021 REISSUED FOR DP TJ 5 20-08-2021 REISSUED FOR ADP TJ 5 20-08-2021 REISSUED FOR ADP TJ 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 ISSUED FOR DP JG 10 29-04-2024 ISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG UPUP P15P15 P15P15P1P1 P1P1 7 % S L O P E U P 7 % S L O P E U P 7% SLOPE UP7% SLOPE UP 12% SLOPE UP12% SLOPE UP 010110101111 1717 2121 2222 2929 3333 34343939 4343 4545 4646 4949 LOCKER # 2LOCKER # 2 PEPE PEPE P2P2 P3P3 P4P4 P8P8 P10P10 P5P5 P11P11 P14P14 P14P14 1616 SCSC SCSCSCSC 6416864168 LONG TERM LONG TERM BIKE STORAGEBIKE STORAGE 24 BIKES24 BIKES EL. 22.18 MEL. 22.18 M 1 DP-301 ______________________1 DP-301 ______________________ P6P6 P13P13 P13P13P12P12 SCSC SCSC GA S E A S E M E N T L I N E GA S E A S E M E N T L I N E PFPF PFPF PDPD PDPD PBPB PBPB PA1PA1 PA1PA1 PAPA PAPA PGPG PGPG PIPI PIPI 19 0 5 1 9 0 5 92 8 0 9 2 8 0 48 6 3 4 8 6 3 39 8 5 3 9 8 5 68 2 3 6 8 2 3 50 3 0 5 0 3 0 580580 88618861 1016010160 2105121051 966966 61376137 1058810588 64066406 6416864168 1410614106 35153515 60336033 68716871 70107010 96399639 1058810588 64066406 19 0 5 1 9 0 5 92 8 0 9 2 8 0 48 6 3 4 8 6 3 39 8 5 3 9 8 5 68 2 3 6 8 2 3 50 3 0 5 0 3 0 580580 P2 ELEV. LOBBYP2 ELEV. LOBBY ELEVATORELEVATOR ELEVATORELEVATOR 3030SCSC PJPJ PJPJ 42 7 9 8 4 2 7 9 8 42 7 9 8 4 2 7 9 8 1 DP-300 ______________________ 1 DP-300 ______________________ P7P7 60 0 0 6 0 0 0 49 0 0 4 9 0 0 74 1 8 7 4 1 8 490 0 4 9 0 0 24002400 305305 25002500 25002500 25002500 302302 25002500 25002500 25002500 309309 254254 67026702 864864 25002500 25002500 25002500 302302 25002500 25002500 25002500 305305 25002500 25002500 25002500 25002500 218218 P9P9 4242 1818 SCSC SCSC GENERATOR GENERATOR ROOMROOM SCSC SCSC TRAVEL DISTANCE = 43.83 MTRAVEL DISTANCE = 43.83 M LOCKER # 1LOCKER # 1 SERVICESSERVICES TR A V E L D I S T A N C E = 3 7 . 5 7 M TR A V E L D I S T A N C E = 3 7 . 5 7 M TRAVEL D I S T A N C E = 3 1 . 5 1 M TRAVEL D I S T A N C E = 3 1 . 5 1 M 10 3 3 2 1 0 3 3 2 10 3 3 2 1 0 3 3 2 55 0 0 5 5 0 0 70 0 0 7 0 0 0 55 0 0 5 5 0 0 384384 24002400 25002500 25002500 25002500 304304 6000600054154125002500250025002500250025002500134113412500250025002500305305250025002500250030230225002500240024002400240024002400504504 55 0 0 5 5 0 0 70 0 0 7 0 0 0 55 0 0 5 5 0 0 55 0 0 5 5 0 0 70 0 0 7 0 0 0 55 0 0 5 5 0 0 966966 300300 24002400 24002400 24002400 300300 43264326 300300 24002400 25002500 25002500 25002500 298298 30530525002500250025002500250025002500648648250025002500250058058025002500250025002400240015001500 60006000 55 0 0 5 5 0 0 70 0 0 7 0 0 0 495 6 4 9 5 6 49 0 0 4 9 0 0 76 0 0 7 6 0 0 1151115140 1 4 4 0 1 4 16511651 57 6 7 5 7 6 7 149 4 1 4 9 4 21 2 4 2 1 2 4 52135213 18001800 18421842 25002500 25002500 55 0 0 5 5 0 0 H/C STANDARD STANDARD PARKING STALLPARKING STALL 55 0 0 5 5 0 0 13001300 HANDICAP HANDICAP PARKING STALLPARKING STALL SC SAMLL CAR SAMLL CAR PARKING STALLPARKING STALL 24002400 49 0 0 4 9 0 0 BIKE STALLBIKE STALL 600600 18 0 0 1 8 0 0 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 0 6 P M DP-1012018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK P2 FLOOR PLAN 1/8" = 1'-0" P2 FLOOR PLAN 1515 1/8" = 1'-0"Parking NOTE: ALL PARKING ON P2 IS SECURED AND FOR RESIDENCES PARKING PROVIDED AT P2 LEVEL: RESIDENCE PARKING: 49 STALLS TOTAL OF 49 STALLS FOR RESIDENCE 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-03-2021 REISSUED FOR ADP TJ 6 20-03-2021 REISSUED FOR ADP TJ 7 09-08-2022 ISSUED FOR CLIENT REVIEW WH 7 09-08-2022 ISSUED FOR CLIENT REVIEW WH 8 17-02-2023 REISSUED FOR DP JG 8 17-02-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 10 22-04-2024 ISSUED FOR DP & ADP JG 10 22-04-2024 ISSUED FOR DP & ADP JG 11 29-04-2024 ISSUED FOR DP JG 11 29-04-2024 ISSUED FOR DP JG 12 29-05-2024 ISSUED FOR ADP REVIEW JG 12 29-05-2024 ISSUED FOR ADP REVIEW JG 13 04-06-2024 ISSUED FOR REZONING JG 13 04-06-2024 ISSUED FOR REZONING JG 14 12-06-2024 REISSUED FOR REZONING JG 14 12-06-2024 REISSUED FOR REZONING JG 15 14-06-2024 REISSUED FOR REZONING JG 15 14-06-2024 REISSUED FOR REZONING JG UPUPDNDN UPUPDNDN P15P15 P15P15P1P1 P1P1 SCSC 7% S L O P E U P 7% S L O P E U P 13.82% SLOPE UP13.82% SLOPE UP 7% S L O P E D N 7% S L O P E D N 010107071212 ACCACC 2525 2626 2929 3030 3939 4141 4242 4545 P1 ELEV. LOBBYP1 ELEV. LOBBY SCSC PEPE PEPE P2P2 P2P2 P3P3 P3P3 P4P4 P4P4 P8P8 P8P8 P10P10 P10P10 P5P5 P11P11 P11P11 P14P14 P14P14 SCSC EL. 25.53MEL. 25.53M 3838 EXIT PATH ON GRADEEXIT PATH ON GRADE EXIT P A T H O N G R A D E EXIT P A T H O N G R A D E TO C I T Y S I D E W A L K TO C I T Y S I D E W A L K25.4825.485 % S L O P E D N 5 % S L O P E D N 1 DP-301 ______________________1 DP-301 ______________________ TRAVEL DISTANCE = 31.19 MTRAVEL DISTANCE = 31.19 M TRAVEL DISTANCE = 44.05 MTRAVEL DISTANCE = 44.05 M TRAVEL DISTANCE = 44.39 MTRAVEL DISTANCE = 44.39 M GAS E A S E M E N T L I N E GAS E A S E M E N T L I N E P6P6 P6P6 P13P13 P13P13 P12P12 P12P12 SCSC PFPF PFPF PDPD PDPD PCPC PCPC PBPB PBPB PA1PA1 PA1PA1 PAPA PAPA PGPG PGPG PIPI PIPI 6416864168 19 0 5 1 9 0 5 92 8 0 9 2 8 0 48 6 3 4 8 6 3 398 5 3 9 8 5 682 3 6 8 2 3 23 0 9 2 3 0 9 80 2 3 8 0 2 3 50 3 0 5 0 3 0 58 0 5 8 0 88618861 1016010160 2105121051 966966 61376137 1058810588 64066406 6416864168 1410614106 35153515 60336033 68716871 70107010 96399639 1058810588 64066406 19 0 5 1 9 0 5 92 8 0 9 2 8 0 48 6 3 4 8 6 3 398 5 3 9 8 5 682 3 6 8 2 3 23 0 9 2 3 0 9 80 2 3 8 0 2 3 50 3 0 5 0 3 0 58 0 5 8 0 ELEVATORELEVATOR ELEVATORELEVATOR PJPJ PJPJ 42 7 9 8 4 2 7 9 8 42 7 9 8 4 2 7 9 8 1 DP-300 ______________________ 1 DP-300 ______________________ SCSC ELECTRICAL ELECTRICAL ROOMROOM EL. 25.53MEL. 25.53M P7P7 P7P7 LONG TERM BIKE LONG TERM BIKE STORAGESTORAGE 08 BIKES08 BIKES SCSC 60 0 0 6 0 0 0 P9P9 P9P9 MECH/ BOILER MECH/ BOILER ROOMROOM 1515 1313 1414 SCSC SCSC EL. 25.53MEL. 25.53M GARBAGE/ GARBAGE/ RECYCLE ROOMRECYCLE ROOM EXIT CORRIDOREXIT CORRIDOR SERVICESSERVICES 26 4 0 2 6 4 0 53 6 0 5 3 6 0 1239512395 0808 UP 1 3 ' - 0 " @ 1 0 % UP 1 3 ' - 0 " @ 1 0 % WASTE COMPACTOR & BINWASTE COMPACTOR & BIN RECYCLE COMPACTOR & BINRECYCLE COMPACTOR & BIN 254254 67026702 864864 25002500 25002500 25002500 302302 25002500 25002500 25002500 305305 25002500 25002500250025003053052500250025002500 839839 427427 24002400 24002400 24002400 300300 43264326 300300 24002400 25002500 25002500 25002500 552552 30530525002500648648250025002500250024002400250025002500250025002500250025005815812500250015001500 55 0 0 5 5 0 0 700 0 7 0 0 0 55 0 0 5 5 0 0 55 0 0 5 5 0 0 70 0 0 7 0 0 0 17181718 6000600030030025002500250025002813281325002500250025002500250030043004 30530525002500250025002500250011421142 305305 25002500 25002500 25002500 1577157725002500 384384 24002400 60006000305305250025002500250025002500 60006000 55 0 0 5 5 0 0 700 0 7 0 0 0 55 0 0 5 5 0 0 55 0 0 5 5 0 0 70 0 0 7 0 0 0 49 5 6 4 9 5 6 49 0 0 4 9 0 0 76 0 0 7 6 0 0 11511151 401 4 4 0 1 4 1667166740 6 4 4 0 6 4 14 9 4 1 4 9 4 13561356 36 6 7 3 6 6 7 12 4 1 1 2 4 1 212 4 2 1 2 4 52135213 18 0 0 1 8 0 0 24 3 2 2 4 3 2 25002500 25002500 55 0 0 5 5 0 0 H/C STANDARD STANDARD PARKING STALLPARKING STALL 55 0 0 5 5 0 0 13001300 HANDICAP HANDICAP PARKING STALLPARKING STALL S C SAMLL CAR SAMLL CAR PARKING STALLPARKING STALL 24002400 49 0 0 4 9 0 0 BIKE STALLBIKE STALL 600600 180 0 1 8 0 0 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 0 7 P M DP-1022018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK P1 FLOOR PLAN 1/8" = 1'-0"1 P1 FLOOR PLAN 1616 1/8" = 1'-0" Parking NOTE: ALL PARKING ON P1 IS SECURED AND FOR RESIDENCES PARKING PROVIDED AT P1 LEVEL: RESIDENCE PARKING: 45 STALLS TOTAL OF 45 STALLS FOR RESIDENCE 6 20-03-2021 REISSUED FOR ADP TJ 6 20-03-2021 REISSUED FOR ADP TJ 7 09-08-2022 ISSUED FOR CLIENT REVIEW WH 7 09-08-2022 ISSUED FOR CLIENT REVIEW WH 8 17-02-2023 ISSUED FOR CLIENT REVIEW JG 8 17-02-2023 ISSUED FOR CLIENT REVIEW JG 9 02-08-2023 ISSUED FOR CLIENT REVIEW JG 9 02-08-2023 ISSUED FOR CLIENT REVIEW JG 10 30-11-2023 REISSUED FOR DP JG 10 30-11-2023 REISSUED FOR DP JG 11 22-04-2024 ISSUED FOR DP & ADP JG 11 22-04-2024 ISSUED FOR DP & ADP JG 12 29-04-2024 REISSUED FOR DP JG 12 29-04-2024 REISSUED FOR DP JG 13 29-05-2024 REISSUED FOR ADP REVIEW JG 13 29-05-2024 REISSUED FOR ADP REVIEW JG 14 04-06-2024 ISSUED FOR REZONING JG 14 04-06-2024 ISSUED FOR REZONING JG 15 12-06-2024 REISSUED FOR REZONING JG 15 12-06-2024 REISSUED FOR REZONING JG 16 14-06-2024 REISSUED FOR REZONING JG 16 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 22 22 77 99 1111 1212 1717 1717 44 66 88 1010 1313 1414 1 DP-301______________________1 DP-301______________________ 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE II II LLLL JJ JJ KK KK HHHH FFFF 11 11 OOOO 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC RESIDENCE RESIDENCE ENTRYENTRY ELEV. LOBBYELEV. LOBBY EL. 29.19MEL. 29.19M SHORT TERM SHORT TERM BIKE BIKE STORAGESTORAGE 17 BIKES17 BIKES ANCILLARY OFFICE SPACEANCILLARY OFFICE SPACE LOBBYLOBBY 1940 SF1940 SF DAYCARE DAYCARE ENTRYENTRY ELEVATORELEVATOR ELEVATORELEVATOR DAYCARE DAYCARE LOBBYLOBBY ELEVATORELEVATOR DRIVEAISLEDRIVEAISLEORGANIC ORGANIC COMPOSTCOMPOST 7% S L O P E U P 7% S L O P E U P 3 2 2 1 PM T P M T EL. 29.19MEL. 29.19M 456711102 3 4 5 RA M P U P 1 . 1 7 M @ 9 . 4 7 % RA M P U P 1 . 1 7 M @ 9 . 4 7 % DOWN TO UNDERGROUND PARKINGDOWN TO UNDERGROUND PARKING 29 . 0 1 2 9 . 0 1 28 . 9 6 2 8 . 9 6 25.9825.98 29.1829.18 RA M P @ 7 . 0 % RA M P @ 7 . 0 % 25.9325.93 @ 1.0 %@ 1.0 %RAMP @ 13.82 % RAMP @ 13.82 % @ 1.0 %@ 1.0 % RA M P U P 0 . 3 6 M @ 6 . 0 0 % RA M P U P 0 . 3 6 M @ 6 . 0 0 % 28.0128.01 29.1829.18 SHORT TERM SHORT TERM BIKE STORAGEBIKE STORAGE 4 BIKES4 BIKES 4 6 2 6 907907 DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR 89113 3 SHORT TERM BIKE SHORT TERM BIKE STORAGE 10 BIKESSTORAGE 10 BIKES 250025002500250025002500311311250025002500250025002500297297 2500250025032503305305 9079072500250032332325002500 25002500 25002500 25002500 311311 25002500 25002500 25002500 316316 25002500 25002500 25002500 306306 25002500 25002500 25002500 810810 25002500 25002500 25002500 307307 55 0 0 5 5 0 0 70 0 0 7 0 0 0 55 0 0 5 5 0 0 13 1 4 1 3 1 4 55 0 0 5 5 0 0 18001800 18001800 12001200 10 8 4 1 0 8 4 15 2 4 1 5 2 4 12 0 0 1 2 0 0 15 2 4 1 5 2 4 28.20 28.0128.01 27.7027.70 27.7627.76 1251.61 SF1251.61 SF 125.44 SF125.44 SF 394.77 SF394.77 SF 64.25 SF64.25 SF 2 bike 2 bike stallsstalls MAIL ROOMMAIL ROOM152.72 SF152.72 SF 1 16951695 35523552 18001800 DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE DAYCARE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE 5 25002500 25002500 55 0 0 5 5 0 0 H/C STANDARD STANDARD PARKING STALLPARKING STALL 55 0 0 5 5 0 0 13001300 HANDICAP HANDICAP PARKING STALLPARKING STALL S C SAMLL CAR SAMLL CAR PARKING STALLPARKING STALL 24002400 49 0 0 4 9 0 0 BIKE STALLBIKE STALL 600600 180 0 1 8 0 0 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 0 9 P M DP-1032018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK MAIN FLOOR 1/8" = 1'-0"1 MAIN FLOOR PLAN 1616 1/8" = 1'-0"Parking PARKING PROVIDED AT MAIN FLOOR LEVEL: RESIDENCE PARKING: 6 STANDARD STALLS VISITOR PARKING: 6 STALLSDAYCARE: 11 NOS. OF STANDARD STALLS OFFICE: 3 NOS. OF STANDARD STALLS TOTAL OF 26 STALLS 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 9 30-11-2023 REISSUED FOR DP JG 9 30-11-2023 REISSUED FOR DP JG 10 22-04-2024 REISSUED FOR DP & ADP JG 10 22-04-2024 REISSUED FOR DP & ADP JG 11 29-04-2024 REISSUED FOR DP JG 11 29-04-2024 REISSUED FOR DP JG 12 29-05-2024 REISSUED FOR ADP REVIEW JG 12 29-05-2024 REISSUED FOR ADP REVIEW JG 13 04-06-2024 ISSUED FOR REZONING JG 13 04-06-2024 ISSUED FOR REZONING JG 14 07-06-2024 ISSUED FOR CITY REVIEW JG 14 07-06-2024 ISSUED FOR CITY REVIEW JG 15 12-06-2024 REISSUED FOR REZONING JG15 12-06-2024 REISSUED FOR REZONING JG 16 14-06-2024 REISSUED FOR REZONING JG 16 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 55 22 22 77 77 99 99 1111 1111 1212 1212 1717 171744 44 66 66 88 88 1010 1010 1313 1313 1414 1414 1 DP- 3 0 1 ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 DP- 3 0 1 ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJJJ KKKK HHHH FFFF 11 11 OOOO 1 DP - 3 0 0 ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 DP- 3 0 0 ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ CCCC ELEV. LOBBYELEV. LOBBY EL. 34.69 MEL. 34.69 M PROPOSED DAYCAREPROPOSED DAYCARE 3535.67 SF (328.47 SQ.M.)3535.67 SF (328.47 SQ.M.) AMENITY ROOMAMENITY ROOM ELEC.ELEC. ELEVATORELEVATOR ELEVATORELEVATOR DAYCARE OUTDOOR DAYCARE OUTDOOR PLAY AREA (COVERED)PLAY AREA (COVERED) DAYCARE OUTDOOR DAYCARE OUTDOOR PLAY AREA (OPEN)PLAY AREA (OPEN) 1141.59 SF (106.05 SM)1141.59 SF (106.05 SM) EL. 34.68 MEL. 34.68 M EL. 34.69MEL. 34.69M600.31 SF (55.77 SM)600.31 SF (55.77 SM) EL. 34.68 MEL. 34.68 M TYPE ATYPE A ELEVATORELEVATOR PRES.PRES. 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 25132513 89928992 73577357 57895789 56395639 56395639 41434143 1202112021 1226312263 25 0 5 2 5 0 5 577 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 167 6 1 6 7 6 15 2 1 5 2 717 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 24 9 8 2 4 9 8 31 2 5 3 1 2 5 57 7 4 5 7 7 4 25 0 5 2 5 0 5 577 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 167 6 1 6 7 6 15 2 1 5 2 717 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 24 9 8 2 4 9 8 31 2 5 3 1 2 5 57 7 4 5 7 7 4 6435564355 1226312263 36 5 4 4 3 6 5 4 4 1142811428 DAYCARE OUTDOOR PLAY AREA DAYCARE OUTDOOR PLAY AREA (COVERED) 330.67 SF (30.72 SM) (COVERED) 330.67 SF (30.72 SM) BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF 435.15 SF435.15 SF COMMON SPACE + DAYCARE + AFFORDABLE RENTALCOMMON SPACE + DAYCARE + AFFORDABLE RENTAL DAYCAREDAYCARE COMMON SPACECOMMON SPACE 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE BTYPE B 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 209.30 SF209.30 SF 1659.48 SF1659.48 SFCORRIDORCORRIDOR 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF TYPE A 1 BRTYPE A 1 BR TYPE B 1 BRTYPE B 1 BR TYPE G 3 BRTYPE G 3 BR AMENITYAMENITY Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 1 1 P M DP-1042018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 2nd FLOOR PLAN 14 14 2ND FLOOR PLAN1/8" = 1'-0" 4 15-03-2021 REISSUED FOR DP TJ 4 15-03-2021 REISSUED FOR DP TJ 5 20-08-2021 REISSUED FOR ADP TJ 5 20-08-2021 REISSUED FOR ADP TJ 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 15-02-2024 REISSUED FOR DP JG 8 15-02-2024 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG 10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG UPUP MEETING ROOMMEETING ROOM 1515 1515 55 PRES.PRES. 22 22 99 1111 1212 1717 1717446688101013131414 COMMON SPACE + AFFORDABLE RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE B 1BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 ELEV. LOBBYELEV. LOBBY ELEC.ELEC. 1 DP-301 ______________________1 DP-301 ______________________ ELEVATORELEVATOR ELEVATORELEVATOR 44 DP-401DP-401 11 DP-401DP-401 PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE II II LLLL JJ JJ KKKK 25132513 89928992 73577357 56395639 41434143 1202112021 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 24 9 8 2 4 9 8 31 2 5 3 1 2 5 57 7 4 5 7 7 4 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 24 9 8 2 4 9 8 31 2 5 3 1 2 5 57 7 4 5 7 7 4 HHHH FFFF 11 11 6435564355 OOOO 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC CORRIDORCORRIDOR BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF 1226312263 36 5 4 4 3 6 5 4 4 22 DP-401DP-401 44 DP-400DP-400 11 DP-400DP-400 EL. 37.81 MEL. 37.81 M 1142811428 BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE BTYPE B 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE BTYPE B 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 435.15 SF435.15 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF OFFICEOFFICE 420.05 SF420.05 SF 209.30 SF209.30 SF 1620.90 SF1620.90 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 1 3 P M DP-1052018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 3RD FLOOR PLAN 1313 1/8" = 1'-0"1 3RD FLOOR PLAN 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 22-04-2024 ISSUED FOR DP & ADP JG 8 22-04-2024 ISSUED FOR DP & ADP JG 9 29-04-2024 REISSUED FOR DP JG 9 29-04-2024 REISSUED FOR DP JG 10 29-05-2024 REISSUED FOR ADP REVIEW JG 10 29-05-2024 REISSUED FOR ADP REVIEW JG 11 04-06-2024 ISSUED FOR REZONING JG 11 04-06-2024 ISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 AMENITYAMENITY 22 22 77 99 1111 1212 1717 1717446688 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 1010 1313 1414 COMMON SPACE + AFFORDABLE RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE B 1BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 1202112021 122631226325132513899289927357735757895789563956395639563941434143 1 DP-301 ______________________1 DP-301 ______________________ PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE II II LLLL JJ JJ KKKK ELEV. LOBBYELEV. LOBBY PRES.PRES. 250 5 2 5 0 5 57 7 6 5 7 7 6 151 3 1 5 1 3 728728 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 338 6 3 3 8 6 22 3 6 2 2 3 6 562 2 5 6 2 2 577 4 5 7 7 4 250 5 2 5 0 5 57 7 6 5 7 7 6 151 3 1 5 1 3 728728 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 338 6 3 3 8 6 22 3 6 2 2 3 6 562 2 5 6 2 2 577 4 5 7 7 4 HHHH FFFF 11 11 6435564355 6435564355 OOOO 365 4 4 3 6 5 4 4 365 4 4 3 6 5 4 4 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC CORRIDORCORRIDOR ELEC.ELEC. ELEVATORELEVATOR ELEVATORELEVATOR EL. 40.93 MEL. 40.93 M BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE BTYPE B 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE BTYPE B 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 435.15 SF435.15 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF OFFICEOFFICE 420.05 SF420.05 SF 209.30 SF209.30 SF 1620.90 SF1620.90 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 1 5 P M DP-1062018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 4TH FLOOR PLAN 1/8" = 1'-0"1 4TH FLOOR PLAN 14 14 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-08-2021 REISSUED FOR ADP TJ 6 20-08-2021 REISSUED FOR ADP TJ 7 17-02-2023 REISSUED FOR DP JG 7 17-02-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG 10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG UPUP UPUP UPUPUPUP UPUP 1515 1515 55 GYMGYM 22 22 77 99 1111 1212 1717 1717446688101013131414 COMMOM SPACE + MARKET RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE C 2BR TYPE D 3BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 ELEV. LOBBYELEV. LOBBY 1 DP-301 ______________________1 DP-301 ______________________ 22 DP-400DP-400 55 DP-400DP-400 PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJJJ KK KK 250 5 2 5 0 5 57 7 6 5 7 7 6 151 3 1 5 1 3 728728 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 338 6 3 3 8 6 22 3 6 2 2 3 6 562 2 5 6 2 2 577 4 5 7 7 4 250 5 2 5 0 5 57 7 6 5 7 7 6 151 3 1 5 1 3 728728 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 338 6 3 3 8 6 22 3 6 2 2 3 6 562 2 5 6 2 2 577 4 5 7 7 4 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 12263122638992899266496649563956395639563956395639563956395639563957445744122631226389928992664966495639563956395639563956395639563956395639574457441226312263 HHHH FFFF 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 11 11 25132513 89928992 73577357 57895789 56395639 56395639 41434143 1202112021 1226312263 6435564355 6435564355 OOOO 365 4 4 3 6 5 4 4 365 4 4 3 6 5 4 4 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC PRES.PRES. CORRIDORCORRIDOR PRES.PRES.ELEC.ELEC. ELEVATORELEVATOR ELEVATORELEVATOR EL. 44.05 MEL. 44.05 M BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE DTYPE D LV.1.LV.1. 678.41 SF678.41 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 435.15 SF435.15 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF STUDIO STUDIO GUEST UNITGUEST UNIT 420.05 SF420.05 SFTYPE DTYPE D LV.1.LV.1. 678.41 SF678.41 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF 209.30 SF209.30 SF 1620.90 SF1620.90 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 1 7 P M DP-1072018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 5TH FLOOR PLAN 1/8" = 1'-0" 5TH FLOOR PLAN 1414 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-08-2021 REISSUED FOR ADP TJ 6 20-08-2021 REISSUED FOR ADP TJ 7 17-02-2023 REISSUED FOR DP JG 7 17-02-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 ISSUED FOR DP JG 10 29-04-2024 ISSUED FOR DP JG 11 29-05-2024 ISSUED FOR ADP REVIEW JG 11 29-05-2024 ISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 LOCKERS/ LOCKERS/ STORAGESTORAGE 22 22 77 99 1111 1212 1717 1717446688101013131414 ELEC.ELEC. COMMOM SPACE + MARKET RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE C 2BR TYPE D 3BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 ELEV. LOBBYELEV. LOBBY 1 DP-301 ______________________1 DP-301 ______________________ ELEVATORELEVATOR 33 DP-400DP-400 66 DP-400DP-400 PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJJJ KKKK 25 0 5 2 5 0 5 577 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 717 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 25 0 5 2 5 0 5 577 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 717 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 HHHH PRES.PRES. FFFF 11 11 6435564355 25132513 89928992 73577357 57895789 56395639 56395639 41434143 1202112021 1226312263 6435564355 OOOO 36 5 4 4 3 6 5 4 4 36 5 4 4 3 6 5 4 4 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC PRES.PRES.ELEC.ELEC. ELEVATORELEVATOR CORRIDORCORRIDOR EL. 47.17 MEL. 47.17 M BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 435.15 SF435.15 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF STUDIO STUDIO GUEST UNITGUEST UNIT 420.05 SF420.05 SF TYPE DTYPE D LV.2LV.2 678.41 SF678.41 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE DTYPE D LV.2LV.2 678.41 SF678.41 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF 209.30 SF209.30 SF 1620.90 SF1620.90 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 1 9 P M DP-1082018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 6TH FLOOR PLAN 1/8" = 1'-0"1 6TH FLOOR PLAN 1414 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-03-2021 REISSUED FOR ADP TJ 6 20-03-2021 REISSUED FOR ADP TJ 7 17-02-2023 REISSUED FOR DP JG 7 17-02-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG 10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 22 22 77 99 1111 1212 1717 1717446688101013131414 LOCKERS/ LOCKERS/ STORAGESTORAGE CARETAKERS'CARETAKERS' SUITESUITE COMMOM SPACE + MARKET RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE C 2BR TYPE D 3BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 1202112021 122631226325132513899289927357735757895789563956395639563941434143 ELEC.ELEC. ELEV. LOBBYELEV. LOBBY 1 DP-301 ______________________1 DP-301 ______________________ ELEVATORELEVATOR 163 SF163 SF STAIRSTAIR PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJ JJ KK KK 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 33 8 6 3 3 8 6 223 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 15 2 1 5 2 71 7 4 7 1 7 4 33 8 6 3 3 8 6 223 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 HHHH FFFF PRES.PRES. 11 11 6435564355 6435564355 OOOO 36 5 4 4 3 6 5 4 4 36 5 4 4 3 6 5 4 4 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC PRES.PRES.ELEC.ELEC. ELEVATORELEVATOR CORRIDORCORRIDOR EL. 50.29 MEL. 50.29 M BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF TYPE ATYPE A 574.63 SF574.63 SF 435.15 SF435.15 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF STUDIO STUDIO GUEST UNITGUEST UNIT 420.05 SF420.05 SF TYPE DTYPE D LV.2LV.2 678.41 SF678.41 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE DTYPE D LV.2LV.2 678.41 SF678.41 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF TYPE CTYPE CLV.2LV.2 574.63 SF574.63 SF 209.30 SF209.30 SF 1620.90 SF1620.90 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 2 1 P M DP-1092018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 7TH FLOOR PLAN 1/8" = 1'-0" 7TH FLOOR PLAN 1414 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-03-2021 REISSUED FOR ADP TJ 6 20-03-2021 REISSUED FOR ADP TJ 7 17-02-2023 REISSUED FOR ADP JG 7 17-02-2023 REISSUED FOR ADP JG 8 02-08-2023 REISSUED FOR ADP JG 8 02-08-2023 REISSUED FOR ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG 10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG 12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 22 22 77 99 1111 1212 1212 1717 1717446688101013131414 AMENITYAMENITY COMMOM SPACE + MARKET RENTAL AMENITY COMMON SPACE TYPE A 1BR TYPE C 2BR TYPE D 3BR TYPE E 2BR TYPE F 2BR TYPE G 3 BR TYPE G 3BR 25132513 89928992 66496649 56395639 56395639 56395639 56395639 56395639 57445744 1226312263 1226312263120211202125132513899289927357735757895789563956395639563941434143 ELEC.ELEC. ELEVATORELEVATOR ELEV. LOBBYELEV. LOBBY 1 DP-301 ______________________1 DP-301 ______________________ ELEVATORELEVATOR PRES.PRES. KITCHENKITCHEN HOT HOT TUBTUB GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF STORESTORE W/CW/CPFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJJJ KKKK 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 152152 71 7 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 25 0 5 2 5 0 5 57 7 6 5 7 7 6 15 1 3 1 5 1 3 72 8 7 2 8 16 7 6 1 6 7 6 152152 71 7 4 7 1 7 4 33 8 6 3 3 8 6 22 3 6 2 2 3 6 56 2 2 5 6 2 2 57 7 4 5 7 7 4 HHHH FFFF PRES.PRES. 11 11 6435564355 6435564355 OOOO 365 4 4 3 6 5 4 4 365 4 4 3 6 5 4 4 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC PRES.PRES. CORRIDORCORRIDOR CARETAKERS'CARETAKERS' SUITESUITE EL. 53.41 MEL. 53.41 M BALCONYBALCONY 64.00 SF64.00 SF BALCONYBALCONY 70.00 SF70.00 SF BALCONYBALCONY 108.00 SF108.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 79.00 SF79.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SF BALCONYBALCONY 61.00 SF61.00 SFBALCONYBALCONY 79.00 SF79.00 SF 1290.14 SF1290.14 SF TYPE GTYPE G 1154.06 SF1154.06 SF TYPE ETYPE E 892.00 SF892.00 SF TYPE FTYPE F 930.91 SF930.91 SF STUDIO STUDIO GUEST UNITGUEST UNIT 420.05 SF420.05 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE DTYPE D LV.1.LV.1. 678.41 SF678.41 SF TYPE DTYPE D LV.1.LV.1. 678.41 SF678.41 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF TYPE CTYPE CLV.1LV.1 574.63 SF574.63 SF 209.30 SF209.30 SF 1578.60 SF1578.60 SF 125.44 SF125.44 SF 190.69 SF190.69 SF 168.47 SF168.47 SF OUTDOOR COMMON OUTDOOR COMMON AMENITYAMENITY 2360.90 SF2360.90 SF 1495 SF1495 SF TYPE GTYPE G Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered theexclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be used once and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as itwas initially intended. Any change or manipulation of this document is expressly forbidden; this document must remain completely intact at all times. The Consultant will notbe responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 2 3 P M DP-1102018-15 SP Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 8TH FLOOR PLAN 1313 1/8" = 1'-0" DP - 8TH FLOOR 3 03-03-2021 ISSUED FOR CLIENT/CONSULTANT TJ 3 03-03-2021 ISSUED FOR CLIENT/CONSULTANT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 4 09-03-2021 ISSUED FOR CLIENT TJ 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-03-2021 REISSUED FOR ADP TJ 6 20-03-2021 REISSUED FOR ADP TJ 7 27-01-2023 REISSUED FOR DP JG 7 27-01-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 12-06-2024 REISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 1515 1515 55 22 22 77 99 1111 1212 1212 1717 1717446688101013131414 GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOFGLASS ROOFGLASS ROOF GLASS ROOFGLASS ROOFGLASS ROOFGLASS ROOF 1 DP-301 ______________________1 DP-301 ______________________ GLASS ROOFGLASS ROOF PFPF PFPF PCPC PCPC PAPA PAPA 33 33 AAAA BBBB DDDD GGGG MMMM NNNN EEEE IIII LLLL JJJJ KKKK HHHH FFFF 11 11 6435564355 OOOO 1 DP-300 ______________________ 1 DP-300 ______________________ CCCC 36 5 4 4 3 6 5 4 4 36 5 4 4 3 6 5 4 4 SOLAR PANELSSOLAR PANELS SOLAR PANELSSOLAR PANELS SOLAR PANELSSOLAR PANELS ATTIC SPACE TO BE ATTIC SPACE TO BE USED FOR SERVICESUSED FOR SERVICES ATTIC SPACE TO BE ATTIC SPACE TO BE USED FOR SERVICESUSED FOR SERVICES 6435564355 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 8 : 2 5 P M DP-1112018-15 SP Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK ROOF PLAN 1/8" = 1'-0" DP-ROOF PLAN 12 12 3 03-03-2021 ISSUED FOR CLIENT/CONSULTANT TJ 3 03-03-2021 ISSUED FOR CLIENT/CONSULTANT TJ 4 20-03-2021 REISSUED FOR ADP TJ 4 20-03-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 22-04-2024 ISSUED FOR DP & ADP JG 7 22-04-2024 ISSUED FOR DP & ADP JG 8 29-04-2024 ISSUED FOR DP JG 8 29-04-2024 ISSUED FOR DP JG 9 29-05-2024 ISSUED FOR ADP REVIEW JG 9 29-05-2024 ISSUED FOR ADP REVIEW JG 10 04-06-2024 ISSUED FOR REZONING JG 10 04-06-2024 ISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m MAIN FLOOR 29.19 m 1 DP-301 ______________________ 1 DP-301 ______________________AABBDDGGMMNNEEIILLJJKKHHFF 222 ST222 ST OO 2 1 6 85 106 [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [5 . 4 9 m ] 18 ' - 0 " CC 127 2ND FLOOR 34.68 m RE A R - E X I S T I N G P R O P E R T Y L I N E RE A R - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E 6.63M TO EXISTING PROPERTY LINE 5.54M TO EXISTING PROPERTY LINE ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31 . 7 6 M HEI G H T O F B U I L D I N G FINISH SCHEDULE 2 EXTERNAL CLADDING 2 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOOREBACKGROUND - AMHERST GRAY - HC-167 3 EXETRNAL CLADDING 3 CLADIFY- BRICK ADMIRAL RED VELOUR 1 EXTERNAL CLADDING 1 ACTIVE MITREX SOLAR PANELS TO MATCH BENJAMIN MOORE COVENTRY GRAY HC-169 SOLAR PANEL ON ROOFMITREX TO MATCH CASCADIA PVDF OLD ZINC GREYRIB STEEL PANEL ROOFRIB STEEL ROOF PANEL CASCADIA PVDF - OLD ZINC GREY 4 5 WINDOW / CURTAIN WALL FRAMEALUMINUM ANODIZED DARK GREY ACTIVE MITREX SOLAR RAILRAIL PANEL GLASS COLUMN CLADDINGNON SOLAR CASCADIASTEEL -REGENT GREY SOFFIT /TRELLIS / BEAMCASCADIA PVDF ACORN FACIA BOARDALUMINUM PAINTED 7 86 9 10 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOOREBACKGROUND - AMHERST GRAY - HC-167WITH LEAVES PATTERN 11 12 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDING WITH MURAL 62226222 874874 87 4 8 7 4 102102 5151 421 3 4 2 1 3 Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 8 : 4 1 P M DP-2002018-15 JVS JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK SOUTH ELEVATION 17 1/8" = 1'-0"1 SOUTH ELEVATION 1/4" = 1'-0"2 FASCIA SIGN - FRONT ELEVATION • • • FASCIA SIGN DETAILS: FASCIA SIGN SHALL NOT PROJECT BEYOND 300MM FROM THE BUILDING FACE. THE MINIMUM VLERANCE OF A FASCIA SIGN SHALL BE 2.4M FROM GRADE. NO PART OF THE FASCIA SIGN SHALL PROJECT ABOVE THE ROOF LINE NOTE: SEPERATE SIGN PERMIT IS REQUIRED. 1/4" = 1'-0"3 FASCIA SIGN - SIDE ELEVATION 7 20-08-2021 REISSUED FOR ADP TJ 7 20-08-2021 REISSUED FOR ADP TJ 8 17-02-2023 REISSUED FOR DP JG 8 17-02-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 10 30-11-2023 REISSUED FOR DP JG 10 30-11-2023 REISSUED FOR DP JG 11 15-02-2024 REISSUED FOR DP JG 11 15-02-2024 REISSUED FOR DP JG 12 22-04-2024 ISSUED FOR DP & ADP JG 12 22-04-2024 ISSUED FOR DP & ADP JG 13 29-04-2024 ISSUED FOR DP JG 13 29-04-2024 ISSUED FOR DP JG 14 29-05-2024 REISSUED FOR ADP REVIEW JG 14 29-05-2024 REISSUED FOR ADP REVIEW JG 15 04-06-2024 ISSUED FOR REZONING JG 15 04-06-2024 ISSUED FOR REZONING JG 16 12-06-2024 REISSUED FOR REZONING JG 16 12-06-2024 REISSUED FOR REZONING JG 17 14-06-2024 REISSUED FOR REZONING JG 17 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m P15P15 55 P1P1P2P2P3P3P4P4P8P8P10P10P5P5P11P11P14P14 12121717 MAIN FLOOR 29.19 m [3 . 6 6 m ] 12' - 0 " [5 . 4 9 m ] 18 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " P6P6P13P13P12P12 33 11 1 DP-300 ______________________ 1 DP-300 ______________________ 11 52 1 5 P7P7 3 3 101010 P9P9 12 44 2ND FLOOR 34.68 m EXISTING PROPERTY LINE IS EXISTING PROPERTY LINE IS AT 15.38M AND PROPOSED AT 15.38M AND PROPOSED PROPERTY LINE IS AT 13.55MPROPERTY LINE IS AT 13.55M EXISTING PROPERTY LINE IS EXISTING PROPERTY LINE IS AT 42.55 MAT 42.55 M ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31. 7 6 M HEI G H T O F B U I L D I N G FINISH SCHEDULE 2 EXTERNAL CLADDING 2 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 3 EXETRNAL CLADDING 3 CLADIFY- BRICK ADMIRAL RED VELOUR 1 EXTERNAL CLADDING 1 ACTIVE MITREX SOLAR PANELS TO MATCH BENJAMIN MOORE COVENTRY GRAYHC-169 SOLAR PANEL ON ROOF MITREXTO MATCH CASCADIA PVDF OLD ZINC GREY RIB STEEL PANEL ROOF RIB STEEL ROOF PANELCASCADIA PVDF - OLD ZINC GREY 4 5 WINDOW / CURTAIN WALL FRAME ALUMINUMANODIZED DARK GREY ACTIVE MITREX SOLAR RAIL RAIL PANELGLASS COLUMN CLADDING NON SOLARCASCADIA STEEL -REGENT GREY SOFFIT /TRELLIS / BEAM CASCADIA PVDFACORN FACIA BOARD ALUMINUM PAINTED 7 86 9 10 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDINGTO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 WITH LEAVES PATTERN 11 12 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDINGWITH MURAL Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 9 : 0 1 P M DP-2012018-15 JVS JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK EAST ELEVATION 15 1/8" = 1'-0"1 EAST ELEVATION 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 20-08-2021 REISSUED FOR ADP TJ 6 20-08-2021 REISSUED FOR ADP TJ 7 17-02-2023 REISSUED FOR DP JG 7 17-02-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 8 02-08-2023 REISSUED FOR DP JG 9 15-02-2024 REISSUED FOR DP JG 9 15-02-2024 REISSUED FOR DP JG 10 22-04-2024 ISSUED FOR DP & ADP JG10 22-04-2024 ISSUED FOR DP & ADP JG 11 29-04-2024 REISSUED FOR DP JG11 29-04-2024 REISSUED FOR DP JG 12 29-05-2024 REISSUED FOR ADP REVIEW JG12 29-05-2024 REISSUED FOR ADP REVIEW JG 13 04-06-2024 ISSUED FOR REZONING JG13 04-06-2024 ISSUED FOR REZONING JG 14 12-06-2024 REISSUED FOR REZONING JG 14 12-06-2024 REISSUED FOR REZONING JG 15 14-06-2024 REISSUED FOR REZONING JG 15 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m 1515 P15P15 55 P1P1 P2 FLOOR 22.33 m P2P2 P3P3 P4P4 P8P8 P10P10P5P5 P11P11 P14P14 22 77 99 1111 1717446688101013131414 UNDERGROUND ENTRANCE UNDERGROUND ENTRANCE GATEGATE MAIN FLOOR 29.19 m [3 . 2 0 m ] 10' - 6 " [3 . 6 6 m ] 12 ' - 0 " [5 . 4 9 m ] 18' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 4 7 m ] 11 ' - 4 5 / 8 " P6P6 P13P13 3311 1 DP-300 ______________________ 1 DP-300______________________ RAMP TO UNDERGROUND RAMP TO UNDERGROUND PARKINGPARKING 5 2 210 2 5 6 1 113 P7P7 3 5 7 3 2ND FLOOR 34.68 m EXISTING PROPERTY LINE IS EXISTING PROPERTY LINE IS AT 42.55 MAT 42.55 M EXISTING PROPERTY LINE IS EXISTING PROPERTY LINE IS AT 15.38M AND PROPOSED AT 15.38M AND PROPOSED PROPERTY LINE IS AT 13.55MPROPERTY LINE IS AT 13.55M ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31 . 7 6 M HE I G H T O F B U I L D I N G FINISH SCHEDULE 2 EXTERNAL CLADDING 2 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 3 EXETRNAL CLADDING 3 CLADIFY- BRICKADMIRAL RED VELOUR 1 EXTERNAL CLADDING 1 ACTIVE MITREX SOLAR PANELS TO MATCH BENJAMIN MOORE COVENTRY GRAY HC-169 SOLAR PANEL ON ROOFMITREX TO MATCH CASCADIA PVDF OLD ZINC GREY RIB STEEL PANEL ROOFRIB STEEL ROOF PANEL CASCADIA PVDF - OLD ZINC GREY 4 5 WINDOW / CURTAIN WALL FRAMEALUMINUM ANODIZED DARK GREY ACTIVE MITREX SOLAR RAILRAIL PANEL GLASS COLUMN CLADDINGNON SOLAR CASCADIA STEEL -REGENT GREY SOFFIT /TRELLIS / BEAMCASCADIA PVDF ACORN FACIA BOARDALUMINUM PAINTED 7 86 9 10 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 WITH LEAVES PATTERN 11 12 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDING WITH MURAL Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 9 : 1 7 P M DP-2022018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK WEST ELEVATION 1/8" = 1'-0"1 WEST ELEVATION 17 17 7 20-08-2021 REISSUED FOR ADP TJ 7 20-08-2021 REISSUED FOR ADP TJ 8 17-02-2023 REISSUED FOR DP JG 8 17-02-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 9 02-08-2023 REISSUED FOR DP JG 10 15-02-2024 REISSUED FOR DP JG 10 15-02-2024 REISSUED FOR DP JG 11 22-04-2024 ISSUED FOR DP & ADP JG11 22-04-2024 ISSUED FOR DP & ADP JG 12 29-04-2024 REISSUED FOR DP JG12 29-04-2024 REISSUED FOR DP JG 13 29-05-2024 REISSUED FOR ADP REVIEW JG13 29-05-2024 REISSUED FOR ADP REVIEW JG 14 29-05-2024 REISSUED FOR ADP REVIEW JG14 29-05-2024 REISSUED FOR ADP REVIEW JG 15 04-06-2024 ISSUED FOR REZONING JG15 04-06-2024 ISSUED FOR REZONING JG 16 12-06-2024 REISSUED FOR REZONING JG 16 12-06-2024 REISSUED FOR REZONING JG 17 14-06-2024 REISSUED FOR REZONING JG 17 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m [3 . 6 6 m ] 12 ' - 0 " [5 . 4 9 m ] 18 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " MAIN FLOOR 29.19 m 1 DP-301 ______________________ 1 DP-301 ______________________ PFPFPDPDPCPCPBPBPA1PA1PAPA PGPG PIPI AA BB DD GG MM NNEEIILLJJKKHHFF PJPJ OO 5 25 3 3 3 CC 97 8 2ND FLOOR 34.68 m RE A R - E X I S T I N G P R O P E R T Y L I N E RE A R - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E 6.63M TO EXISTING PROPERTY LINE 5.54M TO EXISTING PROPERTY LINE ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31 . 7 6 M HEI G H T O F B U I L D I N G FINISH SCHEDULE 2 EXTERNAL CLADDING 2 ACTIVE MITREX SOLAR CLADDING TO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 3 EXETRNAL CLADDING 3 CLADIFY- BRICK ADMIRAL RED VELOUR 1 EXTERNAL CLADDING 1 ACTIVE MITREX SOLAR PANELS TO MATCH BENJAMIN MOORE COVENTRY GRAYHC-169 SOLAR PANEL ON ROOF MITREXTO MATCH CASCADIA PVDF OLD ZINC GREY RIB STEEL PANEL ROOF RIB STEEL ROOF PANELCASCADIA PVDF - OLD ZINC GREY 4 5 WINDOW / CURTAIN WALL FRAME ALUMINUMANODIZED DARK GREY ACTIVE MITREX SOLAR RAIL RAIL PANELGLASS COLUMN CLADDINGNON SOLARCASCADIA STEEL -REGENT GREY SOFFIT /TRELLIS / BEAM CASCADIA PVDFACORN FACIA BOARD ALUMINUM PAINTED 7 86 9 10 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDINGTO MATCH BENJAMIN MOORE BACKGROUND - AMHERST GRAY - HC-167 WITH LEAVES PATTERN 11 12 EXTERNAL CLADDING 4 ACTIVE MITREX SOLAR CLADDINGWITH MURAL Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY As indicated 6/ 1 3 / 2 0 2 4 4 : 1 9 : 3 8 P M DP-2032018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK NORTH ELEVATION 1/8" = 1'-0"1 NORTH ELEVATION 14 14 5 15-03-2021 REISSUED FOR DP TJ 5 15-03-2021 REISSUED FOR DP TJ 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 15-02-2023 REISSUED FOR DP JG 8 15-02-2023 REISSUED FOR DP JG 9 22-04-2024 ISSUED FOR DP & ADP JG9 22-04-2024 ISSUED FOR DP & ADP JG 10 29-04-2024 REISSUED FOR DP JG10 29-04-2024 REISSUED FOR DP JG 11 29-05-2024 REISSUED FOR ADP REVIEW JG11 29-05-2024 REISSUED FOR ADP REVIEW JG 12 04-06-2024 ISSUED FOR REZONING JG12 04-06-2024 ISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 13 12-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 14 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m P2 FLOOR 22.33 m PEPE MAIN FLOOR 29.19 m 1 DP-301 ______________________ 1 DP-301 ______________________ PFPF PDPD PCPC PBPB PA1PA1 PAPAPGPGPIPI AABBDDGGMMNNEEIILLJJKKHHFF PJPJ OO P1 PARKINGP1 PARKING P2 PARKINGP2 PARKING OFFICE OFFICE ATTIC SPACE TO BE ATTIC SPACE TO BE USED FOR SERVICESUSED FOR SERVICES P2 PARKINGP2 PARKING P1 PARKINGP1 PARKING [3 . 4 7 m ] 11 ' - 4 5 / 8 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [5 . 4 9 m ] 18' - 0 " [3 . 6 6 m ] 12 ' - 0 " [3 . 2 0 m ] 10' - 6 " RAMPRAMP RAMPRAMP STACKED PARKINGSTACKED PARKING DRIVE AISLEDRIVE AISLE CC 2ND FLOOR 34.68 m OFFICEOFFICE BALCONYBALCONY BALCONYBALCONY HOSPITALITY HOSPITALITY ROOMROOM BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY RESIDENCE RESIDENCE SUITESUITE RESIDENCE RESIDENCE SUITESUITE RESIDENCE RESIDENCE SUITESUITE RESIDENCE RESIDENCE SUITESUITE RESIDENCE RESIDENCE SUITESUITE RESIDENCE RESIDENCE SUITESUITE CORRIDORCORRIDOR CORRIDORCORRIDOR CORRIDORCORRIDOR CORRIDORCORRIDOR CORRIDORCORRIDOR CORRIDORCORRIDOR DAYCAREDAYCAREBALCONYBALCONYRESIDENCE RESIDENCE SUITESUITE CORRIDORCORRIDOR STACKED PARKINGSTACKED PARKING [3 . 0 5 m ] 10 ' - 0 " RE A R - E X I S T I N G P R O P E R T Y L I N E RE A R - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E FR O N T - E X I S T I N G P R O P E R T Y L I N E 6.63M TO EXISTING PROPERTY LINE FR O N T - P R O P O S E D P R O P E R T Y L I N E FR O N T - P R O P O S E D P R O P E R T Y L I N E 12.50M TO PROPOSED PROPERTY LINE 20.94M TO EXISTING PROPERTY LINE 743743 ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31 . 7 6 M HEI G H T O F B U I L D I N G OFFICEOFFICE Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 9 : 4 0 P M DP-3002018-15 JVS JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK BUILDING SECTION A - A 13 1/8" = 1'-0"1 SECTION AA 6 17-02-2023 REISSUED FOR DP JG 6 17-02-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 7 02-08-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 8 30-11-2023 REISSUED FOR DP JG 9 15-02-2024 REISSUED FOR DP JG 9 15-02-2024 REISSUED FOR DP JG 10 22-04-2024 REISSUED FOR DP & ADP JG 10 22-04-2024 REISSUED FOR DP & ADP JG 11 29-04-2024 REISSUED FOR DP JG 11 29-04-2024 REISSUED FOR DP JG 12 29-05-2024 REISSUED FOR ADP REVIEW JG 12 29-05-2024 REISSUED FOR ADP REVIEW JG 13 04-06-2024 ISSUED FOR REZONING JG13 04-06-2024 ISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 3RD FLOOR 37.72 m 4TH FLOOR 40.77 m 5TH FLOOR 43.82 m 6TH FLOOR 46.87 m 7TH FLOOR 49.92 m P1 FLOOR 25.53 m 8TH FLOOR 52.96 m T/O PLATE 56.01 m 1515 P15P15 55 P1P1 P2 FLOOR 22.33 m P2P2 P5P5 P14P14 22 77 99 1111 1717 MAIN FLOOR 29.19 m RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE OFFICEOFFICE HOSPITALITY RM.HOSPITALITY RM. RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITE OFFICEOFFICE RESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITE ATTICATTIC ELEVATOR SHAFTELEVATOR SHAFT PROPOSED DAYCAREPROPOSED DAYCARE PARKING P2PARKING P2 PARKING P1PARKING P1 PARKING P2PARKING P2 P13P13 3311 1 DP-300 ______________________ 1 DP-300______________________ OUTDOOR PLAY AREA (COVERED)OUTDOOR PLAY AREA (COVERED) RESIDENCE RESIDENCE ENTRYENTRY LOBBYLOBBY DRIVEWAYDRIVEWAY BIKE ROOMBIKE ROOM MECH/BOILER MECH/BOILER ROOMROOM PARKING P1PARKING P1 P7P7 BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY BALCONYBALCONY2ND FLOOR 34.68 m STACKED PARKINGSTACKED PARKING BIKE ROOMBIKE ROOM RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITERESIDENCE SUITE MEETING ROOMMEETING ROOM CORRIDORCORRIDOR CORRIDORCORRIDOR CORRIDORCORRIDOR RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE RESIDENCE SUITERESIDENCE SUITE CORRIDORCORRIDOR RESIDENCE SUITERESIDENCE SUITE CORRIDORCORRIDOR RESIDENCE SUITERESIDENCE SUITE KITCHENKITCHEN AMENITY ROOMAMENITY ROOM GYMGYM ROOF DECKROOF DECK LOCKERS/STORAGELOCKERS/STORAGE LOCKERS/STORAGELOCKERS/STORAGE CORRIDORCORRIDOR CORRIDORCORRIDORAMENITY ROOMAMENITY ROOM RESIDENCE SUITERESIDENCE SUITE ACCESIBLE REGULAR PARKINGACCESIBLE REGULAR PARKING STACKED PARKINGSTACKED PARKING [3 . 2 0 m ] 10' - 6 " [3 . 6 6 m ] 12' - 0 " [5 . 4 9 m ] 18 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 0 5 m ] 10 ' - 0 " [3 . 4 7 m ] 11 ' - 4 5 / 8 " EXISTING PROPERTY LINE IS EXISTING PROPERTY LINE IS AT 42.55 MAT 42.55 M SETBACK TO EXISTING SETBACK TO EXISTING PROPERTY LINE IS AT 15.38M PROPERTY LINE IS AT 15.38M AND TO THE PROPOSED AND TO THE PROPOSED PROPERTY LINE IS AT 13.55MPROPERTY LINE IS AT 13.55M 25322532 24812481 ROOF PEAK 63.44 m MIDPOINT OF RIDGE & UNDERSIDE OF TRUSS 59.48 m AVG.GRADE 27.72 m 31. 7 6 M HE I G H T O F B U I L D I N G HOSPITALITY RM.HOSPITALITY RM. HOSPITALITY RM.HOSPITALITY RM. HOSPITALITY RM.HOSPITALITY RM. Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/8" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 9 : 4 2 P M DP-3012018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK BUILDING SECTION B - B 1/8" = 1'-0"1 SECTION B-B 13 13 3 15-03-2021 REISSUED FOR DP TJ 3 15-03-2021 REISSUED FOR DP TJ 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 15-02-2024 REISSUED FOR DP JG 7 15-02-2024 REISSUED FOR DP JG 8 22-04-2024 REISSUED FOR DP & ADP JG 8 22-04-2024 REISSUED FOR DP & ADP JG 9 29-04-2024 REISSUED FOR DP JG 9 29-04-2024 REISSUED FOR DP JG 10 29-05-2024 REISSUED FOR ADP REVIEW JG 10 29-05-2024 REISSUED FOR ADP REVIEW JG 11 04-06-2024 ISSUED FOR REZONING JG11 04-06-2024 ISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 12 12-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 13 14-06-2024 REISSUED FOR REZONING JG 44 66 KITCHENKITCHEN DINING RMDINING RM LIVING RMLIVING RM BALCONYBALCONY 61.0 SF61.0 SF 16R @7.5"16R @7.5" FLEX RMFLEX RMPWD.PWD. CL.CL. PAN.PAN. PFPF PFPF MM NN LL KK OO [5.64 m] 18' - 6" [9 . 9 6 m ] 32' - 8 " UPUP [5 . 4 2 m ] 17 ' - 9 3 / 8 " [2 . 0 0 m ] 6' - 6 7 / 8 " [1 . 6 0 m ] 5' - 3 " [3 . 1 7 m ] 10' - 4 7 / 8 " [2 . 6 9 m ] 8' - 9 7 / 8 " [2.91 m] 9' - 6 3/8" [2.16 m] 7' - 1"[0 . 2 1 m ] 0' - 8 1 / 4 " [2 . 2 9 m ] 7' - 6 " 44 66 M.BEDROOMM.BEDROOM 2ND.BEDROOM2ND.BEDROOM ENSUITEENSUITE CL.CL. DN 16R @7.5"DN 16R @7.5" CL.CL. W/DW/D TYPE CTYPE C ENSUITEENSUITE PFPF PFPF MM NN LL KK OO DNDN [2 . 5 3 m ] 8' - 3 3 / 4 " [2 . 7 4 m ] 9' - 0 " [1 . 7 0 m ] 5' - 7 " [1 . 5 2 m ] 4' - 1 1 7 / 8 " [2.91 m] 9' - 6 3/8" [2.16 m] 7' - 1" [1 0 . 0 0 m ] 32 ' - 9 5 / 8 " [5.64 m] 18' - 6" [5.64 m] 18' - 6" [4 . 1 1 m ] 13 ' - 6 " BALCONYBALCONY 61.0 SF61.0 SF [0 . 2 1 m ] 0' - 8 1 / 4 " [2 . 2 9 m ] 7' - 6 " 22 DININGDINING LIVINGLIVING BALCONYBALCONY 79.0 SF79.0 SF CL.CL. PAN.PAN. PWRPWR ST O R A G E S T O R A G E KITCHENKITCHEN TYPE DTYPE D PFPF PFPF GG II LL JJ KK HH FF 11 UPUP [3 . 1 0 m ] 10 ' - 2 " [3.59 m] 11' - 9 3/8" [1.71 m] 5' - 7 1/4" [7 . 0 9 m ] 23 ' - 3 1 / 4 " [1.79 m] 5' - 10 5/8" [3 . 9 8 m ] 13 ' - 0 1 / 2 " 22 W/DW/D W.R.W.R. ENSUITEENSUITE 2ND BR2ND BR 3RD BR3RD BR MASTER BRMASTER BR TYPE D [5 . 6 5 m ] 18 ' - 6 5 / 8 " PFPF PFPF GG II LL JJ KK HH FF 11 DNDN CL.CL.CL.CL. CL.CL. [2.88 m] 9' - 5 1/4" [3 . 0 6 m ] 10 ' - 0 1 / 2 " [2 . 7 4 m ] 8' - 1 1 7 / 8 " [3.59 m] 11' - 9 3/8" [1.71 m] 5' - 7 1/4" [2 . 9 7 m ] 9' - 8 3 / 4 " [2 . 7 0 m ] 8' - 1 0 3 / 8 " BALCONYBALCONY 79.0 SF79.0 SF [1.79 m] 5' - 10 5/8" [3 . 9 8 m ] 13 ' - 0 1 / 2 " 22 PFPF PFPF GGGG II II LLLL JJJJ KKKK HHHH FFFF 11 [2 . 8 6 m ] 9' - 4 3 / 4 " [3 . 8 4 m ] 12 ' - 7 1 / 4 " [2.29 m] 7' - 6 1/4" [1.97 m] 6' - 5 5/8" [2 . 7 0 m ] 8' - 1 0 3 / 8 " [7 . 5 8 m ] 24 ' - 1 0 5 / 8 " [3.57 m] 11' - 8 1/2" LIVINGLIVING BEDROOMBEDROOM DININGDINING KITCHENKITCHEN CL.CL. WR.WR. BALCONYBALCONY 79.0 SF79.0 SF [1.79 m] 5' - 10 5/8" [3 . 9 8 m ] 13 ' - 0 1 / 2 " 44 66 PFPF PFPF MMMM NNNN LLLL KKKK OOOO KITCHENKITCHEN DINING RMDINING RM LIVING RMLIVING RM BALCONYBALCONY 61.0 SF61.0 SF BEDROOMBEDROOM W.R.W.R. [5.64 m] 18' - 6" [1 . 5 0 m ] 4' - 1 1 " [3 . 1 0 m ] 10 ' - 2 " [5 . 2 8 m ] 17 ' - 3 3 / 4 " [3 . 1 5 m ] 10' - 4 " [4 . 3 1 m ] 14 ' - 1 3 / 4 " [3.05 m] 10' - 0 1/4" [2.16 m] 7' - 1"[0 . 2 1 m ] 0' - 8 1 / 4 " [2 . 2 9 m ] 7' - 6 " Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/4" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 9 : 4 4 P M DP-400 ENLARGED UNIT PLANS 2018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 1111 1 20-08-2020 FOR CLENT REVIEW SP 1 20-08-2020 FOR CLENT REVIEW SP 2 28-08-2020 ISSUED FOR DP SP 2 28-08-2020 ISSUED FOR DP SP 3 15-03-2021 REISSUED FOR DP TJ 3 15-03-2021 REISSUED FOR DP TJ 1/4" = 1'-0"2 TYPE C - 2 BEDROOM - LOWER FLOOR 1127.61SF 1/4" = 1'-0"3 TYPE C - 2 BEDROOM - UPPER FLOOR 1/4" = 1'-0"5 TYPE D - 3 BEDROOM LOWER FLOOR 1363.95 SF 1/4" = 1'-0"6 TYPE D - 3 BEDROOM UPPER FLOOR 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 1/4" = 1'-0"1 TYPE B - 1 BEDROOM 696.16SF 1/4" = 1'-0"4 TYPE A - 1 BEDROOM 582.89 SF1 6 22-04-2024 ISSUED FOR DP & ADP JG 6 22-04-2024 ISSUED FOR DP & ADP JG 7 29-04-2024 REISSUED FOR DP JG 7 29-04-2024 REISSUED FOR DP JG 8 29-05-2024 REISSUED FOR ADP REISSUE JG 8 29-05-2024 REISSUED FOR ADP REISSUE JG 9 04-06-2024 ISSUED FOR REZONING JG9 04-06-2024 ISSUED FOR REZONING JG 10 12-06-2024 REISSUED FOR REZONING JG 10 12-06-2024 REISSUED FOR REZONING JG 11 14-06-2024 REISSUED FOR REZONING JG 11 14-06-2024 REISSUED FOR REZONING JG 1515 LIVING RMLIVING RM BALCONYBALCONY 64.0 SF64.0 SF CL.CL. W.R.W.R. 2ND BEDROOM2ND BEDROOM MASTERMASTER BEDROOMBEDROOM ENSUITEENSUITE DINING RMDINING RM W/DW/D KITCHENKITCHENCL.CL. [6 . 6 3 m ] 21' - 9 " [3 . 6 6 m ] 12 ' - 0 1 / 4 " TYPE ETYPE E PCPC PCPC DDGGEEFF CC CL.CL. [4 . 9 0 m ] 16' - 0 7 / 8 " [2 . 8 9 m ] 9' - 5 3 / 4 " [1.84 m] 6' - 0 3/8" [3.55 m] 11' - 7 3/4" [1.85 m] 6' - 0 7/8" [3.21 m] 10' - 6 1/2" [3.28 m] 10' - 9 1/8" [2.40 m] 7' - 10 5/8" [2 . 3 3 m ] 7' - 7 5 / 8 " 1515 1212 LIVING LIVING CL.CL. W/D W.R.W.R. KITCHENKITCHEN BALCONYBALCONY 70.0 SF70.0 SF ENSUITEENSUITE TYPE F 2ND BEDROOM2ND BEDROOM MASTER MASTER BEDROOMBEDROOM CL.CL. CL.CL. CL.CL. DINING AREADINING AREA [1 2 . 0 2 m ] 39 ' - 5 1 / 4 " PAPA PAPAAA BB CC [2 . 5 4 m ] 8' - 4 1 / 8 " [2 . 8 0 m ] 9' - 2 1 / 4 " [3 . 1 0 m ] 10 ' - 2 " [2 . 8 6 m ] 9' - 4 3 / 4 " [2.98 m] 9' - 9 1/8" [3.58 m] 11' - 8 3/4" [2.97 m] 9' - 8 7/8" [3 . 4 3 m ] 11 ' - 2 7 / 8 " [1 . 8 6 m ] 6' - 1 1 / 4 " [5.36 m] 17' - 7" [1 . 9 7 m ] 6' - 5 1 / 2 " 44 33 MM MM NN NN II II LL LL JJ JJ KK KK OO OO [3.65 m] 11' - 11 5/8" [2 . 6 4 m ] 8' - 8 1 / 8 " [2.73 m] 8' - 11 3/8" [3.22 m] 10' - 6 7/8" [2.72 m] 8' - 11 1/4" [4.84 m] 15' - 10 5/8" [3 . 0 8 m ] 10 ' - 1 1 / 8 " [3 . 8 2 m ] 12 ' - 6 3 / 8 " [2 . 6 2 m ] 8' - 7 1 / 8 " MASTER MASTER BEDROOMBEDROOM ENSUITEENSUITE WALK-IN-WALK-IN- CLOSETCLOSET BALCONYBALCONY 108.0 SF108.0 SF LIVINGLIVINGDININGDINING KITCHENKITCHEN WRWR 2ND BEDROOM2ND BEDROOM 3RD BEDROOM3RD BEDROOM WALK-WALK- IN-CLOSETIN-CLOSET W/DW/D STORESTORE [3 . 0 9 m ] 10' - 1 1 / 2 " [3.34 m] 10' - 11 5/8" Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 1/4" = 1'-0" 6/ 1 3 / 2 0 2 4 4 : 1 9 : 4 5 P M DP-401 ENLARGED UNIT PLANS 2018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 1 20-08-2020 FOR CLENT REVIEW SP 1 20-08-2020 FOR CLENT REVIEW SP 2 28-08-2020 ISSUED FOR DP SP 2 28-08-2020 ISSUED FOR DP SP 3 15-03-2021 REISSUED FOR DP TJ 3 15-03-2021 REISSUED FOR DP TJ 1/4" = 1'-0"4 TYPE E - 2 BEDROOM 903.17SF 1/4" = 1'-0"1 TYPE F 2 BEDROOM 944.60 SF 4 20-08-2021 REISSUED FOR ADP TJ 4 20-08-2021 REISSUED FOR ADP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 1/4" = 1'-0"2 TYPE G - 3 BEDROOM 1173.84SF 11 11 TOTAL 106 7029 SF (653.01 SQ.M.) TYPE G 3 BEDROOM 1154.06 SF 108.00 SF 7 756 SF TYPE F 2 BEDROOM 930.91 SF 70.00 SF 6 420 SF TYPE E 2 BEDROOM 892.00 SF 64.00 SF 6 384 SF TYPE D 3 BEDROOM 1356.82 SF 79.00 SF 4 316 SF TYPE C 2 BEDROOM 1149.26 SF 61.00 SF 18 1098 SF TYPE B 1 BEDROOM 678.41 SF 79.00 SF 5 395 SF TYPE A 1 BEDROOM 574.63 SF 61.00 SF 60 3660 SF UNIT TYPEUNIT TYPE UNIT AREAUNIT AREA OUTDOOR AMENITYOUTDOOR AMENITY # OF UNITS# OF UNITS TOTAL OUTDOOR AMENITY PERTOTAL OUTDOOR AMENITY PER UNIT TYPEUNIT TYPE UNIT MATRIXUNIT MATRIX 6 22-04-2024 ISSUED FOR DP & ADP JG 6 22-04-2024 ISSUED FOR DP & ADP JG 7 29-04-2024 REISSUED FOR DP JG 7 29-04-2024 REISSUED FOR DP JG 8 29-05-2024 REISSUED FOR ADP REVIEW JG 8 29-05-2024 REISSUED FOR ADP REVIEW JG 9 04-06-2024 ISSUED FOR REZONING JG 9 04-06-2024 ISSUED FOR REZONING JG 10 12-06-2024 REISSUED FOR REZONING JG 10 12-06-2024 REISSUED FOR REZONING JG 11 14-06-2024 REISSUED FOR REZONING JG 11 14-06-2024 REISSUED FOR REZONING JG Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 6/ 1 3 / 2 0 2 4 4 : 1 9 : 4 6 P M DP- 900 3D VIEWS 2018-15 SP JMM 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK 12 12 BIRD'S EYE VIEW OF THE DEVELOPMENT EAST SIDE VIEW WITH MURAL NORTH-EAST VIEW OF THE BUILDING WEST VIEW OF THE BUILDING NORTH-WEST VIEW OF THE BUILDING 3 09-03-2021 ISSUED FOR CLIENT TJ 3 09-03-2021 ISSUED FOR CLIENT TJ 4 15-03-2021 REISSUED FOR DP TJ 4 15-03-2021 REISSUED FOR DP TJ 5 17-02-2023 REISSUED FOR DP JG 5 17-02-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 6 02-08-2023 REISSUED FOR DP JG 7 22-04-2024 ISSUED FOR DP & ADP JG 7 22-04-2024 ISSUED FOR DP & ADP JG 8 29-04-2024 REISSUED FOR DP JG 8 29-04-2024 REISSUED FOR DP JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 9 29-05-2024 REISSUED FOR ADP REVIEW JG 10 04-06-2024 ISSUED FOR REZONING JG 10 04-06-2024 ISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 11 12-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG 12 14-06-2024 REISSUED FOR REZONING JG Project No. RE V N o . COPYRIGHT & USE OF DOCUMENTSCOPYRIGHT & USE OF DOCUMENTS Principal: Joe M. Minten architect aaa, aibc, mraic 107-15055 54 Avenue Surrey, B.C. V3S 5X7604 - 583 2003 - Tjoe@jmarchitecture.ca - E Project Name START DATE PROJECT No DR. CH. SCALE DO NOT SCALE DRAWING Architects Seal Digital Certificate This document has been electronically certified with digital certificate and encryption technology authorized by the AIBC and APEGBC. The authoritative original had been transmitted to you in electronic form. Any printed version can be relied upon as a true copy of the original when supplied by the original author, bearing images of the professional seal and digital certificate, or when printed from the digitally certified electronic file provided. Client: This plan and design are considered a 'Consultant's instrument of service' and shall be considered the exclusive property of the Consultant, JM Architecture Inc. and may not be used or reproduced without the consent of Mr. Joe M. Minten, architect aibc, aaa, mraic. This instrument of service shall only be usedonce and solely for this project; no further use shall be deemed a right by anyone without the written consent of the Consultant. No project renovations, additions or alterations shall stem from the use of this document, in any possible form of reproduction, without the written consent of the Consultant. This document may not be sold or transferred without written agreement from the Consultant. Only the client may retain copies of this document, and only for the purpose of information and reference as it was initially intended. Any change or manipulation of this document isexpressly forbidden; this document must remain completely intact at all times. The Consultant will not be responsible for changes to this document by others. REV DATE DESCRIPTION BY 6/ 1 3 / 2 0 2 4 4 : 1 9 : 5 9 P M DP- 9012018-15 Author Checker 2018-15 SIMPLEX MEADOWS DEVELOPMENT CORP. MAPLE RIDGE, BC 222 MEADOWS WALK222 MEADOWS WALK MATERIAL BOARD CLADIFY Brick Cladding Admiral Red Velour MITREX Active Solar Panel Colour to match Benjamin Moore Amherst Gray 2 EXTERIOR CLADDING 1 7 MITREX Active Solar panel BALCONY SOLAR GLASS RAIL 1 14-06-2021 ISSUED FOR ADP TJ 1 14-06-2021 ISSUED FOR ADP TJ 8 SOFFIT/TRELLIS/BEAM Cascadia -PVDF Acorn 2 20-03-2021 REISSUED FOR ADP TJ 2 20-03-2021 REISSUED FOR ADP TJ MITREX Active Solar Panel Colour to match Benjamin Moore Coventry Gray 3 ANODIZED Dark Grey 6 ALUMINIUM FRAMES CASCADIA Regent Grey 9 Column Cladding 3 17-02-2023 REISSUED FOR DP JG 3 17-02-2023 REISSUED FOR DP JG CASCADIA - Rib steel roof panel PVDF - Old Zinc Grey 4 ROOFING METRIXSolar panel To match Cascadia - Rib steel roof panel PVDF - Old Zinc Grey 5 11 MITREX Active Solar Panel Colour to match Benjamin Moore Amherst Gray with leaves MITREX Active Solar Panel Artwork 12 1261178314 4 02-08-2023 REISSUED FOR DP JG 4 02-08-2023 REISSUED FOR DP JG 1 COVER-MATERIAL BOARD 1010 5 22-04-2024 ISSUED FOR DP & ADP JG 5 22-04-2024 ISSUED FOR DP & ADP JG 6 29-04-2024 ISSUED FOR DP JG 6 29-04-2024 ISSUED FOR DP JG 7 29-05-2024 REISSUED FOR ADP REVIEW JG 7 29-05-2024 REISSUED FOR ADP REVIEW JG 8 04-06-2024 ISSUED FOR REZONING JG 8 04-06-2024 ISSUED FOR REZONING JG 9 12-06-2024 REISSUED FOR REZONING JG 9 12-06-2024 REISSUED FOR REZONING JG 10 14-06-2024 REISSUED FOR REZONING JG 10 14-06-2024 REISSUED FOR REZONING JG 1. COMPLIANCE, GOVERNMENT - ALL WORK SHALL BE COMPLETED TO THE SATISFACTION OF THE CITY OF MAPLE RIDGE AND SHALL COMPLY WITH ALL STANDARDS AND REGULATIONS OF THE SAME. CONTRACTORS SHALL ENSURE COMPLIANCE OF ALL WORK PRIOR TO INSTALLATION. 2. COMPLIANCE, STANDARD - ALL MATERIAL, SHIPPING PROCEDURES, AND INSTALLATION OF LANDSCAPE ELEMENTS SHALL CONFORM TO LATEST EDITION OF THE CANADIAN LANDSCAPE STANDARD AVAILABLE AT COMMENCEMENT OF WORK. 3. COMPLIANCE, MMCD - ALL WORKS SHALL CONFORM TO THE LATEST MMCD DETAILS AND SPECIFICATIONS AVAILABLE AT COMMENCEMENT OF WORK WHERE NO SPECIFIC DETAIL, NOTE OR SPECIFICATION IS PROVIDED IN THE DRAWING SET OR ATTACHED MATERIALS. 4. EXISTING SERVICES - REFER TO ENGINEERING DRAWINGS FOR LOCATIONS OF ALL BURIED SERVICES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL UTILITIES LOCATIONS AND ANY AND ALL COSTS WHICH ARISE FROM DAMAGE TO SERVICES CAUSED BY ANY ACT OR FAILURE TO ACT OF THE CONTRACTOR. 5. COORDINATION - THESE DRAWINGS SHALL BE TAKEN TO BE PART OF THE LARGER SET OF DRAWINGS AND SPECIFICATIONS, WHETHER DIRECTLY ATTACHED OR NOT, ISSUED FOR THE CONSTRUCTION OF THE ASSOCIATED BOULEVARD WORKS. THESE DRAWINGS SHALL BE READ IN CONCERT WITH SUCH DOCUMENTATION AND, WHERE CONFLICTS ARISE, THE CONTRACTOR SHALL IMMEDIATELY REPORT SUCH CONFLICTS TO THE LANDSCAPE ARCHITECT. THE WORK IS TO BE DONE IN COORDINATION WITH THE CONTRACTOR OR CONTRACTORS ENGAGED IN CONSTRUCTION OF SUCH ADJACENT WORKS. 6. CONCRETE, FORMS - THE CONTRACTOR SHALL COMPARE DIMENSIONS PROVIDED WITH SITE CONDITIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE LANDSCAPE ARCHITECT AND THE ENGINEER. ONCE COMPLETED THE CONTRACTOR SHALL CALL FOR INSPECTION OF THE FORMS PRIOR TO PLACING STEEL REINFORCEMENT. CONTACT LANDSCAPE ARCHITECT A MINIMUM OF 48 HOURS PRIOR TO DESIRED INSPECTION TIME. 7. CONCRETE, REINFORCEMENT - ALL CONCRETE REINFORCEMENT SHALL BE INSPECTED AND APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO POURING OF CONCRETE. CONTACT STRUCTURAL ENGINEER A MINIMUM OF 48 HOURS PRIOR TO DESIRED INSPECTION TIME. 8. GRADING, GENERAL - THE CONTRACTOR SHALL ESTABLISH GRADES SUCH THAT THERE IS, IN ALL AREAS, POSITIVE DRAINAGE TO AN ADJACENT DRAIN. MINIMUM SLOPES SHALL BE AS FOLLOWS: PEDESTRIAN PAVED AREAS 1% VEHICULAR PAVED AREAS 1% LAWN AREAS 2% PLANTED BEDS 5% 9. GRADING, ALLOWANCES AND TOPSOIL PLACEMENT - OVERALL DEPTH OF PLANTING MEDIUM AFTER SETTLEMENT SHALL BE: GRASS AREAS 150 MM SHRUB BEDS 450 MM GROUND COVER AREAS 300 MM TREES 600 MM N.B. ALL SOIL SHALL BE TESTED NOT MORE THAN 14 DAYS PRIOR TO INSTALLATION ON SITE. TESTING SHALL BE SPECIFIC TO THIS WORK. CONTRACTOR SHALL AMEND THE SOIL ACCORDING TO THE RECOMMENDATIONS OF THE SOILS TESTING LAB. 10. GRADING, BUILDING FINISHED FLOOR & CORNER ELEVATIONS - SEE ARCHITECTURAL DRAWINGS. 11. PLANT MATERIAL, QUANTITIES - CONTRACTOR SHALL CONFIRM ALL PLANT MATERIAL QUANTITIES. ANY DISCREPANCIES BETWEEN THE PLANT LIST AND THE DRAWING SHALL BE REPORTED TO THE CONSULTANT. IN CASE OF DISCREPANCY CONTRACTOR SHALL INSTALL PLANT MATERIAL AS PER DRAWING. IN CIRCUMSTANCES WHERE THERE IS A DISCREPANCY BETWEEN GROUND COVER QUANTITY AND SPACING THE SPACING REQUIREMENT WILL PREVAIL. 12. PLANT MATERIAL, SUBSTITUTIONS - NO SUBSTITUTIONS TO PLANT LIST SHALL BE MADE BY CONTRACTOR WITHOUT PRIOR WRITTEN AUTHORIZATION FROM CONSULTANT. 13. PLANT MATERIAL, HEALTH - ALL PLANT MATERIALS MUST BE DISEASE FREE FROM CERTIFIED NURSERIES. 14. MULCH - ORNAMENTAL PLANTING AREAS ALONG THE ROAD FRONTAGES AND IN THE PARING AREAS SHALL BE MULCHED WITH 50 MM OF HEM/FIR BARK MULCH. THE USE OF CEDAR MULCH OR ANY MIX CONTAINING CEDAR IS NOT PERMITTED. NATURESCAPED AREAS SHALL NOT BE MULCHED. GENERAL NOTES GT CN gs pm SIZESCIENTIFIC NAMEQTY COMMON NAME MATURE SIZECOMMENTSCODE SPACING PLANT LIST DECIDUOUS TREES COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING BROADLEAF EVERGREEN SHRUBS COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING FERNS COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING GROUND COVERS GT 1 Gleditsia triacanthos Honey Locust 6 cm cal 150cm standard B&B min. 50cm root ball dia. 20m height 20.0m spread as shown CN 2 Cornus 'Eddies White Wonder'White Wonder Dogwood 6 cm cal.150cm standard B&B min. 50cm root ball dia. 6.0m height 4.5m spread as shown ah 52 Azalea japonica 'Hino Crimson'Crimson Japanese Azalea #2 pot minimum 20cm height 100cm height 120cm width 60cm pm 30 Polystichum munitum Swordfern #1 pot minimum 30cm height 100cm height 100cm width 60cm gs 24 Gaultheria shallow Salal #1 pot minimum 30cm height - heavy 100cm height 150cm width 60cm cij 375 Carex Iris Juncus Mix Pacific Pleeding Heart plug 50% Carex densa + 10% Carex vulpinoidea + 10% Iris douglasiana +30% Juncus balticus 50cm o.c. ah COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING DECIDUOUS EVERGREEN SHRUBS la 16 Lavandula angustifolia English Lavender #2 pot minimum 20cm height 70cm height 70cm width 75cm rs 47 Ribes sanguineum Flowering Currant #2 pot minimum 50cm height 300cm height 20cm width 75cmrs COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING VINES gf 7 Lonicera 'Gold Flame'Gold FlameHoneysuckle #5 potgf vo 42 Vaccinium ovatum'Thunderbird'Evergreen Huckleberry #2 pot minimum 20cm height 180cm height 150cm width 75cmvo cs 88 Cornus sericea Red Osier Dogwood #2 pot minimum 50cm height 200cm height 200cm width 75cm cf 165 Cornus sericea 'Flaviramea'Yellowtwig Dogwood #2 pot minimum 50cm height 200cm height 200cm width 75cmcf cs AC AC 5 Acer circinatum Vine Maple 2.5m clumpB&B min. 60cm root ball dia.4.5m height 4.5m spread as shown cdo1040 Cornus Dicentra Oxalis Mix Redwood Sorrel/Bleeding Heart plug 25% Cornus canadensis + 25% Dicentra formosa + 50% Oxalis oregana 50cm o.c. arc 48 Arctostaphylos uva-ursi Kinnikinnick 10cm pot 30cm o.c. COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING CONIFEROUS TREES TS 16 Tsuga heterophylla Western Hemlock 3.5m B&B B&B min. 50cm root ball dia.50m height 15m width as shown TP 14 Thuja plicata Western Red Cedar 2.5 m B&B B&B min. 50cm root ball dia.40m height 15m width as shown TS TP pf pf 28 Photinia f. 'Little Red Robin'Christmas Berry #5 pot minimum 60cm height 150cm height 100cm width 150cm oo2412 Gaultheria Mahonia Rubus Mix Redwood Sorrel plug 30% Gaultheria shallon + 40% Mahonia repens + 10% Rubus spectabilis + 20% Vaccinium vitis-idaea 50cm o.c. la Lawn Shade Tolerant Blend la AJ 3 Acer palmatum 'Sango Kanku'Coral Bark Maple 2 m clump B&B min. 50cm root ball dia.4.5m height 4.5m spread as shownAJ mn 212 Mahonia nervosa Cascade Mahonia #2 pot minimum 30cm spread 60cm height 60cm width 75cmmn PLANT PALLET Acer circinatum Acer p. 'Sango Kaku' Cornus 'Eddies White Wonder' Geditsia triacanthos Thuja plicata Tsuga heterophylla Azalea j. ' Hino Crimson' Gaultheria shallon Mahonia nervosa Photinia f. 'Red Robin' Vaccinium o. 'Thunderbird' Cornus sericea Cornus s. 'Flaviramea' Lavandula angustifolia Ribes sanguineum Polystichum munitum Lonicera 'Gold Flame' Arctostaphylos uva-ursi AC AJ CN GT TP TS ah gs mn pf vo cs cf la rs pm gf arc HARD LANDSCAPE CONCRETE UNIT PAVERS WOOD MULCH PLAY AREA RIVER ROCK MULCH GRAVEL WALKING SURFACE WOODEN BENCH BICYCLE PARKING PRE-CAST CONCRETE SLABS PL O T D A T E : M a y 2 9 , 2 0 2 4 T I M E : 4 : 0 0 P M F U L L P A T H A N D F I L E N A M E : D : \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 1 - 0 0 . D W G P L O T S Y L E T A B L E : - - - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L1-00 NOTES & KEYS APPENDIX F KOMPAN PLAY HOUSE NRO414 123 AVENUE 22 2 S T EX1ST. TREE (TYP.) EXIST. TREE (TYP.) TREE PROTECTION FENCE (TEMPORARY) TREE PROTECTION FENCE (TEMPORARY) C.I.P. CONCRETE WALK AS PER CITY STANDARD MID-SLOPE STORM WATER DIVERSION SWALE INFILTRATION AREA 02 L5-03 LOG & CABLE CLIMBING STRUCTURE 01 L5-03 POST AND RAIL FENCE06 L5-02 1.5m WIDTH TRAIL GRAVEL TRAIL PAVING 02 L5-02 RIVER ROCK GRAVEL MULCH 07 L5-02 PAVING SLABS 455 x 455 03 L5-02 BELGARD STANDARD PAVERS BASKET / NATURAL 05 L5-02 1.5m WIDTH TRAIL GRAVEL TRAIL PAVING 02 L5-02 01 L3-10 MID-SLOPE STORM WATER DIVERSION SWALE 03 L3-10 POST AND RAIL FENCE 06 L5-02 MID-SLOPE STORM WATER DIVERSION SWALE 01 L3-10 BELGARD STANDARD PAVERS HERRINGBONE / HARVEST 05 L5-02 PERVIOUS CONCRETE UNIT PAVERS 05 L5-02 PERVIOUS CONCRETE UNIT PAVERS 05 L5-02 BELGARD COBBLE PAVERS RUNNING BOND / CHARCOAL 05 L5-02 1.5 METER WALKWAY PERVIOUS CONCRETE UNIT PAVERS 05 L5-02 WOOD FIBER MULCH SAFETY SURFACING WOODEN BENCH ACHORED TO CONCRETE PAD 01 L5-02 PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 3: 0 2 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 2 - 0 0 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L2-00 HARD SITE PLAN 01 L2-00 HARD SITE PLAN SCALE 1:300 INTERCEPTION SWALE TO CAPTURE, REDIRECT & INFILTRATE RUN-OFF FROM BUILT AREA EL . 2 2 . 7 5 EL . 2 1 . 4 9 EL.2 1 . 7 0 EL.2 2 . 3 0 EL . 2 2 . 1 2 EL . 2 0 . 7 0 EL . 1 9 . 5 2 EL . 1 9 . 0 7 EL . 1 9 . 1 6 EL . 1 9 . 6 4 EL . 2 0 . 4 6 EL . 1 9 . 3 0 EL . 1 9 . 5 9 EL . 1 9 . 0 7 EL . 1 9 . 7 5 EL . 1 8 . 9 9 EL. 1 8 . 6 2 EL . 1 8 . 9 9 EL . 1 8 . 9 2 EL . 1 8 . 5 8 EL.1 8 . 9 1 EL . 1 8 . 5 7 EL . 1 8 . 8 1 EL. 1 8 . 2 5 EL . 2 5 . 4 9 EL . 2 5 . 6 2 EL . 2 5 . 7 7 EL . 2 5 . 9 0 EL . 2 5 . 6 6 EL . 2 5 . 5 5 EL . 2 5 . 7 0 EL . 2 2 . 0 6 EL.2 3 . 5 2 EL . 2 2 . 9 0 EL. 2 4 . 9 9 EL. 2 5 . 0 6 EL . 2 2 . 5 5 EL . 2 5 . 0 7 EL . 2 4 . 6 1 EL . 2 4 . 3 2 EL . 2 4 . 6 6 EL . 2 4 . 4 2 EL. 2 3 . 6 7 EL . 2 3 . 6 2 EL . 2 4 . 2 6 EL . 2 3 . 3 9 EL.2 4 . 1 5 EL . 2 4 . 8 9 EL . 2 3 . 9 7 EL . 2 1 . 0 9 EL . 2 0 . 6 6 EL. 2 1 . 1 2 EL.2 0 . 8 2 EL . 2 2 . 3 1 EL . 2 0 . 0 1 EL . 2 1 . 5 5 EL. 2 1 . 1 5 EL . 2 2 . 3 0 EL. 2 1 . 9 2 EL . 2 3 . 1 7 EL . 2 2 . 5 4 EL . 2 3 . 5 6 EL . 2 2 . 7 5 EL . 2 3 . 9 5 EL. 2 3 . 0 9 EL . 2 4 . 0 1 EL . 2 3 . 4 3 EL . 2 4 . 0 1 EL . 2 3 . 8 2 EL . 2 3 . 9 2 EL . 2 4 . 6 3 EL . 2 5 . 7 5 EL . 2 7 . 0 0 EL . 2 6 . 0 0 EL . 2 5 . 9 4 EL . 2 6 . 0 7 EL . 2 5 . 0 7 EL . 2 3 . 3 5 EL . 2 4 . 7 8 EL . 2 4 . 2 4 EL . 2 5 . 0 4 E L . 2 6 . 9 5 EL. 26.80 EL. 26.65 EL . 2 6 . 0 0 2% D N 2% D N EL . 2 5 . 7 9 EL. 25.80 EL . 2 5 . 8 3 EL. 2 5 . 7 8 EL. 2 5 . 7 4 EL. 2 5 . 7 5 EL . 2 5 . 6 0 EL . 2 7 . 2 5 EL . 2 5 . 1 0 E L . 2 5 . 7 7 EL . 2 6 . 6 0 EL . 2 7 . 2 6 4% D N 3 % D N EL . 2 5 . 6 3 EL . 2 5 . 5 3 31 % D N EL . 2 5 . 4 0 EL . 2 5 . 3 0 EL. 2 5 . 4 0 EL . 2 5 . 6 3 EL . 2 7 . 2 6 EL . 2 7 . 1 6 EL . 2 5 . 0 0 EL. 2 4 . 9 0 EL . 2 5 . 0 0 15% D N EL . 2 7 . 2 5 EL . 2 7 . 1 6 EL. 2 6 . 4 5 EL. 2 6 . 3 0 EL. 2 7 . 6 6 EL . 2 7 . 6 6 EL. 2 7 . 5 6 EL . 2 7 . 3 7 28%DN 30%DN IN TREE PROTECTION AREA BOTTOM OF CHANNEL TO BE NO MORE THAN 100mm BELOW EXISTING GRADE INTERCEPTION SWALE TO CAPTURE, REDIRECT & INFILTRATE RUN-OFF FROM BUILT AREA IN TREE PROTECTION AREA BOTTOM OF CHANNEL TO BE NO MORE THAN 100mm BELOW EXISTING GRADE EL . 2 0 . 0 0 EL. 2 0 . 0 0 2% DN PROPOSED GRADE PROPOSED SLOPE EXISTING GRADE GRADING SYMBOL KEY INTERCEPTION SWALE TO CAPTURE, REDIRECT & INFILTRATE RUN-OFF FROM BUILT AREA PRIMARY INFILTRATION AREA EL. 2 4 . 0 0 EL. 2 4 . 0 0 EL. 2 4 . 0 0 EL . 2 6 . 4 5 INTERCEPTION SWALE TO CAPTURE, REDIRECT & INFILTRATE RUN-OFF FROM BUILT AREA A A B B 12 % D N C C EL. 2 7 . 0 5 EL . 2 7 . 1 3 EL . 2 6 . 5 5 EL. 2 6 . 5 5 EL. 2 6 . 4 5 EL . 2 7 . 2 5 EL . 2 7 . 1 6 EL. 2 7 . 1 5 EL . 2 6 . 3 5 FEATURE AREAS PRIMARY INFILTRATION AREA CAPTURE, REDIRECTION & INFILTRAION SWALE TREE PROTECTION AREA ABOVE T.O.B. GRADING NOTES 1.THE CONTRACTOR SHALL ESTABLISH GRADES SUCH THAT THERE IS, IN ALL AREAS, POSITIVE DRAINAGE TO AN ADJACENT DRAIN. MINIMUM SLOPES SHALL BE AS FOLLOWS: PEDESTRIAN PAVED AREAS 1% VEHICULAR PAVED AREAS 1% LAWN AREAS 2% PLANTED BEDS 5% 2.OVERALL DEPTH OF PLANTING MEDIUM AFTER SETTLEMENT SHALL BE: GRASS AREAS 150 MM SHRUB BEDS 450 MM GROUND COVER AREAS 300 MM TREES 600 MM RESTORATION AREA 100 MM (TILLED INTO UPPER 150MM OF EXISTING SOILS) N.B. ALL SOIL SHALL BE TESTED NOT MORE THAN 14 DAYS PRIOR TO INSTALLATION ON SITE. TESTING SHALL BE SPECIFIC TO THIS WORK. CONTRACTOR SHALL AMEND THE SOIL ACCORDING TO THE RECOMMENDATIONS OF THE SOILS TESTING LAB. 3.SEE ARCHITECTURAL DRAWINGS. 4.ALL RETENTION WORKS REQUIRED DUE TO UNANTICIPATED CONDITIONS AT THE TIME OF CONSTRUCTION SHALL BE DRY STACKED MODULAR CONCRETE BLOCKS. 5.REGRADING WITHIN TREE PROTECTION AREAS SHALL BE LIMITED TO THE ABSOLUTE MINIMUM REQUIRE TO MEET PATHWAY REQUIREMENTS AND DRAINAGE OBJECTIVE. SUCH WORK IS TO BE DONE ONLY UNDER THE SUPERVISION OF THE LANDSCAPE ARCHITECT AND THE ARBORIST. EL . 2 3 . 8 0 EL . 2 3 . 8 0 EL. 2 3 . 7 0 PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 2: 1 4 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 3 - 0 1 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L3-01 PRESERVE AREA GRADING & WATER MANAGEMENT PLAN 01 L3-01 PRESERVE AREA GRADING & WATER MANAGEMENT PLAN SCALE 1:150 NOTE: FOR GRADING OF FRONTAGE, DRIVEWAY AND PARKING PORTIONS OF SITE, SEE ARCHITECTURAL DWGS. (DP-100) EL . 2 2 . 7 5 EL.2 1 . 4 9 EL . 2 1 . 7 0 EL.2 2 . 3 0 EL . 2 2 . 1 2 EL.2 0 . 7 0 EL . 1 9 . 5 2 EL . 1 9 . 0 7 EL . 1 9 . 0 7 EL.1 9 . 7 5 EL . 2 5 . 4 9 EL . 2 5 . 6 2 EL . 2 5 . 7 7 EL . 2 5 . 9 0 EL . 2 5 . 6 6 EL.2 5 . 5 5 EL . 2 5 . 7 0 EL . 2 2 . 0 6 EL . 2 3 . 5 2 EL. 2 3 . 5 6 EL . 2 2 . 7 5 EL . 2 3 . 9 5 EL . 2 3 . 0 9 EL . 2 4 . 0 1 EL. 2 3 . 4 3 EL . 2 4 . 0 1 EL . 2 3 . 8 2 EL . 2 3 . 9 2 EL . 2 4 . 6 3 EL . 2 5 . 7 5 EL . 2 7 . 0 0 EL . 2 7 . 2 5 EL . 2 5 . 1 0 E L . 2 5 . 7 7 EL . 2 6 . 6 0 EL . 2 7 . 2 6 4% D N 3 % D N EL . 2 7 . 2 6 EL . 2 7 . 1 6 EL . 2 7 . 2 5 EL . 2 7 . 1 6 EL. 2 6 . 4 5 EL . 2 7 . 6 6 EL . 2 7 . 6 6 EL . 2 7 . 5 6 EL . 2 7 . 3 7 28%DN 30%DN INTERCEPTION SWALE TO CAPTURE, REDIRECT & INFILTRATE RUN-OFF FROM BUILT AREA EL . 2 7 . 0 5 EL. 2 7 . 1 3 EL . 2 6 . 5 5 EL . 2 6 . 5 5 EL. 2 6 . 4 5 EL . 2 7 . 2 5 EL. 2 7 . 1 6 EL. 2 7 . 1 5 EL . 2 6 . 3 5 EL . 2 9 . 4 8 EL . 2 9 . 8 8 EL . 2 9 . 9 0 EL . 2 9 . 6 8 EL . 2 9 . 3 6 EL. 2 8 . 2 0 EL. 2 9 . 3 0 EL. 2 9 . 3 4 EL . 2 9 . 3 4 4% D N 1% D N EL . 2 9 . 1 8 EL . 2 8 . 0 1 123 AVENUE 22 2 S T R E E T PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 3: 0 4 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 3 - 0 2 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L3-02 GRADING PLAN 01 L3-02 123 FRONTAGE GRADING PLAN SCALE 1:150 25.00 26.00 27.00 28.00 MIXED PLANTING MEADOWSWALEMIXED PLANTING MEADOW RIPARIAN AREA 25.00 26.00 27.00 28.00 MIXED PLANTING MEADOW SWALE RIPARIAN AREA MIXED PLANTING MEADOW 25.00 26.00 27.00 28.00 24.00 23.00 22.00 21.00 RIPARIAN AREA TREE PRESERVATION AREA TREE PRESERVATION AREA 1500 BUFFER ZONE MIXED PLANTING MEADOW 1500 BUFFER ZONE 1500 BUFFER ZONE PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 2: 2 8 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 3 - 1 0 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L3-10 SECTIONS 02 L3-00 SECTION B-B SCALE 1:100 01 L3-00 SECTION A-A SCALE 1:100 03 L3-00 SECTION C-C SCALE 1:100 RESIDENTIAL BUILDING UNDISTURBED AREA TO REMAIN IN CURRENT CONDITION AREAS BELOW EXISTING TREES TO REMAIN UNDISTURBED WHERE POSSIBLE - MITIGATE WITH SHRUB AREA MIX WHERE DISTURBANCE OCCURS MEADOW AREA (TYP.) w/Cornus Dicentra Oxalis Mix CENTRAL INFILTRATION SWALE (TYP.) w/Carex Iris Juncus Mix 123 AVENUE 22 2 S T R E E T CENTRAL INFILTRATION SWALE (TYP.) w/Carex Iris Juncus Mix AREAS BELOW EXISTING TREES TO REMAIN UNDISTURBED WHERE POSSIBLE - MITIGATE WITH SHRUB AREA MIX WHERE DISTURBANCE OCCURS SHRUB AREA (TYP.) w/Gaultheria Mahonia Rubus Mix SHRUB AREA (TYP.) w/Gaultheria Mahonia Rubus Mix 1. COMPLIANCE, GOVERNMENT - ALL WORK SHALL BE COMPLETED TO THE SATISFACTION OF THE CITY OF MAPLE RIDGE AND SHALL COMPLY WITH ALL STANDARDS AND REGULATIONS OF THE SAME. CONTRACTORS SHALL ENSURE COMPLIANCE OF ALL WORK PRIOR TO INSTALLATION. 2. COMPLIANCE, STANDARD - ALL MATERIAL, SHIPPING PROCEDURES, AND INSTALLATION OF LANDSCAPE ELEMENTS SHALL CONFORM TO LATEST EDITION OF THE CANADIAN LANDSCAPE STANDARD AVAILABLE AT COMMENCEMENT OF WORK. 3. COMPLIANCE, MMCD - ALL WORKS SHALL CONFORM TO THE LATEST MMCD DETAILS AND SPECIFICATIONS AVAILABLE AT COMMENCEMENT OF WORK WHERE NO SPECIFIC DETAIL, NOTE OR SPECIFICATION IS PROVIDED IN THE DRAWING SET OR ATTACHED MATERIALS. 4. EXISTING SERVICES - REFER TO ENGINEERING DRAWINGS FOR LOCATIONS OF ALL BURIED SERVICES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL UTILITIES LOCATIONS AND ANY AND ALL COSTS WHICH ARISE FROM DAMAGE TO SERVICES CAUSED BY ANY ACT OR FAILURE TO ACT OF THE CONTRACTOR. 5. COORDINATION - THESE DRAWINGS SHALL BE TAKEN TO BE PART OF THE LARGER SET OF DRAWINGS AND SPECIFICATIONS, WHETHER DIRECTLY ATTACHED OR NOT, ISSUED FOR THE CONSTRUCTION OF THE ASSOCIATED BOULEVARD WORKS. THESE DRAWINGS SHALL BE READ IN CONCERT WITH SUCH DOCUMENTATION AND, WHERE CONFLICTS ARISE, THE CONTRACTOR SHALL IMMEDIATELY REPORT SUCH CONFLICTS TO THE LANDSCAPE ARCHITECT. THE WORK IS TO BE DONE IN COORDINATION WITH THE CONTRACTOR OR CONTRACTORS ENGAGED IN CONSTRUCTION OF SUCH ADJACENT WORKS. 6. CONCRETE, FORMS - THE CONTRACTOR SHALL COMPARE DIMENSIONS PROVIDED WITH SITE CONDITIONS AND IMMEDIATELY REPORT ANY DISCREPANCIES TO THE LANDSCAPE ARCHITECT AND THE ENGINEER. ONCE COMPLETED THE CONTRACTOR SHALL CALL FOR INSPECTION OF THE FORMS PRIOR TO PLACING STEEL REINFORCEMENT. CONTACT LANDSCAPE ARCHITECT A MINIMUM OF 48 HOURS PRIOR TO DESIRED INSPECTION TIME. 7. CONCRETE, REINFORCEMENT - ALL CONCRETE REINFORCEMENT SHALL BE INSPECTED AND APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO POURING OF CONCRETE. CONTACT STRUCTURAL ENGINEER A MINIMUM OF 48 HOURS PRIOR TO DESIRED INSPECTION TIME. 8. GRADING, GENERAL - THE CONTRACTOR SHALL ESTABLISH GRADES SUCH THAT THERE IS, IN ALL AREAS, POSITIVE DRAINAGE TO AN ADJACENT DRAIN. MINIMUM SLOPES SHALL BE AS FOLLOWS: PEDESTRIAN PAVED AREAS 1% VEHICULAR PAVED AREAS 1% LAWN AREAS 2% PLANTED BEDS 5% 9. GRADING, ALLOWANCES AND TOPSOIL PLACEMENT - OVERALL DEPTH OF PLANTING MEDIUM AFTER SETTLEMENT SHALL BE: GRASS AREAS 150 MM SHRUB BEDS 450 MM GROUND COVER AREAS 300 MM TREES 600 MM N.B. ALL SOIL SHALL BE TESTED NOT MORE THAN 14 DAYS PRIOR TO INSTALLATION ON SITE. TESTING SHALL BE SPECIFIC TO THIS WORK. CONTRACTOR SHALL AMEND THE SOIL ACCORDING TO THE RECOMMENDATIONS OF THE SOILS TESTING LAB. 10. GRADING, BUILDING FINISHED FLOOR & CORNER ELEVATIONS - SEE ARCHITECTURAL DRAWINGS. 11. PLANT MATERIAL, QUANTITIES - CONTRACTOR SHALL CONFIRM ALL PLANT MATERIAL QUANTITIES. ANY DISCREPANCIES BETWEEN THE PLANT LIST AND THE DRAWING SHALL BE REPORTED TO THE CONSULTANT. IN CASE OF DISCREPANCY CONTRACTOR SHALL INSTALL PLANT MATERIAL AS PER DRAWING. IN CIRCUMSTANCES WHERE THERE IS A DISCREPANCY BETWEEN GROUND COVER QUANTITY AND SPACING THE SPACING REQUIREMENT WILL PREVAIL. 12. PLANT MATERIAL, SUBSTITUTIONS - NO SUBSTITUTIONS TO PLANT LIST SHALL BE MADE BY CONTRACTOR WITHOUT PRIOR WRITTEN AUTHORIZATION FROM CONSULTANT. 13. PLANT MATERIAL, HEALTH - ALL PLANT MATERIALS MUST BE DISEASE FREE FROM CERTIFIED NURSERIES. 14. MULCH - ORNAMENTAL PLANTING AREAS ALONG THE ROAD FRONTAGES AND IN THE PARING AREAS SHALL BE MULCHED WITH 50 MM OF HEM/FIR BARK MULCH. THE USE OF CEDAR MULCH OR ANY MIX CONTAINING CEDAR IS NOT PERMITTED. NATURESCAPED AREAS SHALL NOT BE MULCHED. GENERAL NOTES GT CN gs pm SIZESCIENTIFIC NAMEQTY COMMON NAME MATURE SIZECOMMENTSCODE SPACING PLANT LIST DECIDUOUS TREES COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING BROADLEAF EVERGREEN SHRUBS COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING FERNS COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING GROUND COVERS GT 1 Gleditsia triacanthos Honey Locust 6 cm cal 150cm standard B&B min. 50cm root ball dia. 20m height 20.0m spread as shown CN 2 Cornus 'Eddies White Wonder'White Wonder Dogwood 6 cm cal.150cm standard B&B min. 50cm root ball dia. 6.0m height 4.5m spread as shown ah 52 Azalea japonica 'Hino Crimson'Crimson Japanese Azalea #2 pot minimum 20cm height 100cm height 120cm width 60cm pm 30 Polystichum munitum Swordfern #1 pot minimum 30cm height 100cm height 100cm width 60cm gs 24 Gaultheria shallow Salal #1 pot minimum 30cm height - heavy 100cm height 150cm width 60cm cij 375 Carex Iris Juncus Mix Pacific Pleeding Heart plug 50% Carex densa + 10% Carex vulpinoidea + 10% Iris douglasiana +30% Juncus balticus 50cm o.c. ah COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING DECIDUOUS EVERGREEN SHRUBS la 16 Lavandula angustifolia English Lavender #2 pot minimum 20cm height 70cm height 70cm width 75cm rs 47 Ribes sanguineum Flowering Currant #2 pot minimum 50cm height 300cm height 20cm width 75cmrs COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING VINES gf 7 Lonicera 'Gold Flame'Gold FlameHoneysuckle #5 potgf vo 42 Vaccinium ovatum'Thunderbird'Evergreen Huckleberry #2 pot minimum 20cm height 180cm height 150cm width 75cmvo cs 88 Cornus sericea Red Osier Dogwood #2 pot minimum 50cm height 200cm height 200cm width 75cm cf 165 Cornus sericea 'Flaviramea'Yellowtwig Dogwood #2 pot minimum 50cm height 200cm height 200cm width 75cmcf cs AC AC 5 Acer circinatum Vine Maple 2.5m clumpB&B min. 60cm root ball dia.4.5m height 4.5m spread as shown cdo1040 Cornus Dicentra Oxalis Mix Redwood Sorrel/Bleeding Heart plug 25% Cornus canadensis + 25% Dicentra formosa + 50% Oxalis oregana 50cm o.c. arc 48 Arctostaphylos uva-ursi Kinnikinnick 10cm pot 30cm o.c. COMMENTSSCIENTIFIC NAMEQTY COMMON NAME MATURE SIZESIZECODE SPACING CONIFEROUS TREES TS 16 Tsuga heterophylla Western Hemlock 3.5m B&B B&B min. 50cm root ball dia.50m height 15m width as shown TP 14 Thuja plicata Western Red Cedar 2.5 m B&B B&B min. 50cm root ball dia.40m height 15m width as shown TS TP pf pf 28 Photinia f. 'Little Red Robin'Christmas Berry #5 pot minimum 60cm height 150cm height 100cm width 150cm oo2412 Gaultheria Mahonia Rubus Mix Redwood Sorrel plug 30% Gaultheria shallon + 40% Mahonia repens + 10% Rubus spectabilis + 20% Vaccinium vitis-idaea 50cm o.c. la Lawn Shade Tolerant Blend la AJ 3 Acer palmatum 'Sango Kanku'Coral Bark Maple 2 m clump B&B min. 50cm root ball dia.4.5m height 4.5m spread as shownAJ mn 212 Mahonia nervosa Cascade Mahonia #2 pot minimum 30cm spread 60cm height 60cm width 75cmmn PL O T D A T E : Ju n e 4 , 2 0 2 4 T I M E : 4: 0 1 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 4 - 0 0 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L4-00 OVERALL PLANTING PLAN 01 L4-00 OVERALL PLANTING PLAN SCALE 1:300 1 AC 10 cs5 pf 16 pf 23 cf 7 cs19 cf 37 mn 4 mn 1 pf 1 pf 32 mn 1 pf 7 mn 8 mn 8 mn 18 mn 8 mn 8 mn 4 mn 22 mn 7 mn 8 mn 4 mn 7 mn 1 pf 1 pf 4 mn 8 mn 8 mn 8 mn 2 mn RESIDENTIAL BUILDING Acer rubrum 'Red Sunset'Acer rubrum 'Red Sunset' PL O T D A T E : Ju n e 4 , 2 0 2 4 T I M E : 4: 1 0 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 4 - 0 1 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L4-01 PLANTING PLAN 01 L4-01 PLANTING PLAN - SOUTHERN PORTION SCALE 1:100 1 AC 1 AC 1 TP 10 cs 21 cf 1 AC 1 TS 1 TP 1 TP 20 cs 1 TP 8 cf 1 TS 7 cf 5 pf 4 pf 27 vo 24 gs 9 cs 1 TS 1 TP 1 TP 1 AC 1 CN 16 cf 16 rs 4 vo 11 vo 4 rs 11 rs 8 cs 1 TP 8 rs 1 CN 8 rs 1 TP 10 cf 16 pm 1 TS 1 TS 27 cf 1 TS 1 TP 7 cs19 cf 1 TS 27 cf 1 TS PL O T D A T E : Ju n e 4 , 2 0 2 4 T I M E : 4: 1 6 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 4 - 0 2 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L4-02 PLANTING PLAN 01 L4-02 PLANTING PLAN - CENTRAL PORTION SCALE 1:100 02 L4-02 PLANTING PLAN - CENTRAL WEST WEDGE SCALE 1:100 NOTE: SEE 02 ABOVE FOR WESTERN EXTENT OF PLANTING 27 vo 24 gs 1 TS 9 cs 1 AC 1 TS 15 cf 1 TS 1 TS 1 TS 1 TP 1 TS 13 cs 1 TP 15 cf 1 TP 1 TP 11 cs 1 TP 1 GT 1 TS 1 TP 9 cs 1 TS 1 TP 1 TP 1 CN 16 cf 16 rs PL O T D A T E : Ju n e 4 , 2 0 2 4 T I M E : 4: 3 9 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 4 - 0 3 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L4-03 PLANTING PLAN 01 L4-03 PLANTING PLAN - NORTHERN PORTION SCALE 1:100 ag AJ AJ ag ag ag ag ag ag ag ag gf gf ah ah ah ah ah ah ah ah ah ah ah ah ah ah ah ah ah ah pm pmpm pm pm pm pm pm AJpm pmpm pm pm pm ag ag ag ag gf gf gf gf gf ag agag ag agah ah ah ah ah ah ah ah ah ah ag agah ah ah ah ah ah ah ah ah ah ag agah ah ah ah ah ah ah ah ah ah ah ah ah ah la la la la la lala la la lala la la lala la PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 10 : 3 3 A M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 4 - 0 4 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L4-04 PLANTING PLAN 01 L4-04 PLANTING PLAN - EIGHTH FLOOR PATIO SCALE 1:100 OF SODDED AREA USED FOR PERIMETER FULL ROW OF SOD TO BE SL O P E DO W N DO W N SL O P E PLANTING AREA OR WALKWAY SOD TO BE LAID CLOSELY PACKED TOGETHER, JOINTS IN ADJACENT ROWS SHALL BE STAGGERED COMPACTED SUBGRADE FLUSH WITH PAVED AREA (IF APPLICABLE) SOD FLUSH WITH CURBS (IF APPLICABLE) PLAN VIEW OF SOD LAYOUT AND EDGING NOT TO SCALE SECTION THROUGH SOD SOIL LEVEL: TO BE SLIGHTLY HIGHER THAN SURROUNDING GRADE TO ALLOW FOR BACKFILL SETTLING. UNDISTURBED NATIVE SOIL PRUNE ONLY DEAD, BROKEN, OR DISEASED LIMBS TO MAINTAIN NATURAL FORM OF SHRUB. 75mm MIN. DEPTH BARK MULCH OR APPROVED EQUAL. TAPER MULCH TO BASE OF SHRUB. REESTABLISH ANY DAMAGED SEED / SOD. POTTED ROOT CONIFEROUS OR DECIDUOUS SHRUB MIN. 450 mm BACK OF PLANTING BED EDGE Less than 100mm caliper (optional) SPADE CUT EDGE 100 TYP. GALVANIZED GUY WIRE No. 11 MIN. POSITIONED ABOVE FIRST STRONG BRANCHES. NEW 2 PLY / 12mm, REINFORCED BLACK RUBBER HOSE OR APPROVED EQUAL. POSITIONEDAPPROX. 3/5 HT. FOR ALL TREES. WIRE DOES NOT GO AROUND TREE. USE THREE (3) 50mm X 50mm X 2500mm LNG. STUDDED HEAVYWEIGHT T-POSTS (7.5 POUND). ALL EXPOSED PORTIONS OF TREE STAKE TO BE FREE OF RUST AND PRIMED. TREE STAKE SET MIN. 900mm INTO UNDISTURBED SOIL W/ ONE ON SIDE OF PREVAILING WINDS. STAKES ARE TO BE REMOVED AFTER ONE GROWING SEASON. 3X ROOT BALL DIAMETER 10 0 n.t.s.STAKING PLAN TAMP TOP SOIL AROUND ROOTBALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. B&B ROOTBALL n.t.s.DETAIL TOPSOIL, REFER TO TOP SOIL SPECS. 400mm COMPACTED LOAM BELOW ROOT BALL. 75mm MIN. DEPTH BARK MULCH OR APPROVED EQUAL OVER EXPOSED ROOTBALL. TAPER MULCH TO BASE OF TREE. MULCH STARTING 50mm FROM ROOT FLARE (TRUNK) & EXTENDING THE HOLE. PRUNE ONLY DEAD, BROKEN, OR DISEASED TREE LIMBS TO MAINTAIN NATURAL FORM OF TREE. IF TREE IS IN WIRE BASKET, CUT AND REMOVED STRAPPING AND THE HORIZONTAL/ VERTICAL WIRES OF THE BASKET TO A MIN. DEPTH OF 200mm FROM TOP OF ROOTBALL. PULL BACK BURLAP TO MIN. DEPTH. UNDISTURBED NATIVE SOIL SCARIFY WALL OF TREE WELL. EVERGREEN CONIFEROUS BROADLEAF DECIDUOUS * ANGLE STAKES $7ƒ SLOPE TOPSOIL FROM ROOT BALL TO EDGE OF HOLE TO FORM WELL. SINGLE LEADER (unless multistem species is specified) DO NOT DAMAGE OR CUT LEADER 150 REMOVE CONTAINER AND LOOSEN ROOTS OF POTBOUND PLANTS BY SCORING OR PULLING. 45 0 M I N . 450mm MIN. DEPTH LIGHTLY COMPACTED TOPSOIL REFER TO TOP SOIL SPECS. 15 0 M I N . 150mm MIN. DEPTH LIGHTLY COMPACTED TOPSOIL REFER TO TOP SOIL SPECS. 60 0 M I N . PL O T D A T E : M a y 2 9 , 2 0 2 4 T I M E : 2 : 3 3 P M F U L L P A T H A N D F I L E N A M E : D : \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 5 - 0 1 . D W G P L O T S Y L E T A B L E : - - - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L5-01 DETAILS 02 L5-01 TREE INSTALLATION SCALE 1:20 01 L5-01 SHRUB INSTALLATION SCALE 1:20 03 L5-01 GRASS INSTALLATION SCALE 1:20 04 L5-01 500 1600 15 0 75 102x102 MW13.3/MW13.3 BENCH (TYP.) MODEL: QUEEN CHAROLETTE MANUF.: SARITA 50 0 500x150 P/T HEM/FIR RAIL COMPACTED GRAVEL FINISH GRADE 150x150 P/T HEM/FIR POST 400 60 0 400 60 0 75 67 5 50 0 60 0 9 GA. x 50 SQUARE CHAIN LINK FENCE MESH w/ BLACK VINYL COAT COMPACTED GRAVEL FINISH GRADE 100 DIA. P/T HEM/FIR POST 400 SECTIONINTERIOR ELEVATION 400 60 0 60 0 75 67 5 50 0 10 0 60 0 10 0 10 0 12 5 0 50 0 10 0 100 DIA. P/T HEM/FIR RAIL 400 60 0 10 0 10 0 12 5 0 50 0 10 0 100 DIA. P/T HEM/FIR RAIL 50 150GROUND LEVEL TO BE FLUSH w/ SURFACE OF PAVER 34" MINUS COMPACTED GRAVEL BED 15 0 SECTION PLAN VIEW PRECAST CONCRETE SLABS SIZE: 600 x 600 (24" x 24") FINISH: SANDSTONE 5mm CLEAR CRUSH OPEN GRADED PAVING COURSE @ 500mm DEPTH 20mm CLEAR CRUSH OPEN GRADED AGGREGATE UPPER SUB-BASE @ 100mm DEPTHNON-WOVEN GEOTEXTILE NILEX 4510 OR EQUIVOLENT SECTIONINTERIOR ELEVATION 10 0 1% CROSS-SLOPE 10 0 EXPANSION JOINT 6000mm O.C. (TYP.) ZIP STRIP @ 1500mm O.C. 102 x 102 MW13.3/MW13.3 100mm x 250mm C.I.P. CONC. CURB STOP w/2 x #3 REBAR AS SHOWN CONCRETE UNIT PAVERS TYPE: AS PER LAYOUT PLAN PATTERN: AS PER LAYOUT PLAN COLOUR: AS PER LAYOUT PLAN 5mm CLEAR CRUSH OPEN GRADED BEDDING COURSE @ 50mm DEPTH 20mm CLEAR CRUSH OPEN GRADED AGGREGATE UPPER SUB-BASE @ 100mm DEPTH INBITEX GEOTEXTILE GEOTEXTILE BROUGHT UP TO CURB AND CUT FLUSH WITH SURFACE OF AQUAPAVE NOTE: DETAIL SUBJECT TO CO-ORDINATION & REVIEW BY ENGINEER. ENGINEER'S DETAIL SHALL GOVERN. ȕ ALLAN BLOCK WALL BATTER FROM VERTICAL 100 mm TOE DRAIN INFILL BLOCK CAVITY WITH COMPACTED 20MM MINUS GRAVEL UNDISTURBED SUBGRADE OR FILL COMPACTED TO 95% S.P.D. MI N . 4 0 0 AS R E Q . 10 0 3 ALLAN BLOCK WALL BATTER FROM VERTICAL 100 mm TOE DRAIN DRAIN ROCK MI N . 4 0 0 AS R E Q . 10 0 460 50mm RIVER ROCK @ 100mm DEPTH NON-WOVEN GEOTEXTILE NILEX 4510 OR EQUIVOLENT PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 2: 3 4 P M F U L L P A T H A N D F I L E N A M E : D: \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 5 - 0 2 . D W G P L O T S Y L E T A B L E : -- - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L5-02 DETAILS 03 L5-02 PAVING SLABS SCALE 1:20 01 L5-02 BENCH SCALE 1:20 02 L5-02 GRAVEL TRAIL SCALE 1:20 06 L5-02 POST & RAIL FENCE SCALE 1:20 08 L5-02 CONCRETE UNIT BLOCK WALL SCALE 1:20 04 L5-02 CONCRETE PAVING SCALE 1:20 05 L5-02 CONCRETE UNIT PAVING SCALE 1:20 07 L5-02 CHAIN LINK FENCE SCALE 1:20 09 L5-02 RIVER ROCK PAVING SCALE 1:20 PL O T D A T E : Ma y 2 9 , 2 0 2 4 T I M E : 2 : 4 1 P M F U L L P A T H A N D F I L E N A M E : D : \ P R O J E C T S \ D 2 0 - 0 0 7 1 2 2 2 S T M R \ 5 0 0 - D E L I V \ L A N D \ 0 1 - T B \ L 5 - 0 3 . D W G P L O T S Y L E T A B L E : - - - - Project No. Check Scale (may be photo reduced) 0 1inch 10mm0 Drawing Title Project Leader Drawing No. Consultants This drawing shall not be used for construction purposes until the seal appearing hereon is signed and dated by the Landscape Architect. DATE ISSUED FOR Architectural: Arborist: Civil: Structural: Mechanical: Electrical: This drawing has been prepared solely for the use of the CLIENT and there are no representations of any kind made by Donald V. S. Duncan to any party with whom Donald V. S. Duncan has not entered into a contract. 603 - 220 Eleventh Street New Westminster BC Canada V3M 6N9 778-791-4323 dvsduncan@gmail.com 20-0071 12297 222 St/22175, 22185 123 Ave Maple Ridge BC Residential Development prepared for: D.Duncan D.Duncan JMArchitecture Inc. - DrawnO Revision Maple Ridge # 2018-255-RZ/DP All dimensions shall be confirmed on site and discrepancies reported immediately. Required setbacks shall govern in all cases. 2023-11-23 D.P. 2024-04-05 D.P. 2024-04-18 A.D.P. 2024-04-29 D.P. L5-03 DETAILS 01 L5-03 KOMPAN PLAY HUT NRO404 N.T.S. 02 L5-03 SUTTLE RECREATION CLIMBER N.T.S. Development Permit No: 2020-309-DP / 12297 222 ST, 22175 123 AVE, 22185 123 AVE Note: V. Nguyen recused herself from the agenda item due to a conflict of interest. The Chair welcomed the project team to the meeting. The project team presented the development plans and answered questions from the Panel. R/2024-ADP-012 It was moved and seconded That the following concerns be addressed and digital versions of revised drawings and memo be submitted to Planning staff; and further the Planning staff forward this on to the Advisory Design Panel for information and review. CITY REQUESTED COMMENTS FROM ADP Please comment on the overall form and character of this development and identify issues that the applicant should be aware of. Architectural Comments: •Parking: Ensure parking level stairs/elevator vestibules conform to code. Some appear to meet code, and some have yet to be considered. •Design rendering: Consider using a more realistic rendering to illustrate that the building is highly technical as described. In particular, the cladding in the renderings appear as concrete, though they are described as fully solar panel, which makes it difficult to determine whether the building fits into the local urban fabric. •Pedestrian access: Consider better pedestrian access to the front lobby of the building residences to encourage public transportation use. •Lighting: Consider addressing the covered area in front of the recessed lobby with better lighting and a safer cross walk with center landscape median. •Design rendering: Consider including a sample picture of the solar panels to provide a more realistic understanding of the materials. Also, consider using a more vibrant color of solar panel. •Vehicle charging stations: Consider installing charge stations for electric vehicles with the anticipated excess electricity generated by the solar panels. Landscape Comments: •Overall landscape: Consider alignment of the swale/planting/and post/rail fence. Some areas of the fence cut through the swale. APPENDIX G • Site Permeability: Designs suggest that the ground materials are all permeable. Consider providing design to the granular pathway and a more attractive approach to the youth recreation area. • Overall landscape: Consider working with the City, within their restrictions, to improve the north landscape site as it is very dull and there is room for improvement. • Youth recreation area: Consider improvements as there is very little play value there and a lot of lost opportunity. • Front driveway entrance round-about: The spiral pattern is a little on point. Consider using different paving materials and/or including another small plant bed. • Bike Racks: Consider whether the front entrance bike rack area is tight. • Outdoor seating: Consider whether to use a material other than wood benches as they cannot be secured which may be a concern in a rental building. • Pathway materials: Consider whether to use a smaller granular material such as pea gravel rather than river rock as the path will have movement and larger rocks may be difficult to walk on. • Trees near the covenant: Once Fortis BC assigns a consultant to work with the project team, there will likely be some potential for trees outside of the 10 meter mark. Consider including trees in this area with the input of the Fortis BC consultant. • Plant list: The size of some of the species on the plant list appear to be out of proportion to availability, such as lavender pot size 5 seems large, and red and yellow dogwoods appear to be small. • Daycare parking: Consider denoting a walkway from the daycare parking spaces to the front door of the daycare. • Landscape materials: Consider introducing a coil form into the landscape. CARRIED1 N. MCGARVEY WAS OPPOSED 1 This resolution is subject to endorsement of meeting minutes at the next Advisory Design Panel regular meeting. JM Architecture Inc. Registered in BC - AB Joe M. Minten - principal Architect AIBC | AAA | MRAIC Unit 107 – 15055 54A Ave. Surrey, B.C. V3S 5X7 604 583-2003 -T joe@jmarchitecture.ca- E www.jmarchitecture.ca 29 May 2024 City of Maple Ridge 11995 Haney Place Maple Ridge, B.C. Planning Department Attention: Maryam Lotfi – Planner Re: 2019-255 RZ Please accept this itemized response to the Advisory Design Panels review comments of May 15, 2024 We trust this letter and the accompanying architecture and landscape plans address the intent of the review comments. ADP Comments May 15, 2024 File No.2019- 255-RZ Architectural Comments Item No. City of Maple Ridge Comment Design Team Response Reference Document A Parking: Ensure parking level stairs/elevator vestibules conform to code. Some appear to meet the code, and some have yet to be considered. JMA: Parking level stair & elevator vestibules are code compliant. Refer to Architectural sheets # DP- 102 & DP- 102_P1 & P2 Floor Plan B Design rendering: Consider using a more realistic rendering to illustrate that the building is highly technical as described. In particular, the cladding in the renderings appear as concrete, though they are described as fully solar panel, which makes it difficult to determine whether the building fits into the local JMA: As instructed by our client, the work for the 3d-renders is in progress and you should have the renderings sometime next week. JM Architecture Inc. Registered in BC - AB Joe M. Minten - principal Architect AIBC | AAA | MRAIC Unit 107 – 15055 54A Ave. Surrey, B.C. V3S 5X7 604 583-2003 -T joe@jmarchitecture.ca- E www.jmarchitecture.ca urban fabric. C Pedestrian access: Consider better pedestrian access to the front lobby of the building residences to encourage public transportation use. JMA: Sidewalks have been proposed from 222 St. and 123 Ave leading to the daycare entrance & the residence main entrance lobby. Please refer to Architectural drawing sheet # DP- 100A_Site Plan D Lighting: Consider addressing the covered area in front of the recessed lobby with better lighting and a safer cross walk with center landscape median JMA: Noted. An efficient and effective lighting plan for the covered drive aisle will be proposed at the building permit stage. E Design rendering: Consider including a sample picture of the solar panels to provide a more realistic understanding of the materials. Also, consider using a more vibrant color of solar panel. JMA: Please use the links below to refer to more realistic images of solar cladding and solar railing used in different parts of Canada by Mitrex, the solar cladding company for the project. For Solar Cladding: https://www.mitrex.com/projects/capital-towers https://www.mitrex.com/projects/hospital-in-alberta https://www.mitrex.com/projects/carrtera-avonhead https://www.mitrex.com/projects/midland-courthouse https://www.mitrex.com/projects/1451-wellington-st For Solar Railing: https://www.mitrex.com/projects/1154-wilson-ave F Vehicle charging stations: Consider installing charge stations for electric vehicles with the JMA: Noted. We will review this in detail at a later stage. JM Architecture Inc. Registered in BC - AB Joe M. Minten - principal Architect AIBC | AAA | MRAIC Unit 107 – 15055 54A Ave. Surrey, B.C. V3S 5X7 604 583-2003 -T joe@jmarchitecture.ca- E www.jmarchitecture.ca anticipated excess electricity generated by the solar panels. Landscape Comments H Overall landscape: Consider alignment of the swale/planting/and post/rail fence. Some areas of the fence cut through the swale. DVS: The alignment of the infiltration swale will be adjusted to avoid contact with the fence. I Site Permeability: Designs suggest that the ground materials are all permeable. Consider providing design to the granular pathway and a more attractive approach to the youth recreation area. DVS: The current alignment of the trail, which sits against the foundation of the building, is mandated by Planning and intended to minimize impact of the areas to be naturalized. If Planning revises its directive and prefers that the trail be moved away from the building foundation and given a more meandering character, as proposed in our previous design, our design will be amended accordingly. J Overall landscape: Consider working with the City, within their restrictions, to improve the north landscape site as it is very dull and there is room for improvement. DVS: The landscape architect will entertain any substantive suggestions the City wishes to make regarding the north landscape. He will make himself available for discussions at the convenience of city staff. K Youth recreation area: Consider improvements as there is very little play value there and a lot of lost opportunity. DVS: The recreation area was designed based on the discussions with Planning that appeared to request an absolutely minimal installation of structures in this area. The landscape architect will entertain any substantive suggestions the City wishes to make regarding the recreation area. He will make himself available for discussions at the convenience of city staff. JM Architecture Inc. Registered in BC - AB Joe M. Minten - principal Architect AIBC | AAA | MRAIC Unit 107 – 15055 54A Ave. Surrey, B.C. V3S 5X7 604 583-2003 -T joe@jmarchitecture.ca- E www.jmarchitecture.ca L Front driveway entrance round-about: The spiral pattern is a little on point. Consider using different paving materials and/or including another small plant bed. DVS: Additional colours will be added to the paving pattern to accentuate the design. M Bike Racks: Consider whether the front entrance bike rack area is tight. DVS: The location of the bike racks will be reviewed but do meet current requirements for clearances. JMA: Please refer to the detailed measurements shown in the images below. All the short-term bike parking spaces adhere to zoning bylaws. Also, there are a couple of bicycle parking stalls near the daycare entrance. Refer to Architectural Drawing Sheet # DP- 100A_Site Plan. N Outdoor seating: Consider whether to use material other than wood benches as they cannot be secured which may be a concern in a rental building. DVS: The wooden benches will be secured with two steel angle brackets as per detail 01/L5-02 of the submitted set. O Pathway materials: Consider whether to use a smaller granular material such as pea gravel rather than river rock as the path will have movement and larger rocks may be difficult to walk on. DVS: No pathways are specified as river rock. Pathways will be constructed of 5mm minus clear crush over a 20mm clear crush base as per detail 02/L5-02 of the submitted set. The bands of river rich in the front lawn are ornamental elements edging planting beds. A central concrete walkway is provided through the bands leading from the 123 Avenue frontage to the autocourt. JM Architecture Inc. Registered in BC - AB Joe M. Minten - principal Architect AIBC | AAA | MRAIC Unit 107 – 15055 54A Ave. Surrey, B.C. V3S 5X7 604 583-2003 -T joe@jmarchitecture.ca- E www.jmarchitecture.ca P Trees near the covenant: Once Fortis BC assigns a consultant to work with the project team, there will likely be some potential for trees outside of the 10 meter mark. Consider including trees in this area with the input of the Fortis BC consultant. DVS: Previous information provided by and communications with Fortis have indicated that trees will not be allowed in this area. However, we will review the matter with Fortis again. Q Plant list: The size of some of the species on the plant list appear to be out of proportion to availability, such as lavender pot size 5 seems large, and red and yellow dogwoods appear to be small. DVS: Container sizes will be reviewed and adjusted as necessary. R Daycare parking: Consider denoting a walkway from the daycare parking spaces to the front door of the daycare. DVS: This issue will be addressed by architecture. S Landscape materials: Consider introducing a coil form into the landscape. DVS: Inclusion of such a form will be considered. Please confirm acceptance of this report by reply email. Best Regards Joe Minten Architect AIBC | AAA | MRAIC PRINCIPAL APPENDIX H May 31 2024 2019-255-RZ PUBLIC INFORMATION MEETING FOR DEVELOPMENT Dear neighbour, You are invited to attend A public Information meeting to review and discuss the proposed development at 12297 222 Street and 22175 & 22185 123 Avenue Maple Ridge. The intent of this Public Meeting to seek input from the area residents on the proposed amendments and address any questions which may arise. The proposal includes the following components: Official Community Plan Amendment from RS1 (Single Detached Residential) to CD-6-21 (Medium Density Mixed Use Rental and Market Apartment Residential) The current application is to build an 8 story rental building It will provide 106 units of rental accommodation It will preserve a large area of riparian green-space MEETING DATE JUNE 13 2024 From 5:30 PM To 7:45 PM LOCATION MAPLE RIDGE PUBLIC LIBRARY 130-22470 Dewdney Trunk Road Maple Ridge BC Details of the proposed development will be presented at the Development Information Meeting. The proponent and consultants will be available throughout the meeting to answer any questions and to get your input on the proposal prior to proceeding to Council for further consideration. Please also NOTE that this is not a public hearing notice. Please join us. Your thoughts are important to us. If you are unable to join the meeting and require further information, please call Chuck at Civic Visions 604 290 6216,engagement@civicvisions.ca or city of Maple Ridge Planning Dept. 604 467 7341. Sincerely, Shahin, Simplex Meadows Development. PUBLIC INFORMATION MEETING REPORT JUNE 13 2024 130-22470 Dewdney Trunk Road Maple Ridge The public Information meeting for 12297 222 Street and 22175 &22185 123 Avenue No.2019-255 RZ was held at the Maple Ridge Public Library on June 13 2024 from 5:30 to 7:45 PM. In Attendance for the development were Shahin Soheili from Simplex Meadows Development Ltd.,Joe Minten from JM Architecture,Donald Duncan from Donald VS Duncan Development Consultant Landscape Architect,Anthony Vermeuleiv from Quad Lock Air Foam,and Chuck Puchmayr from Civic Visions Inc. We presented 17 foam display boards showing all aspects of this development and landscape profile. It showed the complexity of building on this site and addressed the need for the significant riparian setback areas required to meet Provincial and Civic requirements. The foam insulation sample was presented to show how this development plans to achieve the superior R-Value of insulation and how it will resist the conductive flow of heat. Samples of the Solar panels were presented to show how this development will be clad with the ability to generate vast sources of clean energy. Eleven members of the public signed in,representing 13 people. Seven written comments were received (enclosed).Five of the comments were in opposition with four of those comments being opposed to the height of the building. One comment expressed concern related to parking,increased traffic and crime. Two of the comments were strongly in favor of this development,with one of the two expressing a need to house “people with needs and limitations physically and financially.” Another supporter was pleased with how we were “protecting the natural features on the site”she went on to state that,“I hope Maple Ridge approves this development ASAP.” Those expressing negative concerns lived in close proximity to the development. Please contact me,should you require anything further pertaining to this engagement. Chuck Puchmayr Civic Visions Inc School District No. 42 I Maple Ridge - Pitt Meadows 22225 Brown Avenue Maple Ridge, BC V2X 8N6 Phone: 604.463.4200 I Fax: 604.463.4181 June 10, 2024 City of Maple Ridge 11995 Haney Place Maple Ridge, BC V2X 6A9 Attention: Maryam Lotfi Re: File: 2019-255-RZ Legal: Lot: 5, DL: 396, Plan: NWP830; Lot: 9. D.L.: 396, Plan: NWP15728; and Lot; 10, D.L.: 396, Plan: NWP15728 Location: 12297 222 ST, 22175 123 AVE and 22185 123 AVE From: RS-1 (One Family Urban Residential) To: Amended CD-6-21 (Medium Density Mixed Use Rental and Market Apartment Residential) The proposed application would affect the student population for the catchment areas currently served by Glenwood Elementary and Maple Ridge Secondary School. Glenwood Elementary School has an operating capacity of 383 students. For the 2023-24 school year the student enrolment at Glenwood Elementary School is 361 students (94% utilization) including 80 students from out of catchment. Maple Ridge Secondary School has an operating capacity of 1300 students. For the 2023-24 school year the student enrolment at Maple Ridge Secondary is 1169 students (90% utilization) including 715 students from out of catchment and 320 French Immersion students. Based on the density estimates for the various land uses at build out the following would apply: •For the construction of 106 residential units, the estimated number of schoolage residents is 8. Sincerely, Richard Rennie Secretary Treasurer The Board of Education of School District No. 42 (Maple Ridge – Pitt Meadows) cc: Louie Girotto, Director, Facilities Sam Elliot, Manager, Facilities Planning Michael Scarcella, Assistant Superintendent Rebecca Lyle, Executive Coordinator APPENDIX I ~ Maple Ridf?e ~ Council Report TO: His Worship Mayor Dan Ruimy MEETING DATE: June 18, 2024 FILE NO: 11-5255-40-204 MEETING: cow SUBJECT: Budget Increase for 123 Avenue Roadway and Utility Improvements Project (Laity St to 216 St) ----------------~--- EXECUTIVE SUMMARY: The purpose of this report is to obtain Council approval to increase the budget for the 123 Avenue Roadway and Utility Improvements Project (Laity St to 216 St) to allow the project to proceed to construction. RECOMMENDATION: That the budget be increased for the 123 Avenue Roadway and Utility Improvements project (Laity St to 216 St) to $11,288,875 plus applicable taxes. DISCUSSION: a) Background Context The 123 Avenue corridor has not been upgraded since its construction in approximately 1964. The public has raised concerns regarding safe walking and cycling facilities and has advocated for improvements over the past decade. The 123 Avenue corridor between Laity Street and 216 Street is a collector road that sees considerable foot traffic as it is geographically located between Laity View Elementary, Glenwood Elementary and Maple Ridge Secondary schools. It is also a designated cycling route in the City's cycling network, per the Strategic Transportation Plan . This project includes construction of new sanitary mains, drainage mains, a multi-use pathway (MUP), sidewalks, street and MUP lighting, and paving of 123 Avenue between Laity Street and 216 Street. The road upgrades will meet current standards for designated cycle routes that connect to schools, parks and commercial areas. Drake Excavating (2016) Ltd. is the lowest compliant bidder for this project and a budget increase is required to award the construction contract. Construction will commence in July 2024 and be completed by summer 2025. Doc#3835891 Page 1 of 5 ~ Maple Ridee -Council Report b) Desired Outcome: The desired outcome is to provide safe and comfortable corridors, aligned with our urban road design criteria, to meet the needs of the community while also improving the functionality and overall safety of the road and cycling infrastructure within the City. c) Strategic Alignment: This project aligns with Council's Strategic Plan priority for Liveable Community which has the goal to improve mobility with safe, sustainable and effective transportation options. It also aligns with Council's Strategic Plan priority for Engaged, Healthy Community which has the goal to ensure the safety and enhance the well-being of residents. d) Citizen/Customer Implications: Construction will commence following the contract award and procurement of required materials and equipment. Project completion is anticipated for summer 2025. Single-lane alternating traffic will be in place on 123 Avenue as required while maintaining vehicle and pedestrian access . Residents who live adjacent to the construction sites will be notified by mail of any construction or traffic impacts at the outset of the project. The project site will include signage with appropriate contact information should residents have questions or concerns, and the City will actively promote construction updates through our social media channels. e) Interdepartmental Implications: The Engineering, Properties and Engineering Operations Departments provided input during the design process. f) Business Plan/Financial Implications: The project is funded through the General Capital Fund (GCF), Development Cost Charges (DCC) Road Infrastructure Sustainability Reserve {ISR Road), Drainage Infrastructure Sustainability Reserve {ISR Drainage), Drainage Improvement Levy, Sewer Capital Fund (SCF) and Translink Grant {GRA TL). The budget allocation for this project is summarized in the table below. Additional funds are required as noted. Doc#3835891 Page 2 of 5 ~ Maple Ridee _, Council Report Project Expenditures (Excluding Taxes) Engineering Design and Construction (Aplin & Martin) $ 470,000 Electrical Service Relocations (BC Hydro) $ 100,000 Telecommunications Service Relocations (Telus) $ 50,000 City of Maple Ridge -Waterworks (Relocations) $ 210,000 City of Maple Ridge -Property Acquisition $ 70,000 Construction Contract (Drake Excavating (2016) Ltd.) $ 8,988,875 Contract Contingency (15%) $ 1,400,000 Total Projected Cost $ 11,288,875 Expenditure bt Sub-Project (Excluding Taxes) 123 Ave Corridor-Laity to 216 Road Improvements $ 5,197,875 Contract Contingency (15%) $ 591,000 123 Ave (Laity St -216 St) Storm Sewer Replacement $ 3,332,000 Contract Contingency (15%) $ 568,000 123 Ave (Laity St -216 St) Sanitary Sewer Replacement $ 1,359,000 Contract Contingency (15%) $ 241,000 Total Projected Cost $ 11,288,875 Funding Sources Existing Funding General Capital Fund $ 1,566,000 Infrastructure Sustainability Reserve -Road $ 2,864,000 TransLink Grant $ 119,000 Drainage Improvement Levy $ 434,000 Infrastructure Sustainability Reserve -Drainage $ 2,200,000 Sewer Capital Fund $ 1,400,000 Total Existing Funding $ 8,583,000 Work in Progress Transfers General Capital Fund $ 721,808 Development Cost Charges $ 516,682 Drainage Improvement Levy $ 408,776 Infrastructure Sustainability Reserve -Drainage $ 37,014 Sewer Capital Fund $ 200,000 Total Work in Progress Transfers $ 1,884,280 Additional Funding Infrastructure Sustainability Reserve -Drainage $ 821,595 Total Additional Funding $ 821,595 Total Funding Sources $ 11,288,875 Doc#3835891 Page 3 of S ~ Maple Ridee -Council Report This project is in a neighbourhood with limited record information which may result in unforeseen utility relocations not included in the construction contract. Frontage restoration requirements for driveways and landscaping in front of homes can vary significantly from the design during construction. Accordingly, a $1,400,000 contingency is recommended to address any unforeseen circumstances, which will only be used if required. Factors causing project costs to exceed available budget include contingency allowance noted above, current market conditions, inflation impacts and price increases relative to estimated project costs when the project was included in capital planning. The budget shortfall will be funded through transfers from completed projects that have unused budget as well as from available funding from reserves. There will be no increase to taxes as a result of the identified funding allocations. g) Alternative: Since the total projected cost of $11,288,875 exceeds the available project budget of $8,583,000, staff have considered options for delivering the project within the available budget. Constructing the road, storm sewer and sanitary sewer works at the same time will maximize cost efficiency and reduce disturbance to the neighbourhood; therefore, separating these works is not recommended. An alternate option is to construct the project in two phases over multiple years. The following is an example of revised project extents, which would be confirmed upon detailed review: • Phase one scope would be revised to include roadway and utility improvements between approximately 216 Street -214 Street. Staff would commence this work in 2024 with completion planned in 2025 • Phase 2 would be for roadway and utility improvements between approximately 214 Street and Laity Street would be budgeted for construction in a future year in the next financial plan Alternative recommendation: That staff be directed to deliver the project in two phases, with phase one being the portion of work that can be constructed within available funding in the current financial plan and phase two identified in the next financial plan for construction in a future year. Doc#3835891 Page 4 of 5 ~ Maple Ridee -Council Report CONCLUSION: The City plans to construct new sanitary mains, drainage mains, a multi-use pathway, sidewalks, street and MUP lighting, and paving on 123 Avenue between Laity Street and 216 Street. The expected project expenditure of $11,285,875 exceeds the available project budget of $8,583,000. The City requires approval of additional budget to proceed with project construction as planned in 2024 or direction to deliver the project in two phases over multiple years. Preparedby: Jati~.Eng . .Ro ~anager of Design and Construction 1/ ;/~'"'''"=· Reviewed by: MBA Director of Engineering Financial: ~ Trevor Thompson, BBA, CPA, CGA Concurrence: Director of Finance Concurrence: Attachments: {A) Map Doc#3835891 Chief Administrative Officer Page 5 of 5 D N Scale: 1 :2,500 The City of Maple Ridge makes no guarantee regarding the accuracy or present status of the information shown on this map. ATTACHMENT A 123 Avenue Roadway and Utility Improvements (Laity St -21 6 St) -·· , I-u.- 1m,·_·1 11-i-!=LJ-:-,:t:Jpr-. ~ ENGINEERING DEPARTMENT +r~~~~~~~_71·'~°71,_ ~ Maple Ridee > \\~',,.] ,. ~ ~ j ~--1,t ~-~~ l i i·~ -------------1 "'.,::::s --~-I • L ~~ ', DATE: Jun 12, 2024