Demolition/Removal Permit Application
Requirements prior to and for final approval of building demolitions
Page 1 of 2
City of Maple Ridge Revised 2015-08-28
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca
Today’s Date: Proposed Demo Date:
Demolition Address:
Legal Description:
Provide a site plan showing all buildings, well and septic locations with distance to property lines
(required).
Type of Demolition: Check ONE box only (for comm., ind. & inst. sites a site profile is required)
Single Family Dwelling Industrial
Garage Institutional
Shed Mobile Home
Commercial Other
Name of Property Owner(s):
Address: Phone Number:
Contractors Name: Phone Number:
Contractor’s Address:
Contractor’s Maple Ridge Business Licence Number:
Upon completion of demolition which includes removal of all relevant structures, foundations, debris and
garbage from the property. This also includes the filling, leveling and grading of the site to eliminate all
potential areas of ponding or pooling of water, plus prevention of drainage to adjacent properties, contact
the Building Department to schedule a "Final" inspection.
Note: No active demolition of buildings or structures is to occur until written confirmation is received
from the City’s Operations Centre and a valid demolition permit is issued.
* Property Owner OR Agent’s Signature
* Proof of ownership or a signed “Letter of Authorization" is required at time of permit application.
PLEASE TURN PAGE OVER
Demolition Application Guide
Requirements acceptance and issuance of demolition permits
Page 2 of 2
City of Maple Ridge Revised 2015-10-14
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca
The following information is required to be provided with or completed as part of the demolition process:
Site plan showing all buildings, well and septic locations with distance to property lines, and
Building(s) to be demolished.
The building(s) must remain secure during demolition and the site must remain secure until all** debris is
removed. This may be achieved by:
Temporary 1.8m (6 ft.) high fencing,
Complete boarding of accessible doors and windows at the end of every work day, or
24hr onsite security.
** All relevant structures, foundations, building components, debris (which includes but not limited to internal contents, glass
metal material, brush, etc), garbage.
Have the following services been removed?
*BC one call 1-800-474-6886 for gas and
electrical disconnects
**Inspection of septic tank required after broken
up and void filled with gravel
***Confirmation by City Engineering Department
A hazardous materials survey following the guidelines for OHS Regulation 20.112 is to be completed and any
hazardous materials identified are to be safely removed by a qualified abatement contractor. For more
information contact WCB at: (604) 276-3100 or www.worksafebc.com
The following is only required if building was built prior to 1990. The following must be submitted before
this permit can be issued and any work can commence on the job site.
Hazardous Material Survey submitted? Yes No
Copy of NOPA form and number (provided by WCB)? Yes No
Is there a fuel tank on the property? Yes No
If “Yes” please contact the Fire Department at 604-463-5880 for a removal permit.
Does this building have a heritage designation? Yes No
If yes contact the planning department for any additional requirements.
Is this identified as a potentially contaminated site? Yes* No
*NOTE: If “Yes” a site profile is required to be submitted PRIOR to permit issuance and any
work commencing on the referenced property.
Has this site had rodent abatement conducted? Yes* No
If yes provide copy of summary report from Pest Control Company.
If no then a demolition permit cannot be issued until such as this has occurred.
*NOTE: Trapping must be in place for a minimum 3 week period before a demolition permit will
be issued. A copy of the “service record” is required to release the permit.
*Gas Yes No
*Electrical Yes No
**Septic Yes No *___________
***Water Yes No *___________
***Sewer Yes No * ___________