HomeMy WebLinkAbout2014 BC Building Code Changes - Bulletin 2015-01-BGBULLETIN 2014 Code Changes 9.32 & 9.36
(Plan submission criteria)
Bulletin 2015-001-BG
Page 1 of 5
"This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial
or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works
complies with such Bylaws, Codes or other laws."
City of Maple Ridge Created Jan 2015
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Web site:www.mapleridge.ca Inquiries at: permits@mapleridge.ca Revised Mar 23, 2015
The purpose of this bulletin is to identify what will be required to be shown on all plan submissions to
verify compliance with the code changes effective December 19, 2014. The Code offers 3 methods
for compliance; Prescriptive – which is what this bulletin address’, Prescriptive with trade-offs –
briefly mentioned and; Performance based which requires energy modeling and compliance with the
National Energy Code – not covered in this document.
PRESCRIPTIVE REQUIRMENTS:
Details to be included on plan submissions;
Beam entering exterior wall assembly. Code requires that an effective RSI value of 60% of
the wall assembly’s RSI value be maintained across the end of the beam to reduce thermal
bridging.
All landings are to be mounted to ledger boards to allow for a continuous air/vapour barrier
installation.
Slab edge showing insulation at RSI value to 50% of under slab RSI value. Insulation to be
installed between slab edge and foundation wall.
Slab on grade detail at top of foundation to slab connection. Detail to show reduced
thickness of foundation wall to eliminate exposed top edge of foundation and RSI value to
50% of slab insulation.
Showing services being run in exterior walls and how full RSI value is to be maintained (IE
heat ducts, plumbing pipes, electrical panel, etc.).
Information to show on plans;
Location of principle exhaust fan. If this is to be the main bath fan then it must be a two
speed fan for continuous operation at low speed with wall switch in bathroom for second
speed when used for moisture extraction.
o NOTE: this fan is to have a labeled override off switch for fan maintenance purposes.
It is recommended that this switch be located in the mechanical room above
1.5metres off the floor.
Type of heating system to be used.
If other than forced air or a combined forced air electrical/hydronic heating system then floor
plans must show air outlet locations in each room as required by Section 9.32.
HRV location if one is being installed (must be installed in conditioned area) is to be shown
on the plans.
Location of air barrier if other than the poly
Assembly make-up. (Reference table attached).
General Notes;
The following statement must occur on every page of permit drawings; “These drawings
comply to the 2012 BCBC including Dec 2014 revisions”
BULLETIN 2014 Code Changes 9.32 & 9.36
Bulletin 2015-001-BG
Page 2 of 5
"This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial
or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works
complies with such Bylaws, Codes or other laws."
City of Maple Ridge Created Jan 2015
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Web site:www.mapleridge.ca Inquiries at: permits@mapleridge.ca Revised Jan 23, 2015
O/H garage doors are to be weather stripped around their entire perimeter and have an R-
Value of 6.2 when the garage is supplied with heat. For unheated garages only weather
stripping is required
All ducting running through unconditioned space to be insulated to R-16
All non-gasket devices installed in insulated assemblies are to be provided with backing to
allow sealing of sheet poly to poly boots.
Attic access hatch to be insulated with ridgid insulation to a value of R-15.
PRESCRIPTIVE WITH TRADE-OFFS:
This method of compliance will currently need to be used in areas of home renovations or additions
where the work is significant but due to existing configurations it may not be practical to achieve
code compliance through the prescriptive path. You may also want to consider this option where the
majority of the wall assembly is glazed to improve the performance of the dwelling. In this method
the code allows for the increase in RSI values of other wall assemblies to offset the lack of insulated
value in the glazed wall assembly due to the framing occupying more than 23% of the opaque wall
area.
In any of these cases the following is required:
Opaque building envelope assembly trade-off
The plans are to identify the building envelope assemblies requiring the trade-off option
and building envelope assemblies being used to off-set.
Provide a table comparing the Code compliant referenced design.
This trade-off assumes compliant RSI value of the glazing within the wall in question.
Fenestration trade-off
The plans are to identify the windows (fenestrations) requiring the trade-off option and
the windows being used to off-set.
Identify the orientation of the windows in question. Windows involved in trade-off must
be from the same orientation.
Provide a table comparing the referenced design with the proposed trade-off option for
the windows.
Fenestration area trade-off for reduced floor insulation or ceiling insulation for attics under
sloped roofs in buildings that are one storey in building height
The plans are to identify the floor or ceiling areas requiring the trade-off option and the
windows being used to off-set.
Provide a table comparing the referenced design with the proposed trade-offs.
This trade off assumes compliant RSI value of the glazing within the wall in question.
Note: Reference table showing calculations attached.
BULLETIN 2014 Code Changes 9.32 & 9.36
Bulletin 2015-001-BG
Page 3 of 5
"This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial
or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works
complies with such Bylaws, Codes or other laws."
City of Maple Ridge Created Jan 2015
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Web site:www.mapleridge.ca Inquiries at: permits@mapleridge.ca Revised Jan 23, 2015
SOURCES OF INFORMATION:
For additional information to aid in determining code compliance consider the following documents:
HPO’s “Illustrated Guide – Energy Efficiency Requirements for Houses in British Columbia”
Zone 4. hpo.bc.ca
BOABC’s Energy Provisions Seminar material: “BCBC Energy Efficiency Requirements for Part
9 Buildings” boabc.org
Canadian Wood Councils wall thermal design calculator. cwc.ca/resources/wall-thermal-
design
City of North Vancouver Trade-off calculator: cnv.org and type in under the search line
“Trade-off Spreadsheet Template” or click on the link Trade-off spread sheet and go to the
related documents at the bottom of the web page.
BC Energy Advisors list from Natural Resources Canada (nrcan) for Performance path. Find
BC Energy Advisors
(http://www2.nrcan.gc.ca/oee/nh-mn/f-t/index.cfm?fuseaction=s.ssr&lang=eng)
NOTE: It can be expected that as we work through the code changes some revisions to this
document will occur.
Rev: 01/23/2015
BULLETIN 2014 Code Changes 9.32 & 9.36
Bulletin 2015-001-BG
Page 4 of 5
"This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial
or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works
complies with such Bylaws, Codes or other laws."
City of Maple Ridge Created Jan 2015
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Web site:www.mapleridge.ca Inquiries at: permits@mapleridge.ca Revised Jan 23, 2015
Wall Assembly Layout Sample:
Envelope Construction Component
effective R-Value
Concrete Foundation Wall
Dampproofing
8” Conc. Foundation
Air Film
2x4 Studs @ 24”o.c.
Insulation
6mil Poly V.B.
½” GWB
Air Film
Total
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
Exterior Framed Wall
Air Film
Vinyl Siding
House Wrap
½” Plywood/OSB
2x6 Studs @ 16”o.c.
Batt Insulation
6mil Poly V.B.
½” GWB
Air Film
Total
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
Exterior Framed Wall (Rain Screen)
Air Film
Composite Siding
9.5mm Strapping
Air Film
House Wrap
½” Plywood/OSB
2x6 Studs @ 16”o.c.
Batt Insulation
6mil Poly V.B.
½” GWB
Air Film
Total
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
Attic Roof Assembly
Air Film
Roofing membrane asphalt/fiberglass
Roofing paper
½” Plywood/OSB
Trusses @ 24”o.c.
Blown insulation
6mil Poly V.B.
½” GWB
Air Film
Total
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
__________________
BULLETIN 2014 Code Changes 9.32 & 9.36
Bulletin 2015-001-BG
Page 5 of 5
"This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial
or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works
complies with such Bylaws, Codes or other laws."
City of Maple Ridge Created Jan 2015
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Web site:www.mapleridge.ca Inquiries at: permits@mapleridge.ca Revised Jan 23, 2015
Example of Trade-off calculation:
For the trade off to work
the A/R value for the
proposed design must be
equal to or less than the
Reference design A/R
value.