Loading...
HomeMy WebLinkAboutOccupancy Permit Requirements for Commercial, Industrial or Institutional Projects - Bulletin 2015-006BULLETIN Provisional & Final Occupancy Requirements to obtain a Provisional or Final Occupancy Permit for Commercial, Industrial or Institutional Projects Bulletin 2015-006-BG Page 1 of 2 "This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." City of Maple Ridge Revised 2015-10-14 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca This bulletin is being provided to clarify the requirements around obtaining Provisional or Final Occupancy Permits on Commercial, Industrial or Institutional Projects. 1. For Provisional Occupancy we require:  A sealed letter from the CRP/Architect outlining all the deficiencies that are still to be completed,  Either a complete schedule C-B package or written verification from the CRP that the has confirmed all other disciplines are okay with the units being occupied, o If C-Bs are provided they cannot contain any annotations but must be a clean C-B. If annotations are necessary then a C-B is not ready to be issued.  A time line when all the deficiencies will be completed,  All other permits (plumbing, electrical, gas, sprinkler, etc.) are to be finalized or authorization to occupy noted on the final inspection notices,  Fire department approval and construction fire safety plan in place,  Active fire hydrants within 90 metres of the entrance to the most distant unit,  Works and service completed to the point that authorization to connect to the mains (sanitary, storm & water) has been issued by the engineering department,  An approximate dollar value on the work still outstanding to determine size of security,  Security deposit has been received for the outstanding works,  The permit fee per permit charge - for the provisional occupancy permit - has been paid. 2. For full Occupancy Permit on the development:  A complete schedule C-B package is to be submitted with no annotations,  Schedule L-3 (landscape). Should the weather not permit installation of landscaping then only a provisional occupancy permit will be issued per item 1 above,  All permits are to be finalized,  Final approval from any additional 3rd party permits,  Fire department approval,  All on and off site fire hydrants are to be commissioned,  Works and service completed and final sign off issued by the engineering department, and  The final lift of asphalt has been installed. Should the weather not permit installation of the final lift then only a provisional occupancy permit will be issued perm item 1 above. PLEASE TURN PAGE OVER  BULLETIN Provisional & Final Occupancy Requirements to obtain a Provisional or Final Occupancy Permit for Commercial, Industrial or Institutional Projects Bulletin 2015-006-BG Page 2 of 2 "This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." City of Maple Ridge Revised 2015-10-14 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca The following is an excerpt from the City’s Building Bylaw No. 6925-2012: