HomeMy WebLinkAboutOccupancy Permit Requirements for Single Family Dwellings and Duplexes - Bulletin 2015-008BULLETIN PROVISIONAL & FINAL OCCUPANCY Requirements to obtain a Provisional or Final Occupancy Permit for Single Family Dwellings and Duplex’s Bulletin 2015-008-BG Page 1 of 2 "This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." City of Maple Ridge Revised 2015-10-14 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca This bulletin is being provided to clarify the requirements around obtaining Provisional and Final Occupancy Permits for single family dwellings and duplex’s. 1. For a Provisional Occupancy Permit:  Either a complete schedule C-B package or written verification from each registered professional that they are okay with the building being occupied, o If C-Bs are provided they cannot contain any annotations; they must be a clean C-B. If annotations are necessary then a C-B is not ready to be issued.  Building inspection conducted and has approved for provisional occupancy,  All other permits (plumbing, electrical, gas, sprinkler, etc.) are to be finalized or authorization to occupy noted on the final inspection slip for each permit inspected,  Engineering yards inspection has been conducted and is either signed off or the works inspector has given approval for the service connections,  An approximate dollar value on the work still outstanding to determine size of security,  Security deposit has been received for the outstanding works,  Site has been graded to ensure all surface flows are being contained within property lines,  All retaining walls on or adjacent to property lines are installed and completed. and  The permit fee for the provisional occupancy permit has been paid. 2. For a full Occupancy Permit:  A complete schedule C-B package to be submitted with no annotations,  On site water detention facilities sign off letter, foundation drainage mat letter, pressure treated material letter, Mechanical ventilation checklist, etc.,  All permits are to be finalized (plumbing, electrical, gas, sprinkler, retaining wall, basement finish, etc.), and  Engineering yards inspection has been conducted and is signed off, PLEASE TURN PAGE OVER  BULLETIN PROVISIONAL & FINAL OCCUPANCY Requirements to obtain a Provisional or Final Occupancy Permit for Single Family Dwellings and Duplex’s Bulletin 2015-008-BG Page 2 of 2 "This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." City of Maple Ridge Revised 2015-10-14 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Web Site: www.mapleridge.ca Inquiries at: permits@mapleridge.ca The following is an excerpt from the City’s current Building Bylaw: