HomeMy WebLinkAboutBuilding Permit Application Checklist for Commercial, Industrial, Multifamily & InstitutionalPage 1 of 4
Received Not required Required # Drawings
Drawings signed & sealed by a Professional Engineer
Drawings signed and sealed by a Landscape Architect
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
CIVIL DRAWINGS (5 sets) Prepared by: _____________________________________________(name of Consulting firm)
Liability Coverage Summary (Expiry date: ________________)
Cross Section Plans
Detail Plans
ARCHITECTURAL DRAWINGS (4 sets) Prepared by: _______________________________________(name of Architectural firm)
REQUIRED DOCUMENTATION (as per current Building Bylaw)
Foundation Plans
Code compliance Plans
Elevation Plans
Cover Sheet (index sheet)
Floor Plans
Site Plan
Other (Please specify)
Liability Coverage Summary (Expiry date: ________________)
LANDSCAPE PLAN (3 sets) Prepared by: ____________________________________________(name of Consulting firm)
Sealed Letter of Assurance (Schedules LB)
Other (Please specify)
Sealed Letter of Assurance (Schedule B per current BCBC)
Sealed Letter of Assurance (Schedule B per current BCBC)
Framing Plans (Floor, Walls & Mezzanine)
Drawings signed & sealed by a Professional
Shoring Plans
Liability Coverage Summary (Expiry date: ________________)
City of Maple Ridge
Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca
Landscape Securities paid
On-Site Civil Servicing (including fire hydrant locations, meter chambers, manholes, etc)
Foundation Plans
All on site retaining including sections & details (Zoning Compliance: Height)
Off-Site Civil Plan
Sealed Letter of Assurance (Schedule B per current BCBC)
Site Servicing Plan showing Site Drainage (Lot Grading Plan)
Drawings signed & sealed by the Professional Engineer
Excavation and Shoring Drawings
Building Permit Application Checklist for Commercial,
Industrial, Multifamily & Institutional Buildings
STRUCTURAL DRAWINGS (3 sets) Prepared by: ____________________________________________(name of Consulting firm)
Other (Please specify)
Landscape Cost Analysis
Address:________________________________ Project name: _________________________________
Detail Plans
Window, Door, Wall Schedules
Page 2 of 4
Drawings signed and sealed by the Professional Engineer
Received Not required Required # Drawings
Received Not required Required # Drawings
City of Maple Ridge
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Architectural (reduced to 11" x 17") for Fire Dept use on CD (PDF's)
Other (Please specify)
ADDITIONAL DRAWINGS Prepared by: _____________________________________________(name of Consulting firm)
Liability Coverage Summary (Expiry date: ________________)
REQUIRED DOCUMENTATION
Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca
Updated 2016-02-22
Electrical Detail Plans
Site Service Plans
ELECTRICAL DRAWINGS (3 sets) Prepared by: _____________________________________________(name of Consulting firm)
Electrical Layout Plan for the entire project drawings showing the following: Design
data load calculations for the service, Fault current calculations, Grounding etc
Drawings signed & sealed by the Professional Engineer
Liability Coverage Summary (Expiry date: ________________)
Liability Coverage Summary (Expiry date: ________________)
Other
Other
Sealed Letter of Assurance (Schedule B per current BCBC)
Drawings signed & sealed by the Professional Engineer
Building Permit Application Checklist for Commercial,
Industrial, Multifamily & Institutional Buildings
MECHANICAL DRAWINGS (3 sets) Prepared by: ____________________________________________(name of Consulting firm)
Sprinkler Design Plans (to include standpipe loc.)
Plans of all lift pumps and cross connection control devices
Sealed Letter of Assurance (Schedule B per current BCBC)
HVAC Plans
PLUMBING DRAWINGS (3 sets) Prepared by: _______________________________________________(name of Consulting firm)
Schedule E
WATER COURSE PROTECTION BYLAW
Erosion and sediment control plan (3 Sets)
Schedule A
Schedule D
Electrical Main Switch Size (Voltage - one or three phase)
Other (Please specify)
Other (Please specify)
Plumbing Layout Plans (showing location of all pipe work and interior oil, grit and greasse interceptors)
Sealed Letter of Assurance (Schedule B per current BCBC)
REQUIRED DOCUMENTATION
Page 3 of 4
MISCELLANEOUS COMMENTS
Note:
City of Maple Ridge
11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461
Highway use permit
Liability Insurance coverage summary for the Geotech. P.Eng.
Electrical Service Load Calculation & One Line Schematic Plan
Plumbing Service Load Calculations & One Line Schematic Plan
Alternate Solution Proposal(s) (if accepted a sealed pdf version is required)
Topographical Survey Plan
Construction Fire Safety Plan
Municipal Reliance upon Plan Certification by Reg. Professionals
Development Permit Securities
Other Securities
Hazardous Materials Report
Health Dept "septic system filing" for new septic disposal fields
Site Profile (for contaminated sites)
Other approvals (septic disposal, etc) ____________________
Address Plans for Multi-Tenant Buildings
Project Specifications
HPO Form
Liability Insurance coverage summary (Fire Suppression Systems)
Sealed Fire Suppression Systems Letter of Assurance (Schedule B per current BCBC)
Sealed Geotech Letter of Assurance (Schedule B per current BCBC)
Sealed Soils (Geotechnical) Report
Current BC Building Code Analysis Review (sealed)
Commitment by Owner Letter (Schedule A per current BCBC)
APEGBC Appendix 'D' Landslide Assesment (sloping sites only)
APEGBC Appendix 'J' Floodplain Assesment (prop. In floodplain only)
Owner Acknowledgement Letter
ADDITIONAL ITEMS
Building Permit Application Checklist for Commercial,
Industrial, Multifamily & Institutional Buildings
The Coordinating Professional and the Owner of the property must have their signatures on the Building Permit
Application Form prior to the application being made.
Updated 2016-02-22
Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca
BUILDING HEIGHT BASE LINE - means:
I. averaging the two front Datum Determination Points on the lot; and
II. averaging the two rear Datum Determination Points on the lot; and
III. longitudinally extending a line joining (i) and (ii); illustrated by way
of the following diagram;
DATUM DETERMINATION POINTS - means the two
points on a lot created where the front most and
rearmost wall face of the principal building, or
projections thereof, intersect with the outermost
sidewall faces, or projections thereof, measured
as the lesser of Natural or Finished Grade.
LOCALIZED DEPRESSION - means:
I. an existing depression in Natural Grade not exceeding 3 metres (9.8ft.) in width, or the lesser of 3 metres or 20% of the wall length along any building wall that
it intersects;
II. a depression below Finished Grade created for the purposes of providing vehicles or pedestrian entrance to a building subject to the following conditions:
A. only one vehicle entrance and one pedestrian entrance are permitted as Localized Depressions on a single family residential building.
B. on any side of the building in a single family residential zone, the Localized Depression width shall not exceed the lesser of 50% of the corresponding
building width or:
* 6.0m (20 ft.) width for vehicle access.
* 2.44m (8 ft.) wide 3.0 m2 in area for a pedestrian access.
* 7.3m (24 ft.) wide for a combined vehicle and pedestrian access
III. any combination of vehicle or pedestrian entrances and existing depressions remaining after finish grading shall not exceed 50% of the corresponding building
width or length along any side of a building.
Highest Building Face Exemptions:
I. 40% of the length of the building face can be exempt from this regulation. Different parts of the building face can be exempted, provided that the
sum of their lengths does not exceed 40% of the total length of the elevation.
II. 100% of the length of the rear building face for those lots whose entire rear lot line abuts land dedicated for park purposes by subdivision plan, within
which a watercourse shown on Schedule āEā exists, provided that the Highest Building Face is identified on the rear building elevation.
III. 100% of the length of the interior side building face for those lots whose entire interior side lot line abuts land dedicated for park purposes by
subdivision plan, within which a watercourse shown on Schedule āEā exists, provided that the Highest Building Face is identified on the interior side
building elevation.
IV. Roof eaves, decks, decorative features, and the pitched roof portion of either gable ends or dormers are exempt.
V. Any portion of the roof structure above the top plate is exempt from this calculation.