Loading...
HomeMy WebLinkAboutBuilding Permit Application Checklist for Commercial, Industrial, Multifamily & InstitutionalPage 1 of 4 Received Not required Required # Drawings Drawings signed & sealed by a Professional Engineer Drawings signed and sealed by a Landscape Architect 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 CIVIL DRAWINGS (5 sets) Prepared by: _____________________________________________(name of Consulting firm) Liability Coverage Summary (Expiry date: ________________) Cross Section Plans Detail Plans ARCHITECTURAL DRAWINGS (4 sets) Prepared by: _______________________________________(name of Architectural firm) REQUIRED DOCUMENTATION (as per current Building Bylaw) Foundation Plans Code compliance Plans Elevation Plans Cover Sheet (index sheet) Floor Plans Site Plan Other (Please specify) Liability Coverage Summary (Expiry date: ________________) LANDSCAPE PLAN (3 sets) Prepared by: ____________________________________________(name of Consulting firm) Sealed Letter of Assurance (Schedules LB) Other (Please specify) Sealed Letter of Assurance (Schedule B per current BCBC) Sealed Letter of Assurance (Schedule B per current BCBC) Framing Plans (Floor, Walls & Mezzanine) Drawings signed & sealed by a Professional Shoring Plans Liability Coverage Summary (Expiry date: ________________) City of Maple Ridge Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca Landscape Securities paid On-Site Civil Servicing (including fire hydrant locations, meter chambers, manholes, etc) Foundation Plans All on site retaining including sections & details (Zoning Compliance: Height) Off-Site Civil Plan Sealed Letter of Assurance (Schedule B per current BCBC) Site Servicing Plan showing Site Drainage (Lot Grading Plan) Drawings signed & sealed by the Professional Engineer Excavation and Shoring Drawings Building Permit Application Checklist for Commercial, Industrial, Multifamily & Institutional Buildings STRUCTURAL DRAWINGS (3 sets) Prepared by: ____________________________________________(name of Consulting firm) Other (Please specify) Landscape Cost Analysis Address:________________________________ Project name: _________________________________ Detail Plans Window, Door, Wall Schedules Page 2 of 4 Drawings signed and sealed by the Professional Engineer Received Not required Required # Drawings Received Not required Required # Drawings City of Maple Ridge 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Architectural (reduced to 11" x 17") for Fire Dept use on CD (PDF's) Other (Please specify) ADDITIONAL DRAWINGS Prepared by: _____________________________________________(name of Consulting firm) Liability Coverage Summary (Expiry date: ________________) REQUIRED DOCUMENTATION Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca Updated 2016-02-22 Electrical Detail Plans Site Service Plans ELECTRICAL DRAWINGS (3 sets) Prepared by: _____________________________________________(name of Consulting firm) Electrical Layout Plan for the entire project drawings showing the following: Design data load calculations for the service, Fault current calculations, Grounding etc Drawings signed & sealed by the Professional Engineer Liability Coverage Summary (Expiry date: ________________) Liability Coverage Summary (Expiry date: ________________) Other Other Sealed Letter of Assurance (Schedule B per current BCBC) Drawings signed & sealed by the Professional Engineer Building Permit Application Checklist for Commercial, Industrial, Multifamily & Institutional Buildings MECHANICAL DRAWINGS (3 sets) Prepared by: ____________________________________________(name of Consulting firm) Sprinkler Design Plans (to include standpipe loc.) Plans of all lift pumps and cross connection control devices Sealed Letter of Assurance (Schedule B per current BCBC) HVAC Plans PLUMBING DRAWINGS (3 sets) Prepared by: _______________________________________________(name of Consulting firm) Schedule E WATER COURSE PROTECTION BYLAW Erosion and sediment control plan (3 Sets) Schedule A Schedule D Electrical Main Switch Size (Voltage - one or three phase) Other (Please specify) Other (Please specify) Plumbing Layout Plans (showing location of all pipe work and interior oil, grit and greasse interceptors) Sealed Letter of Assurance (Schedule B per current BCBC) REQUIRED DOCUMENTATION Page 3 of 4 MISCELLANEOUS COMMENTS Note: City of Maple Ridge 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Highway use permit Liability Insurance coverage summary for the Geotech. P.Eng. Electrical Service Load Calculation & One Line Schematic Plan Plumbing Service Load Calculations & One Line Schematic Plan Alternate Solution Proposal(s) (if accepted a sealed pdf version is required) Topographical Survey Plan Construction Fire Safety Plan Municipal Reliance upon Plan Certification by Reg. Professionals Development Permit Securities Other Securities Hazardous Materials Report Health Dept "septic system filing" for new septic disposal fields Site Profile (for contaminated sites) Other approvals (septic disposal, etc) ____________________ Address Plans for Multi-Tenant Buildings Project Specifications HPO Form Liability Insurance coverage summary (Fire Suppression Systems) Sealed Fire Suppression Systems Letter of Assurance (Schedule B per current BCBC) Sealed Geotech Letter of Assurance (Schedule B per current BCBC) Sealed Soils (Geotechnical) Report Current BC Building Code Analysis Review (sealed) Commitment by Owner Letter (Schedule A per current BCBC) APEGBC Appendix 'D' Landslide Assesment (sloping sites only) APEGBC Appendix 'J' Floodplain Assesment (prop. In floodplain only) Owner Acknowledgement Letter ADDITIONAL ITEMS Building Permit Application Checklist for Commercial, Industrial, Multifamily & Institutional Buildings The Coordinating Professional and the Owner of the property must have their signatures on the Building Permit Application Form prior to the application being made. Updated 2016-02-22 Inquires at: permits@mapleridge.ca Web site: www.mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca BUILDING HEIGHT BASE LINE - means: I. averaging the two front Datum Determination Points on the lot; and II. averaging the two rear Datum Determination Points on the lot; and III. longitudinally extending a line joining (i) and (ii); illustrated by way of the following diagram; DATUM DETERMINATION POINTS - means the two points on a lot created where the front most and rearmost wall face of the principal building, or projections thereof, intersect with the outermost sidewall faces, or projections thereof, measured as the lesser of Natural or Finished Grade. LOCALIZED DEPRESSION - means: I. an existing depression in Natural Grade not exceeding 3 metres (9.8ft.) in width, or the lesser of 3 metres or 20% of the wall length along any building wall that it intersects; II. a depression below Finished Grade created for the purposes of providing vehicles or pedestrian entrance to a building subject to the following conditions: A. only one vehicle entrance and one pedestrian entrance are permitted as Localized Depressions on a single family residential building. B. on any side of the building in a single family residential zone, the Localized Depression width shall not exceed the lesser of 50% of the corresponding building width or: * 6.0m (20 ft.) width for vehicle access. * 2.44m (8 ft.) wide 3.0 m2 in area for a pedestrian access. * 7.3m (24 ft.) wide for a combined vehicle and pedestrian access III. any combination of vehicle or pedestrian entrances and existing depressions remaining after finish grading shall not exceed 50% of the corresponding building width or length along any side of a building. Highest Building Face Exemptions: I. 40% of the length of the building face can be exempt from this regulation. Different parts of the building face can be exempted, provided that the sum of their lengths does not exceed 40% of the total length of the elevation. II. 100% of the length of the rear building face for those lots whose entire rear lot line abuts land dedicated for park purposes by subdivision plan, within which a watercourse shown on Schedule ā€œEā€ exists, provided that the Highest Building Face is identified on the rear building elevation. III. 100% of the length of the interior side building face for those lots whose entire interior side lot line abuts land dedicated for park purposes by subdivision plan, within which a watercourse shown on Schedule ā€œEā€ exists, provided that the Highest Building Face is identified on the interior side building elevation. IV. Roof eaves, decks, decorative features, and the pitched roof portion of either gable ends or dormers are exempt. V. Any portion of the roof structure above the top plate is exempt from this calculation.