Loading...
HomeMy WebLinkAboutResidential Documentation Checklist Residential Documentation Checklist Documents received as part of the inspection/construction process Page 1 of 1 City of Maple Ridge Revised 2017-06-26 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Enquiries only at: buildingenquiries@mapleridge.ca ADDRESS: BUILDING PERMIT NO. ****Documents to be on site at time of inspections**** Req’d Rec’d N/A Forms inspection Inspectors Initials    Sealed Site Survey Certificate ______    Structural Engineer – Field Report for Footings ______    Structural Engineer – Field Report for Foundation ______    Geotechnical Engineer – Field Report for Soil Bearing ______    Geotechnical Engineer – Field Report for Site Excavation ______ Req’d Rec’d N/A Slab    Compaction Report ______    Dampproofing Report ______ Req’d Rec’d N/A Sheathing    Structural Sheathing Review ______ ______ Req’d Rec’d N/A Frame    Structural Frame Review ______    Sealed Roof Truss Specs ______    Sealed I Joist Floor Layout ______    Mechanical Ventilation Checklist ______ Req’d Rec’d N/A Insulation    Sprinkler engineers report ______    Spray foam letter ______    Spray foam installers certification documents ______    Spray foam installation documentation ______ Req’d Rec’d N/A Final    Structural CB ______    Geotechnical CB ______    Fire Suppression CB ______    Letter or Plumbing CB Soil Amendment ______    Plumbing CB (storm water management system) ______    Plumbing CB Rock Pit ______    Structural Engineer Letter for Window Well ______    Retaining Wall CB Struct./Geo. ______    Engineers letter for glass guard rails ______    Vapour Barrier Paint Letter ______    Treated Wood Compliance Letter ______    Contractors Insulation Report (spray foam) ______    Vinyl Decking Roofing Compliance Letter ______    Well Potability Letter ______    Well Potability lab results ______    Septic Authorization to Operate Letter ______    Suite / TRU Covenant Registered ______    DGS & Parking Covenant Registered ______    Sewage pump Covenant Registered ______    Flood Plain Covenant Registered ______    Fraser River escarpment Covenant Registered ______    Storm Sewer pump Covenant Registered ______  Plan Checker to check (√) which documents are required ___________ INITIAL  DST’s to do final review of all documents prior to issuing Occupancy ___________ INITIAL ****Documents to be on site at time of inspections****