Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Residential Documentation Checklist
Residential Documentation Checklist Documents received as part of the inspection/construction process Page 1 of 1 City of Maple Ridge Revised 2017-06-26 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Inspection Requests: inspectionrequests@mapleridge.ca Enquiries only at: buildingenquiries@mapleridge.ca ADDRESS: BUILDING PERMIT NO. ****Documents to be on site at time of inspections**** Req’d Rec’d N/A Forms inspection Inspectors Initials Sealed Site Survey Certificate ______ Structural Engineer – Field Report for Footings ______ Structural Engineer – Field Report for Foundation ______ Geotechnical Engineer – Field Report for Soil Bearing ______ Geotechnical Engineer – Field Report for Site Excavation ______ Req’d Rec’d N/A Slab Compaction Report ______ Dampproofing Report ______ Req’d Rec’d N/A Sheathing Structural Sheathing Review ______ ______ Req’d Rec’d N/A Frame Structural Frame Review ______ Sealed Roof Truss Specs ______ Sealed I Joist Floor Layout ______ Mechanical Ventilation Checklist ______ Req’d Rec’d N/A Insulation Sprinkler engineers report ______ Spray foam letter ______ Spray foam installers certification documents ______ Spray foam installation documentation ______ Req’d Rec’d N/A Final Structural CB ______ Geotechnical CB ______ Fire Suppression CB ______ Letter or Plumbing CB Soil Amendment ______ Plumbing CB (storm water management system) ______ Plumbing CB Rock Pit ______ Structural Engineer Letter for Window Well ______ Retaining Wall CB Struct./Geo. ______ Engineers letter for glass guard rails ______ Vapour Barrier Paint Letter ______ Treated Wood Compliance Letter ______ Contractors Insulation Report (spray foam) ______ Vinyl Decking Roofing Compliance Letter ______ Well Potability Letter ______ Well Potability lab results ______ Septic Authorization to Operate Letter ______ Suite / TRU Covenant Registered ______ DGS & Parking Covenant Registered ______ Sewage pump Covenant Registered ______ Flood Plain Covenant Registered ______ Fraser River escarpment Covenant Registered ______ Storm Sewer pump Covenant Registered ______ Plan Checker to check (√) which documents are required ___________ INITIAL DST’s to do final review of all documents prior to issuing Occupancy ___________ INITIAL ****Documents to be on site at time of inspections****