Loading...
HomeMy WebLinkAboutElectrical Permit Fee 2012THE CITY OF MAPLE RIDGE ELECTRICAL PERMIT FEE (effective December 13, 2012) Licences, Permits and Bylaws Department Phone: 604-467-7311, Fax: 604-467-7461 ESTIMATED $10.00 per $1,000 COST FEE (up to $100,000) 0 - $ 1000.00 $150.00 37001 - 38m $637.00 Temp to Perm $75.00 38001 - 39m $647.00 Temp Service $75.00 39001 - 40m $657.00 Service Duct $75.00 40001 - 41m $667.00 Re-inspection fee $150 + tax $23.00 per $1,000 41001 - 42m $677.00 Permit Transfer $150.00 42001 - 43m $687.00 Permit Renewal $75.00 1001 - 2m $173.00 43001 - 44m $697.00 Hot Tub/Spa $15.00 2001 - 3m $196.00 44001 - 45m $707.00 Massage Tub $15.00 3001 - 4m $219.00 45001 - 46m $717.00 Elec Heat $75.00 (minimum) 4001 - 5m $242.00 46001 - 47m $727.00 Air Conditioning/Heat Pump $15.00 (per unit) 5001 - 6m $265.00 47001 - 48m $737.00 Each Sub Panel $15.00 6001 - 7m $288.00 48001 - 49m $747.00 7001 - 8m $311.00 49001 - 50m $757.00 8001 - 9m $334.00 50001 - 51m $767.00 9001 - 10m $357.00 51001 - 52m $777.00 52001 - 53m $787.00 $10.00 per $1,000 53001 - 54m $797.00 (up to $100,000)54001 - 55m $807.00 10001 - 11m $367.00 55001 - 56m $817.00 11001 - 12m $377.00 56001 - 57m $827.00 12001 - 13m $387.00 57001 - 58m $837.00 $10.00 per $1,000 for first $100,000 $967.00 13001 - 14m $397.00 58001 - 59m $847.00 $7.00 per $1,000 for $100,001 to $250,000 1,050.00 14001 - 15m $407.00 59001 - 60m $857.00 $5.00 per $1,000 for $250,001 to $300,000 250.00 15001 - 16m $417.00 60001 - 61m $867.00 $4.00 per $1,000 for $300,001 to $2,000,000 6,800.00 16001 - 17m $427.00 61001 - 62m $877.00 Total Permit Cost $9,067.00 17001 - 18m $437.00 62001 - 63m $887.00 18001 - 19m $447.00 63001 - 64m $897.00 19001 - 20m $457.00 64001 - 65m $907.00 20001 - 21m $467.00 65001 - 66m $917.00 21001 - 22m $477.00 66001 - 67m $927.00 Movie Location Fee: 22001 - 23m $487.00 67001 - 68m $937.00 $150.00 23001 - 24m $497.00 68001 - 69m $947.00 $210.00 24001 - 25m $507.00 69001 - 70m $957.00 $270.00 25001 - 26m $517.00 70001 - 100m $967.00 $300.00 26001 - 27m $527.00 $360.00 27001 - 28m $537.00 $7.00 per $1,000 (up to $250,000)$420.00 28001 - 29m $547.00 100001-250m $2,017.00 $480.00 29001 - 30m $557.00 $540.00 30001 - 31m $567.00 $5.00 per $1,000 (up to $300,000)$600.00 31001 - 32m $577.00 250001-300m $2,267.00 $660.00 32001 - 33m $587.00 33001 - 34m $597.00 $4.00 per $1,000 (over $300,000) 34001 - 35m $607.00 300001-400m $2,667.00 35001 - 36m $617.00 400001-500m $3,067.00 36001 - 37m $627.00 500001-600m $3,467.00 Multi Family Dwellings are charged on a per building basis with an additional charge of $30.00 per unit For one and two family dwellings, including additions, the permit fee shall be 15% of the building permit fee or the minimum electrical permit fee, which ever is greater. Additional charges as outlined on the electrical application form will apply when the electrical permit is taken out in conjunction with a building permit. Note: NO temporary construction services will be issued without an issued building or site servicing permit. Annual Permit - unlimited locations Five Location - Valid for 180 days six Location - Valid for 180 days Seven Location - Valid for 180 days Eight Location - Valid for 180 days Nine Location - Valid for 180 days Four Location - Valid for 180 days One Location - Valid for 180 days Two Location - Valid for 180 days normal work hours $206.00 Minimum or union contract Three Location - Valid for 180 days Applied for Estimated Value = $2,000,000 Fees for all other work not included above shall be based on estimated cost of work as outlined below. (com/ind/inst/multifd/ plus sheds garages sundecks, basement finishes etc.) IN ADDITION (SFD's only) Additional fee: Inspection outside Temporary to permanent conversion requires full service or may be issued in conjuction with a construction service Example of Com/Inst/Ind/Mfd Permit Fees Calculation "This information is provided for convenience only and is not a substitution of applicable City Bylaws." revised 4/28/2015