Loading...
HomeMy WebLinkAboutRequirements for Gas Permit Inspections Required Gas Permit Inspections Inspection order and timing Page 1 of 2 City of Maple Ridge Revised 2017-06-24 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Trades Permit Applications: permitapplications@mapleridge.ca Enquiries only at: buldingenquiries@mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca Gas inspections are required during various phases of a project. It is up to the permit holder to arrange for inspections via:  the inspection request line 604-467-7380,  the email request line inspectionrequests@mapleridge.ca , or  fax at 604-467-7461. ALL inspection requests, including those left on our Inspection Request phone line, must provide ALL of the following information:  Correct Gas permit number;  Type of inspection requested (per list below);  Correct street address of the property to be inspected.  For multi building sites include each gas permit for each building being inspected.  For apartment buildings include the floor and unit numbers being inspected. Note: it is recommended using the email request line when calling for multiple inspections on different buildings. We regret to inform you that no inspections will be registered and no inspections will take place if the above information is not provided. GAS INSPECTION  CALL FOR AN UNDERGROUND PIPING INSPECTION: After all underground gas Construction is complete, but prior to the placing of any concrete or backfill.  CALL FOR B-VENT, F/P B-VENT and ROUGH-IN GAS INSPECTIONS: After heating duct installations, gas venting installations fire place rough-in installation but prior to framing inspection. Note: Should different contractors be installing the gas piping and the fireplaces, separate permits and separate rough-in inspections will be required.  SUBMIT DECLARATION FOR FINAL GAS INSPECTION: Gas final inspection must be performed prior to the final building inspection and can only be scheduled with the submittal of the “Gas Contractor Declaration of Compliance” form. ***Note: Owners issued a homeowner's permit to do their own gas work, must phone for inspections via the inspection line 604-467-7380 or email to inspectionrequests@mapleridge.ca PLEASE TURN PAGE OVER "This information is provided for convenience only and is not a substitution of applicable City Bylaws, Provincial or Federal Codes or Laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." Required Gas Permit Inspections Inspection order and timing Page 2 of 2 City of Maple Ridge Revised 2017-06-24 11995 Haney Place, Maple Ridge, BC V2X 6A9 Tel: 604-467-7311 Fax: 604-467-7461 Trades Permit Applications: permitapplications@mapleridge.ca Enquiries only at: buldingenquiries@mapleridge.ca Inspection Requests: inspectionrequests@mapleridge.ca EVERY PERMIT IS ISSUED UPON THE CONDITION THAT: 1. Construction is to be started within 6 months from the date of issuance. An inspection on each permit is required and must pass within this time frame to verify construction commencement. 2. Construction is not to be discontinued or suspended for a period of more than 12 months. 3. The permit is no longer valid if conditions 1 and 2 noted above are violated. 4. The exterior of the building is completed within 6 months of the date of commencement of construction. 5. An Occupancy Permit is required prior to moving people or contents into any building. 6. If all inspectors approve for provisional occupancy, a Provisional Occupancy Permit may be issued for a limited period of time. Permit fee and security is required for this. 7. Occupancy of a building without first obtaining an Occupancy or Provisional Occupancy Permit may result in penalties as stated in the City of Maple Ridge Building Bylaw. 8. For any inspections to be conducted, the permit package, all prior inspection slips and engineering reports must be on site for all inspections including plumbing, gas, electrical, sprinkler and building. 9. For renovations or additions or where contents have been installed in a dwelling, a person of the age of majority must be present while inspections are being conducted. Should no one be present or be under age, the requested inspection will not be conducted. 10. All pets must be secured prior to inspectors attending the site. 11. Permit card must be posted as soon as construction commences. This card must be posted in such a position as to be clearly visible from the street at all times and protected from weathering.