Loading...
HomeMy WebLinkAboutAmendments.pdf City of Maple Ridge Design and Construction Documents (2015) Page 1 of 6 UPDATES Part 1: Design Criteria Manual Section Item Number Type of Change Status Amendment Date G-General G3.13 Add Previous N/A Oct 2015 Update g) a complete construction estimate G-General G3.14 Revise Previous c) Complete sealed construction estimate Oct 2015 Update c) revised construction estimate G-General G3.15 Add Previous N/A Oct 2015 Update f) a sealed construction estimate R-Roads R2 Add Previous N/A Oct 2015 Update Bicycle Facilities -Include Off-Street Pathways, Neighbourhood Bikeways, Painted Bicycle Lanes and Shoulder Bikeways as defined in the City of Maple Ridge Strategic Transportation Plan. R-Roads R19 Replace Previous Pavement markings and street signs shall be designed in accordance with the Provincial Ministry of Transportation and Highway’s Manual. Oct 2015 Update Pavement markings and street signs shall be designed in accordance with the Transportation Association of Canada (TAC) guidelines. Where approved by the City bicycle facilities shall incorporate, green zones where high conflict zones occur between vehicles and bike facilities and red curbs at grade transitions between bike facilities. D-Drainage D3 Replace Previous *Mean Annual Rainfall (MAR) is considered as the 2 year return event. Oct 2015 Update *Mean Annual Rainfall (MAR) is considered as the 2 year 24 hour return event. D-Drainage D5.1 Replace Previous Woodlands Oct 2015 Update Woodlands/Forested W-Water W16 Replace Previous VALVE CHAMBER DRAINAGE Oct 2015 Update CHAMBERS City of Maple Ridge Design and Construction Documents (2015) Page 2 of 6 Part 1: Design Criteria Manual (Continued) Section Item Number Type of Change Status Amendment Date W-Water W16 Replace Previous N/A Oct 2015 Update Chambers shall be capable of withstanding all possible thrust forces (e.g. fully closed valve thrust force) unless these thrust forces are restrained by features outside of the chamber. City of Maple Ridge Design and Construction Documents (2015) Page 3 of 6 UPDATES Part 2: Supplementary General Conditions Section Item Number Type of Change Status Amendment Date 33 11 01 WATERWORKS 2.0 Add Previous N/A Oct 2015 Update 2.0 PRODUCTS 33 44 01 MANHOLES AND CATCHBASINS 2.0 Add Previous N/A Oct 2015 Update 2.0 PRODUCTS City of Maple Ridge Design and Construction Documents (2015) Page 4 of 6 UPDATES Part 3: Supplementary Specifications Section Item Number Type of Change Status Amendment Date N/A Previous Update City of Maple Ridge Design and Construction Documents (2015) Page 5 of 6 UPDATES Part 4: Supplementary Standard Detail Drawings Drawing Number Drawing Title Change Notes Date R100 Limited Urban Local Replaced Limited Urban Local Oct 2015 R101 Through Urban Local Replaced Through Urban Local Oct 2015 R102 Urban Collector Without Bike Lane Replaced Urban Collector Without Bike Lane Oct 2015 R103 Urban Collector With Bike Lanes Replaced Urban Collector With Bike Lanes Oct 2015 R104 Urban Arterial Without Bike Lanes Replaced Urban Arterial Without Bike Lanes Oct 2015 R105 Urban Arterial With Bike Lanes Replaced Urban Arterial With Bike Lanes Oct 2015 R109 Rural Arterial and Collector Replaced Rural arterial and Collector Oct 2015 W2c Meter Installation for 19mm and 25mm Service Connections Replaced See Part 5 Water Meter Material Specifications & Design Guidelines WM1-WM8 Oct 2015 W2d Meter Installation for 38mm and 50mm Service Connection Replaced See Part 5 Water Meter Material Specifications & Design Guidelines WM1-WM8 Oct 2015 C7 Driveway Crossing Replaced Changed reference from R12 to R13 Oct 2015 R106 Urban Lane Replaced ROW Width and Added Type A /Type B Oct 2015 City of Maple Ridge Design and Construction Documents (2015) Page 6 of 6 UPDATES Part 5: Water Meter Material Specifications & Design Guidelines (added October, 2015) Section Item Number Type of Change Status Amendment Date Appendix B Supplementary Standard Detail Drawings – Water Meter Installation WM3 Replaced Previous Oct 2015 Update Remove Product Code Appendix B Supplementary Standard Detail Drawings – Water Meter Installation WM5 Replaced Previous Oct 2015 Update General Revision