City of Maple Ridge
Public Works & Development Services - Administration
Business Plan 2017 - 2021
Departmental Overview
The Public Works & Development Services (PWDS) division is responsible for carrying out corporate
initiatives as directed by Council. PWDS provides leadership in the implementation of services including
development processing, the issuance of building permits and business licences and the construction,
operation and maintenance of City infrastructure. In addition, the division attends to enquiries and
requests for assistance from the public. The people in the division strive to provide excellent customer
service and present a business friendly `How Can I Help?' approach. The division continues to work with
its partners such as the Urban Development Institute, and Greater Vancouver Homebuilders Association
and the Downtown Business Improvement Association to ensure its processes align with Best Practices.
The Division sees public consultation being at the forefront of its activities and continues to build a
successful public consultation process to engage and inform residents.
The total expenditure budget for this department is $362,000.
Organization Chart
General Manager:
Public Works &
Development Services
Director of
Planning
Senior Development
Municipal Manager of
Services Technician Engineer Inspection Services
Mgr of Development
and Environmental
Services-
Manager of
Senior Project
Infrastructure Engineer
Approving Officer
Development
Manager of
Community
Planning
Manager of
Design & Manager of
Construction Utility Engineering
& Construction
Full -Time Equivalent Staff = 1
Manager of Bylaws Director of
and Licences Engineering
Operations
Manager Manager of
"o/Mechanical m Procurement
Superintendent of I I Superintendent of
Sewerworks m Roads & Fleet
Superintendent of
Waterworks
Executive
Assistant
Strategic Alignment
• The people in the division strive to provide excellent customer service and present a business
friendly "How can I help" approach. The Division has been noted for best practices in many areas as
it works towards implementing Council's strategic direction.
• All departments' work aligns with Council direction.
The Division works closely with the development community and the public, providing excellent
customer service in alignment with best practices.
Council Review - December 2016 Page 206
Business Perspective/Environmental Scan
• Processing times have been reduced.
• Emerging issues often result in delays to planned work.
• Development activity remains strong. High volume of applications.
• Awards have been received for Most Business Friendly and Most Improved Municipality.
Continuous Improvement
• The department's participation on the UDI Development Liaison Committee. This Committee is
committed to implementing the 10 Best Practices for Development.
• Customer Service Co-ordinator has enhanced the City's approach to Customer Service.
Accomplishments and Work in Progress (highlights only)
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Albion Flats: Council discussion -
Update and reports presented to Council in
Determine direction for Albion Flats
2015. Council directed that charrette options
50%
(include agricultural fair, sports tourism).
be revisited. Further reports deferred pending
results of Parks initiatives.
Transportation Plan: Staff presentation
Transportation Plan adopted. Major projects
and Council discussion - Implement the
underway - Abernethy, 128 Avenue, 203
100%
Transportation Plan.
Street, 232 Street.
Advertise for Environmental
Committee established and underway.
Sustainability Advisory Committee
100%
Members. Conduct Interviews. Obtain
Council Approval
Advertise for Active Transportation
Committee established.
Advisory Committee Members. Conduct
90%
Interviews. Obtain Council Approval.
Develop an implementation plan to
Transportation Plan endorsed. Implementation
advance the approved Transportation
is through Annual and Five Year Business
Plan. Prepare list of priority projects.
Plans.
100%
Prepare report for Council review.
Incorporate projects into Financial Plan.
Implement and complete the following
Abernethy Phase 2 - 90% complete
Capital Projects:
203 Street - 80% complete
• Abernethy Way/128 Avenue - Phase 2
2016 Paving Program - 100% complete
90%
• 203 Street - Lougheed Highway to
Golden Ears Way
• 2015 Paving Program
Develop an implementation schedule for
Items included in 2016 and 2017 Business
items approved by Council from the list
Plans.
100%
of recommendations by the Mayors
Open Government Task Force
Council Review - December 2016 Page 207
Ongoing Deliverables
• Continued representation on the Records Management Committee. The representative will develop
`power user' level skills and provide training and hands-on assistance to department staff, as well as
Work with IT on development and implementation of the IT Strategic Plan.
• Support the MRRI through Planning and Bylaw enforcement and operational requirements.
• Assist Parks & Recreation on implementing the Housing Action Plan.
• Work with SD42 to support property acquisition.
• Support Parks & Recreation on advancement of a Community Hall.
• Propose the appropriate OCP and zoning amendments.
• Provide ongoing leadership to the Division's departments
• Participate in necessary training, and contribute to the development of appropriate business
practices in our area as we grow the document management system
• Review Departmental reports to Council
• Liaise with Ridge Meadows Recycling Society
• Attend Public Hearings
• Assist Economic Development Department in securing potential investors
• Liaise with School District No. 42 on cross jurisdictional issues
• Meet with citizens to resolve issues of concern
• Work with outside agencies for approvals and feedback on municipal issues
• Participate in the Emergency Program.
• Review succession plan requirements for Division
• Represent senior staff at Public Information meetings
• Work with Engineering and Operations to ensure core services such as water and sewer remain
operational in the short term, and are managed to serve the community into the future
• Apply for appropriate grant funding
• Work with Manager of Sustainability & Corporate Planning to implement energy efficient initiatives
• Provide regular updates to Council on workplan items/found milestones
• Implement Capital Plan including preparation of appropriate concept plans, contract administration,
as well as completion of studies and tenders
• Attend and participate in Metro Vancouver and TransLink public and technical meetings. Advise and
update Council and prepare submissions to Metro Vancouver and TransLink as required
Council Review - December 2016 Page 208
Found Milestones
• Review of 203 Street intersection in relation to a Development Variance Permit
• Suburban residential and Estate Suburban Residential Discussion Paper (September 2016)
• Staff report on proposed Aquilini exclusion application and requested community consultation
(August 2016)
• Creation of Citywide Community Amenity Contribution Policy
• Provide assistance to Parks and Leisure Services on Recreation Prioritization and aquatic Facility
land use
• Rezoning File Extension Reports discussion paper
• Agricultural Plan Facilitation
• Referrals from Metro Vancouver on Regional Growth Strategy Consideration of Review and Housing
Action Plan
• Report on the Regional Affordable Housing Strategy
• Report on the National Housing Strategy
• Speed Reader Boards. At Council's behest staff reviewed a request for additional digital speed
reader boards throughout the City. The purchase and installation of the speed reader boards is in
progress.
• North Slope Interceptor. Consultant retained to develop and evaluate options to address the issue.
City has retained a land agent and commenced discussions with residents to secure amendments to
the existing statutory right-of-way.
• Lougheed Highway Corridor. There has been extensive consultation with the Ministry of
Transportation and Infrastructure along the entire Lougheed Highway corridor, with special emphasis
on the Haney Bypass. The Ministry has developed a number of options to improve the functionality
of the highway and the City has worked closely with the Ministry staff and consultants.
• B line Bus Study. In support of the Mayors Vision the City, along with Pitt Meadows, Port Coquitlam
and Coquitlam has sought confirmation of the contemplated B line bus route along Lougheed
Highway and the Engineering department prepared a draft Request for Proposal for the conceptual
study and secured endorsement from all parties.
• Solid Waste review
• Relocating Bylaw office to the main floor of the Randy Herman Safety Building to improve customer
service
• Review of other municipalities methods of dealing with hoarding
• Local taxi company relocation
• Permit process for mobile food vendors
Council Review - December 2016 Page 209
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Service Area Goal: Strategic Planning
• To provide leadership and mentorship in assisting departments in meeting strategic goals.
Objectives.-
To
bjectives:To implement strategic Council and organization initiatives.
Action Item
Lead
ETA
Implement and substantially complete the following major
General Manager
capital projects:
Support:
• 232 Street (Fern Crescent to Silver Valley Road)
Engineering
Q4
• 2016 Paving Program
Work with Parks and SD42 on the advancement of new
General Manager
Q4
school and community centre in Albion
Support: Parks
Work with Ministry of Transportation to implement
General Manager
improvements on Haney Bypass
Support:
Q4
Engineering
Work the TransLink to advance the B-line implementation
General Manager
and new bus service to Silver Valley
Support:
Q4
Engineering
Implement the Hammond Area Plan
General Manager
Q4
Support: Planning
Implement actions from Open Government Task Force
All Departments
Support: All
Q4
Departments
Housing Action Plan Implementation
General Manager
Q4
Planning
Operating Budget
Council Review - December 2016 Page 210
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Administration
Proposed Changes or Remarks:
Salaries
• This area includes $65,000 in growth funds that are intended to address costs related to population
growth. All growth funds in 2017 and $40,000 in 2018 have been allocated.
Incremental Packages - None
Capital Budget - None
Information Technology - None
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Expenditures
Conferences & Meetings
29
29
0%
29
29
29
29
Memberships
25
25
0%
25
25
25
25
Salaries
300
304
4
1%
337
408
479
553
Supplies
4
4
-
0%
4
4
4
4
358
362
4
1%
395
466
537
611
Internal Transfers
Salaries Recovery
(82)
(84)
(2)
2%
(86)
(87)
(89)
(91)
(82)
(84)
(2)
2%
(86)
(87)
(89)
(91)
Totals
276
278
2
1%
309
379
448
520
Proposed Changes or Remarks:
Salaries
• This area includes $65,000 in growth funds that are intended to address costs related to population
growth. All growth funds in 2017 and $40,000 in 2018 have been allocated.
Incremental Packages - None
Capital Budget - None
Information Technology - None
Council Review - December 2016 Page 211
City of Maple Ridge
Public Works & Development Services - Engineering
Business Plan 2017 - 2021
Departmental Overview
The core driver for the Engineering Department is ensuring that the residents of the City of Maple Ridge
can rely upon high quality infrastructure services including drinking water, sanitary sewage collection,
rain water discharge as well as the multi -modal transportation network.
The Engineering Department develops and implements initiatives and programs to construct municipal
infrastructure services in support of ongoing growth throughout the City as well as maintaining the
existing infrastructure through the complete life cycle. The foundation for the management of municipal
infrastructure is a suite of coordinated Master Plans that cover all infrastructure sectors.
Capital project definitions, along with appropriate funding sources are developed for consideration in the
City's Financial Plan. The Engineering Department staff oversee those projects through conception,
design, tendering, construction and administration for roads, sewers, drainage and water works.
Land development applications are reviewed for compliance with the City standards and the
confirmation of the infrastructure servicing requirements.
The management of the overall transportation system includes consideration of all travel modes -
walking, cycling, transit as well as vehicles. Rapid growth throughout the City, especially where
developments occur in a non-linear manner often provides challenges, especially for sidewalk
connectivity.
The City's ability to respond to large-scale emergency or disaster situations is critical and the Engineering
Department plays a significant role within the City's Emergency Operations Centre, providing professional
expertise and advice on a large range of hazard mitigation and risk management issues.
The Engineering Department works in close cooperation with other departments within the City and staff
also provide information and technical expertise to internal City committees as well as a number of
external regional committees.
The total expenditure budget for this department is $3,449,000.
Organization Chart
Municipal
Engineer
Council Review - December 2016 Page 212
Development Traffic &
Pcnnn-1.r�,,,1ive Engineering Manager ofServices Technicians Transportation Manager of Llnlrlaclr,,Orfe
t Project Clerk 2 Fr Technologist LDesign & Utility Engineering
Construction
Engineering
Technologist 1
Senior Project Instrumentperson 2 Engineering
Engineer Technologist 1
Traffic
Technician Subdivision
Engineering Development
Technologist 1 Technologist
Engineering 2 FT
ech nologist-Projects
Supervisor -Mapping Engineering
and Drafting Inspector
Engineering 2 FT
Technologist 1
3 FT
Engineering
Inspector 2
Draftsperson 2
3 FT
Full -Time Equivalent Staff = 28
Strategic Alignment
• Ensuring that the residents of the City of Maple Ridge can rely upon the provision of high-quality
infrastructure including drinking water, sanitary sewage collection, rain water collection and
discharge as well as roads is a key driver for the Engineering Department. The development and
implementation of coordinated infrastructure planning master studies and initiatives ensure that as
Maple Ridge continues to grow, the appropriate municipal services are in place or identified for
future construction. That same growth provides challenges, especially in the area of streets and
sidewalks as developments may not occur in a contiguous manner, thereby creating gaps in the
street network.
• The development of a true multi -modal transportation network is not only desirable, it is a
requirement if the City is to create a discernible shift away from the reliance upon the single -
occupancy vehicle. Council's commitment to this matter is reflected in the creation of annual
programs to provide enhanced facilities for cyclists and pedestrians as well as advocating for
additional transit services, local locally and inter -regionally.
Business Perspective/Environmental Scan
The City owns, operates and maintains a wide array of infrastructure assets valued at approximately
one billion dollars. The expectation is that the assets will function effectively for many years but all
infrastructure has a finite service life. The challenge for the City, as for other municipalities is not
only to build infrastructure in support of growth but to manage all assets in a cost-effective manner
over their life cycle and plan for their replacement.
Council Review - December 2016 Page 213
Business Perspective/Environmental Scan - cont'd
• The securing of funding from senior agencies to complete major projects is vitally important to
ensure that those projects occur in a timely manner - the extension of Abernethy Way; the buildout
of 232 Street in Silver Valley; the completion of the redevelopment of Lougheed Highway from 224
Street to 226 Street; the overpass to improve access to the Albion Industrial Area; the 240 Street
crossing to Silver Valley).
Public engagement is a critical component for all infrastructure construction. The scope and nature
of consultation process may vary depending upon the specific project or initiative but the Engineering
Department will continue to build on previous successful public consultation processes to ensure
residents are engaged and informed. Recent examples include the reconstruction of 203 Street
north of Dewdney Trunk Road, the proposed 232 Street Road Improvements from 132 Avenue to
Silver Valley Road as well as the significant traffic calming initiatives underway on 123 Avenue and
River Road. Public consultation may include regular Open Houses throughout the development of a
project, or the formation of a neighbourhood advisory committee as employed in the traffic calming
initiatives.
Continuous Improvement
• The Traffic Calming Policy is a solid policy document that outlines a transparent process for residents
to be involved in when evaluating the need for neighbourhood traffic calming. The policy sets out a
pre-screening that requires a week-long data collection. Given the considerable number of requests
for traffic calming, this can slow the process down considerably. Implementation of traffic calming
requires majority support within the neighbourhood and there are cases where, after going through
the data collection, evaluation and consideration of options the installation is not supported. To
address requests quicker and reduce the backlog, when a request is first received the
neighbourhood will be surveyed to determine the level of support before undertaking data collection.
BC One Call is a service where, upon request the City will collate as -built drawings for a specific area
where a party is contemplating excavating within the right-of-way. This can be a very time-consuming
process for the front counter staff, and often requires re -issuance of the drawings because there is a
time limit on the work. There is also a cost to the City for each application, to be paid to BC One Call.
The City will be exiting from the BC One Call program but will still provide as -built records to
contractors and utility companies upon request.
• In conjunction with the IT Department, the Infrastructure Development Section has developed a
project tracking function within Amanda for the processing of development applications.
• The City recently adopted a new Design Criteria Manual and staff in all sections of the Department
are evaluating the new criteria and what, if any criteria or sections should be amended or updated,
based upon the experience of consultants and contractors utilizing the document.
Council Review - December 2016 Page 214
Accomplishments and Work in Progress (highlights only)
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Develop and submit a corporate asset
In progress
75%
management policy to CMT
Review water distribution system
Complete
100%
capacity in the SE 84m pressure zone
Complete Master Plans - Sanitary,
Complete. Detailed servicing plans will be
Water and Drainage in growth areas
developed as needed, dealing with timing and
100%
(Silver Valley, Albion)
phasing.
Complete a file management update
Process Review is 90% complete, next step is
that incorporates improvements to
to develop and implement solutions to the
75%
Amanda, the LaserFiche system and
recommendations
manual checklists
Oversee the development of Integrated
This is a multi-year project that entails
Stormwater Management Plans for the
significant data collection and consultation.
50%
South Alouette and Kanaka Watersheds
Assist with development of a Fiscal
Complete
100%
Impact Analysis Model
Update Building Permit processes in
Building Permit Process has been adjusted
Amanda and Laserfiche
internally through Laserfiche, next step is to
50%
update Amanda and incorporate recommenda-
tions from the Internal Process Review
Update Works and Services Agreement
Underway
25%
template
Review Subdivision process and identify
Complete
100%
opportunities
Expand Engineering Development
Working through information bulletins to add
40%
webpage
to website in 4th Quarter
Implement Council's Fiscal Impact
Analysis Model for key development
Complete
100%
proposals
Construction Drawing Intake and
Processing Review in order to improve
Rescheduled to 2017 due to resource
the efficiency with which infrastructure
constraints.
0%
construction drawings are tracked,
delivered and processed
Complete Drinking Water Master Plan
Complete
100%
Update
Complete Integrated Stormwater
This is a multi-year project that entails
Management Plans for Kanaka and
significant data collection and consultation
°
50%
South Alouette Watersheds
Review need and scope of infrastructure
Transportation Plan - 100%; Water Master
improvement projects identified in high-
Plan - 60%; Sanitary Master Plan - 75%
°
80%
level master plans
Review cost/benefits of universal
On hold, awaiting outcome of Metro Vancouver
0%
metering of drinking water
universal metering review
Develop Strategic Framework for Asset
Working with other Divisions on a corporate -
Management
wide strategy, rather than only engineering
5%
infrastructure
Council Review - December 2016 Page 215
Ongoing Deliverables
• Continued representation on the Records Management Committee. The representative will develop
`power user' level skills and provide training and hands-on assistance to department staff, as well as
keep staff up to date on policies and procedures as they relate to records management.
Infrastructure Development Engineering
• Provide clarification on engineering -related development issues as a result of public inquiries
• Liaise with Planning Department on long-range and community planning issues and provide input on
infrastructure services requirements or constraints
• Process development applications, land use inquiries and servicing design reviews
• Resolution of ongoing development -related issues during design and construction
• Provide field inspection prior to acceptance of off-site developer -constructed municipal services
• Coordination of external utility companies within municipal boundaries
• Evaluation of Local Area Service inquiries
• Updates to development processes
• Provide guidance to staff at weekly meetings related to development proposals
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Review existing Maple Ridge Dyking
In progress. A consultant is reviewing the
District Agreement with Pitt Meadows
existing agreement, liaising with both Maple
25%
and identify any required revisions
Ridge and Pitt Meadows staff on expectations,
recent studies in each municipality.
Implement pedestrian and cycling
Implemented in 2016. Complete and will be
100%
facilities as identified in the STP
ongoing.
Review and implement pedestrian
Design completed. Construction to begin in 4t"
crossing safety measures at existing
Quarter
50%
multi -lane crosswalks as needed
Work with SD 42 elementary schools to
Training provided to Yennadon Elementary
provide bicycle training and road safety
School completed.
°
100%
programs
Review procurement process
Working with the Manager of Procurement.
20%
Completion planned in 4t" Quarter
Review capital projects for schedule
compliance to ensure 80% of projects
Complete and ongoing
100%
are completed in accordance with the
schedule
Review of capital projects for budget
compliance to ensure that 90% of
projects are completed within the
Complete and ongoing
100%
funding envelope barring unforeseen
extras
Ongoing Deliverables
• Continued representation on the Records Management Committee. The representative will develop
`power user' level skills and provide training and hands-on assistance to department staff, as well as
keep staff up to date on policies and procedures as they relate to records management.
Infrastructure Development Engineering
• Provide clarification on engineering -related development issues as a result of public inquiries
• Liaise with Planning Department on long-range and community planning issues and provide input on
infrastructure services requirements or constraints
• Process development applications, land use inquiries and servicing design reviews
• Resolution of ongoing development -related issues during design and construction
• Provide field inspection prior to acceptance of off-site developer -constructed municipal services
• Coordination of external utility companies within municipal boundaries
• Evaluation of Local Area Service inquiries
• Updates to development processes
• Provide guidance to staff at weekly meetings related to development proposals
Council Review - December 2016 Page 216
Ongoing Deliverables - cont'd
Utility Engineering
• In collaboration with Operations, ensure that the potable water distributed to residents in the City is
in accordance with established public health standards and the Drinking Water Management Plan
• Collaborate with Operations to manage the sewage collection system in accordance with the goals
of the Integrated Liquid Waste and Resource Management Plan
• Develop master plans for drinking water, sewage and drainage infrastructure
• Conduct investigations and preliminary project planning to confirm need and scope of projects
flagged in high-level planning studies
• Collaborate with Operations to assess the condition of public infrastructure and develop
replacement/rehabilitation plans
• Maintain infrastructure records, maps, aerial photos and topographic information; provide survey
and drafting services; communicate infrastructure data to customers
• Develop emergency response plans
Traffic and Transportation Engineering
• Improve the current transportation network to incorporate all modes of transportation through
provision of bike facilities, sidewalks and road improvements
• Undertake annual intersection performance reviews
• Support the City's Active Transportation Committee.
• Review of traffic calming requests including data collection, review and development of traffic
calming plans as required
• Review of requests for activities within municipal roadways and issuance of Highway Use Permits
• Liaison with school Parent Advisory Committees (PACs) and resident groups
• Participation on TransLink regional committees
• Participate with ICBC Road Improvement Program and safety awareness
• Support TransLink Travel Smart Program
• Engage with CP Rail and Transport Canada to ensure safe and efficient rail crossings
• Investigate and evaluate Action Requests and respond accordingly with a plan of action
• Manage and report out traffic counts and classifications
• Evaluate and accept requests for road closures and detours
• Support special events and filming activities within our roadway through a permitting process
• Support and provide guidance to other internal departments on traffic related issues
• Manage and evaluate street lighting program
Council Review - December 2016 Page 217
Design and Construction Engineering
• Ensuring that newly identified capital projects are accompanied by a business case/project
justification document that includes a concise scope of work and updated budget estimates
• Review the long term Capital Plan to ensure projects are adequately scoped and that the timing is
appropriate. Any identified redundant projects will be recommended to be eliminated and replaced
with new projects that support the City's long term goals and are in alignment with current
infrastructure master plans for water, sewer and transportation
• Completion of the annual Capital Program on schedule and within established approved budgets
• In collaboration with Operations, Design & Construction will develop project scope, designs, and
budgets that will support the watermain replacement program, culvert replacement program and
sewage system rehabilitation program. Projects will consider longterm master plans and break
history and remaining life of the infrastructure.
• In collaboration with Water Works Operations, Design & Construction will develop work plans that
minimize the need for Operations Water Crews to complete water system relocations or repairs on
proposed Design & Construction projects. As well Design & Construction will develop infrastructure
renewal programs that are ahead of major roadway resurfacing projects planned by Operations..
• Liaison with the Parks Department to insure that any new construction incorporates review of
requirements for any street trees or landscaping along with maintenance schedules.
Found Milestones
• Speed Reader Boards. At council's behest staff reviewed a request for additional digital speed
reader boards throughout the City. A review of the effective of various options was undertaken and
through dialogue with RCMP Traffic Division a strategy was developed and endorsed by Council. The
purchase and installation of the speed reader boards is in progress.
• North Slope Interceptor. Upon confirmation that the sanitary trunk sewer was not on the correct
alignment a consultant was retained to develop and evaluate options to address the issue. With the
decision to have the sewer remain in its current location the City has retained a land agent and
commenced discussions with residents to secure amendments to the existing statutory right-of-way.
• Lougheed Highway Corridor. There has been extensive consultation with the Ministry of
Transportation and Infrastructure along the entire Lougheed Highway corridor, with special emphasis
on the Haney Bypass. The Ministry has developed a number of options to improve the functionality
of the highway and the City has worked closely with the Ministry staff and consultants.
• B-line Bus Study. In support of the Mayors Vision the City, along with Pitt Meadows, Port Coquitlam
and Coquitlam has sought confirmation of the contemplated B line bus route along Lougheed
Highway and the Engineering department prepared a draft Request for Proposal for the conceptual
study and secured endorsement from all parties.
• School District 42 (SD 42) Buses. The school bus service was eliminated by SD 42 due to funding
constraints. At SD 42's request the City lobbied Translink for expansion of bus service in the City as
well as re -working existing schedules to accommodate students seeking to use public transit.
• Solid Waste review. In an effort to ascertain per household costs for municipal curbside solid waste
collection Council requested information on what factors would influence costs and what
components would form the basis for the Level of Service.
• DCC Bylaw. The existing DCC Bylaw includes a list of capital projects in support of growth; the recent
updating of the various infrastructure master plans has identified new projects as well as determined
that some existing projects are redundant. The DCC Program has been revised in conjunction with
the Finance Department and the bylaw will be updated.
Council Review - December 2016 Page 218
Found Milestones - cont'd
There have been a number of Local Area Service requests from neighbourhoods, predominantly in
the Hammond area for ditch enclosures and road construction. When a request is made Engineering
staff have to clarify the project scope, undertake conceptual designs and prepare cost estimates to
determine the neighbourhood support. The projects may not proceed if there is not adequate
support in the neighbourhood.
New Deliverables for 2017
Service Area Goal: Infrastructure Development Engineering
• The goal of this area is to identify the level of municipal infrastructure required in support of
proposed developments, ensuring that Engineering requirements are applied in a consistent and
equitable manner
• Infrastructure Development staff process development applications (rezoning, subdivisions or
building permits) upon referral from either Planning or Building departments. The processing
includes Engineering comments on the original development proposal, evaluation of the
development servicing designs as well as the field inspection services through construction
• Local Area Service (LAS) initiatives are coordinated by the Infrastructure Development section.
Objectives.•
• Continue to seek potential efficiencies within the current development processes
• Continue to improve public transparency and consistency related to development projects and
requirements
• Provide additional resources online to assist customers in preparing documentation for
submission
• Review recommendations for Building Permit process improvements and implement as
appropriate
• Coordinate telecommunication initiatives with external service providers such as Telus and Shaw
Measures
Achieve target performance timelines for development referrals:
• 80% of rezoning and subdivision referrals processed and returned to Planning within 20 working
days
• 80% of single family building permits processed and returned to Building within 5 working days
• 80% of multi -family building permits processed and returned to Building within 10 working days
• Clarify the referral process and Engineering servicing requirements through public education
Action Item
Lead
ETA
Integrate mobile workstations for Field Inspections
Mgr Inf Dev
2nd Quarter
Support:
Information
Technology Dept
Update the Electronic Inspection Forms and AMANDA
Mgr Inf Dev
4th Quarter
processes
Support:
Information
Technology Dept
Create process for authorizing Encroachment Agreements
Mgr Inf Dev
3rd Quarter
Review Driveway Access and prepare policy
Mgr Inf Dev
1St Quarter
Update Engineering Design and Construction Documents
Mgr Inf Dev
4th Quarter
Council Review - December 2016 Page 219
Action Item
Lead
ETA
Support testing of AMANDA upgrade
Information
4th Quarter
Water and Sewer System
Technology
Update drinking water system fire flow information for fire
Support:
2nd Quarter
suppression system designers
Mgr Inf Dev
Service Area Goal: Utility Engineering
• The Utility section is responsible for the development of citywide utility master servicing plans to
ensure that the continued growth of the City is sustainable from an infrastructure perspective -
the identification of reservoirs, pump stations, main upgrades for inclusion in the Capital Plan.
The section has a strong relationship with the Operations Department as well as other
Engineering service area teams to ensure the provision of safe, efficient and reliable drinking
water, drainage and sewage infrastructure systems
• The development of all record drawings is undertaken by the drafting component of the Utilities
section
Objectives.•
• To develop an integrated asset management plan for all infrastructure classes to facilitate
informed decision-making about the condition of assets as well as full life -cycle costing and
appropriate levels of funding required to maintain appropriate levels of service
• Implement the Drinking Water Management Plan
• Implement the Integrated Liquid Waste and Resource Management Plan (ILWRMP)
• Develop master plans, complete additional studies as required to confirm need and scope of
infrastructure improvement projects identified through high-level planning
• Maintain infrastructure maps and data; communicate information to customers; provide survey
and drafting services
Measures
• Water quality parameters (presence of indicator bacteria, level of turbidity, etc.) as identified in
the BC Drinking Water Protection Regulation
• Rate of rainwater inflow and infiltration into sewage collection system compared to levels set out
in the ILWRMP
Action Item
Lead
ETA
Develop 100 Year Rehabilitation & Replacement Forecast for
Mgr Util Eng
4th Quarter
Water and Sewer System
Update drinking water system fire flow information for fire
Mgr Util Eng
2nd Quarter
suppression system designers
Monitor sewage flows and pipe conditions through CCTV
Eng Tech
3rd Quarter
inspections
Create sewage system emergency response plan
Mgr Util Eng
4th Quarter
Develop detailed Silver Valley drinking water system
Mgr Util Eng
3rd Quarter
reconfiguration and expansion plans
Update growth areas components of sewage and drinking
Mgr Util Eng
2nd Quarter
water models for use in reviewing development proposals
Oversee the development of Integrated Stormwater
Eng Tech
4th Quarter
Management Plans for the North Alouette, Blaney Bog and
Fraser River watersheds
Council Review - December 2016 Page 220
Service Area Goal: Traffic and Transportation Engineering
• The goal of this area is to provide for a safe, convenient, efficient, reliable multi -modal road
transportation system with choices for the accessibility and mobility of people and goods in an
affordable manner.
Traffic and transportation engineering ensures that management and processing tools and
techniques are in place to provide effective people and goods movement. This goal supports the
desire for provision of a pro-business, customer -service oriented approach in the delivery of
municipal services.
Objectives.,
• To ensure that the City's transportation infrastructure system provides safe, reliable, multi -modal
quality service in a cost effective manner to customers using: timely traffic analysis and
response, promotion of accessibility and multi -modes, management of congestion, enhanced
safety standards and specifications, relevant bylaws and legislative tools and best management
practices.
• To address regional issues related to transportation infrastructure to best advance and serve the
City's interests.
Measures.,
• Implementation of strategies within the Strategic Transportation Plan (STP) including the
provision of sidewalks and cycling facilities
• Review and evaluate neighbourhood requests for Traffic Calming
• Refine website -based traffic count information and statistics
• Implement updated bicycle route signage in line with Metro Vancouver guidelines - identify
routes and install signage and monitor feedback
Action Item
Lead
ETA
Evaluate and test pedestrian detection hardware and
Traff Tech
4t" Quarter
software at the intersection of 224 Street and 121 Avenue.
Support:
Detection is to extend red time for vehicles stop for slow
Operations Dept
pedestrian crossing.
provide safe cycling training to our young residents at 4
Traff Tech
3rd Quarter
elementary schools.
Liaise with Ministry of Transportation and Infrastructure to
Mun Eng
2nd Quarter
finalize the phasing of improvements along the Haney Bypass
and secure appropriate provincial funding
Complete Rapid Bus Study along Lougheed Hwy Corridor
Mun Eng
3rd Quarter
Work with IT Department to implement the appropriate
Mun Eng
4t" Quarter
components of the Mayors Open Government Task Force
Council Review - December 2016 Page 221
Service Area Goal: Design and Construction
• To construct the annual Capital Plan projects in a timely and cost effective manner.
Minimize impacts on adjacent properties while meeting design standards for new roadway and
drainage projects. Over the last few years D&C has constructed several projects that during
construction have either effected access or had an impact on the adjacent properties, such as
removal of trees, reduction of driveways, removal of trespasses, limiting access, relocating
driveways, etc.
Objectives.•
• To stream line the process, and improve on public consultation to expedite the project delivery in
a timely fashion
• Reduce overall project costs by resolving conflicts prior to the work going to construction
Measures
• Early identification of driveway conflicts or non standard access points as well as trespasses in
City right of ways that will require either tree or fence removal or both. Enter into conflict
resolution process early into the process.
Action Item
Lead
ETA
Early project review to determine driveway impacts and
Mgr D&C
3rd Quarter
trespasses into City right-of-ways. Followed up with
notification to property owners
Review current project definition documentation and revise
Mgr D&C
3rd Quarter
as appropriate
Operating Budget
Council Review - December 2016 Page 222
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Engineering
Proposed Changes or Remarks:
Salaries
• The increase is in line with corporate -wide increases.
Salaries Recovery
• These are recoveries for employee costs from the Water and Sewer Utilities.
Special Projects
• The proposed special projects for 2017 are (in $ thousands)
Audible Signals
Adopted
Proposed
Proposed Changes
FG 300 Changeout Program
Proposed
Gravel Review
75
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Revenues
Fees
335
344
9
3%
354
364
364
364
Permits
10
10
-
0%
10
10
10
10
Sales
25
25
-
0%
25
25
25
25
370
379
9
3%
389
399
399
399
Expenditures
Consulting
86
86
-
0%
86
86
86
86
Eviromental Monitoring
20
20
0%
20
20
20
20
Miscellaneous
12
12
0%
12
12
12
12
Other Outside Services
10
10
0%
10
10
10
10
Salaries
2,818
2,859
41
1%
2,927
2,997
3,073
3,155
Service Severance
55
55
-
0%
55
55
55
55
Special Projects
290
295
5
2%
240
220
285
220
Supplies
26
26
-
0%
26
26
26
26
Utilities -Telephone
12
12
-
0%
12
12
12
12
Vehicle Charges
72
74
2
3%
76
79
81
83
3,401
3,449
48
1%
3,464
3,517
3,660
3,679
Internal Transfers
Contribution to own Reserves
-
-
-
-
-
-
-
Contributions from own Reserves
(12)
(12)
-
0%
(12)
(12)
(12)
(12)
Salaries Recovery
(1,006)
(1,033)
(27)
3%
(1,058)
(1,084)
(1,110)
(1,137)
Transfers from Reserve Funds
(69)
(70)
(1)
3%
(72)
(74)
(76)
(78)
(1,087)
(1,115)
(28)
3%
(1,142)
(1,170)
(1,198)
(1,227)
Totals
1,944
1,955
11
1%
1,933
1,948
2,063
2,053
Proposed Changes or Remarks:
Salaries
• The increase is in line with corporate -wide increases.
Salaries Recovery
• These are recoveries for employee costs from the Water and Sewer Utilities.
Special Projects
• The proposed special projects for 2017 are (in $ thousands)
Audible Signals
5
Drainage CCTV Program
50
FG 300 Changeout Program
50
Gravel Review
75
Safer School Travel Program
50
Video and Spot Repairs - Drainage
65
295
Council Review - December 2016 Page 223
Incremental Packages - Attached
Capital Budget - See Capital Works Program Business Plan
Information Technology - None
Performance Measures/Indicators
The City tracks our performance in a number of ways. Some of the measures are tracked using
Performance Reporting Scorecards which appear in the City's performance system. The scorecards for
this area are listed below. Full scorecards can be found in the Scorecards tab.
To access the "live" scorecard, visit www.mapleridge.ca/787 and use the Scorecard Lookup tool.
Code Scorecard (on followingpages Why this Scorecard is important to this department:
The City is working with ICBC on the release of crash
TR01 Improve Traffic Safety data - the corporation has not been willing to
release accident data over the last year.
Council Review - December 2016 Page 224
Incremental Package Report
2017 Proposed Budget
Division: PW&DS Date: October 2016
Department: Engineering Submitted By: Engineering
Request For: Additional Staff - Manager of Transportation Engineering
Package: 1 of 3
Activities/ Purpose:
The Traffic Section of the Engineering Department currently has a complement of three staff that report
to the Municipal Engineer. A Traffic & Transportation Technologist is the senior staff member who
provides functional direction to the intermediate Engineering Technologist 1 as well as the Traffic
Technician but the Municipal Engineer is responsible for decision-making both on policies and issue
resolution and a considerable amount of his time is dedicated to dealing with traffic and transportation
matters.
The addition of a Manager of Transportation Engineering will facilitate a more strategic role to the Traffic
Section, providing direction on strategic initiatives and processes.
Functions Performed/ Degree of Service:
The Manager of Transportation Engineering would provide direction to the Traffic Section staff on a
range of matters from individual resident concerns through to the implementation of strategic initiatives.
The Manager of Transportation Engineering would also be able to provide advice to both internal and
external customers on transportation planning, review development applications as well as represent the
City at Regional committees.
Staff Position:
This would be an exempt position, responsible for managing the Traffic Section of the Engineering
Department.
Performance Measure:
Package:
2017
Budget
$140,000
Furniture/Computer 7.000
Council Review - December 2016 Page 225
Incremental Package Report
2017 Proposed Budget
Division: PW&DS Date: October 2016
Department: Engineering Submitted By: Engineering
Request For: Development of Strategy to Reduce/Eliminate Illegal Dumping
Package: 2 of 3
Activities/ Purpose:
Illegal dumping is a concern across Metro Vancouver, and the level of instances in the City is not worse
than other Lower Mainland jurisdictions. The development and implementation of an campaign to
reduce/eliminate illegal dumping would include a communication strategy to educate residents about
the impact of illegal dumping and work toward a significant reduction or elimination of the instances of
illegal dumping.
Functions Performed/ Degree of Service:
The illegal dumping strategy would provide education on the costs to the taxpayer of waste material
dumped around the City, more in rural areas. It would include the development of a social media
campaign ad incorporate a reporting structure for residents to phone in to report instances of illegal
dumping.
Staff Position:
There would not be a staff resource but rather the City would retain a consultant to develop the anti-
dumping program, including the education material, social media and a reporting tool or app.
Performance Measure:
The amount of illegal dumping is recorded by the Operations Department currently and could continue to
be monitored on an annual basis to determine the success of the campaign.
Package:
2017
Budget
$40,000
Council Review - December 2016 Page 226
Incremental Package Report
2017 Proposed Budget
Division: PW&DS Date: October 2016
Department: Engineering Submitted By: Engineering
Request For: Additional Staff - Engineering Technologist 1
Package: 3 of 3
Activities/ Purpose:
Residential and commercial development applications that are referred to the Engineering Department
are currently reviewed by two technologists (Engineering Technologist 1 and a Subdivision Development
Technologist) and a junior Subdivision Development Technologist reviews building permit applications.
Performance measures have been established for processing application referrals within a determined
time periods as follows:
80% of rezoning and subdivision referrals processed and returned to Planning within 20 working
days
• 80% of single family building permits processed and returned to Building within 5 working days
• 80% of multi -family building permits processed and returned to Building within 10 working days
The building permit processing is meeting the performance target as they are relatively simple
applications but the challenge has been in meeting the targets for the rezoning and subdivision referrals
and subsequent applications as these can be substantial in size and increasingly complex in nature.
Given that there are significant fees collected as part of the development process it is recommended
that an additional technologist be hired to augment existing staff resources to ensure that applications
are processed in a timely manner.
The new staff position could also back up the construction inspectors as required to cover off vacations
and high demand periods in the field.
Functions Performed/ Degree of Service:
The position would be an intermediate level position that would process the rezoning and subdivision
referrals and subsequent applications as well as providing backup to the field inspection function.
Staff Position:
This would be a CUPE position, an intermediate level position reporting to the Manager, Infrastructure
Engineering
Performance Measure:
Package:
2017
Budget
$90,000
Furniture/Computer 7.000
Council Review - December 2016 Page 227
City of Maple Ridge
Public Works & Development Services - Active Transportation Advisory Committee
Business Plan 2017 - 2021
Committee Purpose
• The bylaw enacting the Active Transportation Advisory Committee was given final reading on January
26, 2016. The Active Transportation Advisory Committee was formed to advise Council on strategic
priorities, planning, policies and mobility issues relating to transportation in Maple Ridge, using the
Strategic Transportation Plan as a guide.
Committee Structure and Members
The Active Transportation Advisory Committee is comprised of 11 members, which include: one
Council liaison, one alternate Council liaison, one member from the Municipal Advisory Committee
on Accessibility Issues, one member from School District No. 42, three members from the
community -at -large, one member at large with a cycling interest, one member representing the
business community, one member representing the seniors' community, one youth representative
(aged 25 years or under) and one member from Ridge Meadows RCMP.
Accomplishments and Work in Progress (highlights only)
Ongoing Deliverables
• The committee has not yet met - still soliciting members.
Found Milestones
• None
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Action Item
Lead
ETA
Action Item
Status or Outcome
Complete
Plan and use the document to establish a work plan, and
Engineering
(and ETA if
identify other issues that are of interest.
not 100%)
Selection of committee members
In progress - it has been a challenge to identify
potential committee members. Interviews were
undertaken in the Summer and a subsequent
request for volunteers issued but not all
75%
categories were addressed. The intent is to
have an inaugural meeting by years -end and
solicit additional committee members in the
spring of 2017
Ongoing Deliverables
• The committee has not yet met - still soliciting members.
Found Milestones
• None
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Action Item
Lead
ETA
The committee will review the current Strategic Transportation
Support:
31d Quarter
Plan and use the document to establish a work plan, and
Engineering
identify other issues that are of interest.
Council Review - December 2016 Page 228
Council Review - December 2016 Page 229
City of Maple Ridge
Public Works & Development Services - Licences, Permits & Bylaws
Business Plan 2017 - 2021
Departmental Overview
The Licences, Permits & Bylaws Department contributes to the corporate vision by identifying policy
initiatives that enhance Maple Ridge's "business friendly" approach by pursuing compliance of City
bylaws in a fair and consistent manner; ensuring that all construction works carried out within the City
comply with the conditions detailed within the Maple Ridge Building Bylaw by providing excellent
customer service. The Department works closely with development and building communities through
participation on the Development Liaison Committee and hosting Builders Forums.
The department also works closely with the Economic Development Department issuing business
licences and providing enhanced customer service. The department also administers the dog licence
program and works with the BCSPCA with regard to animal welfare.
The total expenditure budget for this department is $3,682,000.
Organization Chart
General Manager:
Public Works &
Development
Services
Manager of Administrative/ Manager of Bylaws
Inspection Services Program Assistant and Licences
Site Grading Plan Checker 2 Senior Bylaw Bylaw
Technologist 3 FT Compliance Officer Compliance Officer
5 FT
Trades Inspector Parking Officer Bylaw
3 FT Plan Checker 1 1.5 FT Enforcement Clerk
3 FT
Building Inspector 1 Develop't Services Coordinator LicencesBusiness Support
4 FT Technicians and Permits Analyst
Electrical Inspector
2 FT
Full -Time Equivalent Staff = 33.5
Council Review - December 2016 Page 230
Strategic Alignment
• The Licences, Permits & Bylaws Department contributes to the corporate vision by identifying policy
initiatives that assist in improving the image of Maple Ridge as "business friendly"; pursuing
compliance of City bylaws in a fair and consistent manner; ensuring that all construction works
carried out within the City comply with the conditions detailed within the Maple Ridge Building Bylaw;
and, providing excellent customer service.
• All department work will align with Corporate Customer Service Quality Program.
Business Perspective/Environmental Scan
• The anticipated transition to the legalization of marijuana will require careful management.
• Public demands for staff one-on-one time in person, on the telephone and email continue to
increase.
• Processing times have been reduced - Awards received from NAIOP.
• Technological advances are changing the way we do business.
• The work of the Maple Ridge Resilience Initiative Task Force and has seen the daily involvement of
our staff and is expected to continue through 2017.
Accomplishments and Work in Progress (highlights only)
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Review permit application process
Development Liaison committee reviewing and
85%
making recommendations
Develop a new builder package
Development Liaison committee reviewing and
95%
making recommendations
Review & enhance customer service
Working with HR on corporate initiative
100%
levels
Establish a new policy & procedure for
Ongoing
100%
liquor licence applications
Review licencing process
Ongoing
100%
Review bylaw approach
Ongoing
75%
Review & amend the Taxi Bylaw
Ongoing
100%
Review existing website and restructure
information to ensure Applicants can
Ongoing
100%
readily obtain all necessary
documentation.
To review current practices and develop
improved policies to assure excellent
Ongoing
100%
customer service
Continue monitoring all potential
hotspots and develop an ongoing plan
Ongoing
100%
for future problems (eg: St. Anne's, Cliff
Avenue, Nokia Park)
ork with IT to assess and potentially
[deploy
°
65/0
electronic ticketing service
Council Review - December 2016 Page 231
Ongoing Deliverables
• Continued representation on the Records Management Committee. The representative will develop
`power user' level skills and provide training and hands-on assistance to department staff, as well as
keep staff up to date on policies and procedures as they relate to records management.
• Participate in necessary training, and contribute to the development of appropriate business
practices in our area as we grow the document management system.
• Update statistical information monthly and post to the website
• Co-ordinate and host semi-annual builders' forums
• Pursue compliance of regulatory bylaws
• Review submissions for building permits
• Review submissions for trades permits
• Provide inspections on permitted buildings
• Provide improved documentation that better anticipates customers' needs
• Ensure documentation provides clear guidance as to the City's requirements for permitting
• Monitor site grading on approved developments
• Work with civil engineers to ensure site grading provides usable space for purchasers of product
• Monitor site grading on approved developments
• Liaise with SPCA
• Administration of dog licences
• Administration of business licences
• Administration of parking passes
• Continue to collaborate with Community Outreach workers and other service providers to address
homelessness issues
• Review permit submissions for medical marijuana grow ops
• Continue enforcement action with RCMP of Scrap Metal Dealer Bylaw
• Continue with Customer Service Initiatives
• Continue to attend communications committee and website committee meetings
Found Milestones
• Improved delivery of home based business processes
• Relocating Bylaw office to the main floor of the Randy Herman Safety Building to improve customer
service
• Review of other municipalities methods of dealing with hoarding
• Working with Conservation Officers on early garbage set out times
• Working with the Planning Department and our local Taxi Company on a relocation
• Permit process for mobile food vendors
• Injunction against businesses with no business licence
• Rework documentation to be more intuitive of clients' needs
• Increased use of email to provide better and more efficient customer service
Council Review - December 2016 Page 232
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Service Area Goal: Work with the Intermunicipal Business Licence (IMBL) Committee on considering
broader partnerships
Objectives.-
To
bjectives:To review current situation and recommend future actions.
Measures.•
• Provide more opportunities for Maple Ridge businesses
Action Item
Responsibility
Scheduled for
Develop amendment to current bylaw for Council's
consideration
Robin MacNair
Completion
Work with IMBL Committee to assess and potentially
Robin MacNair
2nd & 3rd quarter
deploy expanded IMBL program
Service Area Goal: Migrate services from AMANDA database to Tempest
Objectives.•
• To provide input and perform testing to move to a more user friendly system.
Measures.•
• Improved customer service through updated processes and improved efficiency.
Action Item
Responsibility
Scheduled for
Develop amendment to current bylaw for Council's
consideration
Robin MacNair
Completion
Work with IT to assess and deploy new database
Robin MacNair/IT
1St & 2nd quarter
Service Area Goal: Review animal control services and current contract
Objectives.•
• To assess current services.
Measures.•
• Improved delivery of services and reporting.
Action Item
Responsibility
Scheduled for
Develop amendment to current bylaw for Council's
consideration
Robin MacNair
Completion
Review best practices of other municipalities.
Robin MacNair
1St & 2nd quarter
- Consider alternate approaches
Service Area Goal: Review current Highway & Traffic Bylaw
Objectives.-
To
bjectives:To ensure all sections of bylaw are current and effective
Measures
• Bylaw considered by Council
Action Item
Lead
ETA
Develop amendment to current bylaw for Council's
consideration
Robin MacNair
2nd & 3rd quarter
Council Review - December 2016 Page 233
Service Area Goal: Review current Business Licence Bylaw
Objectives.-
To
bjectives:To ensure a more improved service delivery model for customers.
Measures.-
Bylaw
easures:Bylaw considered by Council.
Action Item
Responsibility
Scheduled for
Completion
Review best practices of other Municipalities
Robin MacNair
2nd & 3rd quarter
Robin
Develop new bylaw for Council's consideration
MacNair/City
3rd & 4th quarter
Solicitors
Service Area Goal: Review current Animal Control Bylaw
Objectives.•
• To ensure a more improved service delivery model for customers.
Measures.•
• Bylaw considered by Council.
Action Item Responsibility Scheduled for
Completion
Review best practices of other Municipalities Robin MacNair 2nd & 3rd quarter
Robin
Develop new bylaw for Council's consideration MacNair/City 3rd & 4th quarter
Solicitors
Service Area Goal: Report on Airbnb
Objectives.•
• To prepare a report for Council outlining our position on Airbnb's
Measures.•
• Council give staff direction on how Airbnb's should be dealt with.
Action Item Responsibility Scheduled for
Completion
Review practices of other Municipalities Robin MacNair 2nd & 3rd quarter
Robin
Bring information report forward to Council MacNair/City 3rd & 4th quarter
Solicitors
Council Review - December 2016 Page 234
Service Area Goal: Implement study of practical policy to deal with Marijuana Dispensaries
Objectives.-
To
bjectives:To provide a current policy that aligns with federal law and with actions taken by other
municipalities.
Measures.-
Adopting
easures:Adopting a sustainable and actionable method for dealing with this type of activity.
Action Item
Responsibility
Scheduled for
Completion
Review current web pages to determine if have capacity
Robin MacNair/
Completion
Review best practices of other Municipalities
Planning
2nd & 3rd quarter
employee parking passes
Department
Service Area Goal: Review current delivery model of employee parking passes
Objectives.,
• To ensure a more improved service delivery model for customers.
Measures.,
• Efficient and timely distribution of parking passes
Action Item
Responsibility
Scheduled for
Review current web pages to determine if have capacity
Stephen J Cote-
Completion
Review computer programs that specifically deal with
Robin MacNair/
1s, & 2nd quarter
employee parking passes
Jaci Diachuk
Service Area Goal: Review current web site technology
Objectives.,
• To ensure system meets customers' expectations
Measures.,
• Increased use of web site and decreased phone call and email inquiries around this information
Action Item
Responsibility
Scheduled for
Completion
Review current web pages to determine if have capacity
Stephen J Cote-
1s, & 2nd quarter
for additional changes
Rolvink
Service Area Goal: Review current hand held technology
Objectives.,
• To determine system capability for increased customer delivery
Measures.,
• Reduced requests for misplaced job site inspection slips
Action Item Responsibility Scheduled for
Completion
Review mobile system to allow for emailing of inspection Stephen J Cote- 2nd & 3rd quarter
slips to identified clients Rolvink
Council Review - December 2016 Page 235
Service Area Goal: Review current information dissemination
Objectives.-
To
bjectives:To ensure are provided with current and ongoing changes to our business
Measures.-
Better
easures:Better understanding and knowledge of changes to the construction compliance industry
Action Item
Responsibility
Scheduled for
To pursue the Homeowners Protection Office(HPO) in
Stephen J Cote -
Completion
Review current method of information delivery and other
Stephen J Cote -
1St & 2nd quarter
methods that are available to better inform our
Rolvink
2nd & 3rd quarter
customers
Service Area Goal: Review current builders forum model
Objectives.-
To
bjectives:To determine other technologies that could be used in conjunction with current delivery model
Measures.•
• Increased participation in program
Action Item
Responsibility
Scheduled for
To pursue the Homeowners Protection Office(HPO) in
Stephen J Cote -
Completion
Review current technologies available to increase
Stephen J Cote-
1St & 2nd quarter
meeting participation options
Rolvink
Service Area Goal: Review current builder education requirements
Objectives.•
• To find opportunities to facilitate builder CPD points
Measures.•
• Increased builders forum attendance
Action Item
Responsibility
Scheduled for
Completion
To pursue the Homeowners Protection Office(HPO) in
Stephen J Cote -
receiving accreditation for the builders forum in obtain
Rolvink
3rd quarter
Continuing Professional Development(CPD) points
Operating Budget
Council Review - December 2016 Page 236
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Licences, Permits & Bylaws
Proposed Changes or Remarks:
Business Licences, Fines, Licences and Permits
• This has been updated to better reflect expected revenue.
Contract
• This is the SPCA contract, which increases 3% annually.
Salaries
• An additional Bylaw Compliance Officer was added in mid -2016. The remainder of the increase is in
line with corporate -wide increases.
Vehicle Charges
• Monthly charges for existing vehicles have increased; an additional vehicle from another department
was also re -assigned here.
Incremental Packages - Attached
Capital Budget -
1. Two vehicles to complement existing staff levels that have increased over the past several years.
Also, required to better meet our customer service needs as not only inspections staff attends
job sites. Due to the complexities of our current land development the plan checking staff site
grading technologist are required to attend sites to gain a better understanding of proposals that
appear not to comply with already submitted documentation and subdivision plans.
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Revenues
Business Licences
623
678
55
9%
678
678
678
678
Cost Recovery
6
6
-
0%
6
6
6
6
Fees
55
55
-
0%
55
55
55
55
Fines
63
69
6
10%
69
69
69
69
Licences
255
245
(10)
(4%)
245
245
245
245
Permits
1,735
1,787
52
3%
1,840
1,895
1,895
1,895
2,737
2,840
103
4%
2,893
2,948
2,948
2,948
Expenditures
Advertising
2
2
-
0%
2
2
2
2
Contract
400
411
11
3%
423
435
447
459
Miscellaneous
2
3
1
0%
3
3
3
3
Publicity
4
4
-
0%
4
4
4
4
Salaries
2,956
3,039
83
3%
3,111
3,186
3,266
3,353
Supplies
76
76
-
0%
76
76
76
76
Utilities -Telephone
13
13
-
0%
13
13
13
13
Vehicle Charges
104
134
30
29%
138
142
146
150
3,557
3,682
125
3%
3,770
3,861
3,957
4,060
Totals
820
842
22
3%
877
913
1,009
1,112
Proposed Changes or Remarks:
Business Licences, Fines, Licences and Permits
• This has been updated to better reflect expected revenue.
Contract
• This is the SPCA contract, which increases 3% annually.
Salaries
• An additional Bylaw Compliance Officer was added in mid -2016. The remainder of the increase is in
line with corporate -wide increases.
Vehicle Charges
• Monthly charges for existing vehicles have increased; an additional vehicle from another department
was also re -assigned here.
Incremental Packages - Attached
Capital Budget -
1. Two vehicles to complement existing staff levels that have increased over the past several years.
Also, required to better meet our customer service needs as not only inspections staff attends
job sites. Due to the complexities of our current land development the plan checking staff site
grading technologist are required to attend sites to gain a better understanding of proposals that
appear not to comply with already submitted documentation and subdivision plans.
Council Review - December 2016 Page 237
Information Technology Update - The department requires IT resourcing to support existing services. In
addition:
Capital: We have worked with IT in submitting the following capital projects, and the timing and
resourcing commitments are represented in the IT business plan:
- Purchase of the Tempest Ticketing module along with an IT commitment towards installation,
data alignment, online integration, testing and training. The Tempest module provides
automated capabilities for the issuance, tracking and payment of tickets which delivers improved
operational efficiencies. Additional benefits include; an improved customer service experience
due to the capacity for real-time uploading and improved reporting and tracking.
Performance Measures/Indicators
The City tracks our performance in a number of ways. Some of the measures are tracked using
Performance Reporting Scorecards which appear in the City's performance system. The scorecards for
this area are listed below. Full scorecards can be found in the Scorecards tab.
To access the "live" scorecard, visit www.mapleridge.ca/787 and use the Scorecard Lookup tool.
Code Scorecard (on followingpages] Why this Scorecard is important to this department:
SL05 Conducted Bylaw Calls for Service It helps to determine trends and deploy resources
appropriately
Process Commercial & Multi- Provides efficient and effective results and is a
SL12 Residential Permits Efficiently & reflection of good customer service
Effectively
Council Review - December 2016 Page 238
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: November 2016
Department: Permits & Licences Submitted By: Stephen Cote-Rolvink
Request For: Building Staffing
Package: 1 of 3
Activities/ Purpose:
Inspection of building electrical installations completed under permit within the city. Review of plan
submission for homeowner permits. Review of building electrical installations completed without benefit
of permits. Maintenance of annual operating system data base
Functions Performed/ Degree of Service:
Preform inspections; provide assistance to customer both in the office and in the field. Provide guidance
and corrective measures to achieve code compliance.
Alternatives Considered/ Reasons for Not Recommending:
Staff Position:
1 part time building electrical inspector.
Performance Measure:
Reduction in overtime expenses; Higher degree of customer satisfaction due to more timely inspections.
Increase in turn -around time of permit applications.
Package:
2017
Budget
Staff $90,000
Furniture/Computer 7,000
$97,000
Council Review - December 2016 Page 239
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: November 2016
Department: Permits and Licences Submitted By: F. Quinn
Request For: Staffing
Package: 2 of 3
Activities/ Purpose:
The City of Maple Ridge has worked diligently to improve processing times while at the same time
providing excellent customer service. The City is striving to be the best among the region in its dealings
with the development and building communities. In order to not only sustain the momentum and
achievements over the past year, but to advance further improvements, additional resources are
required. Maple Ridge is one of the fastest growing municipalities regionally. The annual building
revenues consistently exceed budget. At present the Building Department has one management
position. This level of activity has resulted in this single Manager being required to be `all things to all
people', including managing staff, answering phone and front counter inquiries, provide Building Code
interpretations, addressing customer inquiries and even performing site inspections. This is not
sustainable based on the level of activity.
Functions Performed/ Degree of Service:
A new position that oversees and manages the Building Inspectors will provide oversight to the
Inspectors and support the Department Head in managing the department and allow the Department
Head to provide strategic leadership. The position will allow for an enhanced level of customer service,
allow for quicker response times and provide day to day management to the building inspectors.
Alternatives Considered/ Reasons for Not Recommending
The alternative is to continue doing what's been done to date in the hope that the single management
position can sustain the current pace and not suffer from `burn out'.
Staff Position:
One full time management position. This position will be funded through Building Permit Fees.
Performance Measure:
The success of this position will be measured through the processing times and customer feedback.
Package:
2017
Budget
Funded from Building Permit Fees $110,000
Furniture/Computer 7.000
117
Council Review - December 2016 Page 240
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: November 2016
Department: Permits and Licences Submitted By: F. Quinn
Request For: Staffing
Package: 3 of 3
Activities/ Purpose:
The City of Maple Ridge has worked diligently to improve processing times while at the same time
providing excellent customer service. The City is striving to be the best among the region in its dealings
with the development and building communities. In order to not only sustain the momentum and
achievements over the past year, but to advance further improvements, additional resources are
required. Maple Ridge is one of the fastest growing municipalities regionally. The annual building
revenues consistently exceed budget. At present the Building Department has one management
position. This level of activity has resulted in this single Manager being required to be `all things to all
people', including managing staff, answering phone and front counter inquiries, provide Building Code
interpretations, addressing customer inquiries and even performing site inspections. This is not
sustainable based on the level of activity.
Functions Performed/ Degree of Service:
A new position that oversees the Plan Checkers in the Building Department. This position will provide
leadership and oversight to the Plan Checkers and in addition, coordinate the input from other
departments. The position will allow for an enhanced level of customer service, allow for quicker
response times and provide day to day management to the building inspectors.
Alternatives Considered/ Reasons for Not Recommending
The alternative is to continue doing what's been done to date in the hope that the single management
position can sustain the current pace and not suffer from `burn out'.
Staff Position:
One full time management position. This position will be funded through Building Permit Fees.
Performance Measure:
The success of this position will be measured through the processing times and customer feedback.
Package:
2017
Budget
Funded from Building Permit Fees $110,000
Furniture/Computer 7.000
$117,000
Council Review - December 2016 Page 241
City of Maple Ridge
Public Works & Development Services - Operations Centre
Business Plan 2017 - 2021
Departmental Overview
The Operations Centre takes pride in providing efficient, proactive and responsive customer service to
our residents. Personnel monitor and maintain roads, sidewalks, signage, street lights, traffic lights, fleet
equipment, storm water management, water distribution, sewage collection and City procurement.
Operational focus is on the health and safety of the citizens of Maple Ridge, while protecting the large
investment in public works, underground infrastructure and environment. The Operation Centre is
committed to providing essential and convenient services at a minimum cost to taxpayers, in an efficient
manner to meet current and future needs.
The total expenditure budget for this department is $7,824,000.
Organization Chart
Manager I Manager of
ro/Mechanical Procurement
Director of
Engineering
Operations
Superintentlent of
Roads & Fleet
Administrative Purchasing Fleet System
Supervisor2 Assistant Supervisor Technician Supervisor3
Tradesperson 2 Clerk 2 Buyer Supervisor 2
Electrician 3.8 Ff
Electronics Tech Storekeeper 2 Supervisor 2/
3 FT Equipment Op 3
Labourer Yardperson 2 Equipment
Operator 4b
Equipment
Operator 4a
Equipment
Operator 3
2 Fr
Truck Driver 3
Sign Maintainer
2 FT
Labourer
7 Fr
Full -Time Equivalent Staff = 74.9
Trades
Supervisor
Z
Tradesperson 2
Mechanic
2 Fr
Apprentice
Mechanic
Water System
Operator
Meter Maintenance
Worker
Supervisor 2
Equipment
Operator 4a
Maintenance
Worker Utilities
4 Fr
Equipment
Operator 4a/
Truck Driver 3
Labourer
3 Fr
Water Maintenance
Worker
3 Fr
Equipment
Operator 5
Supervisor 2
2 FT
Z
Equipment
Operator 3
Equipment
Operator 4a
Maintenance
Worker Utilities
3 FT
Labourer
5 Fr
Superintendent of
Superintentlent of
Waterworks
Sewerworks
Engineering
Engineering
Technologist
Supervisor
Technologistl
Supervisor3
Projects
Water System
Operator
Meter Maintenance
Worker
Supervisor 2
Equipment
Operator 4a
Maintenance
Worker Utilities
4 Fr
Equipment
Operator 4a/
Truck Driver 3
Labourer
3 Fr
Water Maintenance
Worker
3 Fr
Equipment
Operator 5
Supervisor 2
2 FT
Z
Equipment
Operator 3
Equipment
Operator 4a
Maintenance
Worker Utilities
3 FT
Labourer
5 Fr
Council Review - December 2016 Page 242
Strategic Alignment
The services provided by the Operations Department align with Council's strategic priorities with our
emphasis on the following:
• Strive for excellent customer service by responding promptly and courteously to inquiries and service
requests from the public.
• 24-hour rapid response to calls relating to roads, sewers, water, drainage and traffic signals/signs
and weather events.
• Providing high quality and cost-effective delivery of City services on the transportation routes and
utilities within Maple Ridge.
• Promote and enable a healthy and safe workplace to reduce the risk of workplace accidents and/or
incidents in all activities.
• Assist internal customer to achieve best value for dollars expended by the City.
• Operation strives to work in an open, fair and friendly manner that aligns with the Corporate
Customer Service Quality Program
Business Perspective/Environmental Scan
• Comprehensive asset maintenance of infrastructure including roads, street superstructure/lighting,
sanitary sewers, storm sewers, ditches, water mains, reservoirs, pump stations. Includes end of life
replacement and funding projections.
• Climate changes are creating uncertain weather patterns and higher intensity storm events.
• Social environment is impacting operational resources.
• Hot, dry seasons increase water supply demand and stress on water utility.
• Currency fluctuations (CDN -USD) are impacting vehicles replacement costs as well as materials
costs.
• Transfer Station fee increases & regulations are impacting the increased number of illegal dumping
sites.
• Opportunities to improve service delivery to the residents by improving information technology.
Continuous Improvement
• To increase efficiencies and improve response and clean up times, during and after storm events, a
designated area has been set up with equipment, supplies and a new service request report.
Implementation resulted in Operations completing 63 service requests and a city-wide post -storm
clean up in one week of the March 10th, 2016 storm. Clean up was reduced by five weeks compared
to the August 2015 storm.
Participated in WorkSafeBC pilot project "Organizational Safety Assessment Tool" which resulted in a
roadmap identifying opportunities to enhance our health and safety culture.
• Operations continue to be proactive in recovering increased repair expenses to City infrastructure.
• Operations, Purchasing, Engineering and Sustainability and Corporate Planning are participating in a
street light working group to ensure the City has a process, from design, purchasing, to maintenance
that is consistent, optimizes the process, and takes full advantage of technology, energy savings and
incentive programs.
Council Review - December 2016 Page 243
Accomplishments and Work in Progress (hiohliohts only)
Ongoing Deliverables
services Provided
Operation Administration:
• Front line customer service for residents and internal customers
• 5,200 service requests generated in 2015 that were dispatched to various departments
• Update public and emergency services with road work and road closures
Roads Maintenance:
• Maintain of 492 km of roads and lanes
• Maintenance of 79 walkways
• Empty and repair 127 litter bins
• Maintenance of 16 bridges
• Snow and ice control
• Maintenance of 7,211 traffic signs
• Maintenance of 8 railway crossings
• Maintenance of 265 km of traffic lane markings
• Roadside mowing of 320 km of which 251 km is moved twice per year
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Fleet Review of rates, revenues and
0% increases for 2017.
100%
efficiencies
Safety improvements at PRV Water
Ongoing. Field review completed to
50%
Stations related to system isolation
prioritize six locations (internal and
Q4/2017
at 6 locations.
external shut-off valves).
Assist with development of a Fiscal
Completed
100%
Impact Analysis Model
Construct two buildings for
electrical, storage and sander
Construction on schedule to be
75%
coverage at the existing Operations
completed in late 2016.
Q4/2016
Centre
Support review of Universal
WSRP Update complete. Awaiting
0%
Metering Review of drinking water.
outcome of Metro Vancouver Universal
ETA from
Update Water Utility Bylaw
Metering Review. Component of Water
Eng.
Utility Bylaw Update.
Implement Council's Fiscal Impact
Analysis Model for key
Completed
100%
development proposals
Develop Master Approval Pilot
Completed initial discussions with
5%
Project with Ministry of
stakeholders.
Q4/2017
Environment and BCIT
Ongoing Deliverables
services Provided
Operation Administration:
• Front line customer service for residents and internal customers
• 5,200 service requests generated in 2015 that were dispatched to various departments
• Update public and emergency services with road work and road closures
Roads Maintenance:
• Maintain of 492 km of roads and lanes
• Maintenance of 79 walkways
• Empty and repair 127 litter bins
• Maintenance of 16 bridges
• Snow and ice control
• Maintenance of 7,211 traffic signs
• Maintenance of 8 railway crossings
• Maintenance of 265 km of traffic lane markings
• Roadside mowing of 320 km of which 251 km is moved twice per year
Council Review - December 2016 Page 244
Sanitary Sewer Utility:
• Collection of domestic sewage and transfer to Metro Vancouver for treatment
• Maintain 321 km of sanitary sewer mains
• Maintain 15,566 sanitary sewer connections
• Maintain 4,832 sanitary sewer manholes
• Maintain 34 air valves on Force mains
Storm Water Management:
• Maintain 335 km of storm sewer system
• Maintain 12,880 service connections
• Maintain 224 km of drainage ditch
• Maintain 6,985 catch basins
• Maintain 5,449 storm sewer manholes
Water Utility:
• Supply of potable water for domestic and fire protection use
• Maintain 425 km of water main
• Maintain 18,495 service connections
• Maintain 2,016 fire hydrants
• Maintain 2,601 water meters
• Maintain 6,014 water valves
• Maintain 50 pressure reducing valves
Instrumentation, Electrical and Mechanical Management:
• Maintain 34 sanitary sewer pump stations
• Maintain 9 water pump stations and 11 water reservoirs
• Maintains SCADA remote monitoring and control system
• Maintain 6 chlorinating stations
• Maintenance of 45 traffic control devices
• Maintenance of 19 illuminated pedestrian crossings
• Maintenance of 4,514 ornamental street lights
• Manage 1,461 mast arm lights
Fleet Management:
• Maintenance of 157 licensed equipment
• Maintenance of 81 pieces of miscellaneous equipment
Council Review - December 2016 Page 245
Procurement Services:
• Overview of corporate purchase and supply contracts as defined within the City Purchasing Policy.
• Prepare, tender and receive sealed offers for 64 bid opportunities.
• Manage warehouse inventory, annual value of $331,759, and annual issue value of $610,000.
• Administer 109 purchasing credit cards for a total annual purchase value of $1,104,756.
• Management of ongoing vendor relations and contract management as required.
• Assess and respond to the needs of internal departments.
• Procurement managed and dispose of surplus assets:
• Asset disposal proceeds for a total value of $229,140;
• Reintegration of surplus assets back into City offices for an estimated annual cost savings of
$12,000.
• Maintain the website contract and agreement registry.
Continued representation on the Records Management Committee. .
Found Milestones
• Wind Event on March 10, 2016 resulting in 63 service requests from the public. The Operation's
team provided support to the fire and police departments, and after storm event cleanup, which was
all completed within one week of the event. A significant improvement compared to the August 29,
2015 storm event which resulted in 87 service requests and took over 6 weeks to recover.
• Assisted in the development of a new corporate Infrastructure Inspection Policy that balances
protection from the risks of defective infrastructure with other City priorities, including funding and
resource availability.
• Contractual amendments required for service and supply contracts due to the dissolution of the joint
services agreement with the City of Pitt Meadows.
• Creation and administration of the Contract and Agreements Registry that flowed from the Mayor's
Task Force on Open Government.
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 work plan.
Service Area Goal: Continuous Improvement
• Enhance customer service by being proactive in maintaining City infrastructure by leveraging
innovative technologies to efficiently streamline data, improving efficiencies while maximizing
resources and minimizing costs.
• Ensure that the corporate purchasing needs continue to be met through up to date policies that
incorporate best practices.
Objectives:
• Eliminate manually work orders so all information is tracked electronically in Amanda, and
available across the organization.
• Collect and analyze data to guide the development and modification of preventative
maintenance programs of City utilities and infrastructure to continue to meet industry standards.
• Update the City Purchasing Policy to meet the current business needs of the organization and
align with best practices.
Council Review - December 2016 Page 246
Measures
• % decrease in manual work orders
• Benchmarking - Keep water main breaks and sewer back-ups below the national average
• Continue to meet Health Canada and AWWA health standards for water quality.
• Obtain Council approval for the updated Purchasing Policy.
Action Item
Lead
ETA
Process Review: Manual Work Order Process
Davin Wilson
Support:
Q4
Engineering
SCP
Develop Drainage and Sanitary Main Flushing Program
Scott Salsbury
Support:
Q3
I.T. David Cooke
Water Quality and Utility Program Review
Davin Wilson
Q4
Purchasing Policy Review
Daniela Mikes
Q4
311 System Review
Christina Crabtree
Support:
Q4
James Storey
Open Government Task Force, Implement Items Identified
James Storey
Q4
Operating Budget
Council Review - December 2016 Page 247
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Operations Centre
Proposed Changes or Remarks:
Internal Equipment
• The increased cost is from a position re -class; the remainder is in line with corporate -wide increases.
Municipal Roads - General Maintenance
• A growth incremental of $65,000 is included to address maintenance costs of additional
infrastructure added through the Capital Improvement Program and through development. The
balance of the increase is due to wage and equipment cost increases.
Street Lighting
• Increase reflects the impact of rising electricity rates.
Incremental Packages - Attached
Capital Budget - See Capital Works Program Business Plan
Information Technology
• Support from Information Technology will be required for the development of the Drainage and
Sanitary Flushing Records System
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Revenues
Fuel Sales
121
124
3
3%
128
131
134
138
Private Services - GR
51
52
1
2%
52
52
52
52
Storm Drainage
26
26
-
0%
26
26
26
26
Traffic Control
10
10
-
0%
10
10
10
10
208
212
4
2%
216
219
222
226
Expenditures
Brushing
479
483
4
1%
489
494
502
509
Ditching
332
337
5
2%
344
350
357
364
Gravel Roads - Maint
61
62
1
2%
63
64
65
66
Internal Equipment
1,856
1,905
49
3%
1,945
1,986
2,029
2,073
Litter Bins and Sweeping
293
299
6
2%
307
314
322
331
Materials Management
483
489
6
1%
501
512
525
539
Municipal Roads -Gen Maint
652
715
63
10%
789
863
938
1,014
Municipal Roads -Patching
499
505
6
1%
513
520
528
537
Operations Management
1,019
1,038
19
2%
1,055
1,072
1,091
1,112
Shouldering
175
178
3
2%
182
185
189
193
Snow and Ice Control
284
288
4
2%
294
299
306
312
Storm Drainage
386
392
6
1%
399
406
415
423
Street Lighting
556
573
17
3%
589
603
615
627
Traffic Control
310
313
3
1%
317
321
326
331
Works Yard
244
247
3
1%
249
252
258
261
7,629
7,824
(195)
3%
8,036
8,241
8,466
8,692
Internal Transfers
Internal Equipment
(1,735)
(1,780)
(45)
3%
(1,818)
(1,856)
(1,895)
(1,935)
Operations Management
(191)
(197)
(6)
3%
(202)
(207)
(212)
(217)
(1,926)
(1,977)
(51)
3%
(2,020)
(2,063)
(2,107)
(2,152)
Totals
5,495
5,635
140
3%
5,800
5,959
6,137
6,314
Proposed Changes or Remarks:
Internal Equipment
• The increased cost is from a position re -class; the remainder is in line with corporate -wide increases.
Municipal Roads - General Maintenance
• A growth incremental of $65,000 is included to address maintenance costs of additional
infrastructure added through the Capital Improvement Program and through development. The
balance of the increase is due to wage and equipment cost increases.
Street Lighting
• Increase reflects the impact of rising electricity rates.
Incremental Packages - Attached
Capital Budget - See Capital Works Program Business Plan
Information Technology
• Support from Information Technology will be required for the development of the Drainage and
Sanitary Flushing Records System
Council Review - December 2016 Page 248
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Utilities
Proposed Changes or Remarks:
Revenue
• The rate increase for water and sewer are 4.5% and 3.6% respectively with the balance of the
change being due to additional units.
Capital
• The planned capital spend fluctuates year to year according to need.
Borrowing Proceeds/Debt/Internal
• The recently completed Water Main West and Pumping Station was largely funded through
Development Cost Charges and financed internally. However, external borrowing may be required.
Special Projects - Sewer
• Starting in 2017, $125,000 per year was added for a Pump Station Electrical Upgrade Program. This
is in addition to pre-existing Sewer Flow Monitoring and Sanitary CCTV Programs.
Special Projects - Water
• In 2017, Water System Assessment and Review increased its budget by $10,000.
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Sewer Utility
Revenues
(10,098)
(10,576)
(478)
5%
(11,078)
(11,604)
(12,158)
(12,738)
Capital
817
1,616
799
98%
3,916
3,643
1,242
395
Expense
1,190
1,214
24
2%
1,247
1,280
1,315
1,352
Special Projects
95
220
125
132%
195
195
195
195
GVS&DD
5,661
6,228
567
10%
6,601
6,997
7,417
7,862
Internal
775
796
21
3%
811
826
842
858
(1,560)
(502)
1,058
(68%)
1,692
1,337
(1,147)
(2,076)
Appropriation from Surplus
-
-
-
0%
1,692
1,337
-
-
Transfer toSurplus
1,560
502
(1,058)
0%
-
-
1,147
2,076
0%
Water Utility
Revenues
(15,742)
(16,420)
(678)
4%
(17,972)
(18,926)
(19,936)
(21,003)
Borrowing Proceeds
-
(6,000)
(6,000)
(7,000)
-
-
-
Capital
2,241
3,224
983
44%
1,375
2,485
2,014
1,728
Debt
-
305
305
850
850
850
850
Expense
2,215
2,231
16
1%
2,282
2,335
2,392
2,450
Special Projects
35
45
10
29%
15
15
15
15
GVWD
7,999
8,237
238
3%
8,502
8,773
9,051
9,337
Internal
988
7,090
6,102
618%
7,463
486
509
532
(2,264)
(1,288)
976
(43%)
(4,485)
(3,982)
(5,105)
(6,091)
Appropriation from Surplus
-
-
-
-
-
-
-
TransfertoSurplus
2,264
1,288
(976)
(43%)
4,485
3,982
5,105
6,091
Totals
-
-
-
-
-
-
-
Proposed Changes or Remarks:
Revenue
• The rate increase for water and sewer are 4.5% and 3.6% respectively with the balance of the
change being due to additional units.
Capital
• The planned capital spend fluctuates year to year according to need.
Borrowing Proceeds/Debt/Internal
• The recently completed Water Main West and Pumping Station was largely funded through
Development Cost Charges and financed internally. However, external borrowing may be required.
Special Projects - Sewer
• Starting in 2017, $125,000 per year was added for a Pump Station Electrical Upgrade Program. This
is in addition to pre-existing Sewer Flow Monitoring and Sanitary CCTV Programs.
Special Projects - Water
• In 2017, Water System Assessment and Review increased its budget by $10,000.
Council Review - December 2016 Page 249
Performance Measures/Indicators
The City tracks our performance in a number of ways. Some of the measures are tracked using
Performance Reporting Scorecards which appear in the City's performance system. The scorecards for
this area are listed below. Full scorecards can be found in the Scorecards tab..
To access the "live" scorecard, visit www.mapleridge.ca/787 and use the Scorecard Lookup tool.
Code Scorecard (on followingpages) Why this Scorecard is important to this department:
Converting some of our fleet to hybrid vehicles
EN06 Vehicle Fleet Efficiency results in reduced operating and replacement costs,
and green house gas emissions.
SL10 Maintain a Dependable Sewage City strives to be below the national average for
System sewage blockages.
SL11 Provide High Quality Drinking Water High quality, safe drinking water to homes and
businesses.
TR02 Provide Safe, Serviceable Roads Maintaining transportation infrastructure in a
serviceable condition ensures public safety.
Council Review - December 2016 Page 250
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Service Date: October 12, 2016
Department: Sewerworks Submitted By: James Storey
Request For: Increase to Sanitary Sewer Flushing Budget
Package: 1 of 6
Activities/ Purpose:
Operations manage the expenses (GL 1-91-05832-000-0000) for Sanitary Sewer Flushing maintenance
which includes cleaning and inspection of sanitary sewer mains to minimize blockages and plugged
sewers. Sewer blockages result in significant costs to the City and private property owners, as well as
serious impacts on the environment and public safety.
Functions Performed/ Degree of Service:
Best practices recommend a 5 year cycle for flushing sanitary mains in order to minimize blockages and
plugged sewers, and to assess infrastructure conditions. The City maintains 321 km of sanitary Sewer
mains and 15,566 Sewer connections. Over the past 5 years the budget has been inadequate to achieve
this frequency and the City has been reduced to a 10 year cycle. In 2015 and early 2016 the Sewer
Department experienced a higher than normal occurrence of blocked mains. The flushing program was
given priority and the 5 year cycle was reinstated. Actual costs to maintain this level of service in 2016
was $168,375 as of October 17, but anticipate a cost at year end of approximately $202,000.
It is requested that the budget for Sanitary Sewer Flushing be increased by $30,000 in 2017, 2018 and
2019 for a total of $90,000.
Alternatives Considered/ Reasons for Not Recommending;
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount.
Package:
This is a permanent increase to be applied to the budget.
2017 Budget $30,000
2018 Budget $30,000
2019 Budget $30,000
Council Review - December 2016 Page 251
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: October 12, 2016
Department:: Electrical Mechanical Submitted By: James Storey
Request For: Increase to Sewage Pump Station Maintenance Budget
Package: 2 of 6
Activities/ Purpose:
Operations manage the expenses (1-91-05870-000-0000) Sewage Pump Station Maintenance of
currently 30 city owned sites for residential and commercial usage.
Functions Performed/ Degree of Service:
The Electrical Mechanical department monitors through SCADA (telemetering) sewage pump stations
efficiencies, logging/trending data, and sharing data with engineering for system wide analysis. The
department also maintains the SCADA communications network and HMI and recording equipment.
The crews perform bi-weekly cleaning and maintenance of station sites, which includes maintenance of
the grounds, kiosks, internal controls, pumping equipment, wet well and forcemain, as well as
responding to 24 hour emergency callouts, 365 days per year.
In 2016, the City experienced two critical failures, which resulted in repair costs of approximately
$76,000. Taking this amount into consideration, the budget for 2016 would still be under funded by
$20,000.
It is requested that the budget for Sewage Pump Station Maintenance be increased by $10,000 for
2017, 2018 and 2019 totalling $30,000.
Alternatives Considered/ Reasons for Not Recommending:
No alternatives considered as reduced maintenance increases breakdowns.
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount
Package:
2017 Budget $10,000
2018 Budget $10,000
2019 Budget $10,000
Council Review - December 2016 Page 252
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: October 12, 2016
Department:: Electrical Mechanical Submitted By: James Storey
Request For: Increase to 225 Street Sewage Pump Station Maintenance Budget
Package: 3 of 6
Activities/ Purpose:
Operations manage the expenses (1-91-05891-000-0000) 225 Street Sewage Pump Station
Maintenance site for residential and commercial usage.
Functions Performed/ Degree of Service:
The Electrical Mechanical department monitors through SCADA (telemetering) sewage pump station
efficiencies, logging/trending data, and sharing data with engineering for system wide analysis. The
department also maintains the SCADA communications network and HMI and recording equipment.
The crews perform weekly cleaning and maintenance of station site, which includes maintenance of the
grounds, kiosks, internal controls, pumping equipment, generator, wet well and forcemain, as well as
responding to 24 hour emergency callouts, 365 days per year.
In 2016, the budget of $177,000 is currently trending to be over spent by $50,000 due to three pump
failures in one year, increase in Hydro rates and increased pumping due to buildout.
Engineering is currently working on an upgrade to the station to increase the stations pumping capacity
due to the Albion area buildout and future flows that includes replacing the current pumps with larger
more efficient pumps. This will reduce expensive breakdowns; however will drive up hydro costs.
It is requested that the budget for 225 Street Sewage Pump Station Maintenance be increased by
$15,000 in 2017, 2018 and 2019 totalling $45,000.
Alternatives Considered/ Reasons for Not Recommending:
No alternatives considered as reduced maintenance increases breakdowns.
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount
Package:
2017 Budget $15,000
2018 Budget $15,000
2019 Budget $15,000
145-000
Council Review - December 2016 Page 253
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: October 12, 2016
Department:: Electrical Mechanical Submitted By: James Storey
Request For: Increase to Water Reservoir Maintenance Budget
Package: 4 of 6
Activities/ Purpose:
Operations manage the expenses (1-90-03896-000-0000) of 6 City owned Reservoir sites consisting of
9 tanks,
Functions Performed/ Degree of Service:
The Electrical Mechanical department monitors through SCADA (telemetering); Reservoirs levels, water
quality sampling, logging trending data, and sharing data for system wide analysis. The department
also maintains the SCADA communications network, HMI and recording equipment.
The crews perform weekly cleaning and maintenance of station sites, which includes maintenance of the
grounds, buildings, chambers, valves, analyzers, video surveillance equipment, generators, and tanks, as
well as responding to 24 hour emergency callouts, 365 days per year. Semi annual inspections and
maintenance are performed, as well as annual flushing of mainlines, hydrant and valve maintenance.
As part of the 2017 Capital projects, two Reservoir sites will be modified by adding two more tanks with
additional control and monitoring equipment. In 2018, a third tank with additional control and
monitoring equipment will be added that will again increase operating and maintenance costs. As
development increases, these budgets need to be reassessed annually.
In 2016, there were several capital projects, which impacted the completion of Reservoir maintenance.
Maintenance will be completed in early 2017, resulting in deferring approximately $20,000 of expense.
It is requested that the budget for Water Reservoir Maintenance be increased by $20,000 in 2017,
2018 and 2019 totalling $60,000 with an annual incremental increase of $15,000 per year per
additional tank. Over the past 3 years, this budget has been under funded by approximately $45,000 per
yea r.
Alternatives Considered/ Reasons for Not Recommending_
No alternatives considered as reduced maintenance increases breakdowns.
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount
Package:
2017 Budget $20,000
2018 Budget $20,000
2019 budget $20,000
Council Review - December 2016 Page 254
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Services Date: October 12, 2016
Department:: Electrical Mechanical Submitted By: James Storey
Request For: Increase to Water Pump Station Maintenance Budget
Package: 5 of 6
Activities/ Purpose:
Operations manage the expenses (1-90-03890-000-0000) of 8 City owned potable Water Pumping
Stations consisting of 20 pumps, 6 CL2 onsite Generation/Injection Sites, and 33 Pressure Reducing
Valve (PRV) sites.
Functions Performed/ Degree of Service:
The Electrical Mechanical department monitors through SCADA (telemetering); Water Pumps and PRV
flow rates, system wide zone pressure monitoring, water quality sampling, logging/trending data, sharing
data for system wide analysis. The department also maintains the SCADA communications network and
HMI and recording equipment. The crews perform weekly cleaning and maintenance of station sites,
includes maintenance of the grounds, buildings, chambers, valves, analyzers, video surveillance
equipment, generators, and onsite CL2 generation/injections equipment, as well as responding to 24
hour emergency callouts, 365 days per year. Semi annual inspections are performed on all sites and
maintenance of PRV stations.
As part of the 2017 Capital Projects, both the 263 Street and 270 Street pump stations will be
upgraded increasing the pump sizes x 4, adding 2 additional CL2 onsite generation/injection sites, and
3 additional PRV stations all equipped with full sampling and SCADA that will increase operating and
maintenance costs. As development increases, these budgets need to be reassessed annually.
In 2016, the maintenance on PRV's is behind and will be addressed in early 2017, resulting in deferring
approximately $30,000 of maintenance expense to next year. Over the last 3 years, this budget has
been under funded by an average of $89,667 per year. It is requested that the budget for Water Pump
Station Maintenance be increased by $30,000 in 2017, 2018 and 2019 totalling $90,000 with an
annual incremental increase of $20,000 per year per additional pump station.
Alternatives Considered/ Reasons for Not Recommending_
No alternatives considered as reduced maintenance increases breakdowns.
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount
Package:
2017 Budget $30,000
2018 Budget $30,000
2019 Budget $30,000
90 000
Council Review - December 2016 Page 255
Incremental Package Report
2017 Proposed Budget
Division: Public Works & Development Service Date: October 12, 2016
Department: Chipping Program Submitted By: James Storey
Request For: Increase to Brushing Maintenance Budget
Package: 6 of 6
Activities/ Purpose:
Operations manage the budget GL 1-68-03321-000-8057 for brushing maintenance which includes the
spring and fall chipping contracts, overhead tree trimming and roadside mowing as a matter of public
safety related to improving vehicular and pedestrian safety on roadways, sidewalks and boulevards, as
well as reduced fire hazards.
Functions Performed/ Degree of Service:
The budget for brushing maintenance has been underfunded for a number of years, and the costs for
the spring and fall Chipping Program have increased substantially. Currently the City budgets $483,000
annually to cover the chipping contracts, overhead tree trimming and roadside mowing costs.
The cost of the 2016 chipping program will be $144,000 to a budget of $72,648, a difference of
$71,352.
In order to maintain the level of the Chipping Program and not negatively affect other service areas, it is
requested that the budget for brushing maintenance be increased to $554,140.
Alternatives Considered/ Reasons for Not Recommending:
1) The City can choose to eliminate the spring and fall chipping programs. Choosing this reduction
in service significantly increases the risk of illegal dumping, illegal burning and untidy and
unsightly premises. This would reduce the necessary increase to $22,744.
Staff Position:
Not Applicable
Performance Measure:
Actual costs are covered by the budgeted amount.
Package:
This is a permanent increase to be applied to the budget.
2017
Budget
$75,000
Council Review - December 2016 Page 256
Council Review - December 2016 Page 257
City of Maple Ridge
Public Works & Development Services- Planning Department
Business Plan 2017 - 2021
Departmental Overview
The Planning Department supports Council's direction through the creation and application of a number
policies, regulations and bylaws. These documents are not only used as a guide for decision making, but
also establish the procedures under which development applications are processed, and how
information is disseminated within the Community.
After Council has set policy guidelines for the community, the department works to ensure that area
residents are kept informed, and that development complies with zoning specifications, environmental
legislation, health regulations and any form and character for a development area. To carry out this work,
the department coordinates the flow of information with a number of internal departments, stakeholder
groups and agencies involved in a development application.
The department provides information, recommendations and technical expertise in the development of
policy as well as providing technical assistance to committees of Council. The department also supplies
information and works closely with external agencies (e.g. Agricultural Land Commission, Metro
Vancouver).
The department has a group of environmental specialists who together with planners and engineers are
working so that Maple Ridge achieves the highest standards of environmental stewardship and
sustainability. This team works in the field to assess the impacts of project applications, and also works
with Council to develop environmental policies to align with Council's direction and Provincial
regulations. These policies and regulations form part of a comprehensive framework that is used to
guide decisions around planning and land use in the community.
The total expenditure budget for this department is $2,454,000.
Organization Chart
Director of
Planning
Mgr of Development Administrative
and Environmental Assistant
Services -
Approving Officer
Planner 2 Environmental
2 FT Planner
munity
L�Managerof
nning
FPlaner2n
2FT
Senior Planning Environmental
Technician m Technician Planner 1
3 FT
Mappingand Planning
Graphics Technician
Technician 2 FT
Planner 1 Development
2FT Services Technician
2 FT
Full -Time Equivalent Staff = 21
Council Review - December 2016 Page 258
Strategic Alignment
The Planning Department supports the Corporate Strategic Vision through the creation, and application
of a number of policies, regulations and bylaws. These documents are not only used as a guide for
decision making, but also establish the procedures under which development applications are
processed, and how information is disseminated within the community. The Corporate Strategic Vision
includes a number of strategic focus areas that are reflected in the Official Community Plan (OCP) and
are summarized in Policy 1-1 of the OCP as "The City will strive to protect its Community values into the
future, as it becomes more vibrant and prosperous, offering residents a strong local economy, stable
and special neighbourhoods, thoughtful development, a diversity of agriculture, and respect for the built
and natural environment".
Business Perspective/Environmental Scan
• Increased tree permit activity following the adoption of the Tree Management Bylaw.
• Complexity of development applications continues to increase; requires more research; legal input;
and infill projects are proving to be time consuming.
• The Electronic Agenda process is time consuming and impacts workloads within the Department.
• Challenges in meeting public demands including phone and email inquiries.
• Increased public enquiries, enforcement compliance and public outreach.
• Public Consultation is very valuable but costly in terms of costs and staffing resources.
• Policy projects and bylaw reviews take a significant amount of time and often require numerous
reports to Council.
• Environmental Advisory Committee duties have impacted staffing in the Environmental Services
section.
• Found Milestones present challenges in adjusting workloads.
• Staff turnover and retirements have resulted in loss of corporate memory.
Continuous Improvement
• Continues to offer the Planner of the Day Program (POD).
• Assisted the Fire Department with the Update to the Wildfire Development Permit Guidelines.
• Assist the Parks & Leisure Services Department with the implementation of the Housing Action Plan.
• Provide Environmental services to the Engineering and Operation Departments for instream works
and compensation projects.
• Assist Information Technology with the on-line development application mapping.
• Provide mapping services to other Departments.
• Continue to utilize the City Website to post information on projects and on-line questionnaires.
• Complete process reviews on a periodic basis, with frequency dependent on scale and complexity.
• Scorecards are maintained in a timely fashion.
Action Item
Lead
ETA
Development report review - explore new staff report
template using bullet structure and limiting length
Development
Services
1 Q 2017
Council Review - December 2016 Page 259
Accomplishments and Work in Progress (highlights only)
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Accomplishments - With no carry-over to 2017
Agricultural Plan Facilitation
Jan 11, 2016 - staff presented questionnaire
100%
results. Council directed a facilitated session
• Ag plan Facilitated Session July 5, 2016
100%
• Final report and Council decision October 25/16
100%
• Action Items are identified as 2017 Deliverable
Albion Industrial Area land owners
Assisted Economic Development with meetings
with property owners and report to Council
100%
Commercial & Industrial Strategy
Implementation - Assist with promotion
Assisted with Animation of Town Centre Report
100%
of food carts in the Town Centre
Development Information Meeting Policy
Policy endorsed July 26, 2016
100%
Review (Policy 6.20)
Development Sign Policy
Discussion paper to discuss changes to the
Development Sign Policy considered at October
100%
24/16 Workshop.
• Referred to UDI & GVHBC
• Adoption expected 4 Q 2016
EMS Implementation: Environmental
Bylaw completed. Members have been
100%
Advisory Committee - assist with
appointed.
formation of Committee
• Committee Meetings commenced September
ongoing
2016
Climate Change Action Strategies -
Scheduled for October 24, 2016 Council
100%
update on environmental pilot projects
Workshop
Extension Report - Development
Discussion Paper
100%
Applications
Consultation with UDI
100%
• Bylaw Preparation
100%
Housing Action Plan (HAP)
Infill and Regulatory Tools options report
100%
Implementation: expanding infill and
presented in August 2016
rental opportunities
Action Items from report are identified as 2017
items in Business Plan
Housing Action Plan - Incentives Report
report was presented at October 24, 2016
100%
to encourage Rental Housing
Workshop.
• Action items are 2017 Deliverables
Planning Fees & Charges Review
CAC Bylaw was adopted
100%
• Assist Sustainability & Corporate Planning with
development application fees review.
4 Q 2016
Council Review - December 2016 Page 260
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Regional Affordable Housing Strategy
Preparation of report on draft RAHS (Feb 2016)
100%
• Council consideration of Strategy scheduled for
4 Q 2016
November 7, 2016 Workshop
National Housing Strategy
Preparation of report on National Housing
100%
Strategy Consultation to October 17 Workshop
Wildfire Development Permit Process -
Update and proposed Amendments presented
100%
update
to Council in July 2016
100%
• Met with UDI Liaison Committee
100%
• Bylaw adoption
4 Q 2016
Accomplishments - with Carry-over to 2017
Albion Flats Area Plan
Feb 22, 2016 - land use planning workshop.
100%
Staff directed to prepare concept plans.
• Commence work on Food Hub and employment
1 Q 2017
opportunities, drainage analysis
• Awaiting outcomes from Parks Prioritization
exercise to prepare concept plans
2 Q 2017
• Commence exclusion application & area plan
3 Q 2017
Commercial Industrial Strategy
Assisting Economic Development with Home
50%
Implementation: Home Occupations -
Occupation Task Force. Zoning Bylaw
review regulations
Amendments (may be included in Zoning Bylaw
review)
Commercial & Industrial Strategy
Rescheduled due to staffing vacancies and
2 Q 2017
Implementation - update OCP policies
found Milestones
Commercial & Industrial Strategy
Rescheduled due to staffing vacancies and
Implementation - commercial &
found milestones
Industrial zoning bylaw amendments
• Amendments to be included into Zoning Bylaw
2 Q 2017
review
Commercial & Industrial Strategy
Consideration given at April 18, 2016 Workshop
100%
Implementation - examine potential for
100%
redesignation of lands for employment
Council request to provide information on
use proformas
feasibility of "bracket" lands adjacent to
Kwantlen. Discussion paper October 25/16
• Kwantlen First Nation & property owner mtgs.
4 Q 2016
• Bylaw Adoption
1 Q 2017
Commercial Industrial Strategy
Preparation of staff report and Amending Bylaws
Implementation - Redesignation of lands
to redesignate lands for employment use
4 Q 2016
at 128/232 for employment use
Rescheduled due to found milestones
Council Review - December 2016 Page 261
Community Amenity Contribution Policy
OCP amendments and Policy adopted May `16
100%
• Council have requested Albion Density
Bonussing Update & city-wide density bonussing
options report. See 2017 Deliverables
Development Cost Charges Bylaw
Assist Finance & Engineering with review
4 Q 2016
EMS Implementation -Soil Deposit
Process Review was adopted in July 2016
100%
Bylaw
Open House held September 29, 2016
100%
• Report and Draft Bylaw
4Q 16
EMS Implementation -Tree
Bylaw was adopted in January 2016
100%
Management Bylaw
1 year update Report
1 Q 2017
EMS implementation - medium & long
Council approved the Short Term
100%
term items to be identified by Council
Implementation items
• forwarded the EMS to the Environmental
1 Q 2017
Management Committee to identify the medium
& longterm items.
Hammond Area Plan
Bylaw received first Reading Sept 2016
90%
• Adoption
1 Q 2017
• Implementation items identified as 2017
Deliverables
Heritage Inventory Project
RFP & Consultant Selection
100%
• Open House held in October 3, 2016
100%
• Presentation to Council on October 11, 2016
100%
• Draft report
1 Q 2017
Housing Action Plan Implementation -
Preliminary work presented to Council in April
75%
Tri-plex/ Fourplex Zone & OCP
2016
amendments
• Bylaw preparation
4 Q 2016
• Design Guidelines
3 Q 2017
Housing Action Plan Implementation -
rescheduled due to found milestones
2 Q 2017
update OCP Housing policies
Integrated Stormwater Management
Assisting the Engineering Department with
ongoing
Plans
development of ISMP's
Local Area Service Bylaw Discussion
Work with the Parks Department to prepare
3 Q 2017
Paper
Discussion Paper to explore LAS Policy creation
Implement Council direction originating
See Development Information Meeting
100%
from the Mayor's Open Government
See Development Sign Policy
75%
Task Force
• Assisting IT Department with Development
Ongoing
Mapping application
Council Review - December 2016 Page 262
Silver Valley Land Use discussion -
Council approved process which noted that
100%
school sites
work would not commence until recreation
prioritization confirmed - March 7, 2016
• Land Use review to commence
2 Q 2017
Suburban/Estate Suburban Residential
Discussion Paper prepared and presented at the
100%
Land Use Discussion Paper
September 19, 2016 Council Workshop
• Bylaws relating to Suburban Residential land
1 Q 2017
use designation and zones
• Redesignation of 256 St. Suburban Residential
lands to Industrial. See 2017 Deliverables
• Discussion paper of Estate Suburban Land Use
requested. See 2017 Deliverables
Transportation Plan Implementation -
rescheduled due to found milestones
2 Q 2017
update OCP transportation policies
Zoning Bylaw - Adoption and
Retired Technician assisting with advancement
100%
Implementation
of Bylaw. Update to Workshop November 7/16
• Numerous amendments have taken place to
100%
advance Bylaw - height, fencing, payday loan,
secondary suites, shipping containers
• Edits to document continue
75%
• Impacted by found milestones and staffing
vacancies.
• Other Bylaw amends underway - home
25%
occupation, duplex, triplex, DGS, Secondary
Suites, residential over commercial, farm plate
Ongoing Deliverables
• Continued representation on the Records Management Committee. The representative will develop
`power user' level skills and provide training and hands-on assistance to department staff, as well as
keep staff up to date on policies and procedures as they relate to records management.
Customer Service
• Update and maintain department web page
• Participate in continuing education in skill development
• Updating public information items
• Provision of support to corporation in promotional material
• Participation in development customer meetings - (383 to September 16 amongst 6 staff members)
• Respond to landowners and the general public on land inquiries - 10 letters of inquiry
• Research and respond to planning requests for internal and external customers - 4,542 phone calls
and 5,102 counter inquiries to September 15
Council Review - December 2016 Page 263
Ongoing Deliverables - cont'd
Approving Officer Function
• Review and process applications for subdivision -11 approved files to September and 77 active files
• Negotiate with external agencies as required
• Work with other departments to ensure servicing, etc. has been addressed
• Process development variance applications to the Subdivision and Development Servicing Bylaw
• Ensure compliance with Land Titles regulations
• Issue Preliminary Review Letters of Approval (PRL's) and ensure compliance
Environmental Practices
• Processing of Soil Deposit Applications - 8 to September and 6 actives files to September 15
• Process Tree Cutting Permits - 306 to September 15 plus an avg of 300-400 inquiries per month
• Bylaw enforcement of watercourse, soil deposit and tree permit bylaws
• Provide environmental monitoring service to Operations and Engineering for in - stream works and
compensation projects
• Provide advice on environmental policy matters and changing provincial regulations
• Respond to complaints - environmental degradation
• Coordinating in -stream emergencies including works projects
• Work to improve sediment control during development
• Coordinate Mosquito Control contract with program partners and review West Nile program, if
required
Protection of Environmental Features
• Act as local Agent pursuant to Agricultural Land Commission
• Liaison with environmental and stewardship groups
• Maintain and update stream mapping
• Coordination of Environmental Review Committee
• Review development applications as required for environmental impact
• Respond to environmental inquiries from the public and others
• Environmental monitoring of development sites and sediment control
Managing Data
• Participate in necessary training, and contribute to the development of appropriate business
practices in our area as we grow the document management system.
• Complete department business plan.
• Dissemination of census and BC Statistics information - review of new Census material.
• Maintain database for lots, housing statistics, etc.
• Maintain brochures and checklists.
Council Review - December 2016 Page 264
Ongoing Deliverables - cont'd
Committee and Partner Support
• Participation on the Property Management Committee
• Provide staff support to the Community Heritage Commission (CHC)
• Heritage awards program - organize selection and presentation of awards with CHC
• Heritage plaque program - organize selection and presentation of plaques with CHC
• Provide staff support to the Advisory Design Panel
• Participate in Builders Forum as required
• Participate on committees associated with Metro Vancouver, including the provision of support to a
new Environmental Committee.
• Provide staff support to the Agricultural Advisory Committee(AAC)
• Assist Agricultural Advisory Committee with Agricultural Awards
• Assist Agricultural Advisory Committee with Golden Harvest
• To provide support to the Board of Variance
• Assist in the creation of business plans for Committees of Council - Staff liaisons
• To participate on the UDI Municipal Liaison Committee
• To assist with the formation of the new Environmental Advisory Committee and provide ongoing
technical support to the Committee.
Development Application Management
• Amendments to the Official Community Plan.
• Amendments to the Zoning Bylaw.
• Subdivision review and approval.
• Agricultural Land Commission applications for exclusion, non-farm use and subdivision.
• Strata Conversions & Phased Strata.
• Development Permits.
• Rental Housing & Phased Development Agreements.
• Development Variance Permits & Board of Variance.
• Land -use inquiries.
• Heritage designation, Heritage revitalization agreements, and Heritage alteration permits.
• Inclusion in the Community Heritage Register.
• Temporary use permits (commercial and industrial).
• Processing and discharging of covenants.
• Pre -application meetings.
• Development Application processing - 186 reports to September 20 and 462 active files
Council Review - December 2016 Page 265
Ongoing Deliverables - cont'd
Policy Review and Development
• Zoning and Official Community Plan policy review and development.
• Environmental bylaw and policy development.
• Creation and maintenance of Area Plans.
• Preparation and review of bylaws related to development including parking, subdivision and
servicing, and sign.
• Review and creation of Council policies
Found Milestones
• Suburban residential and Estate Suburban Residential Discussion Paper
• Staff report on proposed Aquilini exclusion application and requested community consultation
• Creation of Citywide Community Amenity Contribution Policy
• Silver Valley School site presentation
• CAC Density Bonussing Update
• Assist with Development Cost Charge Bylaw
• Provide assistance to Parks and Leisure Services on Recreation Prioritization and Aquatic Facility
land use
• Rezoning File Extension Reports discussion paper
• Provide assistance to Social Planning on transition housing and shelter use, and process
rezoning/OCP amendment for the proposed use
• Agricultural Plan Facilitation
• Council Notice of Motion to prepare report on Operation of Treatment Centres (in conjunction with
Social Planning)
• Wine Sales in Grocery Stores
• Referrals from Metro Vancouver on Regional Growth Strategy Consideration of Review
• Report on the Regional Affordable Housing Strategy
• Report on the National Housing Strategy
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Service Area Goal: Smart Managed Growth
All of the work of the Planning Department falls under the category of Smart Managed Growth which
is guided by the goals, objectives and policies contained in the Official Community Plan.
Objectives:
• To support, maintain and market the community to current and potential employers.
• To increase the jobs/housing ratio and improve opportunities for residents to live and work in the
same community.
• To encourage community consultation and discussion on economic goals.
• To continue to promote the stewardship of natural resources and identify and devise
mechanisms to protect, recognize and manage environmental features.
Council Review - December 2016 Page 266
Objectives: cont'd
• To support healthy community land use strategies and community wellness.
• To promote compact and complete community.
Measures
• Completion of projects in timeframes identified
2017 Deliverables - New Action Items
Lead
ETA
Agricultural Plan Implementation - explore Food Hub Feasibility
Community Planning
2 Q-4 Q 2017
Agricultural Plan Implementation - Agricultural Development
Community
3 Q -4 Q 2017
Permit Guidelines
Planning/AAC
Assist the Information Technology Department with upgrades to
IS/Development
the AMANDA file management system.
Services
ongoing
Commercial & Industrial Implementation - redesignation of
Community Planning
1 Q 2017
Suburban Residential lands at 256th Street to Industrial
Council Advisory Committees Support:
Community
ongoing
Advisory Design Panel
Planning/Development
Community Heritage Commission
Services/Environment
Agricultural Advisory Committee
Environmental Advisory Committee
Board of Variance
Continue to work with Economic Development to encourage and
Attend meetings with
ongoing
attract new business
Economic Dev. staff
Density Bonussing Report - Albion Growth Area & City-wide
Community Planning
3 Q 2017
Environmental Advisory Committee - Environmental
Environment
1 Q 2017
Management Plan Implementation strategy.
Environmental Management Strategy Implementation - Updates
Environment
3 Q 2017
to website, including information around process.
Estate Suburban Land Use Discussion
Community Planning
4 Q 2017
Hammond Area Plan Implementation - work with Katzie First
Community Planning
3 Q 2017
Nation to create an Archaeological Process
Hammond Area Plan Implementation - parking standards and
Community Planning
3 Q 2017
alternative parking options for the Hammond Village Commercial
Hammond Area Plan Implementation - prepare report on options
Community Planning
4 Q 2017
for supporting heritage resources in Heritage Character Area
Housing Action Plan Implementation -Secondary Suites
Community Planning
3 Q 2017
Discussion Paper
Housing Action Plan Implementation -Detached Garden Suites
Community Planning
3 Q 2017
Discussion Paper
Housing Action Plan Implementation - Rental Above Commercial
Community Planning
3 Q 2017
Policy Discussion Paper
Housing Action Plan Implementation - Discussion Paper to
discuss opportunities to facilitate duplex infill development. See
Community Planning
3 Q 2017
below
Housing Action Plan Implementation -incentives for rental
housing: explore fast tracking, fees & DCC's, fees for legal
Community Planning
1 Q -4 Q 2017
documents, and Detached Garden Suite pilot project
Review of Parking Standards for Multi -Family Development
Development Services
3 Q 2017
Process the development application made by BC Housing for aDevelopment
Services/Community
1 Q -3 Q 2017
purpose built shelter and supportive transitional housing facility.
Planning
Treatment Centres - report on the operation of treatment centres
Social Planning/
4 Q 2017
Community Planning
Operating Budget
Council Review - December 2016 Page 267
Proposed Financial Plan 2017 - 2021
Public Works & Development Services- Planning Department
Proposed Changes or Remarks:
Revenues
• Starting in 2017, for three years, fees are expected to increase by 3% to cover the costs of increased
staff that was approved in 2015.
Committee Costs
• Committee Costs were adjusted as directed by Council.
Incremental Packages - Attached
Capital Budget - None
Information Technology - None
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Revenues
ApplicFees - ALR
5
6
1
3%
6
6
6
6
Applic Fees - Dev Permits
161
165
4
3%
170
176
176
176
Applic Fees - OCP
7
7
-
3%
7
7
7
7
ApplicFees-Subdivision
116
119
3
3%
123
126
126
126
Application Fees
116
119
3
3%
123
126
126
126
Fees
5
5
-
3%
5
5
5
5
Program Fees
99
99
0%
99
99
99
99
Sales
7
7
3%
8
8
8
8
User Fees
3
3
3%
3
3
3
3
519
530
11
2%
544
556
556
556
Expenditures
Committee Costs
22
10
(12)
(55%)
10
10
10
10
Consulting
19
19
-
0%
19
19
19
19
Contract
40
40
0%
40
40
40
40
Legal
38
38
0%
38
38
38
38
Publications
2
2
0%
2
2
2
2
Salaries
2,265
2,297
32
1%
2,351
2,407
2,467
2,532
Supplies
31
31
-
0%
31
31
31
31
Travel
16
17
1
3%
17
18
18
19
2,433
2,454
21
1%
2,508
2,565
2,625
2,691
Totals
1,914
1,924
10
0%
1,964
2,009
2,069
2,135
Proposed Changes or Remarks:
Revenues
• Starting in 2017, for three years, fees are expected to increase by 3% to cover the costs of increased
staff that was approved in 2015.
Committee Costs
• Committee Costs were adjusted as directed by Council.
Incremental Packages - Attached
Capital Budget - None
Information Technology - None
Council Review - December 2016 Page 268
Performance Measures/Indicators
The City tracks our performance in a number of ways. Some of the measures are tracked using
Performance Reporting Scorecards which appear in the City's performance system. The scorecards for
this area are listed below. Full scorecards can be found in the Scorecards tab.
To access the "live" scorecard, visit www.mapleridge.ca/787 and use the Scorecard Lookup tool.
Code Scorecard (on following pages) Why this Scorecard is important to this department:
EN07 Protect Environmentally Sensitive
Areas
The scorecard is important as it allows for
identification of areas that have been legally
protected via dedication or restrictive covenant for
environmental reasons. It is noted that 2016, saw a
number of infill and multi -family development
projects on lands that did not have creeks or
watercourses. It is also noted that some parkland
dedication and/or covenants were registered in
2015, although the subdivision applications were not
approved until 2016.
Council Review - December 2016 Page 269
Incremental Package Report
2017 Proposed Budget
Division: PWDS Date: October 13, 2016
Department: Planning Submitted By: C. Carter
Decision Unit: Funding of Environmental Technician Position
Package: 1 of 1
Activities/ Purpose:
The Council endorsed Environmental Management Strategy was created through an extensive
community engagement process. The Strategy identifies some specific findings as follows:
• "Many of the City's stakeholders would like environmental information to be more easily accessible
via handouts, website materials, maps and signage on environmental resources, values and
benefits";
• "Stakeholders are also interested in having more clarification related to Development applications
and homeowner requirements for environmental protection";
• "There are concerns that the City does not have enough environment staff or resources to
implement, monitor, and update all of the on-going environmental programs, update and administer
bylaws, review development applications and other permits, respond to environmental inquiries,
conduct monitoring, enforce regulations, coordinate community stewardship and outreach programs,
and liaise with Senior agencies."
The Mayors Open Government Task Force (MOGTF) recommendations speak to the importance of
improving access to information, and providing greater clarity around process.
In addition to the findings of the EMS consultation, and MOGTF recommendations, the Environment
Section is facing staffing challenges with the following:
• The Tree Bylaw was adopted a year ago. One Technicians time is entirely devoted to the
management of the Bylaw, with another Technician spending approximately 25% of their time
dealing with tree inquiries/permits. There have been 270 tree permits issued to date with an
average of 300-400 inquiries/month.
• The new Council Environmental Advisory Committee will account for 25% of the Env. Planners time,
in addition to attending the new Metro Vancouver RPAC Environmental Sub -Committee.
• To date, the Environmental Planner reviewed & responded to 240 development environmental
inquiries to date, plus approximately 150+ development and environmental DP referrals.
• The Soils/ESC Environmental Technician is spending approximately 40% of their time reviewing and
monitoring erosion control permits, an additional 35% of time on soils permit review, 10% on
enforcement duties, and 5-10 % assisting the Engineering and Operations Departments with
environment advice on capital works projects.
• The Building Permit Environmental DP/Tree Bylaw Technician assists with Tree Permits (25% of
time), final inspection & security releases. An additional 5-10% of time is spent on inquiries and
review of enhancement plans.
• There is currently limited time and resources available to update the municipal website on a regular
basis to improve access to information, nor clarify processes
• Staff are often unable to proactively enforce, rather they are generally required to react when
complaints come in and there are limited resources.
High overtime spending within the section is costly to the City but is not sustainable.
Council Review - December 2016 Page 270
Functions Performed/ Degree of Service:
This full time position would allow an Environmental Technician to dedicate their time to taking on permit
review, monitoring, and enforcement duties of environmental techs. This includes:
• review of environmental reports for permits and carrying out necessary site visits;
• helping with coordination of information;
• carrying out site visits to monitor projects;
• providing technical assistance to the community on various env. permit related issues;
• enforcement and compliance on site for environmental bylaws.
It is recognized that the creation of new positions is not a matter taken lightly, so staff recommend that
a "boots on the ground" position is needed.
In a perfect world, the entire Planning Department would also benefit from the creation of a Manager of
Environment position. Such a position would be advantageous for a number of reasons:
• could take the lead/assist with environmental policy creation;
• could assist with Municipal Committee Support and Regional, and Community stakeholder meetings;
• could assist with internal and external meetings relating to develop./environ. applications;
• could assist with the review of complex development and environment permit reviews;
• would be responsible for management of the group including leave requests (sick, vacation,
conference), budget, work prioritization, permit authorization, and approval of reports.
Important Additional Considerations:
• position would free up the Manager Development Services time to focus on the Zoning Bylaw review
and other corporate initiatives, in addition to Approving Officer and development application duties.
• All of the above would result in more pro -active and effective environmental best practices, improved
turnaround times on referrals, inquiries, and development applications
Alternatives Considered/ Reasons for Not Recommending:
Maintain current staffing component. Should the position not be funded, delays in the processing of
Permits; enforcement duties; inquiries; review of development application enhancement plans/ studies;
and provision of technical assistance to land owners regarding environmental matters would result.
Staff Position:
Environmental Technician
Packa e:
Ongoing: 2017 Budget
Salary $93,000
One time Costs:
Desk & computer: $7,000
Council Review - December 2016 Page 271
City of Maple Ridge
Public Works & Development Services - Agricultural Advisory Committee
Business Plan 2017 - 2021
Committee Purpose
• The Agricultural Advisory Committee, established in June 2007, has been set up to advise Council on
agricultural issues and to engage in activities to support the agricultural sector. The committee works
in collaboration with related agencies and organizations involved in the promotion of agriculture, the
protection of farmland and the recognition of the need for food security.
Committee Structure and Members
The Agricultural Advisory Committee consists of between 13 and 16 members. Eight of these
members are appointed by Council. Councillor Craig Speirs is the Council Liaison for this Committee.
Councillor Kiersten Duncan is the alternate. The remaining representatives are nominated and
appointed by their respective agencies, organizations and governments.
Accomplishments and Work in Progress (highlights only)
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Spring Committee Member Recruitment
Complete
Grant Program
Food Security Policy Project is not complete as
• Country Fest - $1200
Social Sustainability Strategy (of which this is a
50% (ETA
• Food Security Policy Project - $3500
chapter) has an extended timeline. This work
end of
is secured with an AAC 2015 resolution and is
2017)
expected to be completed in 2017.
Golden Harvest
Completion
on
October
14, 2016
Food Garden Contest
Presentation to Council on October 25, 2016
Complete
for Food Garden winners.
Council Review - December 2016 Page 272
Ongoing Deliverables
• Review and establish priorities for new projects in the development and implementation of the
Agricultural Plan.
• Provide Council with advice and direction on agricultural issues and projects.
• Produce web -based information linking consumers with local products
• Golden Harvest
• Support Agricultural Fair
• Support Farmers Market
• Continue to hold Farmer Education Awards
• Educational Displays
• Agricultural Recognition Awards
• Food Garden Contest
• Educational Speakers
• Build Relationships in the following ways:
• Support Country Fest & 4H Clubs
• Support Farmer's Market
• Representation from Economic Development Commission
• Receive updates from Strategic Economic Initiatives.
• Invited and active representation on the Metro Vancouver Agricultural Advisory Committee
• Annual events with neighbouring Agricultural Advisory Committees and Metro Vancouver Agricultural
Advisory Committee
• Maple Ridge Garden Club
• Maple Ridge Communications Department
• Like-minded local agencies and non-profit organizations
• Continue Grant Application Process
• Committee development through conferences, tours, and other events
• In 2014 the Intersections networking event was developed and well received by participants. In
2017, the AAC is anticipating working with other Committees of Council and the Committee Clerk on
a similar type of initiative with objectives including networking to identifying synergies and
opportunities for collaboration, recognition of service, and training.
Found Milestones
• In 2016, a sub -committee was struck to re-examine the True North Fraser brand, which aims to link
local agricultural products with local consumers. The brand's status changed in 2015 with the
withdrawal of the City of Pitt Meadows and District of Mission from the sub -regional partnership. The
partnership was a key component of the brand's marketing strategy. The brand requires a re -set and
alignment with other deliverables in the proposed 2017 work plan such as the proposed Agri -
Tourism Summit and the Needs Assessment.
Council Review - December 2016 Page 273
New Deliverables for 2017 (highlights only) - Any incomplete items from prior years may also form part
of the 2017 workplan.
Action Item
Lead
ETA
Continue to work with Strategic Economic Initiatives and other
AAC staff liaison,
End of 2017
organizations to develop an effective approach to continue use
and sub -
of the True North Fraser brand. Results will be reported to
committee
Council.
Host an Agri -Tourism Summit in partnership with Strategic
AAC staff liaison,
End of 2017
Economic Initiatives (SEI) and other agri-tourism groups to
and sub -
develop a coordinated marketing approach for locally grown
committee
agricultural products. Results will be reported to Council.
Complete a Needs Assessment on the feasibility of a food hub.
AAC staff liaison,
2Q -4Q
The Needs Assessment will examine local context, existing
and sub -
infrastructure, and consider not only a food hub concept but
committee
also consider working with local businesses that are already
involved in food processing and distribution. This assessment
will require the services of a consultant. The staff liaison and a
subcommittee will develop an RFP and work with the successful
candidate to finalize timelines and project deliverables. Results
will be reported to Council.
Complete Development Permit Area Guidelines to protect
AAC staff liaison,
3Q -4Q
agricultural land.
and sub-
committee
Council Review - December 2016 Page 274
Council Review - December 2016 Page 275
City of Maple Ridge
Public Works & Development Services - Community Heritage Commission
Business Plan 2017 - 2021
Committee Purpose
• The Commission is appointed for the purpose of advising the Council on heritage conservation
matters and undertaking and providing support for such activities as benefit and provide for the
advancement of heritage conservation in the District. Bylaw 5908-2000
Commission Overview
Committee Structure and Members
• The Commission is made up of one member from Council, two members from the Maple Ridge
Historical Society and members from the community -at -large (appointed by Council).
Composition of the Heritage Commission
MAPLE RIDGE
1
Community Heritage
Commission
(1) councillor (1) Alternate
Appointed by Mayor
,^ MAPLE RIDGE
HISTORICAL SOCIETY
(2) Appointed by MRHS
Community
-at-Large Members
(4) 2 years
Staff Liaison I Committee Clerk
(1) Planning Department (1) City Clerk's Department
Services Provided:
• Heritage Awareness
• Heritage Education
• Celebration of Community's Past
CHC Members:
Sandra Ayres, Community at Large
Russell Irvine, Community at Large
Julie Koehn, Maple Ridge Historical Society
Len Pettit, Community at Large
Eric Phillips, Community at Large
Nicole Read, Alternate Council Liaison
Steven Ranta, (Vice -Chair), Community at Large
Brenda Smith (Chair), Maple Ridge Historical Society
Craig Speirs, Council Liaison
Customers:
• Maple Ridge's past, present and future will be connected through community and cultural
celebrations, partnerships and heritage activities that will preserve our tangible and intangible
heritage resources, provide educational opportunities and enrich the lives of our citizens and
visitors (S. 4, pg. 23, Maple Ridge Community Heritage Commission Heritage Plan, November
2013).
Council Review - December 2016 Page 276
Mission/Values:
• The City of Maple Ridge will recognize and celebrate our rich historic legacy through the
conservation and interpretation of significant heritage resources. Our Heritage Program will
support the sustainable development of our urban structure and our rural areas, and assist in the
development of a complete and healthy community. As we plan for an exciting, digital future, we
will respect our past by providing a balance for change and new development that recognizes the
importance of our historic communities, our rural lands and our natural landscapes. (S. 4, pg. 23,
Maple Ridge Community Heritage Commission Heritage Plan, November 2013).
Delivering the Mandate:
• The CHC provides information to Council pertaining to matters referred to the Commission as well
as reports about ongoing heritage programs and projects
• The CHC includes a community involvement, service or awareness component in all programs and
projects.
• The CHC looks for opportunities to facilitate or participate in community events to create greater
awareness and knowledge in the community's tangible and intangible heritage resources.
• The CHC recognizes the value of heritage and cultural tourism development.
• The CHC promotes the awareness and conservation of heritage value inherent in many natural
features.
• The CHC is attentive to planning and actions toward the creation of a new museum and archives
to serve the community. The CHC anticipates deeper involvement in the process.
Community Partnerships
• Senior levels of government provide enabling legislation for heritage conservation but do not provide
heritage project funding. The CHC and local community groups are always looking for ways to
"intersect" and identify common goals that will lead to partnership opportunities and leveraging of
skills, effort, and funding.
• The CHC works closely with Maple Ridge Historical Society in support of the delivery of heritage
services to the community. The production and implementation of conservation plans for CMR owned
properties is a timely partnership accomplishment.
• The CHC maintains an ongoing relationship with the Maple Ridge Library and partners on various
projects to help educate and promote heritage awareness and conservation.
• Connecting and partnering with government and province wide organizations is ongoing and involves
looking for opportunities to interact and identify common goals with First Nations, BC Heritage
Branch, Heritage BC, BC Museums Association and the BC Historical Federation.
• The CHC routinely invites community organizations, businesses and individuals to address regular
meetings bringing their varied interests and activities to the CHC's attention.
Council Review - December 2016 Page 277
Continuous Improvement
• The CHC routinely invites community organizations, businesses and individuals to address regular
meetings bringing their varied interests and activities to the CHC's attention.
• Community Open House on Heritage Inventory Project: Included information about the nomination
process and eligibility criteria to place a property in Heritage Inventory or Register.
• Updated brochures describing: CHC operations and opportunities, Heritage Awards nominations.
• The CHC engaged in an exciting partnership opportunity with the Public Art Steering Committee to
bring history of baseball information into the "Play Ball" Project at Hammond Stadium.
• Continued partnership with Maple Ridge Library, Maple Ridge Family History Group, Golden Ears
Writers, and Maple Ridge Historical Society in community conversation program Local Voices.
Accomplishments and Work in Progress (highlights only)
Ongoing Deliverables
• Heritage Here CHC Newsletter - Publication suspended pending improved production resources.
• 2017 Heritage Week including Heritage Awards - Event planning is currently underway for Heritage
Week February 2017
• Local Voices partnership with Maple Ridge Library- Winter 2017 in planning phase.
• Liaison with Heritage Organizations - Memberships maintained in BC Historical Federation and
Heritage BC. New membership in BC Museums Association. Attendance as delegate at all annual
conferences.
• Plaque Program and Information Panels - Pending policy development and improved resources.
Action Item
Status or Outcome
Complete
(and ETA if
not 100%)
Update the Heritage Inventory
See appendix for information.
80%
Q12017
Continue Digitization Project with City
Phase I will be complete early in 2017
25%
and Maple Ridge Historical Society
Phase II planning pending in anticipation of
Ongoing
moving CMR Archives.
over
several
years
Heritage Marker Inventory Data base -
Database constructed, data input
Database of all heritage markers,
underway
50%
signage, plaques, wraps, mosaics and
Reporting functions in planning phase
End of
art. Accessible for CMR maintenance
2017
planning and tracking, community uses.
Heritage Awards: To increase interest
Complete: Partnership with Maple Ridge
100%
and participation in recognizing heritage
Historical Society
achievements and to increase the
"History Is" Conversation Evening
recognition value of the awards for
recipients.
2016 Heritage Awards
• Heritage Awards History Project - Posted on
mapleridge.ca Heritage Awards page.
Ongoing Deliverables
• Heritage Here CHC Newsletter - Publication suspended pending improved production resources.
• 2017 Heritage Week including Heritage Awards - Event planning is currently underway for Heritage
Week February 2017
• Local Voices partnership with Maple Ridge Library- Winter 2017 in planning phase.
• Liaison with Heritage Organizations - Memberships maintained in BC Historical Federation and
Heritage BC. New membership in BC Museums Association. Attendance as delegate at all annual
conferences.
• Plaque Program and Information Panels - Pending policy development and improved resources.
Council Review - December 2016 Page 278
Found Milestones
• The CHC sent delegates to BC Historical Federation, BC Museums Association and Heritage BC
conferences, using the opportunities to network and develop heritage expertise.
• The Heritage Plan is a model for other communities and a flexible reference document for the CHC's
work. The plan continues to support the CHC's use of the strong framework that Maple Ridge has built
for education and conservation.
• Developed a new model to describe CHC operations, including a digital form, for members.
• The CHC is developing a response to CHC financial planning and funding constraints.
• Local Voices: Neighbours Talking With Neighbours -Partnership with Maple Ridge Library Fall 2016 (3
evenings/9 presenters) Winter (4 evenings/12 presenters).
• Coquitlam Heritage Symposium - six Maple Ridge attendees.
• Heritage Plaque Book.
• "Play Ball" Public Art Project -Control Box Wrap -Partnership with Public Art Steering Committee.
• Field Trip to North Vancouver Archives - Education for CHC, Council, MRHS and community.
• What's On Maple Ridge feature article.
• Members binders: Reorganized binders and offered digital version to improve access to information.
Available in paper and digital form for CHC members' use.
• 2015 GETI Fest; Golden Ears Transition Initiative. Partnership resulted in inclusion of Heritage theme
at annual festival.
• BC Day Instameet Heritage Awareness Project. Partnership with Economic Development that was the
only event in Maple Ridge that weekend.
New Deliverables for 2017
Service Area Goal: Community Heritage Infrastructure Preservation
• The CHC looks forward undertaking our role in the community and advising Council on key matters in
the heritage field.
Objectives:
• Having the updated Heritage Inventory available for use by interested parties and to restore its value
as a community resource.
• To partner with other community groups and agencies in the community to plan celebrations of
Canada's 150 Anniversary in 2017.
• Heritage Awards: To increase interest and participation in recognizing heritage achievements and to
increase the recognition value of the awards for recipients.
• Encourage the production of Statements of Significance to support the maintenance of the Heritage
Inventory and facilitate promotion of tangible and intangible heritage features to the Heritage
Register.
Measures•
• For 2017 identified projects, success will lie in either progress through identified project phase(s) or
completion of project and reported in "Accomplishments" table above in 2018 Business Plan.
• For partners, success will be measured in greater participation in heritage activities and the building
of sponsorship funds (reported on twice a year to Council by CHC Chair).
• For the community, success will be evidenced by increased involvement in heritage events and more
telling of the Maple Ridge story (reported on twice a year to Council by CHC Chair).
Council Review - December 2016
Operating Budget: $2,000
Incremental Package Requests
2017 Budget:
• Carry-over program and project funds from 2016
• 2017 Incremental Package Requests: $44,900
1. Education Program 7,300
2. Membership Support Program 900
3. Communication and Outreach Program
3,600
4. Heritage Recognition Program
6,600
5. Open Access Digitization Project
8,000
6. Robertson Cemetery Project
3,500
7. Heritage Register Update
15,000
• 2018 Incremental Package Request:
1. Heritage Incentives Review $ 35,000
• 2019 Incremental Package Request:
1. Heritage Plan Update $ 10,000
Page 279
The Community Heritage Commission requests a reversal of Council's decision to reduce the annual
operating funds going into 2017. The group is concerned it will be unable to fulfill its mandate without the
level of funding it has received for many years. We foresee that project and program sustainability will
become more challenging with a $2,000 annual budget that may allow for only one small project each
year and there is concern that momentum within the group may be lost.
The Heritage Commission is an interface of community, staff and Council, comprised of people who are
passionate about heritage conservation and dedicated to enhancing heritage awareness and
understanding at a local level. The group is trying to understand the rationale for the reduction in funding
and trusts that Council's appreciation for the value of heritage projects and programs undertaken each
year has not faltered.
Since its inception, the volunteer members of the Commission have continuously demonstrated a high
capacity for achieving the mandate established through Heritage Commission Bylaw No. 5908-2000.
Creating awareness and an appreciation for heritage provides benefits well beyond a love for local history.
Heritage awareness helps strengthen the connection people have with their community and heritage
conservation plays a vital role in creating vibrant communities as they evolve and grow over time. We
believe that support for these efforts is a common goal shared by many in Maple Ridge.
The CHC members who have worked with the 2017 Business Planning model have benefited from the
level of detail required and appreciate the insights acquired during the process. It should be noted that
the attached Incremental Project Package has been adjusted to accommodate the specific functions of
the CHC as a committee rather than a staff department.
Council Review - December 2016 Page 280
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Community Heritage Education Program Funding
Package: 1 of 9
Activities/ Purpose:
Heritage Education & Awareness Initiatives: costs associated with community events.
The Heritage Commission has a mandate to help educate the community on local heritage, which helps
strengthen people's connection to the place they live. To do that work, members of the CHC need to
participate in in-service activities to become and remain current in the heritage field.
Maple Ridge Heritage Plan page 34
Education & Awareness Initiatives
The focus would be on the celebrations of history that will occur around Canada's Sesquicentennial.
• Celebrate Canada 150
• Continue to work with community partners (Library, School District #42, MRHS, etc.) in heritage
awareness and education initiatives.
• Promote those aspects of community history that connect to Canada, e.g., CPR main line.
• Continue to celebrate local and community history within the broader national context.
• Engage a broader public through community events and celebrations.
Functions Performed/ Degree of Service:
• Delegate fees support CHC members attending heritage training opportunities.
• Field trips and workshops provide educational opportunities for CHC members, Council, Staff, and
the public.
Networking events provide educational support and partnership opportunities for Maple Ridge
residents to communicate with those engaged in heritage service in other communities and
organizations.
• Some of these activities are conducted as wholly CHC -funded events, others as partially partnership
or sponsor funded events.
ACTIVITY
2017
2018
2019
2020
2021
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
Delegate Fees
300
20
500
30
500
30
500
30
500
30
CHC Hosted Field Trips
1,000
30
1,000
30
1,000
40
1,500
40
1,500
40
CHC Hosted
Workshops
3,000
50
3000
50
3000
50
3500
50
3500
50
Networking
Conference
3000
50
3000
50
3000
50
3500
50
3500
50
Alternatives Considered/ Reasons for Not Recommending:
Restricting opportunities to passive encounters such as brochures and the mapleridge.ca Web site
weakens heritage education. Heritage initiatives need more active delivery to expand community
understanding and support.
Staff Position:
N/A
Council Review - December 2016 Page 281
Performance Measure:
Increased community engagement in the uptake of Heritage Revitalization Agreements and participation
in heritage events.
Package:
2017
Budget
$7,300
E ��
Council Review - December 2016 Page 282
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Membership Support Program Funding
Package: 2 of 9
Activities/ Purpose:
Committees of Council are made up largely of community volunteers, who donate their time and
expertise. The development of a shared community vision for heritage depends on evident support for
the work of the CHC by Council and CMR staff.
The CHC needs sufficient financial reserves to engage in short term, un-forecastable opportunities such
as the 2016 partnership with the Public Art Steering Committee in the "Play Ball" undertaking at
Hammond Stadium where the turn around on the project was two months.
Functions Performed/ Degree of Service:
Operations include member binders and meeting support.
Memberships include: BC Historical Federation, BC Museums Association and Heritage BC. Annual Fees
and conference fees are included.
ACTIVITY
2017 2018 2019
2020
2021
$
Vol Hrs $ Vol Hrs $ Vol Hrs
$
Vol Hrs
$ Vol Hrs
CHC Operations
350 350 350
350
350
Membership:
Annual Fees
Conference Fees
300
600
300 350
600 900
350
900
350
900
Alternatives Considered/ Reasons for Not Recommending:
Fewer than ten public meetings and regular sub -committees meetings will result in the CHC needing to
abandon several of its established programs.
Committee participation in conferences is voluntary and partially funded. There is no transportation or
accommodation support.
Staff Position:
N/A
Performance Measure:
Successful recruitment and retention of skilled commissioners and sub -committee volunteers.
Widened heritage knowledge base supporting CHC work.
Package:
2017
Budget
Council Review - December 2016 Page 283
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Heritage Communications and Outreach Strategy Funding
Package: 3 of 9
Activities/ Purpose:
Heritage Communication Strategy needs to include consultant and contract costs for creating and
maintaining website and print material. Communications strategy is a vital component in all other
programs and projects, particularly Education Initiatives. This work has depended on the skills and
capacity of volunteers. The CMR Communications Department is able to provide only intermittent
support for CHC communications needs.
Maple Ridge Heritage Plan page 34
Heritage Communication Strategy
The first priority for the CHC is to develop a comprehensive communications strategy, to ensure the best
possible dissemination of key messages and heritage information. This includes a review of digital
communication, print materials, messaging, interpretation and public education and awareness
initiatives. The idea of a dedicated heritage website, possibly in conjunction with the MRHS, should be
explored.
Maple Ridge Heritage Plan page 34
Education & Awareness Initiatives
The focus would be on the celebrations of history that will occur around Canada's Sesquicentennial.
• Celebrate Canada 150
• Continue to work with community partners (Library, School District #42, MRHS, etc.) in heritage
awareness and education initiatives.
• Promote those aspects of community history that connect to Canada, e.g., CPR main line.
• Continue to celebrate local and community history within the broader national context.
• Engage a broader public through community events and celebrations.
Functions Performed/Degree of Service:
• Advertising: promotion of heritage events and programs
• Heritage Here Newsletter: 4 issues per year
• Marketing Package to align with City of Maple Ridge re -branding, refreshed annually
• mapleridge.ca: re -design the Community Heritage Commission pages
ACTIVITY
2017 2018 2019
2020
2021
$ Vol Hrs $ Vol Hrs $ Vol Hrs
$ Vol Hrs
$
Vol Hrs
Advertising
20 20 20
20
20
Newsletter
1,600 40 1600 40 1600 40
1600 40
1600
40
Marketing Pkg
2,000 10 500 5 500 5
500 5
500
5
mapleridge.ca
50 10 10
10
10
Council Review - December 2016 Page 284
Alternatives Considered/ Reasons for Not Recommending:
• The CHC has been unable to establish a communications strategy as mandated in the Heritage Plan.
• Social media: not permitted as a function discreet from CMR Communications Department capacity.
• The production of marketing tools, including brochures, posters and Heritage Here newsletter, have
been dependent on the in-house skills of staff and volunteers To improve consistent publication and
compliance with the quality of other City publications, it is necessary to either contract or have
access to staff graphic design services.
Staff Position:
N/A
Performance Measure:
• Increased participation by Council, City staff and public in CHC and partner programs and events.
• Regular production of the Heritage Here newsletter.
• Improved public understanding of heritage.
• A Communications Strategy in place to provide a framework for improved communication and
awareness.
Package:
2017
Budget
$3,600
Council Review - December 2016 Page 285
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Heritage Recognition Program Funding
Package: 4 of 9
Activities/ Purpose:
• The CHC engages in a wide range of programs and projects to develop and enhance community
awareness of heritage.
Heritage Week in February is a national, provincial and local opportunity to recognize the
achievements of Maple Ridge citizens. The Heritage Awards recognize initiatives, achievements, and
projects that have enhanced heritage conservation in Maple Ridge. (By 2018 the event will require
larger premises.). In 2015 and 2016 the CHC hosted a Heritage discussion evening. Activities are
supported in partnership with the Maple Ridge Historical Society. None of these events have
received adequate promotion.
•
Ongoing programs include: Plaque Program, new information panels and signage, heritage marker
replacement. Hopefully, in 2018 an anticipated partnership with the Public Art Steering Committee
will result in a contemporary stantion design for heritage markers.
• Heritage Marker Inventory: In 2016 the CHC created a Heritage Marker Inventory and plans an
activation project for 2017 to celebrate Canada 150. Other anniversaries include BC 160 in 2018
and Maple Ridge's fifth year as a city in 2019. .
Functions Performed/ Degree of Service:
ACTIVITY
2017
2018
2019
2020
2021
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
$
Vol Hrs
Heritage Week:
Heritage Awards
2,000
60
4000
60
4000
60
4000
60
4000
60
Heritage Conversation
500
15
500
15
500
15
700
15
700
15
Partnered Event
200
15
200
15
200
15
500
15
500
15
Plaque Program
400
5
400
5
400
5
400
5
400
5
Information Panels
400
10
10,000
40
400
10
500
10
500
10
and Signage
Heritage Marker
600
20
400
10
400
10
500
10
500
10
Replacement
Canada 150
2500
30
BC 160
2500
30
Maple Ridge
30
5 yrs a city
Alternatives Considered/ Reasons for Not Recommending:
The alternative is to restrict all of these programs and projects.
It should be noted that the annual $2,000 grant already authorized by Council will do little more than
support the Heritage Awards.
Staff Position:
N/A
Council Review - December 2016 Page 286
Performance Measure:
• Identification of a broad range of heritage resources, natural sites and cultural landscapes for
planning purposes.
• Improved base of heritage information. Better identification of potential heritage resources.
• Broader public engagement in the heritage process. Improved identification of historic places valued
by residents.
Package:
2017
Budget
$6,600
Council Review - December 2016 Page 287
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Open Access Digitization Funding
Package: 5 of 9
Activities/ Purpose:
The Digitization Project has been underway since 2012 in partnership with the City Clerk's Department.
The project goals include:
• preserving the City's unique and irreplaceable, at -risk historic records
• creating an archives catalogue
• digitizing the historic records
• creating public access to this invaluable heritage asset
Maple Ridge Heritage Plan page 34
Digitization Initiatives
This would include a renewed focus on initiatives to provide broader public access to historical
information.
• Review current digital initiatives and facilities requirements.
• Review Municipal and Community Archives requirements and opportunities, and ensure that there
will be adequate public access to historical information.
• Promote digital access through grant applications, and dissemination through websites.
Functions Performed/ Degree of Service:
The CHC contribution extends from research and advice to providing contract staff to inventory (Phase 1)
and catalogue (Phase 11) the CMR archives. Phase III will be creating the metadata to index the collection
and develop accessibility tools. At present the scope of the work is impossible to predict.
ACTIVITY 2017 2018 2019 2020 2021
$ Vol Hrs $ Vol Hrs $ Vol Hrs $ Vol Hrs $ Vol Hrs
Phasel 2000 10
Phasell 6000 50
Phaselll 10 6000 50 6000 50 6000 50 6000 50
Alternatives Considered/ Reasons for Not Recommending:
• The CMR archival collection is at high risk. Loss of irreplaceable historical material will be the
consequence of inaction.
• It should be noted that, to date, work has included progress on a preliminary inventory and condition
report by the CHC, and very limited conservation and digitization of a few of the earliest at -risk
material by the City Clerk's department. There is no cataloguing or indexing to permit full access to
the collection.
Staff Position:
N/A
Council Review - December 2016 Page 288
Performance Measure:
The CMR archives will be conserved, secure and fully accessible in digitized form for the use of citizens
and historians.
Package:
2017
Budget
Council Review - December 2016 Page 289
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Robertson Cemetery Project
Package: 6 of 9
Activities/ Purpose:
The site is currently protected under Heritage Designation Bylaw No. 6622-2008. It is also designated
for institutional use only and zoned accordingly. However, the property remains in the name of Robert
Robertson, who died in 1912. A few further steps need to be undertaken for the long-term protection of
this site, including survey work. The project is ongoing since 2015 and can be completed in 2017.
Interments have taken place on the site since about 1860 and it is the un -surveyed portion of an 1859
colonial pre-emption.
Functions Performed/ Degree of Service:
The remaining work includes a survey of the property, tax sale, and provincial recognition of this heritage
site.
ACTIVITY 2017 2018 2019
2020
2021
$ 1 Vol Hrs $
1 Vol Hrs $
Vol Hrs
$
Vol Hrs
$
1 Vol Hrs
Cemetery Project 3500 1 20
Alternatives Considered/ Reasons for Not Recommending:
Leave the site in legal limbo with Robert Robertson, deceased, as the property owner. Deferral will result
in cost increases for the work involved.
Staff Position:
N/A
Performance Measure:
The recognition project will be completed in 2017.
Package:
2017
Budget
$3,500
Council Review - December 2016 Page 290
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Heritage Register Update
Package: 7 of 9
Activities/ Purpose:
• The Heritage Register Update was recommended in the Heritage Plan. Completion of the Heritage
Inventory Update Project in early 2017 will clear the way for updating the Heritage Register.
Maple Ridge Heritage Plan page 10
The Community Heritage Register is an official listing of properties having heritage value, passed by
resolution of local government. The Register may be used to "flag" properties for possible future
protection.
Maple Ridge Heritage Plan page 17
There are currently 28 sites identified as having heritage value that are listed on the Maple Ridge
Community Heritage Register (Note: CMR owns ten of these sites.)
Maple Ridge Heritage Plan page 34
Mechanisms for updating the Heritage Register should be considered, including direct contact with
property owners and a program to prepare Statements of Significance.
Additional information regarding the project is included as Appendix A to this business plan.
Functions Performed/ Degree of Service:
• Heritage Register Update is a complex process requiring the services of a consultant. In some cases,
entries in the Heritage Register need to be carried through to provincial and federation recognition.
ACTIVITY 2017 2018 2019 2020 2021
$ Vol Hrs $
Vol Hrs $
Vol Hrs $ Vol Hrs $ Vol Hrs
Heritage Register 15,000 30 10,000
Update
20 10,000
20 10,000 20 10,000 20
Alternatives Considered/ Reasons for Not Recommending:
The Heritage Plan clearly articulates the deficits of the Heritage Register which is impaired in its
conservation and management roles.
Maple Ridge Heritage Plan page 21
Key areas have been identified where existing heritage policies and initiatives could be strengthened.
• There are few sites coming forward for inclusion on the Heritage Register; the process seems to
be "stalled."
• The District owns heritage sites that have not been legally protected and do not have
Conservation Plans.
• Heritage incentives tend to be minimal, and are not resulting in significant uptake.
• Current incentives are not appropriate for agricultural properties. Consultation is needed with the
Agricultural Land Commission regarding heritage retention strategies on agricultural land.
• There are no incentives for the maintenance of heritage sites.
• Demolition requests have increased as a result of ongoing neglect of heritage structures.
Council Review - December 2016 Page 291
Staff Position:
N/A
Performance Measure:
The Heritage Register Update will provide improved and updated information for planning and
development decision making in Maple Ridge. The Heritage Register improves community and visitor
awareness of cultural assets that will be demonstrated by improved uptake of registration and
designation. CMR will demonstrate heritage leadership along with such communities as:
• Kelowna htti3://apps.kelowna.ca/iHeritage/hc001.cfm
• Surrey http://www.surrey.ca/city-services/3209.aspx
Maple Ridge representation on Canada's Historic Places Register will increase from 15 to 30 or more
heritage assets. http://www.historicplaces.ca/en/results-
resultats.aspx?m=2&Keyword=maple%20ridge&Provinceld=100004&Location=maple%20ridge
Package:
2017
Package:
2017
Budget
$15,000
Council Review - December 2016 Page 292
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Request For: Heritage Incentives Review
Package: 8 of 9
Activities/ Purpose:
The Heritage Incentives Review was mandated in the Heritage Plan to be conducted in 2016. Delays in
funding the Heritage Inventory Update Project have resulted in replacement of the review with more
attention to Education Initiatives. The review can be appropriately scheduled following the updates of the
Heritage Inventory and Heritage Register. Note: this work is not proposed to commence until 2018 and
no funds are requested for this project at this time.
Maple Ridge Heritage Plan page 35
• Heritage Incentives Review
• The CHC should assist in a full review of the City's heritage incentives program. The intent is to
develop an enhanced heritage incentives program that would better serve the needs of heritage
property owners, by considering the following initiatives:
• Review heritage conservation tools enabled under provincial legislation.
• Consider a broader use of tax incentives, financial and developmental incentives and other
methods to ensure financial viability of conservation efforts.
• Review the possibility of a municipal grants program for private building owners, to provide
incentives for restoration as well as maintenance. Determine scope and magnitude of an
ongoing grants program that would assist both restoration and maintenance. Assess delivery
methods for grants (through CHC, a separate foundation or a fee -for service contract).
Functions Performed/ Degree of Service:
• Heritage Incentives Review is a complex process requiring the services of a consultant.
ACTIVITY 2017 2018 2019 2020 2021
$ Vol Hrs $
$
Volt50
Vol Hrs $ Vol Hrs $
Vol Hrs
Heritage Incentives 35,000
Review
Alternatives Considered/ Reasons for Not Recommending:
The alternative is for Maple Ridge to operate as it has with insufficient incentives to encourage citizens
and developers to respect and conserve the community's considerable heritage.
Staff Position:
N/A
Performance Measure:
The Heritage Incentives Review will provide improved and updated information for planning and
development decision making in Maple Ridge. A program of improved incentives will encourage
residents to engage more fully in heritage conservation.
Package:
2018
Budget
$35,000
$35,00
Council Review - December 2016 Page 293
Incremental Package Report
2017 Community Heritage Commission Budget
Division: Public Works & Development Services Date: October 3, 2016
Department: Community Heritage Commission Submitted By: Brenda Smith
Package: 9 of 9
Activities/ Purpose: HERITAGE PLAN UPDATE
The Heritage Plan 2013-2020 has guided the CHC's work very competently since 2014. This is an
essential accountability piece in the CHC's work. Note: this work is not proposed to commence until
2019 and no funds are requested for this project at this time.
Maple Ridge Heritage Plan page 34
Update Heritage Plan
Heritage conservation is an ongoing process. Once updated policies, procedures and regulations are
established, it is necessary to continue to monitor the Heritage Plan to ensure its ongoing effectiveness.
A cyclical re-examination of the Heritage Plan - of planning, implementation and evaluation - should be
initiated, to review the results and effectiveness on a regular basis. A preliminary assessment could
occur at the end of each year's CHC Work Plan, with a full revaluation at the end of each seven-year
cycle, to ensure that the Heritage Plan remains relevant and useful. At the end of the cycle of priority
reviews, the entire Heritage Plan should again be reviewed for relevance based on the current situation.
The effectiveness of existing initiatives should be reviewed, and the community and stakeholders
consulted to determine expectations and new ideas. The outcomes of this Heritage Plan should be
measured to determine the next set of priorities for the CHC.
Functions Performed/ Degree of Service:
Review of the Heritage Plan will be undertaken by CHC and stakeholders with a consultant.
Update of the Heritage Plan will require a year of work by CHC, stakeholders and consultant and will
include community consultation.
ACTIVITY
2017 2018 2019
2020
2021
$ Vol Hrs $ Vol Hrs $ Vol Hrs
$ Vol Hrs
$ Vol Hrs
Heritage Plan Review
2000 30
Heritage Plan Update
8000 50
Alternatives Considered/ Reasons for Not Recommending:
The absence of a functioning and well -used heritage plan will compromise City planning and
development, and negate the excellent reputation Maple Ridge holds among its neighbours and heritage
colleagues.
Staff Position:
N/A
Performance Measure:
A renewed Heritage Plan for Maple Ridge will be in place before the expiry of the present plan. The
updating process will ensure compliance with federal and provincial conservation standards.
Package:
2019
Budget
$10,000
Council Review - December 2016 Page 294
Appendix A
Heritage Inventory Overview
Supporting Information
The Maple Ridge Community Heritage Commission has identified a need to update the community's
Heritage Inventory (Heritage Resources of Maple Ridge) on a regular basis and the Heritage Inventory
update, currently underway, will include designing a process to do just that. The goal for completion of
this project is June 2017. The services Donald Luxton, a heritage professional consultant have been
retained to undertake this work.
Updating the Heritage Inventory involves three phases in total as follows:
Phase I: Identify sites for removal and new sites for possible addition through public
nomination;
Phase II: Research historical aspects of each site for evaluation;
Phase III: Update The Heritage Resources of Maple Ridge (HRMR) document with new
information and present to Council for endorsement.
Key objectives for Phase I are to:
• Consider a wider perspective of historical significance than in the past, such as cultural, social,
scientific, and spiritual heritage.
• Encourage public participation amongst individuals, other municipal committees, commissions,
community groups, sports groups, business community, etc.
• Establish criteria and evaluation process for each potential removal and addition to the HRMR.
The need for the Heritage Inventory Update:
• Improve this important planning and development tool that enables identification of existing heritage
features and describes their historical significance to the community.
• The 1998 work has not been revisited in 17 years. Significant shifts in population and extensive
property development are earmarks of Maple Ridge in the past decade and a half.
• Best practice in the heritage field has matured to consider a wider perspective of historical
significance, such as cultural, social, scientific, and spiritual heritage.
• Provide an opportunity for the present population of Maple Ridge to express the value of heritage
assets and celebrate the unique qualities they bring to the community.
The Heritage Inventory Update Project will:
• Review previous versions of the Inventory.
• Identify the status of previously inventoried features.
• Identify potential sites for addition to the inventory through a public consultation process.
• Update evaluation framework and historical research.
• Conduct a field survey of features, both previously inventoried and newly recommended.
• Identify the historical importance of heritage features to the community.
• Evaluate the resulting inventory.
• Design a process to keep the Inventory updated thereafter.
Council Review - December 2016 Page 295
Considerations:
• It is anticipated that once the update is complete, the costs associated with regular maintenance,
undertaken every 3-5 years, can be covered under the CHC's annual budget.
• The 1998 Inventory was supported by a grant from BC Heritage Trust. Funding is presently no longer
available from senior levels of government for this area of heritage work.
• The goal for completion is 2017. The project is underway.
Background and Context:
• The Heritage Inventory— The Heritage Resources of Maple Ridge is a consolidated list of the City's
heritage resources, published in 1998 by the Community Heritage Commission (then the Heritage
Advisory Committee), prepared by Donald Luxton & Associates.
• Heritage Inventory 1998 Contents— 95 historic buildings, 5 historic cemeteries, 14 landscape
features and three historic objects Some features have been demolished since 1998.
• There are no restrictions or other regulations placed on properties listed on the Inventory, but the
catalogue provides a list of sites that the community has identified as having heritage value.
Supporting Official Community Plan Policies:
4 - 38: Maple Ridge will work cooperatively with the Community Heritage Commission and other
relevant groups and organizations to establish an information database of all types of built,
natural and cultural heritage resources within the District, including evaluation criteria for each
type. This inventory would be updated on an ongoing basis evolving and responding to
theoretical and practical changes in the heritage arena.
4-44 Maple Ridge will endeavor to use tools available under Provincial legislation more effectively to
strengthen heritage conservation in the District. Other planning tools will also be utilized where
appropriate to establish a comprehensive approach to heritage management in the District.
4-45 Maple Ridge will assist the financial aspects of heritage resource management by:
a) Supporting the efforts of the Community Heritage Commission, which may include financial
assistance requests from the Heritage Commission evaluated by Council on a program or
project basis;
b) Working cooperatively with the Community Heritage Commission in fund raising efforts for
the conservation of heritage resources;
c) Supporting and promoting effective marketing of heritage resources to potentially interested
businesses;
d) Supporting heritage tourism efforts;
e) Encouraging local organization, including the Community Heritage Commission to pool
resources and develop partnerships to strengthen heritage conservation activities
throughout the community.
Council Review - December 2016 Page 296
Council Review - December 2016 Page 297
City of Maple Ridge
Public Works & Development Services - Environmental Advisory Committee
Business Plan 2017 - 2021
Committee Purpose
• The Maple Ridge Environmental Advisory Committee will help provide local perspective and advice to
Council with respect to achieving the City's goals and environmental objectives, and to implement
strategic recommendations from the current Maple Ridge Official Community Plan and the
Environmental Management Strategy report, 2014.
Committee Structure and Members
• The Environmental Advisory Committee is comprised of:
Staff Liaison - Rod Stott
VOTING MEMBERS
Council liaison - Councillor Robert Masse
Alternate Council liaison - Councillor Kiersten Duncan
Environmental professionals appointed by Council - David Neufeld
Environmental professionals appointed by Council - Janice Jarvis
Alouette River Management Society nominate - Ken Stewart
Directors Kanaka Education and Environmental Partnership Society nominate - Ross Davies
Chair* Community Education on Environment and Development Centre nominate - Gerry Pinel
Thornhill Aquifer Protection Study Group nominate - Betty & Klaus von Hardenberg
Ridge Meadows Recycling Society nominate - *Leanne Koehn, Kim Day
Council appointee, community youth (aged 25 or under) representative - Lukasz Szlachta
Vice Chair Council appointee, community - Terryl Plotnikoff
Council appointee, community - Dennis Kinsey
NON-VOTING MEMBERS
Member(s) of Parliament representing Maple Ridge - Dan Ruimy
Member(s) of the Legislative Assembly of British Columbia representing Maple Ridge -
Doug Bing, Marc Dalton
Metro Vancouver nominate - Vacant
Katzie First Nation nominate - Pam McCotter
Kwantlen First Nation nominate - Ashley Doyle
BC Conservation Officer Service nominate -Vacant
New Deliverables for 2017 (highlights only)
Action Item
Lead
ETA
Develop a Committee Workplan
Rod Stott
Q2-2017
Council Review - December 2016 Page 298
Council Review - December 2016 Page 299
City of Maple Ridge
Public Works Development Services - Ridge Meadows Recycling Society
Business Plan 2017 - 2021
Departmental Overview
Ridge Meadows Recycling Society (RMRS), a community-based, charitable non-profit organization, in
partnership with Maple Ridge, provides Blue Box recycling collection, operates the Maple Ridge
Recycling Depot and Intermediate Processing Facility and offers education on environmental issues in
Maple Ridge.
As a local employer, with a total of 64 full and part-time employees, the Society provides entry-level
employment and training opportunities, as well as supported work and training for adults with
developmental disabilities.
RMRS is an award-winning environmental organization that has a highly motivated team who promotes
the 3R's (Reduce, Reuse and Recycle), provides excellent customer service, seeks out partnerships to
enhance recycling services and works to maximize financial and sustainability returns on recycled
commodities.
Strategic Alignment:
• The partnership agreement between RMRS and the City aligns with Inter -governmental Relations and
Partnerships as well as Citizen and Business Involvement in Sustainability Efforts. We are a
community-based, non-profit organization working together with the City to provide services in
unique and innovative method.
Our vision of a waste -free, socially responsible community aligns well with Council environmental
strategy of zero waste. Environmental goals are met by providing residential blue box pickup services
to homes and apartments, managing the Maple Ridge Recycling Depot, as well as sorting,
processing and marketing of recyclable commodities. Our location, adjacent to the solid waste
transfer station, reduces travel for customers and truly provides a one-stop public drop-off for all
waste items.
• Council's Financial Management mandate is covered through our participation in the City's formal
Business Planning process. A volunteer Board of Directors with strong membership and citizen
participation, ensuring collection services and routes, fees, and operational and capital planning
decisions make the best use of our collective resources. It also ensures this decision making is
transparent and gives residents opportunities to become informed and to provide input.
Citizen and Business involvement in sustainability efforts is achieved through our commitment to
people of all abilities; the Society demonstrates new and innovative ways to ensure access and
opportunities for employment, training and volunteer services to all residents of Maple Ridge. Ridge
Meadows Recycling Society is one of the largest employers of adults with developmental disabilities
in BC striving to enhance the quality of life and independence of all members of our community,
clearly in alignment with Council's goal of a safe and livable community for all its citizens.
Council Review - December 2016 Page 300
Business Perspective -Environmental Scan
• Metro Vancouver hours of operation for the Transfer station will increase to be open all statutory
holidays. The Recycling Depot hours will correspond with these extended hours resulting in added
costs, as well as expanded level of service to public.
• Responding to regional material bans at transfer stations or other facility has an impact on the types
of materials accepted at the recycling depot. There are congestions issues because of our limited
space and addition staff costs to process increase volume.
• Implementing new Extended Producer Responsibility program items and advocating development of
existing programs will help address some of the difficult to recycle materials not covered by
programs that the public want to recycle.
Continuous Improvement
• Continue to expand our contact list from 8,312 to maximize our outreach efforts
• Re -design of public access road and depot drop off area to improve traffic flow.
• Continue to pursue Commercial commodity volume to maximize equipment potential.
Accomplishments and Work in Progress (highlights only)
Ongoing Deliverables
• Provide weekly recycling pickup services to household and apartments
• Operate the Maple Ridge Recycling drop-off depot 7 days per week with expanded opening hours.
• Provide drop off services for all existing and new EPR commodities
• Respond daily to all customer questions and complaints - file reports
• Sell composters, solar cones and rain barrels annually
• Administer the Brush Chipping program
• Administer Low -flow Toilet Drop-off/Rebate Program
% Complete
Action Item
Status or Outcome
(and ETA if not
100%)
Customer awareness/ satisfaction
survey - random sampling of
membership to determine knowledge of
Report to Council October 2016.
100%
MMBC program and commodities
collected at the curb. Collection pickup
program satisfaction questions.
Customer awareness/ satisfaction
survey - random sampling of
Report to Council October 2016
100%
membership to determine knowledge of
Depot operations and services.
Recommendation & report to Council of
status of Multi -Material BC contract for
Ongoing monitoring of regional contract
25%
Printed Paper & Packaging Residential
changes.
Pickup Services.
Recommendation & report to Council of
status of Multi -Materials BC contract for
Contract expires May 2018. Report to council
25%
Printed Paper & Packaging Depot
for further direction in 2 quarter of 2017.
Services.
Ongoing Deliverables
• Provide weekly recycling pickup services to household and apartments
• Operate the Maple Ridge Recycling drop-off depot 7 days per week with expanded opening hours.
• Provide drop off services for all existing and new EPR commodities
• Respond daily to all customer questions and complaints - file reports
• Sell composters, solar cones and rain barrels annually
• Administer the Brush Chipping program
• Administer Low -flow Toilet Drop-off/Rebate Program
Council Review - December 2016 Page 301
Ongoing Deliverables - cont'd
• Daily tonnage counts; daily depot attendance counts; quarterly and annual reports
• Administer, co-ordinate and report on programs with Multi -Material BC
• Presentations to Council and participation in Business Planning process
• Maintain and update website and all social media platforms
• Continue to develop site expansion and redesign
• Participate in other environmental and social service organizations, further building our knowledge
beyond that gained throughout our 45 year history of environmentalism
• Community educational displays; community workshops/presentation - Goal: 22 workshops
• Conduct School workshops - Composting, Worms, Recycling, Lawn Care, Water Wise, Bear Aware,
Waste Audits and others - Goal: 120 Student contact: 5,000
• Provide education: composting, solar cones and rain barrels; low -flow toilets and water conservation
• Wildlife BC education program support and City subsidies wildlife resistant garbage can program.
Commercial Recycling Services (Fee for Service)
• Respond daily to all customer complaints - file report
• Maintain and nurture existing relationships - 181 businesses
• Report - daily/monthly/quarterly and annually on tonnage statistics by commodity
• Solicit new business opportunities - 5 businesses signed up
Human Service Programs
• Monitor interactions with staff and customers
• Secure working relationship with other agencies: Community Living BC (CLBC), Ridge Meadows
Association for Community Living (RMACL), Possibilities Association, Fraser Health, (LAST)Life After
School Transition Committee
• Documentation and reports to CLBC
• Assist and respond daily to all client needs
Found Milestones
• Scope of changes required for compliance with the new BC Societies Act.
• Plastic commodities market has been greatly impacted by the new MMBC program resulting in no
viable market for plastic items not covered by the MMBC program. Plastics products like;
Rubbermaid containers, garbage cans, plastic toys may have a recycling #1,2,4,5 stamped on the
bottom and use to be accepted, are no longer accepted as there is no market.
Council Review - December 2016 Page 302
New Deliverables for 2017
Service Area Goal: Blue Box/ Apartment Recycling Pickup Collection Service
• To reduce solid waste, improve customer participation rates, customer satisfaction and
encourage proper sorting methods while providing weekly pickup collection for all residents in
the urban & designated -for -service areas of Maple Ridge and multi -family buildings.
Objectives.-
Ensure
bjectives:Ensure City fulfills terms of contract with Multi -Material BC
• Fully informed residents who understand recycling source separation methods and benefits
Measures
• Annual tonnage recycled per household and report number of customer complaints
• Random sampling of set out content.
Action Item
Lead
ETA
Target education campaign for Blue Box and Yellow bag
Leanne Koehn
October 2017
sorting and accepted items including displays and
information at all scheduled events .
Leanne Koehn
September 2017
Expand Service area further east.
Kim Day
November 2017
Customer participation survey for Apartment complexes
Leanne Koehn
November 2017
Recommendation & report to Council of status of Multi-
Kim Day
2nd quarter
Material BC contract for Printed Paper & Packaging
Residential Pickup Services.
Kim Day
3rd quarter
Service Area Goal: Maple Ridge Depot and Processing Service
• To reduce solid waste, improve customer participation rates, customer satisfaction and expand
the range of commodities collected by participating in new Extended Producer Responsibility
programs. Administer and co-ordinate programs with Multi -Material BC for depot contract.
Objectives.,
• Ensure City fulfills terms of contract with Multi -Material BC.
• Expand range of materials accepted at the Depot as opportunities arise.
• Fully informed residents who understand all materials that are accepted at the Depot.
Measures
• Depot visit participation report
• Customer complaints
Action Item
Lead
ETA
Targeted education campaign for item NOT accepted at the
Leanne Koehn
October 2017
Depot
Offer Public Depot tours highlighting items with low
Leanne Koehn
September 2017
awareness rates as determined by the 2016 survey.
Dan Mikolay
Recommendation & report to Council of status of Multi-
Kim Day
2nd quarter
Materials BC contract for Printed Paper & Packaging Depot
Services.
Report on status on Plastics market for non-MMBC program
Kim Day
3rd quarter
items.
Council Review - December 2016 Page 303
Operating Budget
Proposed Financial Plan 2017 - 2021
Public Works & Development Services - Ridge Meadows Recycling Society
Proposed Changes or Remarks:
Parcel Charges - Blue Box / Recycling Depot Charge
• Recycling Rates are budgeted to increase by 1.67% in 2017 and 2018, the 3 remaining years
increase is 2.75% annually. The 2017 units are updated to reflect the actual number of units being
serviced.
Contract
• The contract increase is more significant than typical in 2017 to cover the additional operating hours
required to match Metro Vancouver's change in operating hours at the transfer station.
Capital Budget - None
Incremental Packages - Attached
Information Technology - None
Adopted
Proposed
Proposed Changes
Proposed
All $ values in 000's (thousands)
2016
2017
$
%
2018
2019
2020
2021
Revenues
Fees
100
100
-
0%
100
100
100
100
Parcel Charges- Blue Box
1,039
1,084
45
4%
1,114
1,156
1,199
1,245
Recycling Depot Charge
865
907
42
5%
931
966
1,003
1,040
Sale of Services
1,249
1,305
56
5%
1,305
1,305
1,305
1,305
3,253
3,396
143
4%
3,450
3,527
3,607
3,690
Expenditures
Contract
2,307
2,475
168
7%
2,523
2,573
2,624
2,676
Insurance Expense
2
2
-
0%
2
2
2
2
Lease Expense
32
32
-
0%
32
32
32
32
Vehicle Charges
742
764
22
3%
787
811
835
860
3,083
3,273
190
6%
3,344
3,418
3,493
3,570
Internal Transfers
Contribution to own Reserves
50
50
-
0%
50
50
50
50
Transfers to Reserve Funds
30
(17)
(47)
(156%)
(35)
(31)
(27)
(20)
80
33
(47)
(59%)
15
19
23
30
Totals
(90)
(90)
-
0%
11 (91)
(90)
(91)
(90)
Transfer to Recycling Reserve
90
90
0%
91
90
91
90
Transfer from Surplus
-
-
-
-
-
-
Totals
(100%)
Proposed Changes or Remarks:
Parcel Charges - Blue Box / Recycling Depot Charge
• Recycling Rates are budgeted to increase by 1.67% in 2017 and 2018, the 3 remaining years
increase is 2.75% annually. The 2017 units are updated to reflect the actual number of units being
serviced.
Contract
• The contract increase is more significant than typical in 2017 to cover the additional operating hours
required to match Metro Vancouver's change in operating hours at the transfer station.
Capital Budget - None
Incremental Packages - Attached
Information Technology - None
Council Review - December 2016 Page 304
Performance Measures/Indicators
The City tracks our performance in a number of ways. Some of the measures are tracked using
Performance Reporting Scorecards which appear in the City's performance system. The scorecards for
this area are listed below. Full scorecards can be found in the Scorecards tab.
To access the "live" scorecard, visit www.mapleridge.ca/787 and use the Scorecard Lookup tool.
Code Scorecard (on following pages) Why this Scorecard is important to this department:
This measure demonstrates Maple Ridge's ongoing
CR05 Provide Work Opportunities for commitment to providing work opportunities to
People with Development Disabilities people with a variety of skills & abilities in our
community.
EN08 Encourage Residents & Businesses Tonnage is an industry standard to measure
to Reduce, Reuse & Recycle materials collected by various sectors.
Council Review - December 2016 Page 305
Incremental Package Report
2017 Proposed Budget
Division: Recycling Date: November 2016
Department: Engineering Submitted By: Kim Day
Decision Unit: Large Item Pickup Program
Package: 1 of 4
Activities/ Purpose:
The existing Brush Chipping program would be replaced with the new Large Item Pickup Program.
Residence can arrange for curbside collection of up to 2 large items each calendar year, per property.
The large items for collection must be pre -schedule for pickup by the homeowner with Ridge Meadows
Recycling Society. The homeowner will place the item at curbside on a specific day for pickup, based on
a list of acceptable items and measurements covered by the program. (Restrictions apply)
• The existing Brush Chipping program has average participation of approximately 2,500 residence,
with an annual budget of $75,000
• Other Cities provide this program: Coquitlam, City of Langley, City of Surrey, City of Burnaby.
Functions Performed/ Degree of Service:
The annual chipping program has been in place for 11 years and was introduced as an alternative to
burning. The program is expensive based on the tonnage diverted and the number of residence
participating in the program, however the people that use the program like the service. The Large Item
Pickup Program will offer services to all homeowners and may address some of the illegal dumping
concerns.
Acceptable Items: White Goods (washing machines, stoves, fridges, freezers, clothes dryers,
dishwashers, etc) Lawn mowers, BBQ's, computers, TV's, Furniture (99kg or measuring 2 metres in any
direction), Mattresses, Brush Yard trimmings (branchs, trees, brush (3'x3'x9') or 3 cubic metres)
Alternatives Considered/ Reasons for Not Recommending:
• Implement a full garbage, green waste/ organics pickup program
• Public perception that comprehensive waste reduction is not a priority in Maple Ridge.
• Non-compliance with the Metro Vancouver Solid Waste Management Plan targets for organics.
• Increased garbage going to landfill.
• Increased incident of illegal dumping as Metro Vancouver Tipping fees increase.
• Option to consider: Run a pilot project for up to 800 homes in two areas (east & west). The research
would include a one-time large item pickup for free with a follow-up survey to determine what a home
owner would be willing to pay for this type of service. The service would be based on a user -pay by
appointment only pickup schedule by specific area and date range. The goal of the pilot project
would be to better determine the interest in the program and potential costs associated with the
wide range of items that are to be covered in the service. Pilot Project costs: $25,000
Performance Measure:
• Number of home owners participating
• Tonnage collected
Package:
2017
Budget
Council Review - December 2016 Page 306
Revenue from Tax Levy $295.164 @$12.00 per property @24,597
Ooerating Costs
Wages: $139,729 (Truck Driver, Swamper & Administration)
Truck expenses 36,000 Chipping expense $69,200 (2014 estimate -
600 hours @$112/hr)
Disposal/tipping 50,235 (weight @ transfer station @$15 min.)
$295,164
Council Review - December 2016 Page 307
Incremental Package Report
2017 Proposed Budget
Division: Recycling Date: November 2016
Department: Engineering Submitted By: Kim Day
Decision Unit: Brush Chipping Pickup Program
Package: 2 of 4
Activities/ Purpose:
The Brush Chipping program started in 2004 with a goal to offer an alternative to burning.
The service is offered twice a year in April and October. In the beginning, the City operations department
hired part-time staff to administered and co-ordinated this program with the homeowners and the
Chipping contractors. In 2009, Ridge Meadows Recycling Society partnered with the City to provide the
administration, supervision and all statistical reporting on this program. The existing Brush Chipping
program has average participation of approximately 2,500 residents, with an annual budget of $75,000.
The program has become more widely used since Council approved and promoted the service to assist
homeowners with cleanup resulting from the windstorm in 2015. Participation in the Spring 2016
program was 2,167 pickups, on target to far exceed previous years and resulting in a budget short -fall.
Functions Performed/ Degree of Service:
The annual chipping program has been in place for 11 years and was introduced as an alternative to
burning. The program is expensive based on the tonnage diverted and the number of residence
participating in the program, however the people that use the program like the service. The 2016
Recycling Customer Satisfaction survey asked the question," Are you aware of the City's Annual Brush
Chipping Program?" 64% of responses were "yes."
Performance Measure:
• Number of home owners participating
• Tonnage collected
Alternatives Considered/ Reasons for Not Recommending_
• Implement a Large Item pickup program and include chipping in the program.
• Public perception that comprehensive waste reduction is not a priority in Maple Ridge.
• Non compliance with the Metro Vancouver Solid Waste Management Plan targets for organics.
• Increased incident of illegal dumping as Metro Vancouver Tipping fees increase.
Package: Annual Brush Chipping Pickup Program
2017
Budge
Program Costs: $85,000
Less- Existing Budget $75,000
Total: $10,000
Council Review - December 2016 Page 308
Incremental Package Report
2017 Proposed Budget
Division: Recycling Date: November 2016
Department: Engineering
Decision Unit: HHW - Household Hazardous Waste Round -Up Day
Package: 3 of 4
Activities/ Purpose:
To remove a significant portion of HHW materials from the waste stream and facilitate the removal of
hazardous wastes from basements and garages within our community. Ensuring hazardous materials do
not enter ground water from illegal dumping is a focus of this program.
To hold a one day collection event in 2017.
Functions Performed/ Degree of Service:
• To recognize that many residents have old toxic products in decomposing containers that need
environmentally safe disposal.
• Flyer to each household to promote a one day collection event for household hazardous wastes.
• A one day collection event, from 8am to 4pm, will be held in May.
• Product Care Association will attend and assist with collection of all products covered by their
program, including left over paint, aerosols, solvents, pesticides, gasoline. This collection is at no
cost.
• Society staff will collect all other materials regularly collected at the Maple Ridge Recycling Depot.
• An Environmental Company will be contracted to handle all the toxic materials not covered by any of
the Product Stewardship Companies
• All residential hazardous materials will be accepted, even unidentified products, however radioactive
materials or explosives will not be accepted.
• Commercial materials will not be accepted.
Alternatives Considered/ Reasons for Not Recommending:
• Do nothing and residents will continue to stockpile toxic materials that will eventually leach into the
environment or be disposed of incorrectly and enter the waste stream.
• Hold an event and charge a fee per car to offset the cost of the Environmental Contractor.
Provide a by -appointment disposal facility so residents can dispose of these materials throughout
the year.
• Metro Vancouver is not supportive on these events as HHW is a provincial responsibility
Council Review - December 2016 Page 309
Package:
2017
Budget
Insurance $ 2,500
Promotion & Advertising 5,000
Net Staffing costs 2,500
Environmental Contractor fees $80,000 (This fee could be much more or less
depending on products collected)
Total 90 000
Council Review - December 2016 Page 310
Incremental Package Report
2017 Proposed Budget
Division: Recycling Date: November, 2017
Department: Engineering Submitted By: Kim Day
Decision Unit: Part-time Community Events Recycling Education and Outreach workers.
Package: 4 of 4
Activities/ Purpose:
To provide recycling, garbage and organic services at community festivals and events. Provide a staff
presence at areas designated as recycling and garbage. To educate and promote zero waste initiatives
to people attending the events by assisting and directing them to use the proper disposal method for
various items; recycling, composting or garbage.
Functions Performed/ Degree of Service:
• To have a staff and/or volunteer presence at up to 20 community festivals event days held in the
Maple Ridge area who are responsible for recycling and garbage/organic management.
• To monitor and supervise the public disposal of recycling, food scraps and garbage at events. Based
on up to 3 supervised stations per event.
• To provide recycling/organics/garbage stations for use at events.
• To expand the City's support of people with disabilities by providing work opportunities at these
events.
Alternatives Considered/ Reasons for Not Recommending:
• Do nothing - may not achieve the "green -festival" goal.
• Continue to pursue volunteer involvement to manage this service
Performance Measure:
• Number of events attending
Package:
2017
Budget
Part-time Wage based on up to 20 events $ 10,000
Promotion & Advertising & equipment 5,000
$15,000